Length Pile Rdu: Hiley Rdu : Max.

Anchor Pile Cut-off Level Length of Working Pile Weight Chieu cao Rebound Dieu kien (Hiley
Test Pile Site Coordiation Toe Level fabrication of Pile Remark Weight Yeu Rdu= 0.7 x 98.1 x H x [ 1-Wp x (1-0.252) / s+0.5c Penetration
SPP (D700) / Top Level Pile (m) Load (KN) Wp (KN) bua TB (H) TB (m) x 0.6 > Rdu yc)
(m) (T) cau (KN) (98.1+Wp)] (m)

Test Pile X= 277.50 Y= 464.50 5.5 -44.46 49.96 53 1800.000 22.582 221.529 3821.529 2.500 0.020 110.993 66.596 0.007

P1 X= 272.50 Y= 459.50 10 -20 30 30 For staging of PDA Test 1800.000 22.582 221.529 3821.529 2.500 0.005 110.993 66.596 0.015
P2 X= 272.50 Y= 469.50 10 -20 30 30 " 1800.000 22.582 221.529 3821.529 2.500 0.010 110.993 66.596 0.012
P3 X= 282.50 Y= 469.50 10 -20 30 30 " 1800.000 22.582 221.529 3821.529 2.500 0.011 110.993 66.596 0.012
P4 X= 282.50 Y= 459.50 10 -20 30 30 For staging of PDA Test 1800.000 22.582 221.529 3821.529 2.500 0.012 110.993 66.596 0.011
P5 X= 274.50 Y= 461.50 8.16 -34.85 43.01 50 For Static Load Test 1800.000 22.582 221.529 3821.529 2.500 0.013 110.993 66.596 0.011
PHC P6 X= 274.50 Y= 463.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.014 110.993 66.596 0.010
D700 P7 X= 274.50 Y= 465.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.015 110.993 66.596 0.010
P8 X= 274.50 Y= 467.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.016 110.993 66.596 0.009
P9 X= 280.50 Y= 467.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.017 110.993 66.596 0.009
P10 X= 280.50 Y= 465.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.018 110.993 66.596 0.008
P11 X= 280.50 Y= 463.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.019 110.993 66.596 0.008
P12 X= 280.50 Y= 461.50 8.16 -34.85 43.01 50 " 1800.000 22.582 221.529 3821.529 2.500 0.020 110.993 66.596 0.007
P13 X= 277.50 Y= 467.50 5.50 -24.50 30 30 " 1800.000 22.582 221.529 3821.529 2.500 0.021 110.993 66.596 0.007
P14 X= 277.50 Y= 461.50 5.50 -24.50 30 30 For Static Load Test 1800.000 22.582 221.529 3821.529 2.500 0.022 110.993 66.596 0.006

Test Pile X= 433.50 Y= 431.50 5.50 -43.39 48.89 52 2585.000 31.290 306.951 5476.951 2.500 0.020 105.326 63.195 0.002

P1 X= 428.50 Y= 426.50 10 -20 30 30 For staging of PDA Test 2585.000 31.290 306.951 5476.951 2.500 0.005 105.326 63.195 0.009
P2 X= 428.50 Y= 436.50 10 -20 30 30 " 2585.000 31.290 306.951 5476.951 2.500 0.010 105.326 63.195 0.007
P3 X= 438.50 Y= 436.50 10 -20 30 30 " 2585.000 31.290 306.951 5476.951 2.500 0.011 105.326 63.195 0.006
P4 X= 438.50 Y= 426.50 10 -20 30 30 For staging of PDA Test 2585.000 31.290 306.951 5476.951 2.500 0.012 105.326 63.195 0.006
P5 X= 430.50 Y= 428.50 8.16 -43.88 52.04 55 For Static Load Test 2585.000 31.290 306.951 5476.951 2.500 0.013 105.326 63.195 0.005
P6 X= 430.50 Y= 430.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.014 105.326 63.195 0.005
PHC
D800 P7 X= 430.50 Y= 432.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.015 105.326 63.195 0.004
P8 X= 430.50 Y= 434.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.016 105.326 63.195 0.004
P9 X= 436.50 Y= 434.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.017 105.326 63.195 0.003
P10 X= 436.50 Y= 432.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.018 105.326 63.195 0.003
P11 X= 436.50 Y= 430.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.019 105.326 63.195 0.002
P12 X= 436.50 Y= 428.50 8.16 -43.88 52.04 55 " 2585.000 31.290 306.951 5476.951 2.500 0.020 105.326 63.195 0.002
P13 X= 433.50 Y= 434.50 5.50 -24.50 30 30 " 2585.000 31.290 306.951 5476.951 2.500 0.021 105.326 63.195 0.001
P14 X= 433.50 Y= 428.50 5.50 -24.50 30 30 For Static Load Test 2585.000 31.290 306.951 5476.951 2.500 0.022 105.326 63.195 0.001

Test Pile X= 481.50 Y= 449.50 5.50 -41.95 47.45 50 3858 12.479 122.422 7838.422 2.500 0.020 123.069 86.149 0.001

P1 X= 476.50 Y= 444.50 10 -20 30 30 For staging of PDA Test 3858 12.479 122.422 7838.422 2.500 0.005 123.069 86.149 0.008
P2 X= 476.50 Y= 454.50 10 -20 30 30 " 3858 12.479 122.422 7838.422 2.500 0.010 123.069 86.149 0.006
P3 X= 486.50 Y= 454.50 10 -20 30 30 " 3858 12.479 122.422 7838.422 2.500 0.011 123.069 86.149 0.005
P4 X= 486.50 Y= 444.50 10 -20 30 30 For staging of PDA Test 3858 12.479 122.422 7838.422 2.500 0.012 123.069 86.149 0.005
P5 X= 478.50 Y= 446.50 8.16 -46.83 54.99 57 For Static Load Test 3858 12.479 122.422 7838.422 2.500 0.013 123.069 86.149 0.004
P6 X= 478.50 Y= 448.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.014 123.069 86.149 0.004
SPP
D900 P7 X= 478.50 Y= 450.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.015 123.069 86.149 0.003
P8 X= 478.50 Y= 452.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.016 123.069 86.149 0.003
P9 X= 484.50 Y= 452.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.017 123.069 86.149 0.002
P10 X= 484.50 Y= 450.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.018 123.069 86.149 0.002
P11 X= 484.50 Y= 448.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.019 123.069 86.149 0.001
P12 X= 484.50 Y= 446.50 8.16 -46.83 54.99 57 " 3858 12.479 122.422 7838.422 2.500 0.020 123.069 86.149 0.001
P13 X= 481.50 Y= 452.50 5.50 -24.50 30 30 " 3858 12.479 122.422 7838.422 2.500 0.021 123.069 86.149 0.000
P14 X= 481.50 Y= 446.50 5.50 -24.50 30 30 For Static Load Test 3858 12.479 122.422 7838.422 2.500 0.022 123.069 86.149 0.000

Test Pile X= 31.50 Y= 467.50 5.50 -46.37 51.87 54 4002 15.146 148.583 8152.583 2.500 0.020 118.939 83.257 0.000

P1 X= 26.50 Y= 462.50 10 -20 30 30 For staging of PDA Test 4002 15.146 148.583 8152.583 2.500 0.005 118.939 83.257 0.008
P2 X= 26.50 Y= 472.50 10 -20 30 30 " 4002 15.146 148.583 8152.583 2.500 0.010 118.939 83.257 0.005
P3 X= 36.50 Y= 472.50 10 -20 30 30 " 4002 15.146 148.583 8152.583 2.500 0.011 118.939 83.257 0.005
P4 X= 36.50 Y= 462.50 10 -20 30 30 For staging of PDA Test 4002 15.146 148.583 8152.583 2.500 0.012 118.939 83.257 0.004
P5 X= 28.50 Y= 464.50 8.16 -47.83 55.99 58 For Static Load Test 4002 15.146 148.583 8152.583 2.500 0.013 118.939 83.257 0.004
P6 X= 28.50 Y= 466.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.014 118.939 83.257 0.003
SPP
D1000 P7 X= 28.50 Y= 468.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.015 118.939 83.257 0.003
P8 X= 28.50 Y= 470.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.016 118.939 83.257 0.002
P9 X= 34.50 Y= 470.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.017 118.939 83.257 0.002
P10 X= 34.50 Y= 468.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.018 118.939 83.257 0.001
P11 X= 34.50 Y= 466.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.019 118.939 83.257 0.001
P12 X= 34.50 Y= 464.50 8.16 -47.83 55.99 58 " 4002 15.146 148.583 8152.583 2.500 0.020 118.939 83.257 0.000
P13 X= 31.50 Y= 470.50 5.50 -24.50 30 30 " 4002 15.146 148.583 8152.583 2.500 0.021 118.939 83.257 0.000
P14 X= 31.50 Y= 464.50 5.50 -24.50 30 30 For Static Load Test 4002 15.146 148.583 8152.583 2.500 0.022 118.939 83.257 -0.001