Area
87853 SQ KM
List of Renewable &Scenario of West Bengal : power to Profile and Energy Co-generation plants selling WBSEDCL :
West Bengal is located in the eastern region of India with an area of 87853of the km and 19 Sl. Name sq. Location No. districts. Entrepreneur West Bengal shares an international border with Haldia, Nepal, Bhutan and Bangladesh Dist 1. M/s Electro Steel Purbo Medinipur and is surrounded by Indian States namely, Sikkim, Assam, Dist M/s Neora Hydro Neora, 2. Ltd. Darjeeling Orissa, Jharkhand and Bihar. Main languages spoken in M/s. Nippon Lodhama, Dist: 3. West Bengal are Bengali, Hindi Power Limited Darjeeling and English. West Bengal is having a total population Mohan Dairy, 80.22 4. WBREDA million (2001 Census) Dist: Purulia with density of population of 904 per Sq.km.
WBSDA WBSEDCL
List of Renewable & Scenario of West Bengalexecuted PPA Profile and Energy Co-generation plants who : with WBSEDCL for sale of power:
West Bengal is located in the eastern region of India with an area ofName of the km and 19 87853 sq. Sl. Location districts. West Bengal shares No. Entrepreneur an international border with M/s. Kamarhatti Raina, Nepal, Bhutan and Bangladesh 1. Co. Ltd. and is surrounded by Dist: Burdwan Indian StatesM/s. Amrit Bionamely, Sikkim, Assam, Dist: Bankati, 2 Energy & Orissa, Jharkhand and Bihar. Bankura Industries Ltd. Main M/s. PCM Hydel spoken in languages West Bengal are Bengali,Chel-I, Dist Hindi 3. Power Darjeeling and English. West Bengal is Corporation Ltd. having a total population Chel-II, Dist 80.22 M/s. Shyam 4. millionEnergy Limited (2001 Census) Darjeeling with density M/s. Eastern of 904 per of population Chel-III, Dist Sq.km. Hydro Power 5.
Company Limited Darjeeling
WBSDA WBSEDCL
Protection :
Protection systems are to be provided by all entities as specified by STU. Requires to isolate the faulty equipment and protect the other equipments against all types of faults internal / external within specified fault clearance time with reliability, selectivity and sensitivity. Relay Setting Coordination shall be done by STU STU shall arrange periodic meeting with the entities to discuss coordination of protection.
WBSEDCL
WBSEDCL
Distribution line requirements: All 33 KV and 11 KV lines at connection point shall be provided with minimum of over current and earth fall protection with or without directional features as. Transformer requirements : For transformers of HV class differential protection shall be provided for 10 KVA and above. For transformers of 2.5 MVA to less than 10 MVA time lag over current, earth fault and instantaneous REF relays. All transformers of 2.5 MVA and above shall be provided with gas operated relays, winding temperature and oil temperature protection.
WBSEDCL
Communication:
Communication system between grid sub-station and generating station shall be developed by the developer at their cost Developers of co generation and renewable energy sources shall abide by all applicable codes, rules & regulations in regard to operational and commercial practices
WBSEDCL
Metering :
Ownership and responsibility of maintaining and testing of meter shall be mutually agreed between the entities and the STU. Minimum standard of accuracy of meter shall be of class 0.2 or as specified by STU. All CTs and PTs used for metering shall confirm to the BIS or standard of IEC.
WBSEDCL
Connection Agreement:
A connection agreement shall include (but may not be limited to), as appropriate, within its terms and conditions, the following: A condition requiring both parties to comply with WBEGC and Grid Code; The details of connection, technical requirements and commercial arrangements; The details of any capital expenditure arising from necessary reinforcement or extension of the system and demarcation of the same between the concerned parties;
WBSEDCL
WBSEDCL
Procedure to be followed for Co-generation & Renewable Energy Sources: After preliminary discussions with the buyer licensee, the developer shall submit full details of the projects alongwith cost data and financial charges and tariff for direct sale to the licensee. The buyer licensee shall examine the tariff proposal in the light of price reasonableness, impact on consumer tariff and the price cap specified in these regulations.
WBSEDCL
Procedure to be followed for Co-generation & Renewable Energy Sources: MOU / PPA shall be signed between developer and purchaser. In case of open access, the transmission and/orwheeling agency shall also be a party to the MOU / PPA. In the MOU / PPA with details of connectivity, completion of project and commencement of supply, periods of supply (month wise), time of supply (peak / off peak), technical & commercial obligation, security and modes of payment of each party, etc. in line with these regulations shall be suitably incorporated. The MOU / PPA, as agreed and signed, shall be submitted to the Commission.