Well wise concrete total quantity breakups ( C

Well Curb Well steining Required Bottom plug Sand filling Top plug
Well no
( cum) ( cum) Sinking (m) (cum) (cum) (cum)

A-1 241.133 4270.2736 48.088 432 1188.312 14.786


P-1 241.133 3883.28 40.304 518 877.932 14.786
P-2 241.133 2638.7068 29.146 432 715.352 14.786
P-3 241.133 2638.7068 29.356 432 715.352 14.786
P-4 241.133 2658.8496 29.568 432 715.352 14.786
P-5 241.133 2986.1701 33.536 432 715.352 14.786
P-6 241.133 2643.743 30.273 437 759.514 14.786
P-7 241.133 2417.136 28.862 433 688.156 14.786
P-8 241.133 2402.029 30.299 438 686.885 14.786
P-9 241.133 2668.921 33.002 514 763.564 14.786
P-10 241.133 2543.029 32.102 553 727.796 14.786
P-11 241.133 2668.921 34.716 438 764.392 14.786
P-12 241.133 2935.8131 35.889 432.5 804.032 14.786
P-13 241.133 3469.5973 39.621 432 1099.632 14.786
A-2 241.133 4773.8436 53.529 432 1365.672 14.786
Total 3616.995 45599.0199 528.291 6787.5 12587.295 221.79

Well wise concrete quantity breaku

Well no Well Curb Well steining Sinking done Bottom plug Sand filling Top plug
( cum) ( cum) (m) (cum) (cum) (cum)
A-1 241.133 4270.2736 41.224
P-1 241.133 3883.28 40.304 518
P-2 241.133 2638.7068 29.146 431 715.352 14.786
P-3 241.133 2638.7068 29.356 431 715.352 14.786
P-4 241.133 2658.8496 29.568 433 762.9576 14.786
P-5 241.133 2986.1701 33.536 431 823.5245 14.786
P-6 241.133 2643.743 30.273 437 759.514 14.786
P-7 241.133 2417.136 28.862 432 688.156 14.786
P-8 241.133 2402.029 30.299 438 686.885 14.786
P-9 241.133 2668.921 33.002 516 763.564 14.786
P-10 241.133 2543.029 32.102 553 727.796 14.786
P-11 241.133 2668.921 34.716 438 764.392 14.786
P-12 241.133 2935.8131 35.889 433 838.3095 14.786
P-13 241.133 3469.5973 39.621 434 995.0978 14.786
A-2 241.133 4773.8436 53.529 432 1365.672 14.786
Total 3616.995 45599.0199 521.427 6357 10606.5724 192.218

Type of
S. NO Required completed % complete
structure
1 Well curb 3616.995 3616.995 100
2 Steining 45458.019 45065.235 100
3 Sinking 515.939 514.242 98.701
4 Bottom plug 6701.5 5839 93.657
5 Sand filling 12587.295 10606.572 84.26
6 Top plug 221.85 192.218 86.67
7 well cap 4462.289 3517.716 86.13
8 Pier shaft 7245.48677 4039.395 61.64
9 Tie beam 221.932 103.61 50.00
10 Pier cap 2325.73 863.45 37.126
Bearing
11 27.93 9.93 35.55
pedestal
12 OHE mast 26 33.33
platform 78
13 OHE mast 97.2 32.4 33.33
Inspection
14 82.777 29.545 35.6922816724
platform

70766.6509 CUM 65146.9019 CUM


% progress of chambal bridge 92.059 %
tal quantity breakups ( CHAMBAL BRIDGE 1282/1)

Well cap Pier shaft Pier cap/Bed Bearing OHE


Tie beam OHE MAST
( cum) (cum) block pedestal platform

325.715 183 18.6 40.38 1.056 5.2 6.48


293.143 433.554 14.786 172.69 1.986 5.2 6.48
293.143 579.245 14.786 172.69 1.986 5.2 6.48
293.143 579.691 14.786 172.69 1.986 5.2 6.48
293.143 583.084 14.786 172.69 1.986 5.2 6.48
293.143 594.856 14.786 172.69 1.986 5.2 6.48
293.143 594.304 14.786 172.69 1.986 5.2 6.48
293.143 587.156 14.786 172.69 1.986 5.2 6.48
293.143 602.788 14.786 172.69 1.986 5.2 6.48
293.143 554.96 14.786 172.69 1.986 5.2 6.48
293.143 534.365 14.786 172.69 1.986 5.2 6.48
293.143 532.223 14.786 172.69 1.986 5.2 6.48
293.143 462.187 14.786 172.69 1.986 5.2 6.48
293.143 281.075 7.3 172.69 1.986 5.2 6.48
325.715 143 18.6 40.38 1.056 5.2 6.48
4462.289 7245.488 221.932 2325.73 27.93 78 97.2

oncrete quantity breakups ( Completed )

Bearing OHE
Well cap Pier shaft Pier cap OHE MAST
pedestal platform
( cum) (cum) Tie beam

293.143
293.143
293.143 197.253
293.143 284.214 7.42
293.143 415.716 7.42
293.143 587.156 14.786
293.143 602.788 14.786
293.143 554.96 14.786 172.69 1.986 5.2 6.48
293.143 534.365 14.786 172.69 1.986 5.2 6.48
293.143 532.223 14.786 172.69 1.986 5.2 6.48
293.143 462.187 14.786 172.69 1.986 5.2 6.48
293.143 281.075 7.42 172.69 1.986 5.2 6.48
325.715 14
3843.431 4465.937 110.976 863.45 9.93 26 32.4
inspection
platform

2.98
5.909
5.909
5.909
5.909
5.909
5.909 'file:///conversion/tmp/activity_task_scratch/602941916.xlsx'#$% progress of chambal bridge
5.909
5.909
5.909
5.909
5.909
5.909
5.909
2.98
82.777

inspection
platform

5.909
5.909
5.909
5.909
5.909
29.545
chambal bridge