SLOPE STABILITY

GEOMETRY
Height of the slope (H) 10 m
Slope angle 89.0 Degree
BERM YES
HEIGHT 4m
WIDTH 2m
SOIL PROPERTIES
LAYER Detail LAYER DEPTH (m) Density Phi Cohesion
Start End kN/m3 (Degree) kN/m2
FILL SOIL 10.0 7.0 20 30 2
COHESIVE SOIL 7.0 4.0 18 2 58
SILTY CLAY 4.0 1.5 19.5 10 20
SANDY SILT 1.5 -1.0 20 22 15
MEDIUM SAND -1.0 -5.0 17 28 2
SANDY SOIL -5.0 and below 20 32 2

LOAD
DISTRIBUTED LEFT 100 KN
DISTRIBUTED RIGHT 90 KN
X start -17.32 m (Toe is at 0,0 ; slope at Left Side, till X = -2.17m )
X end -37.32 m

FACTOR OF SAFETY
FELLENIUS Method 1.001
BISHOP'S Method 1.043

CRITICAL CIRCLE
X Ordinate 10.000 m
Y Ordinate 20.000 m
Radius of Circle 22.305 m
SLOPE STABILITY

SOIL NAIL TYPE


fy fcu Nail Dia Grout Dia Horizontal αs
Name Spacing (m)
Type (N/mm ) (N/mm )
2 2
m m (Degree)
1 TYPE 1 415 20 32 50 2.5 15
2 TYPE 2 415 20 32 50 2 15
3 TYPE 3 415 20 32 50 1.5 15
4 TYPE 4 415 20 32 50 1 15

SOIL NAIL LAYERS


Sl No. Elevation Length Type Detail Comments Detail
1 0.5 5 1 TYPE 1
2 1.5 5 1 TYPE 1
3 2.5 5 1 TYPE 1
4 3.5 7 2 TYPE 2
5 4.5 7 2 TYPE 2
6 5.5 7 2 TYPE 2
7 6.5 7 3 TYPE 3
8 7.5 7 3 TYPE 3
9 8.5 7 3 TYPE 3
10 9.5 7 3 TYPE 3
SLOPE STABILITY
FOS Max
CENTER Radius FOS (FELLENIUS (BISHOP'S Itteration
SLNO X Y (m) Method) Method) reached
1 5 15.000 15.112 1.055 1.095 4
2 5 15.000 15.212 1.037 1.076 5
3 5 15.000 15.312 1.020 1.058 4
4 5 15.000 15.412 1.051 1.092 4
5 5 15.000 15.512 1.035 1.076 4
6 5 16.250 16.258 1.054 1.090 5
7 5 16.250 16.358 1.042 1.077 4
8 5 16.250 16.458 1.026 1.061 4
9 5 16.250 16.558 1.058 1.095 5
10 5 16.250 16.658 1.050 1.086 4
11 5 17.500 17.421 1.063 1.096 4
12 5 17.500 17.521 1.048 1.080 4
13 5 17.500 17.621 1.034 1.065 4
14 5 17.500 17.721 1.032 1.063 4
15 5 17.500 17.821 1.056 1.089 4
16 5 18.750 18.597 1.069 1.100 4
17 5 18.750 18.697 1.055 1.085 4
18 5 18.750 18.797 1.049 1.078 4
19 5 18.750 18.897 1.053 1.080 4
20 5 18.750 18.997 1.083 1.112 4
21 5 20.000 19.784 1.078 1.106 4
22 5 20.000 19.884 1.080 1.107 4
23 5 20.000 19.984 1.073 1.099 3
24 5 20.000 20.084 1.070 1.095 4
25 5 20.000 20.184 1.094 1.121 4
26 6.25 15.000 15.686 1.047 1.092 4
27 6.25 15.000 15.786 1.027 1.072 5
28 6.25 15.000 15.886 1.042 1.089 5
29 6.25 15.000 15.986 1.048 1.092 5
30 6.25 15.000 16.086 1.037 1.082 4
31 6.25 16.250 16.784 1.037 1.079 4
32 6.25 16.250 16.884 1.019 1.060 5
33 6.25 16.250 16.984 1.051 1.092 4
34 6.25 16.250 17.084 1.040 1.081 4
35 6.25 16.250 17.184 1.031 1.071 5
36 6.25 17.500 17.906 1.038 1.076 4
37 6.25 17.500 18.006 1.038 1.073 4
38 6.25 17.500 18.106 1.018 1.053 4
39 6.25 17.500 18.206 1.048 1.085 4
40 6.25 17.500 18.306 1.032 1.069 4
FOS Max
CENTER Radius FOS (FELLENIUS (BISHOP'S Itteration
SLNO X Y (m) Method) Method) reached
41 6.25 18.750 19.047 1.060 1.093 4
42 6.25 18.750 19.147 1.036 1.068 4
43 6.25 18.750 19.247 1.026 1.058 4
44 6.25 18.750 19.347 1.049 1.083 4
45 6.25 18.750 19.447 1.044 1.077 4
46 6.25 20.000 20.203 1.060 1.091 4
47 6.25 20.000 20.303 1.048 1.077 4
48 6.25 20.000 20.403 1.034 1.063 4
49 6.25 20.000 20.503 1.075 1.104 4
50 6.25 20.000 20.603 1.065 1.095 4
51 7.5 15.000 16.353 1.091 1.143 4
52 7.5 15.000 16.453 1.058 1.110 4
53 7.5 15.000 16.553 1.036 1.088 5
54 7.5 15.000 16.653 1.022 1.074 5
55 7.5 15.000 16.753 1.006 1.057 4
56 7.5 16.250 17.400 1.045 1.090 4
57 7.5 16.250 17.500 1.057 1.105 4
58 7.5 16.250 17.600 1.036 1.083 4
59 7.5 16.250 17.700 1.022 1.068 4
60 7.5 16.250 17.800 1.011 1.057 5
61 7.5 17.500 18.477 1.043 1.085 4
62 7.5 17.500 18.577 1.008 1.049 4
63 7.5 17.500 18.677 1.030 1.073 4
64 7.5 17.500 18.777 1.035 1.076 4
65 7.5 17.500 18.877 1.018 1.059 5
66 7.5 18.750 19.579 1.033 1.072 5
67 7.5 18.750 19.679 1.028 1.064 4
68 7.5 18.750 19.779 1.050 1.088 4
69 7.5 18.750 19.879 1.033 1.070 4
70 7.5 18.750 19.979 1.024 1.060 4
71 7.5 20.000 20.700 1.053 1.087 4
72 7.5 20.000 20.800 1.029 1.061 4
73 7.5 20.000 20.900 1.054 1.089 4
74 7.5 20.000 21.000 1.045 1.079 4
75 7.5 20.000 21.100 1.030 1.064 4
76 8.75 15.000 17.099 1.094 1.150 5
77 8.75 15.000 17.199 1.062 1.118 4
78 8.75 15.000 17.299 1.039 1.095 4
79 8.75 15.000 17.399 1.727 1.859 4
80 8.75 15.000 17.499 1.717 1.856 4
FOS Max
CENTER Radius FOS (FELLENIUS (BISHOP'S Itteration
SLNO X Y (m) Method) Method) reached
81 8.75 16.250 18.095 1.090 1.141 4
82 8.75 16.250 18.195 1.056 1.108 4
83 8.75 16.250 18.295 1.034 1.085 4
84 8.75 16.250 18.395 1.017 1.069 4
85 8.75 16.250 18.495 1.646 1.765 4
86 8.75 17.500 19.126 1.077 1.126 5
87 8.75 17.500 19.226 1.055 1.102 4
88 8.75 17.500 19.326 1.033 1.080 5
89 8.75 17.500 19.426 1.018 1.065 4
90 8.75 17.500 19.526 0.999 1.047 4
91 8.75 18.750 20.186 1.037 1.079 4
92 8.75 18.750 20.286 1.049 1.093 4
93 8.75 18.750 20.386 1.023 1.066 5
94 8.75 18.750 20.486 1.021 1.063 4
95 8.75 18.750 20.586 1.011 1.052 5
96 8.75 20.000 21.270 1.047 1.084 4
97 8.75 20.000 21.370 1.021 1.057 4
98 8.75 20.000 21.470 1.041 1.080 4
99 8.75 20.000 21.570 1.024 1.062 4
100 8.75 20.000 21.670 1.014 1.052 4
101 10 15.000 17.913 1.074 1.138 4
102 10 15.000 18.013 1.040 1.104 4
103 10 15.000 18.113 2.023 2.208 4
104 10 15.000 18.213 2.003 2.194 3
105 10 15.000 18.313 2.012 2.206 4
106 10 16.250 18.858 1.069 1.128 4
107 10 16.250 18.958 1.034 1.093 5
108 10 16.250 19.058 1.035 1.090 4
109 10 16.250 19.158 1.914 2.068 4
110 10 16.250 19.258 1.902 2.064 4
111 10 17.500 19.842 1.077 1.129 5
112 10 17.500 19.942 1.052 1.103 4
113 10 17.500 20.042 1.030 1.081 5
114 10 17.500 20.142 1.002 1.054 5
115 10 17.500 20.242 1.806 1.947 4
116 10 18.750 20.860 1.077 1.125 4
117 10 18.750 20.960 1.054 1.101 4
118 10 18.750 21.060 1.023 1.071 4
119 10 18.750 21.160 1.008 1.056 4
120 10 18.750 21.260 1.740 1.862 4
FOS Max
CENTER Radius FOS (FELLENIUS (BISHOP'S Itteration
SLNO X Y (m) Method) Method) reached
121 10 20.000 21.905 1.028 1.071 4
122 10 20.000 22.005 1.053 1.096 4
123 10 20.000 22.105 1.036 1.078 4
124 10 20.000 22.205 1.016 1.058 4
125 10 20.000 22.305 1.001 1.043 4
DETAIL RESULT FOR CRITICAL SLIP CIRCLE Critical Circle center
Co-ordinates of the Slip Circle:
x-Ordinates : 10 m REFILL
y-Ordinates : 20 m
Circle Radius: 22.305 m

FELLENIOUS METHOD BISHOP'S METHOD

∑ Resisting Force = 510.151 KN/m ∑ Resisting Force = 535.140 KN/m


∑ Sliding Force = 586.841 KN/m ∑ Sliding Force = 586.841 KN/m
REINFORCEMENT EFFECT (when Included) REINFORCEMENT EFFECT (when Included)
∑ Moment = 1722.00 KN-m/m (RESISTING) ∑ Moment = 1710.00 KN-m/m (RESISTING)
Equivalent force = 77.20 KN/m (∑ Moment/R) Equivalent force = 76.66 KN/m (∑ Moment/R)

FOS = (∑ Resisting Force + Equivalent force) = 1.001 FOS = (∑ Resisting Force + Equivalent force) = 1.043
∑ Sliding Force ∑ Sliding Force

FELLENIOUS METHOD BISHOP'S METHOD


SLICE SLICE SLIDING SLICE SLIDING SLICE SLIDING BASE COHESION AT EFFECTIVE RESISTING SLIDING RESISTING SLIDING
EDGE (x) WIDTH SURCHARGE ELEVATION HEIGHT INCLINATION SLICE C/S INTERFACE DENSITY FORCE FORCE FORCE FORCE
SLNO m m kN/m2 m m Degree m2 KN/m2 KN/m3 KN/m KN/m KN/m KN/m
1.000 -9.938 0.100 0.000 10.000 0.000 -63.081 0.010 2.000 20.000 0.493 0.176 0.331 0.176
2.000 -9.838 0.100 0.000 9.803 0.197 -62.516 0.029 2.000 20.000 0.590 0.520 0.565 0.520
3.000 -9.738 0.100 0.000 9.611 0.389 -61.967 0.048 2.000 20.000 0.688 0.853 0.790 0.853
4.000 -9.638 0.100 0.000 9.423 0.577 -61.423 0.067 2.000 20.000 0.788 1.175 1.008 1.175
5.000 -9.538 0.100 0.000 9.239 0.761 -60.894 0.085 2.000 20.000 0.889 1.486 1.218 1.486
6.000 -9.438 0.100 0.000 9.060 0.940 -60.367 0.103 2.000 20.000 0.991 1.787 1.422 1.787
7.000 -9.338 0.100 0.000 8.884 1.116 -59.855 0.120 2.000 20.000 1.095 2.079 1.619 2.079
8.000 -9.238 0.100 0.000 8.712 1.288 -59.344 0.137 2.000 20.000 1.200 2.361 1.810 2.361
9.000 -9.138 0.100 0.000 8.543 1.457 -58.848 0.154 2.000 20.000 1.306 2.635 1.995 2.635
10.000 -9.038 0.100 0.000 8.378 1.622 -58.352 0.170 2.000 20.000 1.413 2.900 2.175 2.900
11.000 -8.938 0.100 0.000 8.215 1.785 -57.862 0.186 2.000 20.000 1.521 3.157 2.350 3.157
12.000 -8.838 0.100 0.000 8.056 1.944 -57.386 0.202 2.000 20.000 1.629 3.406 2.521 3.406
13.000 -8.738 0.100 0.000 7.900 2.100 -56.909 0.218 2.000 20.000 1.739 3.647 2.687 3.647
14.000 -8.638 0.100 0.000 7.746 2.254 -56.446 0.233 2.000 20.000 1.848 3.882 2.849 3.882
FELLENIOUS METHOD BISHOP'S METHOD
SLICE SLICE SLIDING SLICE SLIDING SLICE SLIDING BASE COHESION AT EFFECTIVE RESISTING SLIDING RESISTING SLIDING
EDGE (x) WIDTH SURCHARGE ELEVATION HEIGHT INCLINATION SLICE C/S INTERFACE DENSITY FORCE FORCE FORCE FORCE
SLNO m m kN/m2 m m Degree m2 KN/m2 KN/m3 KN/m KN/m KN/m KN/m
15.000 -8.538 0.100 0.000 7.596 2.404 -55.980 0.248 2.000 20.000 1.959 4.108 3.006 4.108
16.000 -8.438 0.100 0.000 7.448 2.552 -55.528 0.263 2.000 20.000 2.069 4.329 3.160 4.329
17.000 -8.338 0.100 0.000 7.302 2.698 -55.073 0.277 2.000 20.000 2.180 4.542 3.310 4.542
18.000 -8.238 0.100 0.000 7.159 2.841 -54.631 0.291 2.000 20.000 2.292 4.749 3.457 4.749
19.000 -8.138 0.100 0.000 7.018 2.982 -54.186 0.305 58.000 19.966 10.036 4.941 9.820 4.941
20.000 -8.038 0.100 0.000 6.879 3.121 -53.754 0.319 58.000 19.881 9.940 5.113 9.739 5.113
21.000 -7.938 0.100 0.000 6.743 3.257 -53.318 0.332 58.000 19.805 9.846 5.280 9.660 5.280
22.000 -7.838 0.100 0.000 6.609 3.391 -52.894 0.346 58.000 19.735 9.758 5.442 9.584 5.442
23.000 -7.738 0.100 0.000 6.476 3.524 -52.467 0.359 58.000 19.672 9.671 5.598 9.510 5.598
24.000 -7.638 0.100 0.000 6.346 3.654 -52.044 0.372 58.000 19.614 9.587 5.750 9.439 5.750
25.000 -7.538 0.100 0.000 6.218 3.782 -51.632 0.385 58.000 19.560 9.507 5.897 9.371 5.897
26.000 -7.438 0.100 0.000 6.092 3.908 -51.216 0.397 58.000 19.511 9.429 6.039 9.304 6.039
27.000 -7.338 0.100 0.000 5.967 4.033 -50.812 0.409 58.000 19.466 9.355 6.177 9.240 6.177
28.000 -7.238 0.100 0.000 5.845 4.155 -50.404 0.422 58.000 19.423 9.282 6.310 9.177 6.310
29.000 -7.138 0.100 0.000 5.724 4.276 -50.007 0.434 58.000 19.384 9.213 6.439 9.117 6.439
30.000 -7.038 0.100 0.000 5.605 4.396 -49.605 0.445 58.000 19.347 9.145 6.563 9.058 6.563
31.000 -6.938 0.100 0.000 5.487 4.513 -49.215 0.457 58.000 19.313 9.080 6.684 9.001 6.684
32.000 -6.838 0.100 0.000 5.371 4.629 -48.819 0.469 58.000 19.280 9.016 6.800 8.945 6.800
33.000 -6.738 0.100 0.000 5.257 4.743 -48.435 0.480 58.000 19.250 8.956 6.913 8.892 6.913
34.000 -6.638 0.100 0.000 5.144 4.856 -48.046 0.491 58.000 19.222 8.896 7.021 8.839 7.021
35.000 -6.538 0.100 0.000 5.033 4.967 -47.659 0.502 58.000 19.195 8.838 7.125 8.788 7.125
36.000 -6.438 0.100 0.000 4.923 5.077 -47.284 0.513 58.000 19.169 8.783 7.227 8.739 7.227
37.000 -6.338 0.100 0.000 4.815 5.185 -46.902 0.524 58.000 19.145 8.728 7.324 8.690 7.324
38.000 -6.238 0.100 0.000 4.708 5.292 -46.532 0.534 58.000 19.122 8.676 7.418 8.644 7.418
39.000 -6.138 0.100 0.000 4.602 5.398 -46.156 0.545 58.000 19.101 8.625 7.508 8.598 7.508
40.000 -6.038 0.100 0.000 4.498 5.502 -45.791 0.555 58.000 19.080 8.576 7.595 8.554 7.595
41.000 -5.938 0.100 0.000 4.395 5.605 -45.420 0.566 58.000 19.061 8.527 7.678 8.510 7.678
42.000 -5.838 0.100 0.000 4.294 5.706 -45.060 0.576 58.000 19.042 8.481 7.759 8.469 7.759
43.000 -5.738 0.100 0.000 4.194 5.806 -44.693 0.586 58.000 19.025 8.435 7.835 8.427 7.835
44.000 -5.638 0.100 0.000 4.095 5.905 -44.338 0.595 58.000 19.008 8.392 7.910 8.387 7.910
45.000 -5.538 0.100 0.000 3.997 6.003 -43.976 0.605 20.000 19.004 4.238 7.985 4.812 7.985
46.000 -5.438 0.100 0.000 3.901 6.099 -43.625 0.615 20.000 19.012 4.255 8.063 4.831 8.063
FELLENIOUS METHOD BISHOP'S METHOD
SLICE SLICE SLIDING SLICE SLIDING SLICE SLIDING BASE COHESION AT EFFECTIVE RESISTING SLIDING RESISTING SLIDING
EDGE (x) WIDTH SURCHARGE ELEVATION HEIGHT INCLINATION SLICE C/S INTERFACE DENSITY FORCE FORCE FORCE FORCE
SLNO m m kN/m2 m m Degree m2 KN/m2 KN/m3 KN/m KN/m KN/m KN/m
47.000 -5.338 0.100 0.000 3.805 6.195 -43.267 0.624 20.000 19.019 4.271 8.137 4.849 8.137
48.000 -5.238 0.100 0.000 3.711 6.289 -42.911 0.634 20.000 19.026 4.287 8.207 4.867 8.207
49.000 -5.138 0.100 0.000 3.618 6.382 -42.566 0.643 20.000 19.033 4.304 8.276 4.886 8.276
50.000 -5.038 0.100 0.000 3.526 6.474 -42.214 0.652 20.000 19.040 4.321 8.340 4.903 8.340
51.000 -4.938 0.100 0.000 3.436 6.564 -41.873 0.661 20.000 19.046 4.339 8.402 4.921 8.402
52.000 -4.838 0.100 0.000 3.346 6.654 -41.525 0.670 20.000 19.052 4.356 8.460 4.938 8.460
53.000 -4.738 0.100 0.000 3.257 6.743 -41.188 0.679 20.000 19.058 4.374 8.517 4.955 8.517
54.000 -4.638 0.100 0.000 3.170 6.830 -40.843 0.687 20.000 19.063 4.392 8.569 4.971 8.569
55.000 -4.538 0.100 0.000 3.083 6.917 -40.509 0.696 20.000 19.069 4.410 8.620 4.987 8.620
56.000 -4.438 0.100 0.000 2.998 7.002 -40.168 0.704 20.000 19.074 4.428 8.667 5.003 8.667
57.000 -4.338 0.100 0.000 2.914 7.086 -39.838 0.713 20.000 19.079 4.446 8.712 5.019 8.712
58.000 -4.238 0.100 0.000 2.830 7.170 -39.499 0.721 20.000 19.084 4.464 8.753 5.035 8.753
59.000 -4.138 0.100 0.000 2.748 7.252 -39.173 0.729 20.000 19.089 4.483 8.793 5.050 8.793
60.000 -4.038 0.100 0.000 2.666 7.334 -38.838 0.737 20.000 19.093 4.501 8.829 5.065 8.829
61.000 -3.938 0.100 0.000 2.586 7.414 -38.504 0.745 20.000 19.098 4.520 8.862 5.080 8.862
62.000 -3.838 0.100 0.000 2.506 7.494 -38.182 0.753 20.000 19.102 4.539 8.895 5.095 8.895
63.000 -3.738 0.100 0.000 2.428 7.572 -37.851 0.761 20.000 19.106 4.558 8.923 5.109 8.923
64.000 -3.638 0.100 0.000 2.350 7.650 -37.532 0.769 20.000 19.110 4.576 8.951 5.123 8.951
65.000 -3.538 0.100 0.000 2.273 7.727 -37.204 0.776 20.000 19.114 4.595 8.974 5.137 8.974
66.000 -3.438 0.100 0.000 2.197 7.803 -36.888 0.784 20.000 19.117 4.614 8.997 5.151 8.997
67.000 -3.338 0.100 0.000 2.122 7.878 -36.563 0.791 20.000 19.121 4.633 9.015 5.165 9.015
68.000 -3.238 0.100 0.000 2.048 7.952 -36.249 0.799 20.000 19.124 4.653 9.034 5.178 9.034
69.000 -3.138 0.100 0.000 1.975 8.025 -35.926 0.806 20.000 19.128 4.672 9.048 5.191 9.048
70.000 -3.038 0.100 0.000 1.902 8.098 -35.615 0.813 20.000 19.131 4.691 9.062 5.205 9.062
71.000 -2.938 0.100 0.000 1.831 8.170 -35.295 0.820 20.000 19.134 4.710 9.071 5.217 9.071
72.000 -2.838 0.100 0.000 1.760 8.240 -34.987 0.828 20.000 19.137 4.729 9.081 5.230 9.081
73.000 -2.738 0.100 0.000 1.690 8.310 -34.669 0.834 20.000 19.140 4.748 9.086 5.243 9.086
74.000 -2.638 0.100 0.000 1.621 8.379 -34.352 0.841 20.000 19.143 4.767 9.089 5.255 9.089
75.000 -2.538 0.100 0.000 1.552 8.448 -34.048 0.848 20.000 19.146 4.786 9.092 5.268 9.092
76.000 -2.438 0.100 0.000 1.485 8.515 -33.733 0.855 15.000 19.152 7.305 9.092 7.752 9.092
77.000 -2.338 0.100 0.000 1.418 8.582 -33.431 0.862 15.000 19.158 7.363 9.093 7.794 9.093
78.000 -2.238 0.100 0.000 1.352 8.648 -33.118 0.763 15.000 19.049 6.706 7.936 7.022 7.936
FELLENIOUS METHOD BISHOP'S METHOD
SLICE SLICE SLIDING SLICE SLIDING SLICE SLIDING BASE COHESION AT EFFECTIVE RESISTING SLIDING RESISTING SLIDING
EDGE (x) WIDTH SURCHARGE ELEVATION HEIGHT INCLINATION SLICE C/S INTERFACE DENSITY FORCE FORCE FORCE FORCE
SLNO m m kN/m2 m m Degree m2 KN/m2 KN/m3 KN/m KN/m KN/m KN/m
79.000 -2.138 0.100 0.000 1.287 6.602 -32.818 0.469 15.000 18.904 4.795 4.805 4.838 4.805
80.000 -2.038 0.100 0.000 1.222 2.778 -32.508 0.281 15.000 19.555 3.651 2.953 3.537 2.953
81.000 -1.938 0.100 0.000 1.158 2.842 -32.210 0.287 15.000 19.565 3.694 2.996 3.582 2.996
82.000 -1.838 0.100 0.000 1.095 2.905 -31.902 0.294 15.000 19.574 3.738 3.037 3.627 3.037
83.000 -1.738 0.100 0.000 1.033 2.967 -31.605 0.300 15.000 19.583 3.781 3.076 3.671 3.076
84.000 -1.638 0.100 0.000 0.972 3.028 -31.299 0.306 15.000 19.591 3.824 3.113 3.714 3.113
85.000 -1.538 0.100 0.000 0.911 3.089 -30.994 0.312 15.000 19.599 3.867 3.148 3.757 3.148
86.000 -1.438 0.100 0.000 0.851 3.149 -30.701 0.318 15.000 19.607 3.910 3.182 3.799 3.182
87.000 -1.338 0.100 0.000 0.791 3.209 -30.397 0.324 15.000 19.614 3.952 3.214 3.841 3.214
88.000 -1.238 0.100 0.000 0.733 3.267 -30.106 0.330 15.000 19.621 3.994 3.244 3.882 3.244
89.000 -1.138 0.100 0.000 0.675 3.325 -29.804 0.335 15.000 19.627 4.036 3.272 3.923 3.272
90.000 -1.038 0.100 0.000 0.617 3.383 -29.515 0.341 15.000 19.634 4.078 3.299 3.963 3.299
91.000 -0.938 0.100 0.000 0.561 3.439 -29.215 0.347 15.000 19.639 4.120 3.323 4.003 3.323
92.000 -0.838 0.100 0.000 0.505 3.495 -28.927 0.352 15.000 19.645 4.161 3.347 4.043 3.347
93.000 -0.738 0.100 0.000 0.450 3.550 -28.629 0.358 15.000 19.651 4.202 3.368 4.082 3.368
94.000 -0.638 0.100 0.000 0.395 3.605 -28.343 0.363 15.000 19.656 4.243 3.389 4.120 3.389
95.000 -0.538 0.100 0.000 0.341 3.659 -28.046 0.369 15.000 19.661 4.283 3.407 4.158 3.407
96.000 -0.438 0.100 0.000 0.288 3.712 -27.762 0.374 15.000 19.666 4.324 3.424 4.196 3.424
97.000 -0.338 0.100 0.000 0.235 3.765 -27.466 0.379 15.000 19.670 4.364 3.439 4.233 3.439
98.000 -0.238 0.100 0.000 0.183 3.817 -27.172 0.384 15.000 19.675 4.403 3.452 4.270 3.452
99.000 -0.138 0.100 0.000 0.132 3.868 -26.890 0.297 15.000 19.734 3.796 2.654 3.627 2.654
100.000 -0.038 0.037 0.000 0.081 2.079 -26.680 0.104 15.000 20.000 2.429 0.933 2.192 0.933
DETAIL RESULT FOR REINFORCEMENT VALUE (INCLUDING BISHOP's FOS in SOIL STRENGTH PARAMETER)

Reinforcement Detail Strength in PULLOUT STRENGTH(kN/nail) Tdesign SF Moment


Sl No. TYPE Elevation(m) Length(m) Rupture (kN/nail) grout-nail Soil-grout (kN/nail) (kN/sqmt) (kN-m/m)
1.000 TYPE 1 0.500 5.000 222.509 267.270 48.588 48.588 13.091 432.526
2.000 TYPE 1 1.500 5.000 222.509 194.208 37.412 37.412 10.936 326.156
3.000 TYPE 1 2.500 5.000 222.509 127.391 20.137 20.137 2.731 139.588
4.000 TYPE 2 3.500 7.000 222.509 187.339 21.838 21.838 3.108 180.250
5.000 TYPE 2 4.500 7.000 222.509 227.929 24.509 24.509 3.625 185.590
6.000 TYPE 2 5.500 7.000 222.509 178.597 24.466 24.466 0.739 141.284
7.000 TYPE 3 6.500 7.000 222.509 133.011 21.238 21.238 0.658 150.031
8.000 TYPE 3 7.500 7.000 222.509 91.172 14.424 14.424 0.457 92.702
9.000 TYPE 3 8.500 7.000 222.509 53.079 8.319 8.319 0.268 48.150
10.000 TYPE 3 9.500 7.000 222.509 17.485 1.092 1.092 0.589 13.846
INTRODUCTION

This Slope Stability Sheet can be useful for the analysis of static stability of soil slopes like embankments,
excavated slopes, and natural slopes in soil and soft rock.
Advantages:
1. Modeling includes entering Slope height and inclination, so very useful for quick check of FOS.
2. One set of uniformly varrying distributed vertical load can be modled for analysis.
3. Fellenius Method and Bishop Method of analysis is available.
4. Bishop Method can be disabled for approx calculation to save time.
5. Soil Nails can be inculded and analysed to increase slope stability.
6. Analysis is done with or without Reinforcement.
7. Maximum of 5 Types of Soil Nail can be defined for analysis.
8. Suggestions displayed below "Calculation" Button can be used for accurate result.
9. Factor of safety for all circle analysed is stored in the "FOS" sheet for reference.
10. The Autocad script file is generated in the same folder to draw the autocad drawing containing
Profile, Soil Layers, Load data, Soil Nails and slip circles.
Limitations:
1. Seismic effect cannot be analysed.
2. Only one Load set is included in the analysis.
3. Modeling horizontal load is not available.
4. Berms are not modled.
5. Water table effect cannot be modled.
6. Visual Interface is absent and data needs to be entered with caution.

1. INPUT

Following are the Inputs Required For Analysis

1. GEOMETRY
2. SOIL PROPERTIES
3. LOAD
4. * REINFORCEMENT TYPE
5. * REINFORCEMENT LAYERS

Note:
* Required if Analysis with Geogrid is done.
Data Requiring Input
Editable cells (for Input values). Only this cells can be selected and changed.
Calculated Result from Analysis
Display Analysis Result

1.01 GEOMETRY

Height of the slope (H) hm


Slope angle Φ Degree
BERM YES
HEIGHT [bm_ht] m (Height of the berm)
WIDTH [bm_b] m (Width of the berm)
The Slope Geometry is defined in this section. This includes slope height and slope.
The Berm may or maynot be provided in the profile.

1.02 SOIL PROPERTIES


LAYER LAYER DEPTH (m) Density Phi Cohesion
Detail Start End kN/m3 Degree kN/m2 The soil properties are accepted
in this section. The Layer
Layer -1 H1 and below 20 30 2 Details as entered in the given
table.

1.03 LOAD
LOAD
DISTRIBUTED LEFT L1 KN
DISTRIBUTED RIGHT L2 KN
X start x1 m (Toe is at 0,0 ; slope at Left Side, till X = -18m )
X end x2 m

L1 - Uniformly distributed intensity at left end.


L2 - Uniformly distributed intensity at right end.
x1 - x-ordinate of the left end of distributed load.
x2 - x-ordinate of the right end of distributed load.
fq - Partial factor for the surcharge load.

(xmax,ymax)

number of
division

L2
width
L1
of
wedge
x1 x2 (xmin,ymin)

1.04 SOIL NAIL TYPE

fy fcu Nail Dia Grout Dia Horizontal


Name (N/mm2) (N/mm2) m m Spacing (m) αs Type

Name : Symbolic name of the given Reinforcement.


fy : Characteristic yield strength of the soil-nail reinforcement
fcu : Characteristic strength of cement grout
αs : Inclination of the soil nail to the horizontal
1.05 SOIL NAIL LAYERS

Elevation Length Type

Elevation : The elevation of reinforcement from the base of slope (in meters)
Length : The length of the reinforcement in meters
Type : The type of reinforcement as mentioned in the Reinforcement type detail.

2. CALCULATION

The "CALCULATE" button on the "SLOPE STABILITY" sheet displays the above window on press.
Following Details are required prior to the start of analysis :

1. Center's Ordinate Limit


2. Radius Value
3. Design Method

2.01 CENTER'S ORDINATE LIMIT

The range and density of centers for the slip circle is defined here. The Range is defined as a square
as shown in the figure with minimum ordinate (Xmin, Ymin) and maximum ordinate as (Xmax, Ymax).
Ymin cannot be less than the height of the slope.

The No. of division defines the no of vertical and horizontal lines. e.g. in the given figure the number of
division would be 5.
Thus the total number of centers considered would be n x n, where n is the number of division.
Width of the wedge is the width of the slice as shown in the figure considered in the analysis. Evidently
less is the width of slice, more will be the accuracy but the calculation time would increase.

2.02 RADIUS VALUE

This parameters defines the the radious size and number of slip circle analysed for each center point.
Radius increment (d) : This accepts the incremental value of slip circle after avery analysis.
Rmin Possible : It is the radius of the circle touching the slope.
x' - Value : The minimum radious of slip circle analysed would be Rmin possible + x. x may or
may not be intiger.
Number of increments: The number of slip circle analysed of varrying radius for every defined center.

Thus the total number of slip circle analysed would be = n x n x Number of increments

2.03 DESIGN METHOD

1. FELLENIUS METHOD
2. BISHOP'S METHOD
3. INCLUDE GEOGRID

2.03.01 FELLENIUS METHOD

N = Normal Reaction perpendicular to the slip surface for each slice. ( In direction of R)
S = force parallel to the slip surface at the line of slip
This method cannot be disabled as it is required to calculate the approx FOS.

2.03.02 BISHOP'S METHOD

To solve the above equation, the initial FOS is assumed as derived from the Fellenious Method and
Desired accuracy is reached after maximum of 100 iteration. The total number of Iteration done in each
analysis is displayed in the "FOS" sheet along with FOS.

2.03.03 INCLUDE SOIL NAIL

If selected the Effect of defined Geogrid is included in the analysis. The Tention in the Reinforcement is
calculated and the resisting moment due to these reinforcement tention is found. These additional
restoring moment due to the reinforcement tention, is inroduced in above analysis by Fellenius
Method and Bishop's Method as given:
Say there are n number of reinforcement at elevation y1, y2, .. , yn.
Tention in the Reinforcement = T1 , T2, .. , Tn

say the y-ordinate of the center of the slip circle is = Ycenter


Then the Moment of resistance due to the Reinforcement would be
∑ M = T1.(Ycenter - y1) + T2.(Ycenter - y2) + .. + T2.(Ycenter - y2)

Hence the Factor of Safety = (∑ S + ∑ M / R)/ ( ∑W sin α )

where, R : Radius of the slip circle

CALCULATING TENTION IN REINFORCEMENT /GEOGRID - (T)

The calculated tention would be minimum of following:

1. The allowable tensile capacity of Soil Nail (TT)


2. Pullout resistance Soil-Grout Interface (TSG)
3. Pullout resistance Grout-Soil Reinforcement Interface(TGR)

NOTE : THE EFFECT OF SHEAR FORCE IS NEGLIGABLE

1. The allowable tensile capacity of Soil Nail

The allowable tensile capacity, TT, of a soil nail is given by:

where, fy : Characteristic yield strength of the soil-nail reinforcement


A' : Effective cross-sectional area of the soil-nail reinforcement
FT : Factor of safety against tensile failure of soil-nail reinforcement

2. Pullout resistance Soil-Grout Interface

REINFORCEMENT PULLOUT RESISTANCE: (HA 68/69)


Where an assumed failure surface cuts a layer of reinforcement or row of soil nails, the force mobilized in
the reinforcement or nails is assumed to be the lesser of the rupture strength and the pull-out resistance of
the length of reinforcement or nails which lies beyond the failure surface. In its most general form the pull
out resistance of each layer of reinforcement is given by:

Where,
Le = Length of reinforcement type which extends beyond the critical failure mechanism.
σ’n = σ’radial
Average n
= effective stress acting on the reinforcement beyond the failure surface.
(Discussed later)
, = Design Strength parameter for the soil
FSG = Factor of safety against pullout failure at soil-grout interface

The value of ‘λp’ shall be taken as follows:


Where,
dhole = Diameter of the grout hole around the nail.
Sh = Horizontal spacing of the nail
α = Interface sliding factor =

The average radial effective stress, F’, acting along the pull-out length of a soil nail may be derived from:

Where,
σ’v = Vertical stress acting along the length.
KL = Coefficient of lateral earth pressure parallel to slope = ½ (1+Ka)
Ka = (1 - sinΦ’des)/ (1 + sinΦ’des)

3. Pullout resistance Grout-Soil Reinforcement Interface

(GUIDE TO SOIL NAIL DESIGN AND CONSTRUCTION - (GEOGUIDE 7))


The allowable pullout resistance provided by the grout-reinforcement bond length in
the passive zone, TGR, is given by:

where, β : Coefficient of friction at the grout-reinforcement interface, which depends on


the bar type characteristic in accordance with BS 8110 (BSI, 1997), e.g., 0.5
for high yield deformed steel bars
fcu : Characteristic strength of cement grout
Pr : Effective perimeter of the soil-nail reinforcement
L : Bond length of the soil-nail reinforcement in the passive zone
FGR : Factor of safety against pullout failure at grout-reinforcement interface (=2.0 assumed)