Académique Documents
Professionnel Documents
Culture Documents
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 9.20 4 1.135 13.161 7.502 0.815 -1.29
B-I 0.318 -16.00 4 1.974 -36.675 -11.663 0.729 -2.87
I
I-H 0.504 22.50 6 1.233 9.570 4.823 0.214 -0.33
H-A 0.298 26.60 6 1.458 13.048 3.888 0.146 -1.29
4.551 1.905
-8.22
-24.42
23.28
18.87
-22.17
-50.16
39.04
20.34
-23.28
-64.40
-83.90
126.10
50.16
II ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 7.91 4 0.975 9.946 5.669 0.717 0.543
B-I 0.318 -18.87 4 2.327 -49.770 -15.827 0.839 0.394
I
I-H 0.504 22.17 6 1.216 9.314 4.694 0.212 -0.711
H-A 0.298 25.31 6 1.387 11.899 3.546 0.140 0.543
-1.918 1.908
-8.07
-24.27
23.20
18.47
-21.46
-49.14
40.29
21.59
-23.20
-64.17
-83.67
126.33
49.14
III ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.45 4 1.042 11.248 6.412 0.759 0.196
B-I 0.318 -18.47 4 2.279 -47.863 -15.220 0.824 0.047
I
I-H 0.504 21.46 6 1.177 8.768 4.419 0.206 0.018
H-A 0.298 25.85 6 1.417 12.377 3.688 0.143 0.196
-0.701 1.931
-7.92
-24.12
22.75
18.43
-21.48
-49.56
40.47
21.77
-22.75
-63.57
-83.07
126.93
49.56
IV ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.65 4 1.067 11.737 6.690 0.774 0.081
B-I 0.318 -18.43 4 2.273 -47.637 -15.149 0.822 -0.005
I
I-H 0.504 21.48 6 1.178 8.782 4.426 0.206 -0.126
H-A 0.298 26.05 6 1.428 12.551 3.740 0.144 0.081
-0.292 1.945
-7.84
-24.04
22.70
18.43
-21.35
-49.48
40.68
21.98
-22.70
-63.44
-82.94
127.06
49.48
V ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.73 4 1.077 11.942 6.807 0.780 0.058
B-I 0.318 -18.43 4 2.274 -47.663 -15.157 0.822 0.030
I
I-H 0.504 21.35 6 1.171 8.687 4.378 0.205 0.005
H-A 0.298 26.13 6 1.432 12.624 3.762 0.144 0.058
-0.210 1.951
-7.81
-24.01
22.61
18.40
-21.36
-49.55
40.73
22.03
-22.61
-63.32
-82.82
127.18
49.55
VI ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.79 4 1.084 12.090 6.891 0.784 0.017
B-I 0.318 -18.40 4 2.270 -47.521 -15.112 0.821 -0.005
I
I-H 0.504 21.36 6 1.171 8.691 4.380 0.205 -0.028
H-A 0.298 26.19 6 1.436 12.676 3.777 0.144 0.017
-0.063 1.955
-7.79
-23.99
22.60
18.41
-21.33
-49.54
40.77
22.07
-22.60
-63.29
-82.79
127.21
49.54
VII ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.80 4 1.086 12.134 6.916 0.786 0.014
B-I 0.318 -18.41 4 2.270 -47.542 -15.119 0.821 0.008
I
I-H 0.504 21.33 6 1.169 8.670 4.370 0.205 0.001
H-A 0.298 26.20 6 1.437 12.692 3.782 0.144 0.014
-0.051 1.956
-7.78
-23.98
22.58
18.40
-21.33
-49.55
40.79
22.09
-22.58
-63.26
-82.76
127.24
49.55
VIII ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.82 4 1.088 12.170 6.937 0.787 0.004
B-I 0.318 -18.40 4 2.270 -47.506 -15.107 0.821 -0.001
I
I-H 0.504 21.33 6 1.169 8.671 4.370 0.205 -0.007
H-A 0.298 26.22 6 1.437 12.704 3.786 0.144 0.004
-0.014 1.957
-7.78
-23.98
22.58
18.40
-21.33
-49.55
40.80
22.10
-22.58
-63.25
-82.75
127.25
49.55
IX ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.82 4 1.088 12.180 6.942 0.787 0.003
B-I 0.318 -18.40 4 2.270 -47.512 -15.109 0.821 0.002
I
I-H 0.504 21.33 6 1.169 8.666 4.368 0.205 0.000
H-A 0.298 26.22 6 1.438 12.708 3.787 0.144 0.003
-0.012 1.957
-7.77
-23.97
22.57
18.40
-21.33
-49.55
40.80
22.10
-22.57
-63.25
-82.75
127.25
49.55
X ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.83 4 1.089 12.188 6.947 0.787 0.001
B-I 0.318 -18.40 4 2.269 -47.503 -15.106 0.821 0.000
I
I-H 0.504 21.33 6 1.169 8.666 4.368 0.205 -0.002
H-A 0.298 26.23 6 1.438 12.711 3.788 0.144 0.001
-0.003 1.957
-7.77
-23.97
22.57
18.40
-21.32
-49.55
40.80
22.10
-22.57
-63.24
-82.74
127.26
49.55
XI ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.83 4 1.089 12.191 6.949 0.787 0.001
B-I 0.318 -18.40 4 2.269 -47.505 -15.106 0.821 0.000
I
I-H 0.504 21.32 6 1.169 8.665 4.367 0.205 0.000
H-A 0.298 26.23 6 1.438 12.711 3.788 0.144 0.001
-0.003 1.957
-7.77
-23.97
22.57
18.40
-21.32
-49.55
40.80
22.10
-22.57
-63.24
-82.74
127.26
49.55
XII ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.83 4 1.089 12.192 6.950 0.787 0.000
B-I 0.318 -18.40 4 2.269 -47.503 -15.106 0.821 0.000
I
I-H 0.504 21.32 6 1.169 8.665 4.367 0.205 0.000
H-A 0.298 26.23 6 1.438 12.712 3.788 0.144 0.000
-0.001 1.958
-7.77
-23.97
22.57
18.40
-21.32
-49.55
40.80
22.10
-22.57
-63.24
-82.74
127.26
49.55
XIII ITERACION
C= 140
Cuadrante Tramo L(Km.) Qo(lps) Ø (pulg.) v(m/seg.) S(%o) hfo = S*L hfo/Qo ΔQ
A-B 0.570 8.83 4 1.089 12.193 6.950 0.787 0.000
B-I 0.318 -18.40 4 2.269 -47.503 -15.106 0.821 0.000
I
I-H 0.504 21.32 6 1.169 8.665 4.367 0.205 0.000
H-A 0.298 26.23 6 1.438 12.712 3.788 0.144 0.000
-0.001 1.958
-7.77
-23.97
22.57
18.40
-21.32
-49.55
40.80
22.10
-22.57
-63.24
-82.74
127.26
49.55