EAST 808 LakeCrest Ave # 110, High Point, NC 27265 Cell: (336) 870-2686 randyeast@clearwire.net
Qualifications: Mechanical Engineer with 12+ years experience in equipment
modifications, Production/Equipment engineering, and machine desig n. Education: B.S. MECHANICAL ENGINEERING, Old Dominion University, Norfolk, VA 1994 Completed FE (EIT) For VA; anticipate completing the PE in Oct 2010. Computer Skills: Extensive experience with Mechanical Desktop, Inventor 9.0 & ProE/Wildfire & SAP . Some SolidsWork experience; GD&T, Finite Element Analysis and C++ programming & visual basic. MSoffice and extensive MS Project experience. GMP training. Highlights of Professional Experience: Bucyrus USA, Pulaski, VA September 2008 to Present An industry leader in heavy mining equipment Vibratory and strain gauge analysis to evaluate conveyor-roller failure due to excessive loading. Root cause analysis for failed sumitomo gear boxes and gear reducers. Design and construction of conveyor roller tester for evaluation of out of bala nce loading on completed customer product necessary to conform to ISO standards.
Banner Pharmcaps, High Point, NC January 2003 to Septe
mber 2008 Pharmaceutical and consumer healthcare products company specializing in large sc ale Manufacturing of liquidfilled gelatin coated tablets sold by marketing partners worldwide. Designed, built and tested prototypes utilizing 3-D solids modeling and BOM lis ts. Experience in design pre-planning with R&D, finance and marketing input to achi eve business goals. Interfaced with vendors to determine best pricing and present cost proposals to management. Redesigned existing machines to reduce time spent on change-over construction. Collected production data on machinery during operation in order to trouble sho ot and solve mechanical problems to improve quality and achieve greater efficien cy. Utilized geometric tolerancing principles to select optimum materials and to en sure proper material fits for various equipment operating temperatures. Experience with heat transfer concepts and equations necessary to determine opt imal machine speeds and equipment operating costs. Wrote, designed, and completed validations for production equipment both of exi sting and new production designs. Managerial experience with 2 direct reports and tasks of completing capital pro jects on 100k and greater with solid delivery dates. Developed and wrote calibration procedures according to process on a case by ca se basis then ran experiments to document that it works and is repeatable. Evaluation of failed product to determine root cause. Complete assessment of de fects and path forward for correcting issues. Maintenance SOPs for mechanics to ensure quality and to comply with Good Manufa cturing Practices as required by the FDA. Abbott Laboratories, Laurinburg NC, Buffalo, NY May 1996 to January 2003 Global manufacture of hospital products including surgical kits, medicine pumps, and prescription drugs Mechanical Design Engineer Utilized factory training to design and develop cones for Branson Sonic Welding equipment. Conceived and implemented modifications on models for both hot and cold runner molds for molding machines. Redesigned and converted existing bowl feeders to maximize production output an d to separate defective parts. Project manager for capital projects up to $134,000. Solids Modeling for mold design including EDM work. Worked directly with the validation department to write testing parameters s fo r testing new/existing equipment before construction and installation in the man ufacturing environment. Supervised machinist, mechanics, and other engineers for various design project s. Responsible for mentoring, performance reviews and developing team building s kills.
Playtex Products, Dover, DE (Contract)
May 1995 to May 1996 A leader in the manufacture of personal hygiene products including infant feedin g bottles, suntan lotions, and shampoos Mechanical Design Engineer Designed and constructed a portable hand-packing device used to load consumer p roducts. The design used pneumatic controls and operated at 45 units per minute. Designed and fabricated electrostatic flocking machines. Completed maintenance manuals and parts list for mechanics and made recommendat ions for periodical replacement parts according to GMP procedures. Philip Morris USA, Richmond, VA (Contract) May 1994 to May 2005 A Fortune 500 company that manufactures, packages, and distributes fine quality tobacco products Mechanical Engineer Designed and constructed various pieces of equipment for high speed machinery s uch as vacuum chambers and mechanically driven blade sharpeners using Parker air cylinders and Reliance AC 3 phase motors. Inspected high speed machinery at machine shops during construction to ensure p roper tolerances and to avoid potential mechanical problems. Collected production data on machinery during operation. This data aided me in performing extensive troubleshooting for solving mechanical problems which redu ced efficiency. These problems were documented and used by me to help modify mac hinery on plant floors thus making them more productive by cutting cost.