Vous êtes sur la page 1sur 37

Western LRT Corridor Planning and Environmental Assessment Study y

Ottawa Forest and Green Space Advisory Committee 30 May 2011

PresentationAgenda Presentation Agenda


StudyOverview y TMPRapidTransitNetwork CorridorsOverview CorridorsEvaluation PublicConsultation

StudyOverview

TMPRapidTransitNetwork

RegionalandLocalNeeds Regional and Local Needs

Internal Trips External Trips

PrimaryCorridors Primary Corridors


Higherspeed Stationsfurtherapart(800 2000m) Substantialstationfacilities Supportsnodaldevelopment FullyexclusiveROW

SupplementaryCorridors Supplementary Corridors


Lowerspeed Stationsclosertogether(400 800m) Simplerstationfacilities Supportslineardevelopment Partially exclusiveROW Partiallyexclusive ROW

NetworkImplications: y PrimaryCorridorintheNorth

NetworkImplications: CarlingasPrimaryCorridor Carling as Primary Corridor

NetworkImplications: Hybrid Primary Corridor HybridPrimaryCorridor

10

11

OperationalRequirementsforWLRTC Operational Requirements for WLRTC


Capacity p y TrainOperations GradeSeparation DesignStandards

12

CorridorsConsidered Corridors Considered

13

PreliminaryScreeningofCorridors Preliminary Screening of Corridors


FatalflawanalysisofAlternativeCorridors y
Basedprimarilyonfeasibility/constructability Alsoconsideredothershowstopperissues

14

Carling
Tweedsmuir/Hydro Churchill OTrain Broadview Kirkwood

IslandPark

Holland

AlternativesScreenedOut: Alternatives Screened Out: Broadview Tweedsmuir/Hydro IslandPark Island Park Holland

15

Carling OptionsCarriedForward Carling Options Carried Forward

OTrain Churchill Kirkwood

16

Richmond/Byron
RochesterField Cleary Laneway/ORP Richmond Churchill

McRae

Woodroffe/Carling

Alternativesscreenedout: ChurchillviaRichmond McRaeviaRichmond McRae via Byron McRaeviaByron ORP/Laneway

17

Richmond/Byron OptionsCarriedForward Richmond/Byron Options Carried Forward


RochesterField Cleary Churchill(viaByron)

Richmond

Woodroffe/Carling CarlingSupplementaryLine Carling S pplementar Line

18

OttawaRiverParkway Ottawa River Parkway

PrimaryLine

CarlingSupplementaryLine

19

OttawaRiverParkway OptionCarriedForward Ottawa River Parkway Option Carried Forward


RochesterField ReuseExistingLanes Cleary Churchill(viaByron)

Richmond

Woodroffe/Carling CarlingSupplementaryLine Carling S pplementar Line

20

DevelopmentofConceptualCorridorAlignments Development of Conceptual Corridor Alignments


Studyteamhasdevelopedalignmentoptionsforcorridors y p g p carriedforwardfrompreliminaryscreening Multipleoptionsforsomealignmentswillneedtobe evaluated(e.g.atgradeandunderground) l t d( t d d d d) Additionalissuestobeaddressedatdesignstage:
Station location and layout Stationlocationandlayout PinecrestCreekcorridorsegmentdesign(gradeseparations, QueenswayStation)

21

CarlingviaOTrain g

22

CarlingviaKirkwood Carling via Kirkwood

23

CarlingviaChurchill Carling via Churchill

24

Carling Carling Concepts

25

Richmond/ByronviaChurchill Richmond/Byron via Churchill

26

Richmond/ByronviaChurchill Richmond/Byron via Churchill

27

Richmond/ByronviaRochesterField Richmond/Byron via Rochester Field

28

Richmond/ByronviaRochesterField Richmond/Byron via Rochester Field

29

Richmond/ByronviaCleary/ORP Richmond/Byron via Cleary/ORP

30

Richmond/ByronviaCleary/ORP Richmond/Byron via Cleary/ORP

31

Richmond/Byron Richmond/Byron Concepts

32

OttawaRiverParkway Ottawa River Parkway

33

OttawaRiverParkway Ottawa River Parkway Concepts

34

CorridorEvaluationCriteria
PromoteSmartGrowth CompatibilitywithAdjacentCommunities ProtectHistorical,CulturalandArchaeologicalResources CreateSuccessfulRapidTransitStations ProvideaSafeFacility IncreaseRidership,MobilityandCapacity I Rid hi M bilit dC it MaximizeSensitivitytoNaturalEnvironment ApplySustainableDesignBestPractices Apply Sustainable Design Best Practices WisePublicInvestment

34

35

PreliminaryCriteriaWeightingResults Preliminary Criteria Weighting Results


Criteria Category Promote Smart Growth Compatibility with Adjacent Communities Protect Historical Cultural and Archaeological Historical, Resources Create Successful Rapid Transit Stations Provide a Safe Facility Increase Ridership, Mobility and Capacity Maximize Sensitivity to Natural Environment Apply Sustainable Design Best Practices Wise Public Investment Study Team 11.21 13.04 10.39 12.07 6.50 13.79 8.32 6.93 17.75 ACG 13.62 10.75 9.58 10.32 9.71 11.94 13.17 10.50 10.42 PCG 12.23 14.09 12.36 13.05 7.27 12.32 11.05 9.14 8.50 BCG 11.25 10.00 6.75 20.75 9.50 16.75 5.75 4.75 14.50 Blended 12.08 11.97 9.77 14.05 8.25 13.70 9.57 7.83 12.79

36

PublicConsultation
ACG/BCG/PCG ACG/BCG/PCG Planningworkshop POH#1 JointACG/BCG/PCGmeeting (3meetingsto date) (3 meetings todate) (September,2010) (November2010) (March2011)

ACG/BCG/PCG POH #2 POH#2 TransportationCommittee

(Evaluationresults) (Evaluationresults) (Evaluation results) (TechnicallyPreferredCorridor)

37