Vous êtes sur la page 1sur 7

Date Taille Secteur Nature Tonnage Mn Tonnage RM Volume RC Déb 1 Déb 2 Déb 3 Déblayage Dumper SDC 670 SDC

Déb 2 Déb 3 Déblayage Dumper SDC 670 SDC 1030 Bure 5 Exhaure
Mon 01-08 P7N 1120 1147 Panneau 1200 RC 0.0 100 0.0 150 TC Amont 640 Amont 640
Mon 01-08 P0S 1147 Panneau 1200 SNA 522.0 264 144 192 600.0 322.0 200.0 TN 240 Amont 640 Amont 640
Mon 01-08 S6/7N 1147 Panneau 1200 SNA 320.0 200 168 368.0 160.0 160.0 Traçage 400S Amont 640 Amont 640
Mon 01-08 P7S 980 Panneau 1000 SNA 753.0 320 200 320 840.0 753.0 420S Amont 640 Amont 640
Mon 01-08 P6S 960 Panneau 1000 SNA 160.0 160 160.0 160.0 TS 520 Amont 640 Amont 640
Mon 01-08 720TC Panneau 840 TMR 0.0 237 0.0 TS 520 TCS Amont 640 Amont 640
Mon 01-08 TS 520 Amont 640 Amont 640 206.0 240 240.0 206.0 TS 640 Amont 640 Amont 640
Mon 01-08 P2 702 BC Panneau 840 SNA 634.0 384 400 784.0 634.0 TS 700 Amont 640 Amont 640
Tue 02-08 P0S 1147 Panneau 1200 SNA 336.0 224 rapport 224.0 262.0 74.0
Tue 02-08 S6/7N 1147 Panneau 1200 SNA 316.0 272 272.0 150.0 166.0 TN 707 Panneau 840 TMR
Tue 02-08 P7N 1120 1147 Panneau 1200 RC 0.0 440 0.0 720TC Panneau 840 TMR
Tue 02-08 P7S 980 Panneau 1000 SNA 200.0 160 64 224.0 200.0 P14N 726 Panneau 840 TMR
Tue 02-08 P6S 960 Panneau 1000 SNA 543.0 200 272 168 640.0 543.0 P2 702 BC Panneau 840 SNA
Tue 02-08 P2 702 BC Panneau 840 SNA 532.5 168 144 320 632.0 532.5 730 P3N Panneau 840 SNA
Tue 02-08 P5S 1018 Panneau 1075 SNA 90.0 24 80 104.0 90.0
Tue 02-08 TS 520 Amont 640 Amont 640 24.0 192 192.0 24.0 P12N 840 Panneau 1000 SNA
Tue 02-08 720TC Panneau 840 TMR 0.0 222 0.0 P6S 960 Panneau 1000 SNA
Wed 03-08 P6S 960 Panneau 1000 SNA 752.0 216 360 224 800.0 752.0 P7S 980 Panneau 1000 SNA
Wed 03-08 P7S 980 Panneau 1000 SNA 150.0 80 120 200.0 150.0 P5S 940 traçage Panneau 1000 SNA
Wed 03-08 P2 702 BC Panneau 840 SNA 785.0 152 288 368 808.0 785.0
Wed 03-08 P0S 1147 Panneau 1200 SNA 603.0 312 312.0 303.0 300.0 P8S 1045 traçage Panneau 1075 SNA
Wed 03-08 P5S 1018 Panneau 1075 SNA 325.0 200 160 360.0 325.0 P7S 1045 1075 Panneau 1075 SNA
Wed 03-08 720TC Panneau 840 TMR 0.0 180 0.0 S3/4S 1045 Panneau 1075 SNA
Wed 03-08 TS 520 Amont 640 Amont 640 97.0 0.0 97.0 P5S 1018 Panneau 1075 SNA
Wed 03-08 P7N 1120 1147 Panneau 1200 RC 0.0 140 0.0
Thu 04-08 P7N 1120 1147 Panneau 1200 RC 0.0 470 0.0 P8N 1120 1147 Panneau 1200 SNA
Thu 04-08 P7S 980 Panneau 1000 SNA 64.0 64 64.0 64.0 P0N 1120/1147 Panneau 1200 SNA
Thu 04-08 P6S 960 Panneau 1000 SNA 723.0 216 352 320 888.0 751.0 P0N 1090/1120 Panneau 1200 SNA
Thu 04-08 TS 520 Amont 640 Amont 640 0.0 348 0.0 S6/7N 1120 Panneau 1200 SNA
Thu 04-08 P0S 1147 Panneau 1200 SNA 401.0 80 216 296 592.0 77.0 345.0 S6/7N 1147 Panneau 1200 SNA
Thu 04-08 S6/7N 1147 Panneau 1200 SNA 238.0 96 136 64 296.0 238.0 P0S 1147 Panneau 1200 SNA
Thu 04-08 P2 702 BC Panneau 840 SNA 474.5 136 160 272 568.0 497.5 S4/5N 1147 Panneau 1200 SNA
Thu 04-08 720TC Panneau 840 TMR 0.0 252 0.0 S5/6N 1147 Panneau 1200 SNA
Thu 04-08 TS 700 Amont 640 Amont 640 269.0 192 96 288.0 269.0 P7N 1120 1147 Panneau 1200 RC
Thu 04-08 P5S 1018 Panneau 1075 SNA 160.0 160 160.0 160.0 P6N 1120 Panneau 1200 SNA
Fri 05-08 720TC Panneau 840 TMR 96.0 96 32 128.0 96.0 P7N 1120 Panneau 1200 SNA
Fri 05-08 TS 640 Amont 640 Amont 640 40.0 30 30.0 40.0
Fri 05-08 TS 700 Amont 640 Amont 640 368.0 192 240 432.0 368.0
Fri 05-08 TS 520 Amont 640 Amont 640 0.0 168 0.0
Fri 05-08 P7S 980 Panneau 1000 SNA 342.0 400 400.0 342.0
Fri 05-08 P6S 960 Panneau 1000 SNA 259.0 80 304 384.0 259.0
Fri 05-08 150 TC Amont 640 Amont 640 0.0 477 0.0
Fri 05-08 P5S 1018 Panneau 1075 SNA 515.0 384 192 576.0 515.0
Fri 05-08 P0S 1147 Panneau 1200 SNA 320.0 288 288.0 129.0 191.0
Fri 05-08 S6/7N 1147 Panneau 1200 SNA 64.0 64 64.0 64.0
Sat 06-08 P6S 960 Panneau 1000 SNA 903.0 264 360 400 1024.0 903.0
Sat 06-08 P7S 980 Panneau 1000 SNA 160.0 160 160.0 160.0
Sat 06-08 P5S 1018 Panneau 1075 SNA 58.0 32 32.0 58.0
Sat 06-08 150 TC Amont 640 Amont 640 0.0 378 0.0
Sat 06-08 S4/5N 1147 Panneau 1200 SNA 259.0 240 240.0 128.0 131.0
Sat 06-08 P0S 1147 Panneau 1200 SNA 242.0 72 128 24 224.0 119.0 123.0
Sat 06-08 S5/6N 1147 Panneau 1200 SNA 328.0 48 256 304.0 162.0 166.0
Sat 06-08 TS 700 Amont 640 Amont 640 72.0 48 48.0 72.0
Sat 06-08 TN 240 Amont 640 Amont 640 217.3 48 72 120.0 26.78 190.5
Sat 06-08 TS 520 Amont 640 Amont 640 0.0 330 0.0
Sun 07-08 P6S 960 Panneau 1000 SNA 772.0 240 416 400 1056.0 786.0
Sun 07-08 P5S 1018 Panneau 1075 SNA 304.0 432 432.0 304.0
Sun 07-08 S5/6N 1147 Panneau 1200 SNA 380.0 56 392 448.0 200.0 180.0
Sun 07-08 P0S 1147 Panneau 1200 SNA 426.0 152 360 512.0 210.0 225.0
Sun 07-08 150 TC Amont 640 Amont 640 0.0 162 0.0
Sun 07-08 TS 640 Amont 640 Amont 640 318.5 272 120 392.0 318.5
Sun 07-08 TS 520 Amont 640 Amont 640 0.0 234 0.0
Sun 07-08 TN 707 Panneau 840 TMR 274.2 272 272.0 280.0
Mon 08-08 S5/6N 1147 Panneau 1200 SNA 541.0 240 336 120 696.0 246.0 295.0
Mon 08-08 P0N 1090/1120 Panneau 1200 SNA 40.0 40 40.0 40.0
Mon 08-08 P0S 1147 Panneau 1200 SNA 121.0 40 120 160.0 130.0
Mon 08-08 P5S 1018 Panneau 1075 SNA 280.0 208 152 360.0 280.0
Mon 08-08 P6S 960 Panneau 1000 SNA 1000.9 240 536 416 1192.0 1019.0
Mon 08-08 TS 520 Amont 640 Amont 640 0.0 48 0.0
Mon 08-08 TN 707 Panneau 840 TMR 144.0 120 48 168.0 144.0
Mon 08-08 P2 702 BC Panneau 840 SNA 187.0 224 224.0 192.0
Mon 08-08 TN 240 Amont 640 Amont 640 67.1 24 24.0 67.14
Tue 09-08 P0N 1090/1120 Panneau 1200 SNA 48.0 48 48.0 48.0
Tue 09-08 S5/6N 1147 Panneau 1200 SNA 559.0 80 216 304 600.0 226.0 312.0
Tue 09-08 P0S 1147 Panneau 1200 SNA 104.0 40 64 104.0 104.0
Tue 09-08 P7S 980 Panneau 1000 SNA 336.0 200 216 416.0 336.0
Tue 09-08 P6S 960 Panneau 1000 SNA 129.0 80 80 160.0 129.0
Tue 09-08 P12N 840 Panneau 1000 SNA 162.0 200 200.0 162.0
Tue 09-08 Traçage 400S Amont 640 Amont 640 100.0 141 141.0 100.0
Tue 09-08 420S Amont 640 Amont 640 268.0 296 296.0 257.0
Tue 09-08 P7S 1045 1075 Panneau 1075 SNA 99.0 96 96.0 78.0
Wed 10-08 P6S 960 Panneau 1000 SNA 634.0 240 360 160 760.0 634.0
Wed 10-08 P12N 840 Panneau 1000 SNA 167.0 200 200.0 167.0
Wed 10-08 TN 240 Amont 640 Amont 640 114.0 0.0 66 48.0
Wed 10-08 420S Amont 640 Amont 640 173.0 144 36 180.0 173.0
Wed 10-08 TS 520 TCS Amont 640 Amont 640 356.5 144 360 96 456.0 356.5
Wed 10-08 720TC Panneau 840 TMR 0.0 60 0.0
Wed 10-08 TN 707 Panneau 840 TMR 0.0 138 0.0
Wed 10-08 S5/6N 1147 Panneau 1200 SNA 740.0 144 280 360 784.0 334.0 406.0
Wed 10-08 P0S 1147 Panneau 1200 SNA 104.0 104 104.0 104.0
Wed 10-08 P5S 1018 Panneau 1075 SNA 139.0 0.0 139.0
Thu 11-08 TN 240 Amont 640 Amont 640 59.4 39 39.0 59.38
Thu 11-08 420S Amont 640 Amont 640 0.0 33 33.0
Thu 11-08 TS 520 TCS Amont 640 Amont 640 495.5 448 96 544.0 495.5
Thu 11-08 TS 700 Amont 640 Amont 640 40.0 136 160 40 336.0 40.0
Thu 11-08 S5/6N 1147 Panneau 1200 SNA 628.0 240 168 184 592.0 283.0 345.0
Thu 11-08 S6/7N 1147 Panneau 1200 SNA 168.0 168 168.0 168.0
Thu 11-08 P6S 960 Panneau 1000 SNA 788.0 520 360 880.0 788.0
Thu 11-08 P12N 840 Panneau 1000 SNA 358.0 400 400.0 358.0
Thu 11-08 P7S 1045 1075 Panneau 1075 SNA 174.6 0.0 158.0
Fri 12-08 S5/6N 1147 Panneau 1200 SNA 471.0 24 24 240 288.0 216.0 255.0
Fri 12-08 P0S 1147 Panneau 1200 SNA 48.0 48 48.0 48.0
Fri 12-08 P6S 960 Panneau 1000 SNA 854.0 160 424 200 784.0 854.0
Fri 12-08 TS 700 Amont 640 Amont 640 266.5 168 112 280.0 328.0 266.5
Fri 12-08 TS 520 TCS Amont 640 Amont 640 248.0 264 264.0 304.0 248.0
Fri 12-08 P7S 980 Panneau 1000 SNA 0.0 368 368.0
Fri 12-08 150 TC Amont 640 Amont 640 242.2 208 208.0 242.18
Fri 12-08 P7S 1045 1075 Panneau 1075 SNA 300.0 188 112 300.0 300.0
Sat 13-08 P6N 1120 Panneau 1200 SNA 547.0 280 400 152 832.0 262.0 285.0
Sat 13-08 150 TC Amont 640 Amont 640 373.7 176 160 105 441.0 373.74
Sat 13-08 P2 702 BC Panneau 840 SNA 0.0 534 0.0
Sat 13-08 P7S 980 Panneau 1000 SNA 905.0 320 400 368 1088.0 905.0
Sat 13-08 TS 520 TCS Amont 640 Amont 640 214.0 232 232.0 214.0
Sat 13-08 730 P3N Panneau 840 SNA 153.0 64 96 160.0 153.0
Sat 13-08 P7S 1045 1075 Panneau 1075 SNA 48.0 0.0 48.0
Sun 14-08 P7S 980 Panneau 1000 SNA 603.0 240 536 776.0 603.0
Sun 14-08 P12N 840 Panneau 1000 SNA 186.0 240 240.0 186.0
Sun 14-08 P6S 960 Panneau 1000 SNA 155.0 200 200.0 155.0
Sun 14-08 P5S 940 traçage Panneau 1000 SNA 100.0 128 128.0 100.0
Sun 14-08 P5S 1018 Panneau 1075 SNA 274.1 200 200.0 200.0
Sun 14-08 P7S 1045 1075 Panneau 1075 SNA 32.0 32 32.0 32.0
Sun 14-08 P6N 1120 Panneau 1200 SNA 629.0 144 288 312 744.0 389.0 240.0
Sun 14-08 730 P3N Panneau 840 SNA 215.0 80 280 360.0 215.0
Sun 14-08 P2 702 BC Panneau 840 SNA 0.0 192 0.0
Sun 14-08 TS 520 TCS Amont 640 Amont 640 521.5 280 320 600.0 496 521.5
Sun 14-08 Traçage 400S Amont 640 Amont 640 240.0 256 256.0 240 240.0
Sun 14-08 TN 240 Amont 640 Amont 640 21.9 90 54 144.0 21.94
Sun 14-08 150 TC Amont 640 Amont 640 0.0 15 15.0
Mon 15-08 P6N 1120 Panneau 1200 SNA 449.0 240 304 544.0 239.0 210.0
Mon 15-08 P5S 1018 Panneau 1075 SNA 583.0 256 208 256 720.0 583.0
Mon 15-08 P5S 940 traçage Panneau 1000 SNA 64.0 64 64.0 64.0
Mon 15-08 P7S 980 Panneau 1000 SNA 344.0 200 240 440.0 344.0
Mon 15-08 730 P3N Panneau 840 SNA 32.0 32 32.0 32.0
Mon 15-08 TN 707 Panneau 840 TMR 236.0 112 160 272.0 236.0
Mon 15-08 TN 240 Amont 640 Amont 640 47.7 24 24 48.0 47.74
Mon 15-08 150 TC Amont 640 Amont 640 48.0 24 24 48.0 48
Mon 15-08 TS 520 TCS Amont 640 Amont 640 167.0 48 112 160.0 167.0
Mon 15-08 Traçage 400S Amont 640 Amont 640 48.0 48 48.0 48.0
Tue 16-08 TS 520 TCS Amont 640 Amont 640 479.5 296 272 568.0 451.5
Tue 16-08 P7S 980 Panneau 1000 SNA 945.0 480 296 280 1056.0 945.0
Tue 16-08 P12N 840 Panneau 1000 SNA 80.0 80 80.0 80.0
Tue 16-08 P5S 940 traçage Panneau 1000 SNA 189.0 128 8 136.0 136.0
Tue 16-08 S5/6N 1147 Panneau 1200 SNA 170.8 144 144.0 144.0
Tue 16-08 P6N 1120 Panneau 1200 SNA 435.0 72 320 392.0 240.0 195.0
Tue 16-08 P2 702 BC Panneau 840 SNA 0.0 108 0.0
Tue 16-08 TN 240 Amont 640 Amont 640 93.0 64 64.0 93
Tue 16-08 150 TC Amont 640 Amont 640 58.0 40 40.0 58
Wed 17-08 P12N 840 Panneau 1000 SNA 320.0 176 40 160 376.0 320.0
Wed 17-08 P5S 940 traçage Panneau 1000 SNA 173.0 200 200.0 173.0
Wed 17-08 P6S 960 Panneau 1000 SNA 283.0 40 288 328.0 283.0
Wed 17-08 TN 707 Panneau 840 TMR 231.0 128 168 184 480.0 231.0
Wed 17-08 P2 702 BC Panneau 840 SNA 0.0 186 0.0
Wed 17-08 TN 240 Amont 640 Amont 640 306.5 84 144 228.0 306.46
Wed 17-08 P6N 1120 Panneau 1200 SNA 512.0 448 184 632.0 377.0 135.0
Wed 17-08 P5S 1018 Panneau 1075 SNA 32.0 32 32.0 32.0
Thu 18-08 P6N 1120 Panneau 1200 SNA 598.0 216 184 192 592.0 508.0 90.0
Thu 18-08 P2 702 BC Panneau 840 SNA 0.0 300 0.0
Thu 18-08 Traçage 400S Amont 640 Amont 640 120.0 160 160.0 120.0
Thu 18-08 420S Amont 640 Amont 640 165.0 192 192.0 165.0
Thu 18-08 P12N 840 Panneau 1000 SNA 335.0 296 160 456.0 335.0
Thu 18-08 P5S 940 traçage Panneau 1000 SNA 64.0 0.0 64.0
Thu 18-08 P6S 960 Panneau 1000 SNA 200.0 200 200.0 200.0
Thu 18-08 TN 707 Panneau 840 TMR 208.5 0.0 208.5
Thu 18-08 P7S 1045 1075 Panneau 1075 SNA 48.0 0.0 48.0
Fri 19-08 P0N 1120/1147 Panneau 1200 SNA 0.0 520 0.0
Fri 19-08 P6S 960 Panneau 1000 SNA 156.0 160 40 200.0 156.0
Fri 19-08 P12N 840 Panneau 1000 SNA 481.0 200 200 248 648.0 481.0
Fri 19-08 P5S 940 traçage Panneau 1000 SNA 80.0 80 80.0 80.0
Fri 19-08 P6N 1120 Panneau 1200 SNA 316.0 192 192 384.0 216.0 100.0
Fri 19-08 P7N 1120 Panneau 1200 SNA 414.0 96 96 312 504.0 229.0 185.0
Fri 19-08 TN 707 Panneau 840 TMR 534.0 240 272 512.0 534.0
Fri 19-08 P2 702 BC Panneau 840 SNA 104.0 132 104 104.0 104.0
Fri 19-08 Traçage 400S Amont 640 Amont 640 265.0 64 64.0 265.0
Fri 19-08 P7S 1045 1075 Panneau 1075 SNA 128.0 128 128.0 128.0
#N/A #N/A 0.0 0.0
#N/A #N/A 0.0 0.0
ZM Pan 840 Total Extrait P2 19-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 240 240 367.5 P1 440 192 632 465.0 0.0
P2 128 272 400 252.0 P2 240 128 168 536 585.0 150.0
P3 144 144 288 283.5 P3 240 192 432 525.0 135.0
Total Puits 2 272 656 928 903.0 Total Puits 3 920 128 552 1600 1290.0 285.0
264.672414 638.327586207 741.75 103.2 445.05

ZM Pan 840 Total Extrait P2 18-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 136 120 256 199.5 P1 200 216 416 360.0 0.0
P2 0 189.0 P2 200 144 344 465.0 60.0
P3 192 120 312 105.0 P3 224 48 168 440 420.0 30.0
Total Puits 2 328 240 568 493.5 Total Puits 3 624 48 528 1200 1155.0 90.0
284.978873 208.521126761 600.6 46.2 508.2

ZM Pan 840 Total Extrait P2 17-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 80 80 52.5 P1 176 96 272 165.0 0.0
P2 136 136 126.0 P2 240 32 192 464 645.0 120.0
P3 72 72 52.5 P3 528 168 696 510.0 15.0
Total Puits 2 0 288 288 231.0 Total Puits 3 944 32 456 1432 1185.0 135.0
0 231 781.173184358 26.4804469274 377.346369

ZM Pan 840 Total Extrait P2 16-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 248 248 147.0 P1 480 96 576 495.0 75.0
P2 272 272 262.5 P2 456 72 528 630.0 60.0
P3 48 48 42.0 P3 368 264 632 615.0 60.0
Total Puits 2 568 0 568 451.5 Total Puits 3 1304 0 432 1736 1545.0 195.0
451.5 0 1160.52995392 0 384.470046

ZM Pan 840 Total Extrait P2 15-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 72 96 168 136.5 P1 64 256 32 352 255.0 60.0
P2 200 200 168.0 P2 200 208 96 504 585.0 75.0
P3 160 160 178.5 P3 240 256 168 664 600.0 75.0
Total Puits 2 232 296 528 483.0 Total Puits 3 504 720 296 1520 1230.0 210.0
212.227273 270.772727273 407.842105263 582.631578947 239.526316

ZM Pan 840 Total Extrait P2 14-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 280 80 360 346.5 P1 448 144 592 450.0 15.0
P2 240 240 315.0 P2 536 32 168 736 675.0 75.0
P3 216 128 344 315.0 P3 280 200 144 624 780.0 150.0
Total Puits 2 736 208 944 976.5 Total Puits 3 1264 232 456 1952 1665.0 240.0
761.338983 215.161016949 1078.1557377 197.889344262 388.954918

ZM Pan 840 Total Extrait P2 13-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 0 42.0 P1 320 72 392 330.0 30.0
P2 64 64 21.0 P2 400 144 544 600.0 180.0
P3 224 96 320 304.5 P3 368 48 96 512 570.0 75.0
Total Puits 2 224 160 384 367.5 Total Puits 3 1088 48 312 1448 1215.0 285.0
214.375 153.125 912.928176796 40.2762430939 261.79558

ZM Pan 840 Total Extrait P2 12-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 72 72 52.5 P1 160 144 304 390.0 0.0
P2 440 440 346.5 P2 424 112 120 656 825.0 135.0
P3 120 120 115.5 P3 568 568 570.0 120.0
Total Puits 2 632 0 632 514.5 Total Puits 3 1152 112 264 1528 1530.0 255.0
514.5 0 1153.5078534 112.146596859 264.34555

ZM Pan 840 Total Extrait P2 11-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 0 0.0 P1 168 168 165.0 0.0
P2 304 304 273.0 P2 920 176 168 1264 930.0 0.0
P3 136 136 262.5 P3 360 168 528 1005.0 345.0
Total Puits 2 440 0 440 535.5 Total Puits 3 1280 176 504 1960 1755.0 345.0
535.5 0 1146.12244898 157.591836735 451.285714

ZM Pan 840 Total Extrait P2 10-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 192 192 105.0 P1 240 48 168 456 360.0 60.0
P2 360 360 283.5 P2 360 48 72 480 750.0 240.0
P3 168 168 189.0 P3 320 64 144 528 675.0 210.0
Total Puits 2 720 0 720 577.5 Total Puits 3 920 160 384 1464 1275.0 510.0
577.5 0 801.229508197 139.344262295 334.42623

ZM Pan 840 Total Extrait P2 9-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 0 0.0 P1 280 72 352 330.0 135.0
P2 96 96 105.0 P2 216 168 384 390.0 0.0
P3 216 216 252.0 P3 280 96 168 544 675.0 225.0
Total Puits 2 312 0 312 357.0 Total Puits 3 776 96 408 1280 1035.0 360.0
357 0 627.46875 77.625 329.90625

ZM Pan 840 Total Extrait P2 8-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 120 120 105.0 P1 240 176 192 608 465.0 75.0
P2 192 192 168.0 P2 536 152 96 784 900.0 150.0
P3 48 48 63.0 P3 416 416 645.0 240.0
Total Puits 2 0 360 360 336.0 Total Puits 3 1192 328 288 1808 1545.0 465.0
0 336 1018.60619469 280.287610619 246.106195

ZM Pan 840 Total Extrait P2 7-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 272 272 126.0 P1 240 408 96 744 465.0 150.0
P2 0 241.5 P2 416 264 680 660.0 75.0
P3 240 240 231.0 P3 400 192 592 780.0 180.0
Total Puits 2 272 240 512 598.5 Total Puits 3 1056 408 552 2016 1500.0 405.0
317.953125 280.546875 785.714285714 303.571428571 410.714286

ZM Pan 840 Total Extrait P2 5-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 40 96 136 157.5 P1 400 48 448 0.0 0.0
P2 192 192 136.5 P2 80 384 464 750.0 120.0
P3 240 240 210.0 P3 304 288 120 712 750.0 135.0
Total Puits 2 472 96 568 504.0 Total Puits 3 784 672 168 1624 1245.0 255.0
418.816901 85.1830985915 601.034482759 515.172413793 128.793103

ZM Pan 840 Total Extrait P2 4-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 0 136.5 P1 280 168 448 60.0 0.0
P2 112 112 224 315.0 P2 352 168 520 900.0 150.0
P3 96 272 368 315.0 P3 320 160 24 504 675.0 195.0
Total Puits 2 208 384 592 766.5 Total Puits 3 952 160 360 1472 1290.0 345.0
269.310811 497.189189189 834.293478261 140.217391304 315.48913

ZM Pan 840 Total Extrait P2 3-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 0 147.0 P1 296 192 488 330.0 0.0
P2 72 216 288 336.0 P2 360 200 560 735.0 120.0
P3 368 368 399.0 P3 344 160 144 648 765.0 180.0
Total Puits 2 72 584 656 882.0 Total Puits 3 1000 360 336 1696 1530.0 300.0
96.804878 785.195121951 902.122641509 324.764150943 303.113208

ZM Pan 840 Total Extrait P2 2-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 336 336 0.0 P1 360 192 552 315.0 0.0
P2 32 120 152 325.5 P2 272 24 120 416 555.0 75.0
P3 264 264 231.0 P3 232 80 168 480 615.0 165.0
Total Puits 2 32 720 752 556.5 Total Puits 3 864 104 480 1448 1245.0 240.0
23.6808511 532.819148936 742.872928177 89.4198895028 412.707182

ZM Pan 840 Total Extrait P2 1-Aug pan 1000 N-1075 N-1147 Total Extrait P3 Bure 5
P1 216 64 280 210.0 P1 320 192 512 450.0 30.0
P2 312 312 346.5 P2 360 144 504 660.0 165.0
P3 288 288 283.5 P3 320 192 512 645.0 165.0
Total Puits 2 216 664 880 840.0 Total Puits 3 1000 0 528 1528 1395.0 360.0
206.181818 633.818181818 912.958115183 0 482.041885
Nbr de jours 8/1/2022 31 Tx humidité
Nbr de jours au 8/19/2022 19 3.45%

Réalisé du 19/08/2022 Cumul au 19/08/2022 Ecart


Secteur Planifié S Réalisé H Réalisé S Tonnage RM Volume RC Cumul P/S Cumul Réalisé H Cumul Réalisé S Tonnage RM Volume RC Journée Ecart Cumul
Amont 640 435 265 256 - - 8,274 7,211 6,962 2,289 - - 180 - 1,312
Panneau 840 210 638 616 132 - 3,984 4,841 4,674 2,541 - 406 690
Panneau 1000 574 717 692 - - 10,910 15,873 15,325 - - 118 4,416
Panneau 1075 494 128 124 - - 9,377 3,590 3,466 - - - 370 - 5,912
Panneau 1200 789 730 705 - 520 14,985 12,398 11,970 - 1,670 - 84 - 3,015
Total DSS 2,502 2,478 2,393 132 520 47,531 43,912 42,397 4,830 1,670 - 109 - 5,134

Tx humidité 2.62%
Lentille OUEST 320 0 0 6074 2414 2350 - 320 - 3,724
Lentille EST 123 496 483 2334 3726 3628 360 1,294
Lentille 3 0 0 0 0 0 0 - -
KOUDIAT AICHA 443 496 483 8408 6139 5978 41 - 2,429

Etat d'extraction
KOUDIAT AICHA Total DSS
ST MN ST MN
Extrait 670
Extrait 1030
-
120.00
903.00
1,575.00
5978 42.397 -
2,010.00
10,636.00
31,860.00
Extrait BURE 5 - 285.00 - 5,700.00
Extrait Dumper - - -2.429 -5.134 - 1,409.98

Skip Koudiat aicha - 496.26 - 6,139.26

Réalisé sec Polynomial (Réalisé sec) Planifié S Réalisé sec Polynomial (Réalisé sec) Planifié S

522
2,875

483
2,618
2,618
2,505

436
2,389

2,393
2,366
2,344

2,346
2,299
2,249

2,163
2,162

378
373
366

354
1,971

347
1,935

1,949

342
333

324
1,793
1,743

308
1,679

267

267

246
243

242
148
0

0
0
0
0
0
0
0
0
0
0
0
0
-
-
-
-
-
-
-
-
-
-
-
-

1-août 8-août 15-août 22-août 29-août 1-août 8-août 15-août 22-août 29-août

Draa sfar Sud Koudiat aicha


DSS KA
Date départ 8/16/2022 Tx humidité 41431 5643
Date fin 8/19/2022 3.45% - 2,480.96 - 496.26

Réalisé HEBDO
Secteur Planifié S Réalisé H Réalisé S Tonnage RM Volume RC Ecart - 2,481
Amont 640 1,742 1,487 1,436 - - - 306 -18% - 433
Panneau 840 839 1,078 1,040 726 - 202 24% - 314
Panneau 1000 2,297 3,306 3,192 - - 895 39% - 962
Panneau 1075 1,974 208 201 - - - 1,773 -90% - 61
Panneau 1200 3,155 2,446 2,361 - 520 - 793 -25% - 712
Total DSS 10,006 8,524 8,230 726 520 - 1,776 -18%
Jours Mois : 31 Tx1 Tx2 Tx3 Tx4 Tx5 Tx6 Tx7 Tx8 Tx9 Tx10 Tx11 Tx12 Tx13 Tx14 Tx15 Tx16 Tx17 Tx18 Tx18
Periode : 19 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45% 3.45%
Situation au : 8/19/2022
8/1/2022 - - - - - - -
- - - - 93 - 265 139 - - - - - - 228 - 223 201 516 - - - - - - - - - - - -
Planifié
Chantiers Planifié Mois période Extrait Hum Réalisé sec Ecart Réalisé jour Réalisé 1-août 2-août 3-août 4-août 5-août 6-août 7-août 8-août 9-août 10-août 11-août 12-août 13-août 14-août 15-août 16-août 17-août 18-août 19-août 20-août 21-août 22-août 23-août 24-août 25-août 26-août 27-août 28-août 29-août 30-août 31-août -2480.96 Foration Foration Cumul Réalisé planifié Réalisé non Planifié non
moyen Hebdo jour planifié réalisé

150 TC 2,000 1,226 722 697 - 529 - 697 - - - - - - - - - - - 234 361 - 46 56 - - - - - - - - - - - - - - - - #DIV/0! - - 697 - 529 1
TN 240 2,000 1,226 927 895 - 331 - 895 - - - - - 210 - 65 - 110 57 - - 21 46 90 296 - - - - - - - - - - - - - - - #DIV/0! - - 895 - 331 1
Traçage 400S 1,500 919 773 746 - 173 256 746 - - - - - - - - 97 - - - - 232 46 - - 116 256 - - - - - - - - - - - - - #DIV/0! - - 746 - 173 1
420S 4,000 2,452 606 585 - 1,867 - 585 - - - - - - - - 259 167 - - - - - - - 159 - - - - - - - - - - - - - - #DIV/0! - - 585 - 1,867 1
TS 520 1,000 613 327 316 - 297 - 316 199 23 94 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - 316 - 297 1
TS 520 TCS 2,000 1,226 2,482 2,396 1,171 - 2,396 - - - - - - - - - 344 478 239 207 504 161 463 - - - - - - - - - - - - - - - - #DIV/0! - - 2,000 396 - 1
TS 640 1,000 613 359 346 - 267 - 346 - - - - 39 - 308 - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - 346 - 267 1
TS 700 - - 1,016 980 980 - 980 - - - 260 355 70 - - - - 39 257 - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - 980 - 1
Amont 640 13,500 8,274 7,211 6,962 - 1,312 256 6,962 199 23 94 260 394 279 308 65 355 621 574 731 567 756 300 609 296 275 256 - - - - - - - - - - - - #DIV/0! - - 5,585 1,377 3,463 1
TN 707 1,500 919 1,628 1,572 652 516 1,572 - - - - - - 265 139 - - - - - - 228 - 223 201 516 - - - - - - - - - - - - - #DIV/0! - - 1,500 72 - 1
720TC 1,500 919 96 93 - 827 - 93 - - - - 93 - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - 93 - 827 1
P14N 726 1,000 613 - - - 613 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 613 1
P2 702 BC 2,500 1,532 2,717 2,623 1,091 100 2,623 612 514 758 458 - - - 181 - - - - - - - - - - 100 - - - - - - - - - - - - - #DIV/0! - - 2,500 123 - 1
730 P3N - - 400 386 386 - 386 - - - - - - - - - - - - 148 208 31 - - - - - - - - - - - - - - - - - #DIV/0! - - - 386 - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
Panneau 840 6,500 3,984 4,841 4,674 690 616 4,674 612 514 758 458 93 - 265 320 - - - - 148 208 259 - 223 201 616 - - - - - - - - - - - - #DIV/0! - - 4,093 581 1,440 1
P12N 840 5,000 3,065 2,089 2,017 - 1,048 464 2,017 - - - - - - - - 156 161 346 - - 180 - 77 309 323 464 - - - - - - - - - - - - - #DIV/0! - - 2,017 - 1,048 1
P6S 960 6,000 3,677 8,312 8,025 4,348 151 8,025 154 524 726 698 250 872 745 966 125 612 761 825 - 150 - - 273 193 151 - - - - - - - - - - - - - #DIV/0! - - 6,000 2,025 - 1
P7S 980 4,800 2,942 4,802 4,636 1,694 - 4,636 727 193 145 62 330 154 - - 324 - - - 874 582 332 912 - - - - - - - - - - - - - - - - #DIV/0! - - 4,636 - - 1
P5S 940 traçage 2,000 1,226 670 647 - 579 77 647 - - - - - - - - - - - - - 97 62 182 167 62 77 - - - - - - - - - - - - - #DIV/0! - - 647 - 579 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
Panneau 1000 17,800 10,910 15,873 15,325 4,416 692 15,325 882 717 871 760 580 1,026 745 966 605 773 1,106 825 874 1,008 394 1,172 749 578 692 - - - - - - - - - - - - #DIV/0! - - 13,300 2,025 1,627 1
P8S 1045 traçage 500 306 - - - 306 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 306 1
P7S 1045 1075 10,000 6,129 830 801 - 5,328 124 801 - - - - - - - - 96 - 169 290 46 31 - - - 46 124 - - - - - - - - - - - - - #DIV/0! - - 801 - 5,328 1
S3/4S 1045 2,800 1,716 - - - 1,716 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 1,716 1
P5S 1018 2,000 1,226 2,760 2,665 1,439 - 2,665 - 87 314 154 497 56 294 270 - 134 - - - 265 563 - 31 - - - - - - - - - - - - - - - #DIV/0! - - 2,000 665 - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
Panneau 1075 15,300 9,377 3,590 3,466 - 5,912 124 3,466 - 87 314 154 497 56 294 270 96 134 169 290 46 296 563 - 31 46 124 - - - - - - - - - - - - #DIV/0! - - 2,801 665 7,351
P8N 1120 1147 11,250 6,895 - - - 6,895 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 6,895 1
P0N 1120/1147 2,150 1,318 - - - 1,318 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 1,318 1
P0N 1090/1120 10,200 6,252 88 85 - 6,167 - 85 - - - - - - - 39 46 - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - 85 - 6,167 1
S6/7N 1120 850 521 - - - 521 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - 521 1
S6/7N 1147 - - 1,106 1,068 1,068 - 1,068 309 305 - 230 62 - - - - - 162 - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - 1,068 - 1
P0S 1147 - - 3,227 3,116 3,116 - 3,116 504 324 582 387 309 234 411 117 100 100 - 46 - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - 3,116 - 1
S4/5N 1147 - - 259 250 250 - 250 - - - - - 250 - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - 250 - 1
S5/6N 1147 - - 3,818 3,686 3,686 - 3,686 - - - - - 317 367 522 540 714 606 455 - - - 165 - - - - - - - - - - - - - - - - #DIV/0! - - - 3,686 - 1
P6N 1120 - - 3,486 3,366 3,366 305 3,366 - - - - - - - - - - - - 528 607 434 420 494 577 305 - - - - - - - - - - - - - #DIV/0! - - - 3,366 - 1
P7N 1120 - - 414 400 400 400 400 - - - - - - - - - - - - - - - - - - 400 - - - - - - - - - - - - - #DIV/0! - - - 400 - 1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0! - - - - - 1
Panneau 1200 24,450 14,985 12,398 11,970 - 3,015 705 11,970 813 630 582 617 371 800 778 678 686 815 769 501 528 607 434 585 494 577 705 - - - - - - - - - - - - #DIV/0! - - 85 11,885 14,901

Total Minerai Fond 77,550 47,531 43,912 42,397 - 5,134 2,393 42,397 2,505 1,971 2,618 2,249 1,935 2,162 2,389 2,299 1,743 2,344 2,618 2,346 2,163 2,875 1,949 2,366 1,793 1,679 2,393 - - - - - - - - - - - - - - - 25,864 16,533 28,780

Planifié jour - - - - - - 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6 2501.6

Extraction journalier
2501.6 2501.6 2311.2 2231.4 Extrait 670 MN 840.0 556.5 882.0 766.5 504.0 262.5 598.5 336.0 357.0 577.5 535.0 514.5 367.5 976.5 483.0 451.5 231.0 493.5 903.0 10636
Extrait 1030 MN 1755.0 1485.0 1830.0 1635.0 1500.0 1950.0 1905.0 2010.0 1395.0 1785.0 2100.0 1785 1500.0 1905.0 1440.0 1740.0 1320.0 1245.0 1575.0 31860
Extrait BURE 5 MN 360.0 240.0 300.0 345.0 255.0 420.0 405.0 465.0 360.0 510.0 345.0 255 285.0 240.0 210.0 195.0 135.0 90.0 285.0 5700
Extrait Dumper MN 0.0 0.0 0.0 0.0 0.0 26.8 0.0 67.1 0.0 66.0 59.0 242 373.7 21.9 95.7 151.0 306.5 0.0 0.0 1410

Extrait 1030 ST 135 135 255 0 0 150 0 0 240 345 0 0 120 225 165 0 0 120 120 2010
Extrait 670 ST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0

Planning journalier
Amont 640 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 435 13500
Panneau 840 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 6500
Panneau 1000 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574 17800
Panneau 1075 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 494 15300
Panneau 1200 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 789 24450
Total Minerai Fond 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 2,502 77,550

Tx1 Tx2 Tx3 Tx4 Tx5 Tx6 Tx7 Tx8 Tx9 Tx10 Tx11 Tx12 Tx13 Tx14 Tx15 Tx16 Tx17 Tx18 Tx18
KOUDIAT AICHA 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62% 2.62%
9910 Lentille OUEST 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320
3808 Lentille EST 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123
0 Lentille 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13718 PLANNING 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443 443

Lentille OUEST 1 60 0 70 249 100 85 275 372 198 274 140 190 190 211
Lentille EST 2 296 0 82 0 275 257 0 76 135 0 223 59 63 172 316 351 388 536 496 0 0 0 0 0 0 0 0 0 0 0 0
Lentille 3 3 0 0 0
REALISE H 356 0 152 249 375 342 275 448 333 274 363 249 253 383 316 351 388 536 496 0 0 0 0 0 0 0 0 0 0 0 0

Lentille OUEST 58 0 68 242 97 83 267 362 193 267 136 185 185 205 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0
Lentille EST 288 0 80 0 268 250 0 74 131 0 217 57 61 168 308 342 378 522 483 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0
Lentille 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0
REALISE SEC 347 0 148 243 366 333 267 436 324 267 354 242 246 373 308 342 378 522 483 0 0 0 0 0 0 0 0 0 0 0 0

356 0 152 249 375 342 274.6 448 333 274 363 249 253 383 316 351 388 536 496
19
Cumul au 19/08
8/19/2022 Planifié Réalisé Ecart Planifié Réalisé
Amont 640 435 256 - 180 8,274 6,962
Panneau 840 210 616 406 3,984 4,674
Panneau 1000 574 692 118 10,910 15,325
Panneau 1075 494 124 - 370 9,377 3,466
Panneau 1200 789 705 - 84 14,985 11,970

Total 2,502 2,393 - 109 47,531 42,397

1,000 20,000
19/08/2022
800
15,000
600
10,000
400

789
705
692
616

574

494
435

200
406

5,000

8,274
256

6,962
210

124
118

-84
-180

840

1000

1075

1200
640

-1,312
-370
-200

640
nt

eau

eau
eau

eau
Amo

-400

nt
n

-5,000
n

n
Pan

Amo
Pan

Pan

Pan
-600
-10,000
Planifié Réalisé Ecart

Réalisé Réalisé non Planifié non Réalisé global Planifié


planifié planifié réalisé global

Amont 640 5,585 1,377 3,463 6,962 8,274


Panneau 840 4,093 581 1,440 4,674 3,984
Panneau 1000 13,300 2,025 1,627 15,325 10,910
Panneau 1075 2,801 665 7,351 3,466 9,377
Panneau 1200 85 11,885 14,901 11,970 14,985

Total 25,864 16,533 28,780 42,397 47,531

61% 39% 61%


/ au realise / au realise / au planifie

20,000
8/12/2022 Planifié Réalisé Ecart Hebd
Amont 640 8,274 6,962 - 1,312 15,000
TMR 840 2,452 1,664 - 787
BC 840 1,532 3,009 1,477 10,000
Panneau 1000 10,910 15,325 4,416
Panneau 1075 9,377 3,466 - 5,912 5,000
8,274
6,962

Panneau 1200 14,985 11,970 - 3,015


2,452
1,664

1,532

-
-1,312

-787
640

840
TMR
on t

-5,000
Total
47,531
42,397
-
5,134
-
10,000

-5,000
5,000

-10,000

Amo
nt 8,274
640
6,962
-1,312

TMR 2,452
840
1,664
-787

1,532
on t 8,274
640
6,962

-10,000
-5,000
5,000
10,000
15,000
20,000
-1,312

-
-
-
-
-
-
-
-
TMR 2,452 Amo 8,274
840 nt
1,664 640
6,962

Ecart
-787 Ecart

5,134
3,015
5,912
1,312
5,134
3,015
5,912
1,312

690
690

4,416
4,416
-1,312

BC 8 1,532 Pan 3,984


403,009 n ea
u 84
1,477 0 4,674
690

10
09
08
07
06
05
04
03
02
01

au 1 10,910

isé

ifié
000

non

39%
15,325

Hebdomadaire
Réal-

plan-
Pan 10,910
n eau
4,416 1000
15,325
au 1 9,377 4,416

Cumul au 19/08
075
3,466
Pan 9,377
-5,912 ne
20
19
18
17
16
15
14
13
12
11

au 1
075
3,466

Chart Title
14,985

isé
au 1

ifié
-5,912

61%
Réal-

plan-
200
11,970
-3,015 Pan
n eau 14,985
1200
11,970
31
30
29
28
27
26
25
24
23
22
21

-3,015
Amo
nt 8,274
640
6,962
-1,312

TMR 2,452
840
1,664
-787

BC 8 1,532
403,009
1,477
Pan
n ea u 10,910
1000
15,325
4,416
Pan
n eau 9,377
1075
3,466
-5,912
Pan
n eau 14,985
1200
11,970
-3,015

Vous aimerez peut-être aussi