SUMMARY: Background of over 20 years of professional experience in project contr


ols, including Planning, Scheduling,CPM, Budgeting, Cost control, Develop Integr
ated Master Schedules, Progress monitoring and reporting; Manpower planning, Res
ource Loading/Management and Performance measurement (EVMS); WBS, supervision an
d administration. Used MS Excel, MS Word, MS Project, P3 and P6 Scheduling prog
rams.

WORK HISTORY:
2009 to SENIOR PRODUCTION PLANNING ENGINEER
2010 HI GLOW Industries, Mysore, India
Performed Production Planning and Scheduling for the manufacture of parts again
st orders for production of machine tools. Duties included reviewing and distrib
uting production, work and shipment schedules; conferring with department super
visors to determine progress of work and completion date; Compiling reports on p
rogress of work, inventory levels, costs, and production problems.
2008 to FIELD SCHEDULING ENGINEER)
2009 Bechtel Corporation, Jensen Beach, Florida
Developed detailed schedules for Work Packages for Engineering, Procurement and
Construction related to System/Plant Eqiupment Modifications for an Extended Pow
er Uprate Project (EPU) at FPL's St.Lucie Nuclear Power Plant. Maintained the
Integrated Master Plans and Schedule; Progress monitoring and updating; Resource
loading, budgeting, Critical path Analysis, Schedule and cost variance analysi
s; Prepared schedule/cost status Reports. Used P6 scheduling program.
2005 to SENIOR SCHEDULING ENGINEER
2008 Hubbard Construction Company, West Palm Beach, Florida
Lead Planner responsible for all Planning, Scheduling and Resource Management fu
nctions on a multitude of projects for Construction of Highways and Bridges for
Florida Department of Transportation using P3 scheduling Program. Interfaced wit
h Project Team members, Client and Subcontractors.

2005 to SCHEDULING ENGINEER


2005 Florida Power & Light Company, Juno Beach, Florida
Prepared CPM Schedules for Design and Construction of an Independent Spent Fuel
Storage Installation Project using Dry Cask Storage System. Duties included net
work logic development, resource loading, progress monitoring updating schedule
analysis and schedule, EVMS, cost and Resource reports and charts. Coordination
with project team members and project management. Used P3 Scheduling software sy
stem.
2003 to 2005 PROGRAM CONTROLS SPECIALIST
South Florida Water Management District, West Palm Beach, FL
Responsible for development and maintenance of Comprehensive Everglades Restorat
ion Project (CERP) Schedules. Duties included developing logics and networks for
Design and Construction of Environmental Restoration Projects. Utilized P3ec
(Enterprise) software program.
2002 to 2003 TECHNICAL SPECIALIST
SOUTHERN CALIFORNIA EDISON, Rosemead, CA
Provided Scheduling and cost management support for Water resource and water sup
ply development projects including modifications to substations and transmission
facilities. Cost and schedule analysis. Tracking progress, updating schedules.
Preparation and issuance of schedules and Cost reports. Coordinating with engi
neering, construction and project management. Used MS Project .
1993 to 2002 SENIOR PROJECT COST AND SCHEDULING ANALYST
WEST VALLEY NUCLEAR SERVICES, West Valley, NY
(A Subsidiary of Westinghouse Government Services Group)
Planning, Scheduling, budgeting and Cost control for the design, procurement and
construction of a high level radioactive waste vitrification project (environme
ntal clean up project) for the Department of Energy. CPM Analysis, EVMS and Cos
t/Schedule variance review and Reporting.
Used Primavera (P3) software program.
1986 to1993 PROJECT SCHEDULING ENGINEER
BECHTEL POWER CORPORATION, Palm Beach Gardens,FL
Worked as a Scheduling Engineer for the Design/Engineering, procurement and cons
truction associated with plant maintenance outage modifications/Retrofit for FPL
's Turkey Point Nuclear Plant Units 3 & 4. Established Cost accounts for each su
b job , prepared budgets, gathered actual costs, including accruals; Comparison
of budgeted and actual costs for each subjob on a YTD and monthly basis; Schedu
le & Cost Variance analysis and reporting; Prepared and issued Project Financia
l Status Reports (PFSRs). Participated in weekly project meetings.
EDUCATION:
Master of Business Administration (MBA)
St. Bonaventure University, NY
Bachelor of Science in Mechanical Engineering (BSME
University of Mysore, India