Comm ents:
Yes No
Yes No
Yes No
Strength: Age:
Comm ents:
Corrosion Shrinkage
Inhibitors? Yes No Reduction? Yes No
Other? Yes No
Comm ents:
Outline procedure to be followed and limitations that apply for measurement of concrete slump and
acceptance of con crete at the job site (wherever tests are taken):
Comm ents:
Yes No
Outline procedure to be followed and limitations that apply when water is added at job site.
Will addition of Super-plasticizer or Mid-Range be allowed for slump adjustment at job site?
Yes No
Comm ents:
Max Min.
If special measures are required to meet concrete temperatures, who will be responsible for
ordering them, since these are e xtra cost items (hot water, cold water, ice)?
Outline procedure to be followed and limitations that apply for measurement of concrete temperature and
acceptance of concrete at the job site:
I. Time Limits:
2. ORDERING PROCEDURES
E. Person on -site responsible for review ing delivery ticket prior to placem ent:
Yes No
cy / hr
Yes No
Yes No
Who is responsible for access for trucks and pump set up?
3. TESTING
A. Concrete su pplier will be on distribution list for all concrete test reports. Further distribution of reports
will be:
Frequency of samples:
Yes No
Target strength:
At what age:
Yes No
Yes No
Flexural tests:
Yes No
Yes No
C. Sampling and Testing will be provided by ACI Certified Personnel or equivalent. Testing
Laboratory will be certified to ASTM C 1077.
D. Specimens will be stored on-site for initial curing at 60 degrees F to 80 degrees F with protection
from moisture loss. Specimen will be transported to lab with protection from moisture loss.
Specimen will be removed from molds within 30 minutes of arrival at the lab. Specimens will be
cured until specified test age with proper temperature and moisture condition.
E. Who is responsible for providing specimen storage area and proper storage box?
W ho is responsible for protecting specimen s for the initial storage on-site for hot/cold weather?
1. Notification of low cylinder test to appropriate party including contractor and supplier.
2. Evaluation fo test results to be done per project specs or according to ACI 318, running average of 3.
4. Structural analysis.
G. Is there any concrete on this project that will be more than superficially wet when in service?
Yes No
H. Who will be responsible for payment of remedial testing costs if strength levels prove to meet or
exceed minimum requirements?
d. Floor tolerances:
Specification:
Who m easures?
When m easured?
e. Equipm ent:
Power:
Lighting:
Other:
2. Layout:
h. Weather protection
Hot weather:
Cold weather: