Vous êtes sur la page 1sur 3

CLIFFORD R.

KUEHNER
142 Norway St * Berlin, NH 03570
ck72bfde@westpost.net * (603) 986-0236

SUMMARY OF QUALIFICATIONS
Experience in Architectural, Mechanical, Civil, Structural Engineering and Manag
ement. Emphasis on Quality Management, Examination, testing of equipment and sys
tems. Proficient in the use of dimensional testing equipment, extensive knowled
ge of ASME, ANSI, AWS, ASTM standards, Federal Regulations in the Federal Bureau
of Prison, Nuclear Power plants and Aerospace facilities.
WORK HISTORY
Tatro Construction Comp, Berlin N.H.- 9/2008 to 6/2010
QualityAsurance Inspector
* Civil and Structural Inspection/Support for the Medium Security FCI, United St
ates Penitentiary.
. Responsible for monitoring general quality , produc
t, and construction methods.
Project cost $238 million dollars, 1152 male prison
ers,
Carter, Goble, Lee , Brunswick GA - 9/2006 to 7/2007
Project Engineer.
* Reviewed the Mechanical, Civil and Structural As-built drawings for all new Fa
cilities work
performed for all Environmental Inspections for the
projects.
* Maintained computer reports that tracked the submittals of projects.
* Reviewed all construction bids for new projects for the county.
East Coast Christian Center, Merritt Island FL - 8/2005 to 5/2006
Construction Manager.
* Reviewed projects for facility, performed engineering evaluation of all const
ruction.
* Approved of all design issues and all materials incorporated into the projects
.
HEERY INTERNATIONAL, United States Penitentiary, Coleman, FL - 8/2001 to 5/2005
Quality Asurance Inspector
* Civil, Architectural, and Structural Inspection/Support for the largest single
Maximum Security USP, United States Penitentiary in the United States.
. Responsible for monitoring general quality, product, and construction methods

Project cost $168 million dollars, 1152 male prison


ers
NATIONAL INSPECTION CONSULTANTS, Ft. Meyers, FL - 2/1991 to 8/2001
Sr. QA Manager - Lockheed Martin/Martin Mairetta Space programs
* Provided Quality Control surveillance & support to field to verify the incorpo
ration of all changes that were made to the drawing packages in the "ITL" area f
or Titan IV program.
* Provided Quality Control surveillance and inspection of all structural members
, base plates, and piping supports.
* Performed field inspection of all welds required, testing and balance of the a
ir conditioning systems for SLC40.
* Provided Quality control surveillance at the support storage facility for the
Titan IV Rocket SRMU segments. Provided the Final Inspection and proof loading o
f cranes, stacking of cells and the facilities
* Provided the Final Inspection and proof loading of cranes, stacking of cells a
nd the facilities
Provided Quality Control surveillance and inspection of the 500/220 ton crane
* Provided Quality control surveillance at the support storage facility for the
Titan IV Rocket SRMU segments.
NACE inspection of all painted products for facilities.
AIDE MANAGEMENT CORP., Atlanta, GA - 6/1987 to 12/1990
Quality Engineer - Contract to Virginia Electric Power Co
* Review of all subcontractor submittal packages.
* Provided Quality Control support for the construction of the Hydroelectric Dam
.

ZACK CO., Clinton, IL - 3/1985 to 5/1987


HVAC Field Engineer - Contract to Clinton Nuclear Power Plant
* Performed and developed the Engineering calculations for the installation of H
VAC systems ensuring compliance with ASME and SMACH regulations for final inspec
tion.
* Monitored, issued and maintained all FCR's, NCR's and as-built drawings.
CDI, CORP., Atlanta, GA - 6/1984 to 2/1985
Field Engineer - Contract to Farley Nuclear Power Plant
* Field verified the electrical conduit installations and prepared isometric dra
wings of all field deviations per ASME.
C & M ENGINEERING & ASSOC., Los Angeles, CA - 10/1983 to 5/1984
Project Manager - Contract to LA Naval & Marine Corp.
* Reviewed daily construction schedule
* Liaison official between Naval Representatives, Project Superintendents, and Q
uality Inspectors.
* Reviewed FCR's and cost proposals.
* Prepared daily reports including the review of design changes for the Departme
nt of the Navy.
CATARACT INC., Pittsburgh, PA - 2/1983 to 9/1983

Quality Inspector - Contract to Diablo Canyon Nuclear Power Plant, Avila Beach,
CA
* Inspection of structural members, pipe supports and HVAC supports.
* Coordinated all FCR's with Engineering and verified tractability of all compo
nents and materials.
* Visual inspection of all field and shop welds.
KAISER CORP., Zimmer Nuclear Power Plant, Moscow, OH - 4/1982 to 1/1983
Field Engineer
* Prepared field hanger engineering packages for installation FCR's .
* Issued as-built data packages prior to QC inspections.
* Ordered all necessary material for pipe supports and hangers.
BUTLER SERVICES, Atlanta, GA - 12/1979 to 3/1982
Quality Inspector - Contract to TVA @ Watts Bar Nuclear Power Plant, Spring Cit
y, TN
* Interfaced with package Engineers and checked all seismic and non-seismic pipe
supports.
* Prepared FCR's and performed hydro and pneumatic testing on completed systems.
* Inspected spool pieces of fabricated pipe (stainless and carbon steel) before
the installation in the field.
TOMKINS & BECKWITH, Jacksonville, FL - 10/1978 to 12/1979
Quality Inspector - Contract to Waterford III Nuclear Power Plant, Taft, LA
* Verified material tractability and performed final inspection of pipe hanger s
upports.
* Implemented preventative maintenance and housekeeping programs.
* Inspected the fabrication of process piping spool pieces and audited the site
controlled tool program.

REFERENCES
Jerry Jones Manager 912-399-9984
Randy Yates Electrical Design Engineer 321-690-2611
Rick Wright Quality Engineer 321-631-7242

Vous aimerez peut-être aussi