WORK ORDER WORK ORDER REQUEST

NO. Work
Description Date Received Est. Start Date Duration Status
To Machine
Flange
1 10-Jan-13 16-Jan-13 1 WEEK COMPLETE
Adapter
(Relief Valve)
To transfer
2 Project 10-Jan-13 13-Jan-13 2-3 Days COMPLETE
Materials

Provide
Blasting
Painting
Manpower for
3 Offshore 13-Jan-13 23-Jan-13 12 WEEKS COMPLETE
Touch Up
Painting
Maintenance
Work

Inspection of
4 V-2326 at CKP 13-Jan-13 19-Feb-13 2 WEEKS COMPLETE
Platform
Punchlist
Clearance for
5 15-Jan-13 13-Feb-13 3 WEEKS COMPLETE
CM3 at CKR
Platform

Punchlist
Clearance for
6 15-Jan-13 20-Feb-13 3 WEEKS ON GOING
BMA/BLA/SYA
Platforms
Flare tip
7 15-Jan-13 19-Jan-13 2 WEEKS COMPLETE
rectification
Provide a
dedicated
8 project 15-Jan-13 9-Jan-13 1 YEAR COMPLETE
management
team (PMT)

Switch-gear
9 support at 17-Jan-13 29-Jan-13 1 WEEK COMPLETE
CKP

Fabricate and
Install the
Sand
10 Monitoring 17-Jan-13 13-Feb-13 1 WEEK COMPLETE
Cabinet
Support Stand
To install
additional
fastener and
support on
11 the 23-Jan-13 18-Feb-13 2 WEEKS COMPLETE
membrane
area module 5
& 6 wall
clading

Repair
weldment
12 crack on the 23-Jan-13 3-Feb-13 1 WEEK COMPLETE
hot water
tank

Base
modification
13 for 23-Jan-13 19-Feb-13 1 WEEK COMPLETE
refrigeration
condenser.

Flare Tip
14 Rectification 2-Apr-13 10-Aug-13 14 DAYS COMPLETE
Work
Hook Up and
15 Commissionin 23-Jan-13 2-Feb-13 8 WEEKS COMPLETE
g for SYA
Flowlines

Provide
welder and
16 23-Jan-13 4-Feb-13 3 DAYS COMPLETE
fitter for
offshore work

Positive
Isolation for
17 23-Jan-13 17-Feb-13 3 DAYS COMPLETE
Shutdown
Work
Drip Ring for
18 Level 6-Feb-13 19-Feb-13 7 DAYS COMPLETE
Transmitter
WORK ORDER
19 CANCEL
CANCELLED
Teletest
Inspection of
20 12-Feb-13 18-Feb-13 4 DAYS COMPLETE
Flare Tip
Piping
ONSHORE
FABRICATION
OF TEST LOOP
WET GAS
21 VENTURI 17-Feb-13 2-Mar-13 8 WEEKS COMPLETE
METERING
SYSTEM FOR
CKA, CKB AND
CKC

To replace 24
VDC Beacons
22 17-Feb-13 4-Mar-13 1 WEEK COMPLETE
with 240 VAC
Type

Install 17 DVC
23 and Test Point 17-Feb-13 2-Jun-13 2 WEEKS COMPLETE
for Gas
Detector
Bumi Boat
24 Landing 21-Feb-13 16-Mar-13 4 WEEKS COMPLETE
Modification
Replacement
25 BLA Sampling 27-Feb-13 4-Apr-13 1 WEEK COMPLETE
Valve
Provide phone
26 28-Feb-13 4-Mar-13 2 WEEKS COMPLETE
line at CM3
To provide
work boat for
27 BUMI 28-Feb-13 16-Apr-13 4 WEEKS CANCEL
ractification
work

20" Blind
Flange
28 28-Feb-13 16-Mar-13 1 WEEK COMPLETE
Reinstatement
work at SYA

Provide
scaffold for
29 28-Feb-13 11-Mar-13 6 WEEKS COMPLETE
the touch up
painting work

Cradle
Support
30 Modification 5-Mar-13 11-Mar-13 2 WEEKS COMPLETE
For SGC#3
REV 1
Provide
Hydraulic
31 Torque 5-Mar-13 11-Mar-13 2 WEEKS COMPLETE
Wrench for V-
2326

Fabricate and
Install Valves
with Elbow
32 and Flanges 21-Mar-13 2-Apr-13 2 WEEKS COMPLETE
for Level
Transmitter /
Gauge at CKP

Purchase and
Install Split
33 Unit Aircond 21-Mar-13 2-Apr-13 2 WEEKS CANCEL
At SYA
Platform

HSE
34 Management 10-Mar-13 13-Mar-13 1 DAY COMPLETE
Workshop
Erect
Scaffolding
35 27-Mar-13 2-Apr-13 2 WEEKS COMPLETE
below BLA
and CKP HVAC
To erect
36 scaffolding at 3-Apr-13 5-Apr-13 2 WEEKS COMPLETE
CKR

To replace
New bolt and
37 Rubber Seal 27-Mar-13 9-Apr-13 3 WEEKS COMPLETE
For Hatch
Cover

To supply
services of
38 27-Mar-13 2-Apr-13 1 WEEK COMPLETE
safe house
habitat

Install 3rd
propane
39 2-Apr-13 2-Aug-13 4 WEEKS CANCEL
Condenser
(Offshore)

Install Drip
Ring Level
40 3-Apr-13 10-Aug-13 10 DAYS COMPLETE
Transmitter
(Offshore)
Install
41 Mercury Catch 3-Apr-13 10-Aug-13 10 DAYS COMPLETE
Pot

To fabricate
and Install The
42 Isolation Valve 3-Apr-13 10-Aug-13 10 DAYS COMPLETE
& Test Port
For PSV

43 20" GRE Pipe 3-Apr-13 9/8.2009 10 DAYS COMPLETE


Repair Work
Modification
44 of Container 3-Feb-13 5-Apr-13 2 DAYS COMPLETE
to secure the
engine

Vessel
Cleaning For
45 Condensate 10-Apr-13 2-May-13 2 WEEKS COMPLETE
Surge Drum,
V-3000

Insulation
46 Work at13/03/2009
CKP Receive 14/4/2009
2-May-13 2 WEEKS COMPLETE
Platform
47 CANCELLED CANCEL
Install Test
Loop Wet Gas
48 Venturi 16-Apr-13 2-Aug-13 3 WEEKS COMPLETE
Metering at
CKA

Install Test
Loop Wet Gas
49 Venturi 16-Apr-13 2-Aug-13 3 WEEKS COMPLETE
Metering at
CKC

CKA
50 Conductor 16-Apr-13 2-Aug-13 3 WEEKS COMPLETE
Hatch Cover

To relocate
the pressure
gauge and
51 pressure 5-May-13 16-May-13 2 WEEKS COMPLETE
transmitter
tubing line at
CKA/CKB/CKC
Provide
Blasting
Painting
Manpower for
52 12-May-13 15-May-13 12 WEEKS COMPLETE
Touch Up
Painting
Maintenance
Work

To erect
Scaffolding at
53 16-May-13 19-May-13 1 WEEK COMPLETE
the 24" PG
Line at CKP

To Provide
Scaffolding set
54 16-May-13 2-Aug-13 3 WEEKS COMPLETE
and Erect of
Scaffolding

WHCP
Modification
55 22-May-13 2-Jul-13 2 WEEKS ON GOING
Work at BMA,
BLA and SYA

Provide
Scaffold for
56 the touch up 22-May-13 30-Mar-13 3 MONTHS COMPLETE
painting work
at CKP
To replace
57 CKA DBB 22-May-13 10-Aug-13 2 WEEKS COMPLETE
Diverter
Valves
To replace
Jiulong Valves
58 on 3 pig 22-May-13 10-Aug-13 2 WEEKS COMPLETE
receivers

To erect
Scaffolding at
59 CKR-XV-2901 22-May-13 10-Aug-13 1 WEEK CANCEL
for Sealant
Injection

Sale Gas
Compressor
60 #3 Labyrinth 23-May-13 10-Aug-13 1 WEEK COMPLETE
Seal
Changeout
Vessel
Cleaning for
61 CKP-V-5500, 23-May-13 10-Aug-13 2 WEEKS COMPLETE
Closed Drain
Drum

Vessel Internal
Inspection for
62 CKR-V-5500, 23-May-13 10-Aug-13 2 WEEKS COMPLETE
Closed Drain
Drum

Inspection of
Exchanger
63 Tube CKP-E- 23-May-13 10-Aug-13 2 WEEKS COMPLETE
4002A/B, Fuel
Gas Heater

To Change out
64 Bolt and Nuts 23-May-13 10-Aug-13 2 WEEKS COMPLETE
on receivers
To change out
bolt and nuts
65 23-May-13 10-Aug-13 2 WEEKS COMPLETE
on Train 1
Inlet cooler

To Install
Butterfly
66 Valves at Sea 23-May-13 10-Aug-13 2 WEEKS COMPLETE
water booster
pump piping

Replacemet of
67 the MOV-HV- 23-May-13 10-Aug-13 2 WEEKS COMPLETE
2814
Fabricate
Cradle
68 23-May-13 16-Jun-13 2 WEEKS COMPLETE
Support for
Solar Turbines
Reinstatement
69 work at 23-May-13 16-Jul-13 2 WEEKS ON GOING
CKP/CKR/CKC
To supply
Services of
70 9-Jun-13 10-Jun-13 1 WEEK COMPLETE
Safe House
Habitat

To change out
Bolt and Nuts
71 12-Jun-13 10-Aug-13 2 WEEKS COMPLETE
on Vibration
Transmitter
To change out
Bolt and Nuts
72 on 12-Jun-13 10-Aug-13 2 WEEKS COMPLETE
Downstream
Dehydrator

To change out
Bolt and Nuts
73 12-Jun-13 10-Aug-13 2 WEEKS COMPLETE
on Membrane
(Cluster 5&6)

To change out
Bolt and Nuts
74 on 12-Jun-13 10-Aug-13 2 WEEKS COMPLETE
Compression
Module 3

To assist
75 Choke Valve 13-Jun-13 10-Aug-13 2 WEEKS COMPLETE
Vendor
To transfer
76 13-Jun-13 10-Aug-13 1 WEEK COMPLETE
DCS Consoles
To supply 20"
77 Insulation 18-Jun-13 10-Aug-13 1 WEEK COMPLETE
Gasket

Positive
Isolation nd
Nitrogen
78 23-Jun-13 10-Aug-13 2 WEEKS COMPLETE
Purging for
August
Shutdown

Service Water
Pump and Sea
79 Water Lift 23-Jun-13 24-Aug-13 1 WEEK COMPLETE
Pump Cradle
Support

To fabricate
and Install
New Pipe
80 27-Jun-13 2-Aug-13 3 WEEKS COMPLETE
Supports and
Structures at
CKP

To fabricate
and Install
81 New Access 27-Jun-13 16-Sep-13 3 WEEKS COMPLETE
Platform at
FSO
Modification
82 of Crane 27-Jun-13 27-Jun-13 3 WEEKS COMPLETE
Boom Rest
Lighting
83 Improvement 27-Jun-13 16-Oct-13 3 WEEKS ON GOING
at CKP

Extension
Deck and
84 Service 27-Jun-13 16-Oct-13 4 WEEKS COMPLETE
Platform at
CKP

York
Refrigeration
85 27-Jun-13 16-Nov-13 3 WEEKS ON GOING
Compressor
Shelter

Miscellaneous
Work For
86 14-Jul-13 10-Aug-13 2 WEEKS COMPLETE
August
Shutdown
To Install 20"
87 MOV HV-0904 21-Jul-13 25-Jul-13 1 WEEK COMPLETE
at SYA

Insulation
Work At K-
88 4200 22-Jul-13 9-Aug-13 2 WEEKS COMPLETE
Compressor
and PSV

Mercury
89 Exposure 25-Jul-13 9-Aug-13 2 WEEKS COMPLETE
Monitoring

Weight
Balancing &
90 Bundle 31-Jul-13 31-Jul-13 1 WEEK COMPLETE
Removal
Bracket

Hook up and
Commissionin
91 g of Bumi 25-Aug-13 NOV 10 WEEKS ON GOING
Shallow
Flowlines
SYA REPAIR
92 26-Aug-13 SEPT 4 WEEKS COMPLETE
WORK
To convert Jet
A1 Fuel Skid
93 into PCHE 28-Aug-13 SEPT 4 WEEKS COMPLETE
Cleaning
Equipment

To change out
Dehydrator
Vessels
94 Sorbead (V- 28-Aug-13 OCT 2 WEEKS COMPLETE
2423& V-
2424)

To provide
Painting and
Scaffolding
95 2-Sep-13 SEPT 2 WEEKS COMPLETE
crews for Post
Shutdown
Work

To erect
scaffolding
96 and Working 5-Sep-13 SEPT 1 WEEK COMPLETE
Platform for
GG Removal

To provide
97 Painting Crew 9-Sep-13 9-Sep-13 1 YEAR ON GOING
and Scaffolder
at CKP

To provide
Manpower for
98 9-Sep-13 29-Sep-13 2 WEEKS COMPLETE
Valve
Hydrotest

To upgrade
pressure
gauge and
modify
99 9-Sep-13 29-Sep-13 2 WEEKS COMPLETE
collection
point at
mercury catch
pots

To fabricate
and install
100 handrail at 10-Sep-13 29-Sep-13 2 WEEKS CANCEL
BMA, BLA &
SYA
To complete
wiring and
101 perform 12-Sep-13 16-Sep-13 2 WEEKS COMPLETE
instrument
loop testing

To replace
Crack 8" GRE
102 18-Sep-13 26-Sep-13 2 WEEKS COMPLETE
Deluge pipe at
CKP

To erect
scaffolding &
103 cable pulling 18-Sep-13 26-Sep-13 2 WEEKS COMPLETE
for HVAC at
BMA & SYA

To install
104 lifting lugs at 18-Sep-13 26-Sep-13 3 WEEKS COMPLETE
BMA Main &
Cellar Deck

Install Test
Loop Wet Gas
105 Venturi #REF! 2-Aug-13 3 WEEKS COMPLETE
Metering at
CKB

To install
protection
106 guard on the 1-Oct-13 6-Oct-13 4 WEEKS COMPLETE
diverter valve
at CKA

To close out
107 UCUA findings 18-Sep-13 26-Sep-13 3 WEEKS COMPLETE
on CKP
TO INSTALL
ONE UNIT OF
3 PHASE
108 #REF! 2-Oct-13 3 WEEKS 0
SOCKET
OUTLET AT
CKP
To fabricate
and install
109 6-Oct-13 DEC 4 MONTHS ON GOING
Bumi deep
pilot well

To machine
Xmas tree
110 8-Oct-13 8-Oct-13 20 DAYS COMPLETE
valve thread
protection
To provide
one porta
111 cabin for 20-Oct-13 26-Oct-13 I2 MONTHS ON GOING
CSR/PMT
office at CKP
To install
112 Acrylic Stem 15-Oct-13 15-Oct-13 20 DAYS COMPLETE
Protector

To carry out
inspection,
cleaning or
113 replace 20-Oct-13 27-Oct-13 1 MONTH ON GOING
tubings at the
CKP, CKR, CKA,
CKB & CKA

To close all 4
ISO corners on
114 CKA-V-41110A 27-Oct-13 27-Oct-13 1 WEEK COMPLETE
(Propoane
Vessel)

To install 2
units of IR
detectors for
115 21-Oct-13 6-Nov-13 1 MONTH COMPLETE
each GQ-7500
and 20 Diesel
Fuel Skids

Solar Engine
Change Out
116 23-Oct-13 8-Nov-13 1 WEEK COMPLETE
and RVDT
Upgrade

Installation of
TLQ and
Associated
117 23-Oct-13 24-Oct-13 2 WEEKS COMPLETE
facilities at
CKP upper
deck

To perform
cleaning work
on PCHE gas
118 28-Oct-13 6-Nov-13 2 WEEKS COMPLETE
cooler train
1&2 with jet
A1 Pump Skid

To fabricate
and replace
119 3-Nov-13 10-Nov-13 1 WEEK COMPLETE
CKP-Topside
hatch cover
To replace all
corroded and
120 11-Nov-13 14-Nov-13 2 MONTHS COMPLETE
worn out
grating

To organize
joint HSE Day
for 150k
manhours
121 without LTI at 11-Nov-13 13-Nov-13 1 DAY COMPLETE
Legend Hotel,
Cherating,
Kuantan

To repair the
boat landing
122 17-Nov-13 18-20/11 3 DAYS COMPLETE
structure on
UFCB Jati 1

To remove
existing air
dryer and
123 25-Nov-13 19-Jan-13 1 WEEK COMPLETE
install 2 new
dryer units at
FSO
To replace all
missing
124 gratings at 19-Nov-13 21-Nov-13 2 WEEKS COMPLETE
BLA Sea Deck
area
To perform
MPI test on
125 Oilfab Cabin 25-Nov-13 2-Dec-13 2 WEEK COMPLETE
and Metal
Basket

To modify
existing CKR
126 CM1 and CM2 25-Nov-13 6-Dec-13 2 WEEKS COMPLETE
Lube Oil drain
line

To fabricate 2
new pumps
127 enclosure 2-Dec-13 11-Jan-13 2 WEEKS 0
(Bolted SS
type)
To survey,
evaluate &
propose to CH
128 8-Dec-13 11-Dec-13 3 WEEKS CANCEL
the valve
repair
workshop

To repair
minor damage
129 to BLA Jacket 10-Dec-13 9-Mar-10 2 WEEKS 0
Leg

To support
sorbead
change out for
130 V2321 & 10-Dec-13 1-Jan-14 3 WEEKS COMPLETE
v2322
Dehydrator
Vessel

To repair &
replacement
of damaged
131 cold insulation 10-Dec-13 21-Jan-14 2 WEEKS 0
for membrane
housing T1C3
& pipe spool

To repair kick
plate, drain
132 line & stair 10-Dec-13 22-Jan-14 2 WEEKS COMPLETE
step at skid
beam at ckc

To replace
valves on CKC
production
133 manifold & 30-Dec-13 1-7/2/10 1 WEEK COMPLETE
test header
(DBB & Ball
Valves)

Blasting &
painting weir
134 pump special 30-Dec-13 11-Jan-14 1 WEEK COMPLETE
tools and big
blind flanges
To erect
scaffolding for
135 Drop Spools 30-Dec-13 9-Jan-14 1 WEEK COMPLETE
site survey at
CM3 Area

To perform
MPI and Load
136 Test for pad 30-Dec-13 11-Jan-14 1 WEEK COMPLETE
eyes in FSO
Pump Room

To support
Sorbead
change out for
137 V2325 & V 7-Jan-14 1-Feb-14 3 WEEKS COMPLETE
2326
Dehydrator
Vessels

To fabricate
metal
138 container for 9-Jan-14 16-Feb-14 2 WEEKS COMPLETE
york
refrigeration

To perform
power tooling
139 and painting 15-Jan-14 22-Jan-14 2 WEEKS ON HOLD
on upper deck
(condensate
MRU area)

To install
additional
grating,
140 #REF! #REF! #REF! COMPLETE
handrails and
kick plate at
CKP module 6

To assist in
cable pulling
& Installation
141 of open path 16-Jan-14 26-Jan-14 2 WEEKS COMPLETE
and point
flame
detectors

Provide a
142 dedicated 23-Jan-14 2-Jan-14 1 YEAR ON GOING
PMT for 2010
To identify the
material grade
143 23-Jan-14 26-Jan-14 3 DAYS COMPLETE
for FSO pad
eye

To replace
endcap at C2
144 27-Jan-14 2-Apr-14 1 WEEK COMPLETE
Flowline, CKC
Platform

To erect
scaffolding
planks &
145 26-Jan-14 31-Jan-14 1 WEEK COMPLETE
canvas to
cover solar
panel at BMA

To modify 2
existing
monorails
146 27-Jan-14 16-Feb-14 2 WEEKS ON GOING
beams at fire
water pumps
area

Removal of
King Post for
147 4-Feb-14 16-Feb-14 1 WEEK COMPLETE
Burner Test
Boom on BMA

Removal of
King Post for
148 4-Feb-14 26-Feb-14 1 WEEK COMPLETE
Burner Test
Boom on SYA

To remove all
the CKA main
deck facilities
149 that could be 4-Feb-14 21-Feb-14 1 WEEK 0
obstruction
for T-10
Drilling Rig

To fabricate
150 SS316 Foam 4-Feb-14 6-Feb-14 7 WEEKS COMPLETE
Tank

To fabricate
and install
Kicker Plates
151 4-Feb-14 18-Feb-14 2 WEEKS COMPLETE
at Life Boat
A/B/C
Platforms
To assemble
choke valve
152 missing parts 4-Feb-14 11-Feb-14 2 WEEKS COMPLETE
and perform
testing

To fabricate
the clamp
153 with hook for 5-Feb-14 11-Feb-14 2 WEEKS COMPLETE
bunkering
hoses

To replace
clogged GRE
154 piping on CKC 5-Feb-14 5-Feb-14 4 WEEKS 0
open drain
system

To replace
leaking 16"
155 MOV Valves at 5-Feb-14 4-Mar-14 2 WEEKS COMPLETE
CKR metering
system

To perform
RFET/IRIS
156 Inspection of 11-Feb-14 2-Jul-14 3 WEEKS COMPLETE
Exchanger
Tubes

Vessel
Cleaning for V-
157 11-Feb-14 2-Jul-14 3 WEEKS COMPLETE
2002, Inlet
Separator

Vessel
Cleaning for V-
158 11-Feb-14 2-Jul-14 3 WEEKS COMPLETE
2052, Inlet
Separator

Vessel
Cleaning for V-
159 11-Feb-14 2-Jul-14 3 WEEKS COMPLETE
5000, Knock-
Out Drum

Vessel
Cleaning for V-
5500, Closed-
160 11-Feb-14 2-Jul-14 3 WEEKS COMPLETE
Drain Drum
(July
shutdown)
161 #REF! #REF! #REF! #REF! CANCEL
Refurbish 20
162 Pcs of CKA 18-Feb-14 2-Mar-14 3 MONTHS ON GOING
Hatch Covers

To support
Sorbead
Change out
163 18-Feb-14 26-Feb-14 3 WEEKS COMPLETE
for V2328
Dehydrator
Vessel

To repair ARV
fittings at
164 firewater 4-Mar-14 16-Mar-14 1 WEEK ON GOING
pump P
8000/8030
Scramble nets
and life raft
165 2-Mar-14 7-Mar-14 1 WEEK COMPLETE
for BMA &
CKP
To install DBB
Valves on
166 BMA 6-Mar-14 2-Jul-14 2 WEEKS COMPLETE
Production
Manifold
To install
temporary
167 pump base 30-Mar-14 16-Apr-14 2 WEEKS COMPLETE
and heavy
duty hoses

To fabricate
168 the push tool 7-Apr-14 16-Apr-14 1 WEEK CANCEL
for offshore

To support
sorbead
change out for
169 10-Apr-14 26-Apr-14 2 WEEKS COMPLETE
V2323/2324
Dehydrator
vessel

Additional 2"
venting line
from Songkhla
Launcher
170 28-Apr-14 29-Apr-14 75 days COMPLETE
facilities to HP
flare system
(July 2010
Shutdown)
To fabricate
circle shape
171 23-Apr-14 23-Apr-14 1 week 0
Bakelite
washer

Modification
of Existing
pipe with the
additional
172 drop spool for 28-Apr-14 29-Apr-14 75 days COMPLETE
PCHE
maintenance
(July 2010
Shutdown)

To perform
leak test for
173 refrigeration 27-Apr-14 7-May-14 1 day COMPLETE
condenser at
CSB

To fabricate
and install
GRE pipe
174 27-Apr-14 2-May-14 2 weeks COMPLETE
spool & pipe
support at
CKP

CM3
175 Alignment 30-Apr-14 16-Jun-14 30 days COMPLETE
Work

To install kick
plate for
176 handrails ar 27-Apr-14 27-Apr-14 2 weeks 0
upper deck
module 5 & 6

To supply &
install new
177 27-Apr-14 2-May-14 2 weeks 0
curtains for
CKP LQ

Condenser
Removal and
reinstatement
for
178 refrigeration 28-Apr-14 1-Jul-14 9 days COMPLETE
condenser, E-
4101 & E4021
(July 2010
Shutdown)
Insulation of
piping spool
for sea water
179 28-Apr-14 22-Jun-14 18 days COMPLETE
booster pump
(July 2010
shutdown)

Installation of
new FGS
cabinet and
180 28-Apr-14 29-Jun-14 20 days COMPLETE
RPM in CKP
IER (July 2010
Shutdown)

Relocation of
Transmitter
tapping point
and
replacement
of transmitter
181 28-Apr-14 2-Jul-14 7 days COMPLETE
(from
displacer to
guided wave
radar) (July
2010
shutdown)

Install partial
stroke
facilities
(scaffolding)
for CKR-XV-
182 28-Apr-14 1-Jul-14 9 days CANCEL
2000
shutdown
valve. (July
2010
shutdown)

DBB change
out as SYA
183 29-Apr-14 2-Jul-14 10 days COMPLETE
(July 2010
shutdown)

To cut a small
section of H-
184 29-Apr-14 29-Apr-14 3 days COMPLETE
beam at CKC
mezz deck
To perform
load test and
185 stencil for all 29-Apr-14 21-May-14 2 weeks 0
lifting padeyes
at FSO

To fabricate
the LQ foam
186 nozzle piping 29-Apr-14 2-May-14 2 weeks 0
supports

Modification
of level
187 transmitter 6-May-14 2-Jul-14 7 days COMPLETE
(July 2010
Shutdown)

To replace 1"
Air Supply
188 30-Apr-14 16-May-14 1 Week 0
Pipe at Open
Drain Pump

Instrument
Gas System
189 5-May-14 4-Jul-14 5 days COMPLETE
Modification
at SYA

To repair
badly
corroded drip
pan hole for
190 13-May-14 21-May-14 2 Weeks 0
propoane
condenser
package at top
deck

To replace the
protection
191 cage at hot 13-May-14 21-May-14 3 Weeks 0
condy line at
CKP

To Fabricate,
Install and
Commissionin
192 g of GRE 8-May-14 9-Jun-14 1 Week ON GOING
Piping for New
Bunkering
Station

Standby
193 Seawater 15-May-14 10-Sep-14 3 Weeks ON GOING
Booster Pump
To separate
the
Instrument
194 15-May-14 4-Jul-14 1 WEEK COMPLETE
and Process
Vent at SYA
during July SD

To reinstate
back the in
line strainer at
195 15-May-14 4-Jul-14 1 WEEK 0
SGC#3 (Train 1
& 2) during
July SD

Compressor
Shaft Seal
196 Replacement 22-May-14 4-Jul-14 2 Weeks COMPLETE
Work During
July Shutdown

Miscellaneous
Work for July
197 19-May-14 1-Jul-14 3 WEEKS COMPLETE
2010
Shutdown

To support
sorbead
198 change out for 21-May-14 16-May-14 2 Weeks COMPLETE
V2327
Dehydrator
Vessel

Positive
isolation and
199 nitrogen 21-May-14 4-Jul-14 2 Weeks COMPLETE
purging for
July 2010 SD

To remove
ram skid from
200 skid from CKC 27-May-14 6-Jun-14 1 WEEK 0
& reinstate
the handrail

To install new
condensed
rubber at CKB
201 27-May-14 16-Jul-14 2 weeks 0
& CKC boat
landing
fenders
To fabricate &
install 8
leftover P2
202 post 1-Jun-14 16-Aug-14 3 WEEKS ON GOING
shutdown
pipe support
at CKP

To replace
cracked GRE
flanges at
203 1-Jun-14 1-Jul-14 9 days COMPLETE
condenser
heat
exchanger
To provide
and install
204 9-Jun-14 10-Jun-14 2 months COMPLETE
liferaft for July
S/D
3rd party to
supervise the
16" valve
205 actuators 9-Jun-14 4-Jul-14 12 Days COMPLETE
installation
during July
S/D

3rd party for


bolt
206 tensioning 9-Jun-14 4-Jul-14 12 Days COMPLETE
activities
during July
shutdown

To install DBB
Valves on CKB
207 10-Jun-14 24-Jun-14 1 WEEK COMPLETE
Production
Manifold
3rd party to
supervise the
16" valve
208 actuators 19-Jun-14 4-Jul-14 12 Days CANCEL
installation
during July
S/D

To overhaul
Snr. Orifice &
Tube
209 19-Jun-14 31-Aug-14 2 WEEKS COMPLETE
inspection at
metering
system
To replace
exisiting
cracked weld
210 19-Jun-14 21-Jul-14 2 WEEKS COMPLETE
neck flange &
reinstall spool
at CKA

To modify
cradle for sea
211 water lift 19-Jun-14 25-Jun-14 1 WEEK ON GOING
pump 4350

To preserve 8
212 nos of 16" 16-Jul-14 Jul/14 3 DAYS COMPLETE
metering
valve
To provide
213 scaffold at 17-Jul-14 22-Jul-14 7 days ON GOING
CKB B-7300

To perform
Passive Fire
Protection
214 21-Jul-14 2-Sep-14 14 days 0
(PFP)
application at
CCR roof

To supply and
fabricate add.
215 Beam support 22-Jul-14 22-Jul-14 1 WEEK COMPLETE
for monorail
load testing

To relocate
temporarily
discharge line
of wilden
216 pump from 22-Jul-14 22-Jul-14 1 WEEK 0
cellar deck to
new tie-in
point at upper
deck

To modify
existing Gre
piping for
additional
217 drop spool at 28-Jul-14 31-Jul-14 1 WEEK 0
inlet cooling
medium
coolers (CKP-
E-4580)
To erect
scaffolding
and assist
solar FSR to
218 4-Aug-14 29-Sep-14 1 WEEK 0
perform
engine and
RGB change
out

To provide
acces platform
219 4-Aug-14 21-Aug-14 2 WEEKS 0
at SGC 3 glass
window

To replace all
corroded and
worn out
220 grating on sea 4-Aug-14 Feb/15 4 WEEKS 0
deck area
( CKC
platform)

To paint black
and yellow
stripes at the
main beam
221 4-Aug-14 Feb/15 5 Weeks 0
boat landing
(CKB, CKC,
BMA, BLA and
SYA)

To fabricate
222 and install 4-Aug-14 Feb/15 2 WEEKS 0
pipe support

To replace
pipe spool on
223 pin hole 4-Aug-14 5-Aug-14 1 WEEK COMPLETE
leaking elbow
at CKP liquid
leg lines

Extension
224 platform for 6-Aug-14 16-Sep-14 6 WEEKS 0
VSAT antenna
at LQ CKP
Vessel
225 cleaning V- 28-Aug-14 29-Aug-14 1 WEEK COMPLETE
3702
Installation of
226 produce water 25-Aug-14 Dec/14 3 WEEKS 0
reinjection
well flowlines

To close the
ISO corner
227 holes of the 26-Aug-14 27-Aug-14 1 WEEK ON GOING
propane tank
skid (CKA-V-
4110C)

To assist well
services on
228 valves and 26-Aug-14 28-Aug-14 1 WEEK COMPLETE
blinds
installation

To remove
and reinstall
wellheads
229 chocke valve 28-Aug-14 Dec/14 4 WEEKS 0
(CKA/CKB/CKC
/SYA/BMA) for
inspection
purpose

To secure
transmitters
230 capillary tube 28-Aug-14 Dec/14 1 WEEK 0
with proper
support (CKP-
LIT-2003 and
CKP-LIT-2053)

Installation of
additional
231 R.O. water 31-Aug-14 Feb/15 2 WEEKS 0
maker at CKP-
XQ-6012

Crane exhaust
232 modification 31-Aug-14 Feb/15 2 WEEKS 0
at
BMA/BLA/SYA
233
TOTAL

NOS Amount
Total Work
Order Request
To Date 232 #REF!
Total Work
Order
Proposal #REF! #REF!

Total
Outstanding
Work Order
Proposal #REF! #REF!
Total Work
Order
Approved #REF! #REF!

Approved
Completed
Work Order
Amount 168 #REF!
Amount Work
Order On-
Going 20 #REF!
Total Work
Order Cancel 12
Total Work
Order Not Yet
Start 31
Variance
(Amount Can't
be Utilised) -