MOUNTAIN VIEW ELEMENTARY SCHOOL

MASTER PLAN for the

ALBUQUERQUE PUBLIC SCHOOLS


NOVEMBER 2010

architects
PA A r c h i t e c t s

MASTER PLAN for the MOUNTAIN VIEW ELEMENTARY SCHOOL Albuquerque Public Schools
PLANNING COMMITTEE
APS Facilities Design & Construction Karen Alarid - Director Roldan Pasion - Staff Architect APS Capital Master Planning Kizito Wijenje - Director Mountain View Elementary School Sara Carrillo Principal Jesse Ontiveros Scott Herschberger Lisa P. Garcia Erin Day-Chesley Betty Jaramillo PA Architects Pat Affholter Principal Nancy Bartlett - Senior Project Manager

ALBUQUERQUE PUBLIC SCHOOLS CAPITAL MASTER PLAN


General Obligation fund February 02, 2010: Mountain View Elementary - $12,305,419 to Replace Older Buildings

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

TABLE OF CONTENTS:
A. B. C. D. E. F. G. EXECUTIVE SUMMARY MOUNTAIN VIEW ELEMENTARY CHALLENGES EXISTING CONDITIONS PROJECT PHASES PROGRAM STATEMENT OF PROBABLE CONSTRUCTION COST MASSING STUDIES

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

A. EXECUTIVE SUMMARY:
Mountain View Elementary is in need of a full facility replacement. PA Architects have observed significant challenges with failing construction, HVAC systems, site layout, acoustics, and security that require well-planned responses. We believe that constructing new buildings without relocating students and staff from the grounds is an important measure to save money for the school district. To achieve this, we recommend demolishing all buildings except for the kindergarten and gymnasium, and constructing new buildings in a three-phase plan. This process will include transitioning from old to new classrooms without interrupting the instruction process. We propose all new classrooms, administration offices, and cafeteria spaces. And, due to unsafe conditions caused by the nearby industrial surroundings (airport, railroad, diversion channel, and heavily trafficked 2nd Street) we propose a re-orientation of the facility on the site. The updated building layout/design, site drainage, pedestrian and vehicular circulation, and innovative building technologies will enhance the schools function and allow future growth in a cost-effective manner. KEY ELEMENTS OF THIS MASTER PLAN: Full operation of existing plant while new building(s) constructed. Demolish selected buildings (including 1909 building) to facilitate efficient land development. Regrade entire site to correct poor drainage and promote maximum land use. Construct complete utility upgrade and central plant to support existing and new construction. Address area noise pollution through careful acoustic design (building and site). Design facility with a single entry for improved security, control, and safety. Reorganize site with emphasis on site vehicle and pedestrian separation, safe drop off/pick up, and adequate transition to 2nd Street.

INTEGRATING AN ENERGY THEME INTO THE BUILDING DESIGN (subject to approval of M&O and FD+C APS) An enthalpy wheel acts as an air-to-air heat exchange system where intake air is conditioned with exhausted air through heat transfer. The aluminum enthalpy wheel contains a desiccant material that draws humidity out of the air while mixing air streams at slow rotation. During interior/exterior temperature differentials, intake air is pre-heated or pre-cooled in a mixing chamber with exhausted building air. With this system, the enthalpy wheel decreases the need for extensive air-conditioning whereby saving energy costs. In addition to the energy and cost savings, the enthalpy wheel is a visible educational tool for teaching the complexities of building systems, energy savings and air-movement. Incorporating the enthalpy wheel within visual access will provide an opportunity for students and visitors to experience building operation. This experience can be further enhanced by allowing students to power the system by manually turning the wheel.

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects

Mountain View Elementary School is located along Second Street in a neighborhood of residences and industrial businesses. Second Street is highly trafficked by semi-trucks, trains and passenger vehicles. The noise from the street in addition to jet airplanes flying overhead is a major acoustic distraction to the instruction process. The schools utilities and construction are outdated and require extensive renovation to meet current standards. Some walls of the school are deteriorated, cracked, and open to the elements. The majority of the classrooms are portable classroom buildings. Due to inefficient space utilization, the schools layout is confusing and lacks a clear sense of security. In the event of an emergency, students and staff would be required to travel outside and across the grounds to reach the health center or administration offices. Each individual building has its own heating and cooling system rather than an efficient consolidated system. The existing parking lot is undersized and serves parents, faculty, staff and school buses. Buses and passenger vehicles share travel lanes instead of separated routes. There are currently no covered walkways between all buildings.

2nd Str

eet (456

Fl ig ht P

B. MOUNTAIN VIEW ELEMENTARY CHALLENGES:

Railroad

0 mph)

PA A r c h i t e c t s

at h

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

2nd Stre
2

et

architects
PA A r c h i t e c t s

C. EXISTING CONDITIONS:
Site: ADA non-compliance Confusing parking lot layout Bus and vehicle traffic routes mixed No separate bus drop-off and parent dropoff areas No separated loading area for cafeteria No clear school entrance Surface ponding; poor drainage Noise pollution from flight path over adjacent highway

Permanent Classroom Buildings: Insufficient space for school population and programs Expensive to maintain or remodel to current APS construction and technology standards Failing construction and substandard building envelopes

Administration + Energy Plant: Lack of site control and security to classrooms and portable classroom buildings Undersized for staff size Outdated construction and HVAC systems

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

C. EXISTING CONDITIONS:
Landscape Play Area and Nature Area: Cannot be monitored visually Unsafe conditions for children to play Animals and insects in this area are a potential hazard

Portable Classroom Buildings: No ADA route from administration building and parking Poor site drainage and grading Limited control and viewlines from administration area Remote location from core school areas

1947 School Building: Outdated and failing construction Expensive to maintain or remodel to current APS construction and technology standards Undersized for school classroom needs Substandard building envelope; high energy consumption

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 1a:

Establish construction zones, extend bus-loop along Second Street, install temporary parking at playground

Due to the complexity and cost of re-locating students and staff, a proposed 3-phase construction schedule will allow Mountain View Elementary to conduct school throughout the duration of construction. Areas such as the parking lot and playground will be used for construction staging while classrooms, cafeteria and offices maintain normal operations.

Temporary Parking

EXISTING KINDERGARTEN BUILDING

Extend drop-off lane (temporary)

TEMPORARY PAVING/ USER ACCESS CONTRACTOR STAGING

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 1b:

Construct classrooms, administration, cafeteria/kitchen, art/music buildings.

kindergarten,

The proposed design groups all 1st-5th grade classrooms into a two-story building connected to a 1-story administration suite. A new kitchen/cafeteria and art/music classroom connects to the existing school gymnasium. Two new kindergarten and one pre-kindergarten classroom would be constructed adjacent to the existing kindergarten building.

Temporary Parking

EXISTING KINDERGARTEN BUILDING

Classrooms Admin. Media Center

K PK PK

Dining/ Art/ Music kitchen

Extend drop-off lane (temporary)

TEMPORARY PAVING/ USER ACCESS NEW CONSTRUCTION CONTRACTOR STAGING

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 2a:

Inhabit newly constructed buildings, begin demolition and removal of existing classroom, media center, all-purpose room, administration and portable buildings.

Scheduling classroom and office transitions will accommodate the instructional process while allowing students and staff to remain on site. Un-compromised portions of the school will not be demolished; included are the gymnasium and kindergarten buildings.

Temporary Parking

EXISTING KINDERGARTEN BUILDING

Classrooms Admin. Media Center

K PK PK
EXISTING GYM

Dining/ Art/ Music kitchen

Extend drop-off lane (temporary)

TEMPORARY PAVING NEW CONSTRUCTION BUILDINGS TO REMAIN BUILDINGS TO BE DEMOLISHED CONTRACTOR STAGING

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 2b:

Selective site demolition and grading.

With the assumption all new APS schools will pursue LEED Silver certification, specific energy saving design strategies will be considered. The design and area of the new buildings will allow for photo-voltaic panels on covered walkways, natural day-lighting, sun-control shading systems, and fresh-air conditioning via an enthalpy wheel. These systems used in conjunction with APS standards can greatly increase the energy savings of HVAC and lighting systems.

Temporary Parking

EXISTING KINDERGARTEN BUILDING

Classrooms Admin. Media Center

K PK PK

EXISTING GYM

Dining/ Art/ Music kitchen

Extend drop-off lane (temporary)

TEMPORARY PAVING NEW CONSTRUCTION BUILDINGS TO REMAIN CONTRACTOR STAGING

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 3a:

Begin layout of sitework: sidewalks, landscaping, parking, bus and parent drop-off zones.

The paving design provides independent areas for vehicle parking, kitchen loading zone, parent drop-off and bus drop-off areas. By placing the administration offices in the center, all visitors to the school can be checked in while visual access and security are maintained. Strategic open space is provided for construction of future classrooms and would have minimal interruption to normal school processes.

kinder drop-o

ff

Exist Kinder Admin. Media Center

Classrooms

PK PK

Art/ Music

Dining/ kitchen
bu
service

sd

Pa
rop -of f

ASPHALT PAVING NEW CONSTRUCTION BUILDINGS TO REMAIN Teacher parking

ren

Exist Gym

td

rop

-of f

Mel C. Aragon Head-Start

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

architects
PA A r c h i t e c t s

D. PHASE 3b:

Construction and site work complete.

The design includes an acoustic buffer zone between Second Street and the buildings. The courtyard and parking lot set the school away from street noise also providing an attractive landscaped entry. Kindergarten-aged students will have a separated bus drop-off zone for safe passage to and from school. Noisy areas such as the cafeteria and music room have been grouped separately from instructional or quiet areas.

Fu tu re C R E xist K in d e r K PK PK E xist G ym P la y Fie ld M u sic 2 0 C la ssro o m s (2 sto ry)

A d m in M e d ia ce n te r P la y co u rt

P la y co u rt V isito r P a rkin g

K itch e n / D in in g

P la y E q u ip

S e rvice

ASPHALT PAVING NEW CONSTRUCTION BUILDINGS TO REMAIN SIDEWALK PAVING / CURBS LANDSCAPING COVERED WALKWAY

Re sid e n tia l

Te a ch e r P a rkin g

Head S ta rt

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

10

architects
PA A r c h i t e c t s

E. PROGRAM:
Outline of Spaces

At its present size, Mountain View Elementary is undersized for its student population. Records show annual growth since the 2006-2007 school year with future growth anticipated. The proposed school design responds to current classroom needs using Albuquerque Public Schools Elementary School Planning Standards published July 2010. Future expansion of classroom or instructional spaces can be accommodated to the western side of the kindergarten building. SPACE (New Construction) FIRST-FIFTH GRADE CLASSROOMS: C & D-LEVEL CLASSROOMS: SPECIAL ED. CLASSROOMS: KINDERGARTEN CLASSROOM: PRE-K CLASSROOMS: MEDIA CENTER / LIBRARY: COMPUTER LEARNING CENTER: ART/MUSIC CLASSROOM: KITCHEN/CAFETERIA: HEALTH CENTER: TEACHER LOUNGE : TEACHER WORKROOM: ADMINISTRATION OFFICES: QUANTITY 20 2 9 1 2 1 2 1 1 1 1 1 1 AREA TOTAL AREA

840 sq ft 16,800 sq ft 840 sq ft 1,680 sq ft 280 sq ft 2,520 sq ft 1,200 sq ft 1,200 sq ft 900 sq ft 1,800 sq ft 3,900 sq ft 3,900 sq ft 1,000 sq ft 2,000 sq ft 1,240 sq ft 1,240 sq ft 4,700 sq ft 4,700 sq ft 800 sq ft 800 sq ft 850 sq ft 850 sq ft 850 sq ft 850 sq ft 4,500 sq ft 4,500 sq ft TOTAL NET ASSIGNABLE 42,840 sq ft TARE AT 70% EFFICIENCY 18,360 sq ft GROSS SQUARE FEET PROPOSED 61,200 sq ft

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

11

12400 Menaul, N.E. Suite 130 Albuquerque, New Mexico 87112 Phone: (505) 275-3890 Fax: (505) 234-1633 Statement of Probable Construction Cost
Project Name : Mountain View Elementary Master Plan Project Number: 08017.3 Estimator: PA Architects Basis of Estimate: Budget Preliminary Final Description DEMOLITION Building Demolition Site Demolition SITE WORK Site Grading Paving Landscaping Temporary Parking Temporary Parking Removal Utility Extension Portable Classroom Removal Only NEW CONSTRUCTION Admin, Classrooms, Cafeteria, Library PROJECT PHASING Mobilization Cost (phasing 16 mo) Quan 30,000 200,000 Date : August 2010 Checked by: Page : 1 of total cost Cost per Total Cost $10.00 $3.00 $300,000.00 $600,000.00

PA Architects

1 Total Cost $300,000.00 $600,000.00

200,000 100,000 35,000 35,000 12

$1.50 $15.00 LS $3.00 $1.50 LS $3,255.00

$300,000.00 $1,500,000.00 $80,000.00 $105,000.00 $52,500.00 $250,000.00 $39,060.00

$300,000.00 $1,500,000.00 $80,000.00 $105,000.00 $52,500.00 $250,000.00 $39,060.00

61,200

$190.00

$11,628,000.00

$11,628,000.00

LS

$175,000.00

$175,000.00

NOTE: Scope of work does not include furniture, fixtures and equipment.

Totals

Material:

$14,129,560.00

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

12

architects
PA A r c h i t e c t s

G. MASSING STUDIES:

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

13

architects
PA A r c h i t e c t s

G. MASSING STUDIES:

New Classroom and Administration Buildings MOUNTAIN VIEW ELEMENTARY SCHOOL Albuquerque Public Schools

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

14

architects
PA A r c h i t e c t s

G. MASSING STUDIES:

New Classroom and Administration Buildings MOUNTAIN VIEW ELEMENTARY SCHOOL Albuquerque Public Schools

MOUNTAIN VIEW ELEMENTARY MASTER PLAN

15

Vous aimerez peut-être aussi