Vous êtes sur la page 1sur 1

1 2 3 4 5 6 7 1 2 3 4 5 6 7

5.51 6.52 5.69 5.69


1 5.69 5.69
0.50

5.51 6.52 5.69 5.69 5.69 5.69


1.15
E 1.30
P1 V1 P1 V1 P1 V1 P1 V1 V3 P1 E P1 P1 P1 P1 V3 P1

BN(25x25)
1 V2 G

L1 (30x45)
BN (25x25)

L1 (30x45)
4.40

L1 (30x45)

L1 (30x45)

V2

BN (25x25)
V2 V2
0.5

V1

B23 (30x50)

B24 (30x50)

B25 (30x45)

B26 (30x45)
V2
0

V2

4.40
1 V1 V2 V2
V2
1.15
D 1
L1 (30x45)
D
0.80

1.10
V3 V3 P1 B9 (30x35)
L1 (30x45) L1 (30x45) L1 (30x45) L1 (30x45)

0.80
C P1 P2 P2 P2 B5 (30x40) B6 (30x35) B7 (30x35) B8 (30x35)
V3 V3 P1
MASSIF MASSIF MASSIF 1 1
C P1 P2 P2 P2
V1
L1 (30x45)

L1 (30x45)
L1 (30x45)

L1 (30x45)
L1 (30x45)

RADIER
4.40

B29 (30x50)

B30 (30x50)

B31 (30x50)

B32 (30x50)

B33 (30x50)
45 cm V1

4.40
0.40 20+5
BN (25x25) BN (25x25)
B L1 (30x45) L1 (30x45) L1 (30x45) L1 (30x45) L1 (30x45) L1 (30x45)
P1 P2 P2 P2 P3 P3 P1 B B10 (30x35) B11 (30x40) B12 (30x35) B13 (30x35) B14 (30x45) B15 (30x45)
MASSIF MASSIF MASSIF MASSIF MASSIF P1 P2 P2 P2 P3 P3 P1

V1
L1 (30x45)
L1 (30x45)

DP DP
L1 (30x45)
L1 (30x45)

L1 (30x45)

B36 (30x50)

B37 (30x50)

B38 (30x50)

B39 (30x50)

B40 (30x60)
25 cm 25 cm
5.91

V1
1 1

5.91
1

P1 V1 P1 V1 P1 V1 P1 V1 P1 V1 P1 V1 P1
A P1 P1 P1 P1 P1 P1 P1
A
0.50

FONDATIONS PLANCHER HAUT SOUS/SOL

1 2 3 4 5 6 7 1 2 3 4 5 6 7
5.51 6.52 5.69 5.69 5.69 5.69 5.51 6.52 5.69 5.69 5.69 5.69

E B1 (30x35) B2 (30x35) B3 (30x35) B4 (30x35) E B1 (30x35) B2 (30x35) B3 (30x35) B4 (30x35)


P1 P1 P1 P1 V3 P1 P1 P1 P1 P1 P1
BN(25x25)

BN(25x25)
G G
BN (25x25) BN (25x25)
V2
BN (25x25)
BN (25x25)

B24 (30x50)

B25 (30x45)

B26 (30x45)

B27 (30x45)

B23 (30x50)

B24 (30x50)

B25 (30x50)

B26 (30x50)

B27 (30x45)
)
4.40

4.40

DP V2 0x
50
50
) 20 V2 2 (3
0x V2 B2 BN (25x25)
2 (3
B2

BN(25x25)

BN(25x25)
Exécutoire de
désenfumage

D D
1m x 1m
B9 (30x35) B9 (30x35)
BN (25x25)
0.80

0.80

V3 V3 P1 V3 P1
C1 (30x30) B7 (30x35) B8 (30x35) B5 (30x40) B6 (30x35) B7 (30x35) B8 (30x35)
C P1 P2 P2 P2 C P2a P2 P2a P2a

)
45
BN (25x25)

0x
B31 (30x50)

B32 (30x50)

B33 (30x50)

B34 (30x45)

B29 (30x50)

B30 (30x50)

B31 (30x50)

B32 (30x50)

B33 (30x50)

B34 (30x45)
) DP (3
4.40

4.40

45 8
0x 20 B2
8 (3
B2 20+5 20+5

B C1 (30x30) B13 (30x35) B14 (30x35) B15 (30x35) B B10 (30x35) B11 (30x40) B12 (30x35) B13 (30x35) B14 (30x35) B15 (30x35)
P1 P2 P2 P2 P2 P2 P1 P1 P2 P2 P2a P2 P2a P1
BN (25x25)

B38 (30x50)

B39 (30x50)

B40 (30x50)

B41 (30x45)

B35 (30x45)

B38 (30x50)

B39 (30x50)

B40 (30x50)

B41 (30x45)
B36 (30x50)

B37 (30x50)

DP
B35 (30x35)
5.91

5.91

20

P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
A B16 (30x35) B17 (30x40) B18 (30x35) B19 (30x35) B20 (30x35) B21 (30x35) A B16 (30x35) B17 (30x40) B18 (30x35) B19 (30x35) B20 (30x35) B21 (30x35)

PLANCHER MEZZANINE PLANCHER HAUT REZ DE CHAUSSEE

AUVENT: FOSSE A HUILE: 0.50


C OUP E 1/1 DETAI L : LONGRINES

Ra die r de 45cm
DETAI L : VOILE V1 DETAI L : ESCALIERS

HA1 2 e =15 cm
HA1 0 e =15 cm
DETAI L : DALLAGE PISTE

T 8 e=15 cm
0.30

3T 14
T 14e= 15 é pi n. T6
1.20
T 12e= 15 B CIMENT e=23cm

P1
4T12 PH SOUS SOL e =30
3T 14 Ca d.+é tr HA1 0 e =15 cm B MAIGRE e=12cm
T14e =15 T 8e =15
45

HA1 0 e =15 cm GNF 1 e=25cm


POUTRE
Etanchéité vertica le 3T 14
HA1 2 e =15 cm

c ad.T 6 e=15
10

CF1 e=40cm
Sens X : 8HA14 e=15cm
0.80 COUPE D/D
1.20

1.20

10 25 10 3T 14

1 2 1 2 V1= 30 cm
HA1 0 e =15 cm
HA1 0 e =15 cm

T 10e =15
HA1 2 e =15 cm DETAI L : S TR UC TURE VOIRIE

Sens Y : 8HA14 e=15cm


DETAI L : M AS S IF EN BETON DETAI L : VOILE V2
1.20 POUTRE
HA1 0 e =15 cm
30
0.15

0.40 EB e= 0.6cm
GBB e=10 cm
é pin.T6e=30 HA1 0 e =15 cm

5.094 RA D IER
T 12e= 15 T 14e= 15 é pi n. T 6 e=30

P1 P1 P1 P1
GNF 1 e= 40 cm
HA1 2 e =15 cm

Radie r de 45cm Cha ise T 10 4/m²


L 1 30X45 CF1 e=50cm
T 14e=15
3T 14

4 Cad HA8 e=7cm


2.50

3T 14 Ca d.+é tr PTR

B B 11 HA 16 e=10cm
T 14e=15 T 8e =15 A A
1.00

1.00

é pin.T6e=20
0.09

3T 14
5 Cad HA8 e=10cm

L1 (40x80)
2 cl és Ø32 /lg =9 50mm
2 Clés D32/lg=950mm
1.45

L1 (40x80)
3 Cad HA8 e=5cm Béton de propre té DETAI L : ACROTERE DETAI L : JARDINIERE DETAI L : TALUS
DETAI L : VOILE V3
0.00 T 14 e=15
0.76

10
0.70
0.25

G ros béton HA8 E = 15CM


Géogrille accroche terre 50x50 e=30cm
1.00

1.00

1.00

0.15 0.46 0.15


HA8 E = 15CM
0.30

C OUP E A/A
0.20 0.40 0.20
Remblais en CF1
Béton de propre té 1 5cm 1 5cm
T 14e=15 Niv eau Plan cher
0.70

0.45
é pi n. T6

0.15 0.60
T 12e= 15

1.70
e =30

0.20 0.20 1.70 0.10 0.10 1.70 0.40 Remblais en T.V. 0/100

0.40
1.20 18HA16
4.00 T8e=15
POUTRE
0.30 0.46
0.20

Gabionnage
0.20
30x10

3.00

136HA12 L=2.65 T10e=15

0.60
0.25

D
0.20

Massif GB Massif GB D
L1 (40x80)

L1 (40x80)

(0.80x0.80x0.80) (0.80x0.80x0.80)
2.25

0.60

3.05
8.20

T12e=15 T12e=15

T8e=20 T8e=20

étr .T6e=40 étr .T6e=40


0.20

L1 (40 x 80)
0.15

T10e=15 T10e=15
0.20
18.00

2 X4T14
Lit de Gravier
0.80

Epin.T6
2T10
66x15

10.00

(e=15)
2T10 C+etT6
(e=15)

2 X4T14

P1 P1 P1 P1
L1 (40x80) L1 (40x80) 0.40
A A
40x10

4.00

0.80

TOTEM :
10.90

0.30 10.30 0.30


FOSSE CITERNES:
A C 3.10
COUPE A/A COUPE B/B COUPE C/C
1.05
0.30

0.30

7.42 10.90 5.42 1.00


1.05 1.05
1.00
3.10

0.30 6.82 0.30 0.30 10.30 0.30 0.30 4.82 0.30


T12e=15 T10e=15 T12e=15 T10e=15 T12e=15
0.30

0.30

0.30

0.30

1.05

T16e=15 T10e=15 T16e=15 T10e=15 T10e=15 T16e=15


5.42
4.82

T10e=15 T10e=15

T12e=15 T12e=15
2.85
3.45

T10e=15 T10e=15 T10e=15 T10e=15


4.05

3.45

4.05

3.45

4.05

3.45
7.42

6.82

B DBA B T12e=15 T12e=15 T12e=15 T12e=15 COFFRAGE Semelle type CM


e=30
T12e=15
0.34
0.30

T10e=15 T12e=15 Chaise T10- 4/m² T12e=15 T10e=15 T10e=15 T12e=15


0.30

Lit de Gravier
0.30

0.30

0.30

9HA8
0.09

0.05
0.66

C 9HA14
1.00

Lit de Gravier
0.30 8.40 0.30 1.60 0.30 Lit de Gravier
24HA12 24HA12

9.00 1.90
0.60

0.60

0.10
0.30

A G RO S BÉTO N JU SQ U' À BON SOL. 24HA12 24HA12 G RO S BÉTO N JU SQ U' À BON SOL.

0.30 5.30 0.30 4.70 0.30

10.90

Vous aimerez peut-être aussi