WILLIAM S HURLEY

C 302-530-5714 H 410-287-5152 W 920-755-7945


52 Hickory Dr., North East, MD 21901 guitarbu@hotmail.com
Over 20 years of experience within the nuclear power and refinery industries. Se
rved as a Plant Reliability Engineer, Project Engineer, Maintenance Engineer, Sy
stem Test Engineer, Outage Coordinator, Fixed Equipment Engineer, Rotating Equip
ment Engineer and Facilities Engineer. My expertise lies within the installation
, reliability, maintenance, startup and testing of various rotating and fixed me
chanical equipment used within Refineries and Power Plants. Familiar with API an
d ASME codes and CMM Systems; (Maximo, SAP, PIMS and PASSPORT).
EDUCATION
BS Mechanical Engineering - Old Dominion University, Norfolk, Virginia
SUMMARY
Career Objective: To secure a permanent position in engineering which is both ch
allenging and rewarding. Willing to relocate and travel.
Bechtel - Two Rivers, WI Present
Field Modifications Engineer
Mechanical modifications for Power Up-rate: Provide design details and field sup
port for installation of Feed water Heaters, piping and Condenser modifications.

Delaware City Power Plant & Refinery: 6/2001 to 1/2010


Reliability and Project Engineer
Managed installations, upgrades, corrective, preventive, predictive maintenance,
procurement, planning and scheduling for fixed and rotating equipment related t
o a power plant, demin water plant and a 180,000 barrels/day refinery. Startup o
f a $800 million dollar gasification project. Areas of responsibility include De
min Water Plant, Utilities, Blenders, Waste Water Treatment Plant, Boilers, CT/H
RSG, Gasification Units, Facilities and Piers. Trained in Root Cause Analysis (T
apRoot), Computer Maintenance Management Systems CMMS (SAP, Maximo, PIMS, PASSPO
RT), Primavera P6 and Microsoft Office). Participated in the PSM Program, writin
g MOC's and PHA analysis. Design changes with focus on mechanical integrity (MI)
, quality assurance (QA), PHA team and API & ASME codes.

Arkansas One Contracted 3/06/00 to 5/30/01


System Test Engineer
Steam Generator Replacement: Developed procedures and performed testing of Conta
inment and CRDM HVAC. Developed and implemented plan for temporary cooling for C
ontainment, Control Room and Aux. Building. Performed RCS Flow Analysis and test
ing of Iso-phase bus cooling for Power Up-rate.
Clinton Power Station Contracted 11/30/98 to 05/06/99
System Test Engineer
Wrote and performed procedures for post modification system testing for the safe
ty injection system, heat exchangers and HVAC balancing.
Indian Point Station Unit Contracted 2 1/09/98 to 08/23/98
In-service Test Engineer
Performed Licensing audit of IST Program/FSAR requirements. Reviewed P&ID's to i
dentify FSAR deficiencies and wrote procedure for testing requirements for conta
inment isolation paths.
Comanche Peak Contract then Direct 3/92 to 8/8/97
Senior Maintenance Engineer
System Maintenance Engineer corrective, preventive and predictive maintenance ro
tating and fixed equipment for two PWR Westinghouse nuclear plants. Outage Coord
inator for Containment critical path activities.
Diablo Canyon Contracted 12/90 to 3/92
System Test Engineer
Developed program, procedures & performed ten-year ISI hydrostatic testing. Desi
gned test equipment used in the testing.

River Bend Station Contracted 8/90 to 12/90

System Test Engineer: Local Leak Rate, In-service Testing & Post Modification Te
sting.

South Texas Project Contracted 1/89 to 8/90


Mechanical Maintenance Planner: Work Order maintenance planning including Sectio
n XI and procurement for all mechanical equipment.
Personal: Married two children 13 & 16, Hobbies; golf, boating, flying, fishing,
boating,