S.No.

BOQ 1- 14 of 14 Construction of VRCC OHSR having with internal dia of 6.00M with 0.15 meter free board and 0.15 meter Dead storage above bottom ring girder capable of holding 120000 Liters with the following sailent features as per departmental design plan and design, pattern with necessary earth connections complete, RCC Ladder inside OHSR with 0.45 m wide, Railing with 32mm dia GI Pipe of "A" class in two Rows around OHSR fixed in RCC (1:2:4) posts of size 150X150X750mm with 1.20m intervals around peripery on top of the OHSR, S&F of one no. of water level indicator of good quality with ebonite / copper float of approved pattern, construction of RCC Spiral stair case as per approved design with outside the reservoir from ground level to roof level, Supply and fixing of Lightening arrestor, including conductor and earthing etc. s/f of RCC fly proof ventilator with copper or steel fly proof mesh, s/f of Light weight Manhole frame and cover with 750 X 750mm as per IS specification 2 Nos, Waterproof plastering inside the tank with CM(1:3) 8mm thick and Plastering with CM(1:3) of 12mm thick out side the tank and supporting structure including Spiral stair case, Snowcem painting of approved colours in two coats over primary coat out side the OHSR and with 3 coats of epoxy paint to inner surfaces of the reservoir including bottom of the top slab, outside lettering with enamel paint of desired matter, including Cost of steel and its fabrication charges, Centering, curing and water leads etc, C/C of all materials and Labour charges etc,. complete, with fixing of Cast iron Pipes and specials for Inlet, Outlet & Scour arrangement from Tank up to Ground level as per the instructions of the department. But excluding cost of CI pipes and CI Specials which will be provide by the department, and arrangement for Over flow The OHSR structure as per PRED type design and foundation. The design bearing capacity of soils at 5 MTon/ Sq. meter for which drawings are enclosed and to be executed by the contractor. The above rates are arrived considering wind pressure as per BIS No 875/88. The rates are inclusive of VAT.

Qty 120000

Unit 1 ltr

Rate(INR) 13.19

2 3

S&D of 90mm dia 6Kg/ Cm2 PVC pipes complete Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes ,testing of pipeline ,refilling the trench, watering & tamping of 90mm dia 6kgf/cm2 size including VAT S&D of 63mm dia 4Kg/ Cm2 PVC pipes complete Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes ,testing of pipeline ,refilling the trench, watering & tamping of 63mm dia 4kgf/cm2 size including VAT S&D of 75mm dia 4Kg/ Cm2 PVC pipes complete Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes ,testing of pipeline ,refilling the trench, watering & tamping of 75mm dia 4kgf/cm2 size including VAT S&D of 90mm dia 4Kg/ Cm2 PVC pipes complete Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes ,testing of pipeline ,refilling the trench, watering & tamping of 90mm dia 4kgf/cm2 size including VAT S&D of 110mm dia 4Kg/ Cm2 PVC pipes complete

2000 2000

1 rmt 1 rmt

101.00 73.20

4 5

5500 5500

1 rmt 1 rmt

35.00 43.20

6 7

500 500

1 rmt 1 rmt

51.00 43.80

8 9

1200 1200

1 rmt 1 rmt

71.00 73.20

10

500

1 rmt

103.00

11

Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes ,testing of pipeline ,refilling the trench, watering & tamping of 110mm dia 4kgf/cm2 size including VAT S&D of 140mm dia 4Kg/ Cm2 PVC pipes complete Earth work excuvation for pipeline trench of size 0.70 X 1.00m in all types of soils except hard rock requires blasting ,lowering, laying & jointing PVC pipes , testing of pipeline , refilling the trench, watering & tamping of 110mm dia 4kgf/cm2 size including VAT Construction of public stand post with RCC collar 75cm dia, RCC pipe 15 cm dia filled with CC(1:2:4) , S & F of 3/4" dia GI pipe and all necessary fixtures complete for finished item. ECV(INR): 2,816,050.00

500

1 rmt

73.95

12 13

500 500

1 rmt 1 rmt

167.00 74.75

14

20

No

1248.00

15

Operation and Maintenance of the "CPWS scheme to Kanagal, Regette, Chandur and other habitations" and to supply treated potable drinking Water to the ( 70 ) Habitations at the specified rate in various habitations of Nalgonda district (as given in the schedule), including cost and conveyance of all materials, all operating expenses, Maintenance of crew and all Labour wages / charges, ( i.e, Pump Operators / Electricians / Fitters / Helpers /Mechanics / Watchmen/ technical personnel / others personnel etc.,) involved in Operation and Maintenance of Pump Sets Electrical Transformers (pertainnig to Department), RSF water Treatment Plants, Chlorinators, Head Works, Trasmission Lines, all pipelines, all balancing and Service Reservoirs, sumps and Distribution Lines, Sluice Valves, Air Valves, scour valves, and all other sorts of valves, Public Stand Posts, land scaping including cost and conveyance of materials like Pipes, CID Joints, Valves, Repairs to Pump Sets etc., including rewinding of electrical motors, panel boards replacement of all spares and chlorinators and mixing of required quantity of bleaching powder/ Chlorine gas / Liquid Chlorine daily as per standard according to seasons and release water to all the habitations daliy to service resorvoirs / GLSRS / Sumps ( as per annexure I) with the specified quality but excluding Power consumption charges, VAT, insurance, Provident Fund contribution, but including all preventive and periodical maintenance of electrical and mechanical equipment, Plant and equipment hire charges, piece welfare expenses, rental for site offices, Godowns, Travel including all incidental and inevitable expenses in Operation and Maintenance of overall scheme execept monthly power consumption charges which will be paid by the department.

335920.00

kL

4.84

Amount(INR) 1582800

202000 146400

192500 237600

25500 21900

85200 87840

51500

36975

83500 37375

24960

2816050
1625852.80

S.No.

Specification No. 1 Construction of 1 No 800KL RCC ELSR of suitable design in a single compartment with a staging of 15m with dead storage of 0.15m and 0.30m free board above MWL. The salient features of the ELSR

Qty

Unit 800000 1 Liter

Rate(INR) 9.35

Amount(INR) 7478400

(Rupees nine and thirty four paise only ) Construction of 1 No 800KL RCC ELSR of suitable design in a single compartment with a staging of 15m with dead storage of 0.15m and 0.30m free board above MWL. The salient features of the ELSR are 1) Average G.L. + 5.86 m 2) LWL +20.86 m 3) MWL +25.36 m With minimum two rows of columns & central dome. The minimum thickness for top roof slab shall be 100mm. The minimum thickness of bottom flat slab & dome shall be 200mm (with reinforcement on both faces) and uncracked section shall be adopted. All RCC components shall be of M30 grade. PCC base course shall be in (1:3:6) 150mm thick with 150mm projection on either sides of the annular raft footing. Minimum depth of foundation shall be 2.50m. (Measured at top of the base course). The SBC shall be adopted as per the report of soil investigation agency or the SBC analysis to be got done by the contractor separately whichever is less and shall be restricted to a certain values as per site conditions to be decided by the Superintending Engineer. Sand cushion of 0.60m shall be provided below PCC as leveling course in case of clayey soils, Galleries of 1.00m width and hand railing shall be provided both at floor level and roof level. Braces and ring beams shall be of uniform cross section with 1st brace at GL. Wind force shall be considered as 350Kg/M2 or all columns & containers as per relevent IS codes. Age factor and redistribution of moments are not allowed. Roof slab shall also be designed as uncracked section. Reservoir construction shall include fixtures and accessories Finishings of the ELSR should be done as per the specifications. Hoisting, laying, jointing and testing of CI pipe connections includes pipes, specials, bell mouths, valves, bends, etc., for inlet, outlet, scour & over flow connections including construction of masonry pits, surface boxes, etc and conveyance of CI D/F pipes, Specials valves etc. The pipes shall be cleaned after fixing and provided with 2 coats of anticorrosive black paint. Supply, delivery and fixing of the following accessories of best quality and as per specification or any other higher quality Fixture Including: a) A Balcony of 1 m width at floor slab level / middle ring beam level, top ring beam level with RCC post with GI pipe hand railing. b) CI light type manhole covers with frames of 600mm of IS make- 2 Nos c) RCC ventilators of 150 mm dia manufactured out of MS 8 mm sheet and fixed with mosquito proof wire mesh and painted with 2 coats of anticorrosive black paint 12 Nos d) RCC Phenol ventilators of 600mm size-1No e) RCC Laders of 450 mm width inside the reservoir- 2 Nos f) Dog legged stair case 1.0m fight width for access to the top of service reservoir with R.C.M Pradha 1No g)RCC hand railing 0.75 m height all round at floor level and roof level h) Water level indicator of float operated type with brass pulley, bracket, Nylon thread, PVC float, enamel gauge numbered in Mts and 1/10th of mt, with moving index -1No i) Lightening arrestor as per IS3070/1974- 1 No with all its accessories. Complete including earthing j) Providing 2 coats of weather proof emulsion paint of approved quality and shade to the outer surface of reservoir lettering all required fixtures, pipes, bends, valves, columns, braces, staircase, etc., k) Applying four coats of corroseal appoxy based coating system to the inner surface of side walls, floor slab and all round inner columns up to roof in base coat and 3 top coats on thoroughly prepared concrete slab surface each coat not exceeding 60 microns in dry film thickness, total thickness 240 microns l) Testing of the reservoir for water tightness including cost and conveyance of water as per class 10 of IS 3370 (part-I) of 1965 and shall satisfy the water tightness requirements as per class.10,12 of 3370 / 1965, emptying the service completed, leveling the site including disposal of surplus earth etc., the contractor has make his own arrangements for conveyance of CI pipes, specials, bolts, nuts, rubber packing and its conveyance to site. The tentative details of pipe connections are as follows : a) Inlet 300mm dia b) Outlet 300mm dia c) Overflow 300mm dia d) Scour 200mm dia M)Leveling the site N) Flooring ELSR area

Specification No. 2 Supply and delivery of the C.I pipes and specials valves for inlet

Qty

Unit 18026 1 Kg

Rate(INR) 70.41

Amount(INR) 1269210.66

(Rupees seventy and forty one paise only ) Supply and delivery of the C.I pipes and specials valves for inlet, outlet scour and over flow connections to site confirming to IS 1538- 1993 of standard / non standard including cost and conveyance, packing forwarding, transit risk etc., complete including cost and conveyance to site including all taxes and duties but excluding turn over tax for vertical connection.

Specification No. 3 300 mm dia PN 1.60

Qty

Unit 3 1 No

Rate(INR) 42236 (Rupees forty two thousand two hundred thirty six only )

Amount(INR) 126708

Manufacture, supply and delivery of CID/F sluice valves confirming to IS 14846 / 2000 with amendments No 1&2 heavy duty with CI grade FG 260 as per IS 210. Two coats of primer suitable for EPOXY paints finish shall be applied to all metal surface and finally two coats of Epoxy paint. The valves shall be tested for (Closed and test) against Hydrostatic test requirement. The rates are including transportation, Central Excise duty and sales tax etc., the operation can be done with hand wheel / cap. ISI marked. Including cost and conveyance to site, insurance, packing, loading at factory and unloading at site etc., complete including all taxes and duties but excluding turn over tax. a)300 mm dia PN 1.60

Specification No. 4 200 mm dia PN 1.60

Qty

Unit 1 1 No

Rate(INR) 22222 (Rupees twenty two thousand two hundred twenty two only )

Amount(INR) 22222

b)200 mm dia PN 1.60

S.No. 1

Description

Qty 250000

Unit Liter

Rate 10.15

Amount 2537500

Construction of 250 KL RCC ELSR with 12.00 m staging

(1) Rate inclusive of three coats of epoxy paint to inner surface of the reservoir including roof dome. (2) The above rates be adopted for estimate purposes for construction of ELSR for a finished work including 2 coats of snow cem painting for external surfaces lettering, fixing of all required fixtures, pipes, bends, valves etc., for pipe connections, but excluding cost of pipes, bends and valves as per departmental designs and drawings. (3) The above rates applicable for wind pressures upto 350 kg/ sqm. If the ELSR is to be designed for seismic forces also, cost shall be arrived by working out detailed quantities based on the designs. (4) Fixtures include : (a) RCC or aluminium ladder inside 0.45m wide. (b) spiral staircase on the out side (c) Lightening arrestor, including conductor and earthing etc., (d) RCC ventilators with copper or stainless steel fly proof mesh (e) RCC final ventilators with copper or stainless steel fly proof mesh (f) Manholes frame and cover 0.75 x 0.75 m with frame as per IS specifications (light duty) -2 Nos. (g) Railing with 32 mm dia GI pipes (A class) in two rows around OHSR fixed in RCC (1:2:4) posts of size 100 x 75 x 75 mm with 1.5 m intervals around periphery on top of the OHSR for smaller capacities. (h) water level indicator of good quality with ebonite / copper float approved pattern 1 No.

Manufacture, supply and delivery of the following sizes of CID/F sluice valve confirming to IS 14846 / 2000 with amendments No. 1 & 2 heavy duty with CI grade FG 260 as per IS 210 two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint. The valves shall be tested for (closed end test) against hydrostatic test requirement. The operation can be done with hand wheel / cap. ISI marked, including cost & transportation to site with taxes excluding CED etc., complete as per SS and directed by the departmental authorities.(a) 150 mm dia sluice valve PN 1.6

Each

12507.25

37521.75

Manufacture, supply and delivery of the following sizes of CID/F sluice valve confirming to IS 14846 / 2000 with amendments No. 1 & 2 heavy duty with CI grade FG 260 as per IS 210 two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint. The valves shall be tested for (closed end test) against hydrostatic test requirement. The operation can be done with hand wheel / cap. ISI marked, including cost & transportation to site with taxes excluding CED etc., complete as per SS and directed by the departmental authorities.(b) 100 mm dia sluice valve PN 1.6

Each

8338.58

8338.58

Manufacture, supply and delivery of following sizes of cast iron pipes and specials confirming to IS No. 7181/1986, 5531 / 1988, 3950/1979 including cost and conveyance loading, unloading at site etc., complete including taxes excluding CED.(a) 150 mm dia x 2.00 m long CI D/F pipe

27

Each

4368.74

117955.98

Manufacture, supply and delivery of following sizes of cast iron pipes and specials confirming to IS No. 7181/1986, 5531 / 1988, 3950/1979 including cost and conveyance loading, unloading at site etc., complete including taxes excluding CED.(b) 150 mm dia x 0.90 m long CI D/F pipe

Each

2299.24

6897.72

Manufacture, supply and delivery of following sizes of cast iron pipes and specials confirming to IS No. 7181/1986, 5531 / 1988, 3950/1979 including cost and conveyance loading, unloading at site etc., complete including taxes excluding CED.(c) 100 mm dia x 2.00 m long CI D/F pipe

Each

2677.32

24095.88

Manufacture, supply and delivery of following sizes of cast iron pipes and specials confirming to IS No. 7181/1986, 5531 / 1988, 3950/1979 including cost and conveyance loading, unloading at site etc., complete including taxes excluding CED. (d) 100 mm dia x 0.90 m long CI D/F pipe

Each

1413.73

1413.73

Manufacture, supply and delivery of following sizes of cast iron pipes and specials confirming to IS No. 7181/1986, 5531 / 1988, 3950/1979 including cost and conveyance loading, unloading at site etc., complete including taxes excluding CED. (e) 150 mm dia CI bell mouth

Each

678.38

2035.14

Lowering the following sizes of CI or DI pipes and fittings with flanged ends carefully in to the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance for source of supply etc., complete to SS as per BIS No. 3114/85. (a) 150 mm dia

57

Rmt

26.5

1510.5

10

Lowering the following sizes of CI or DI pipes and fittings with flanged ends carefully in to the trenches and laying them true to alignment and gradient including all sundries, but excluding conveyance for source of supply etc., complete to SS as per BIS No. 3114/85.(b) 100 mm dia

19

Rmt

25.25

479.75

11

Jointing the following sizes of CI pipes fittings and valves with flanged ends including cost of jointing materials such as bolts, nuts, rubber inserting, white lead and including filling with water lead upto 500 m and testing to required pressure etc., complete as per BIS 3114/85 (a) 150 mm dia

31

Each

612.97

19002.07

12

Jointing the following sizes of CI pipes fittings and valves with flanged ends including cost of jointing materials such as bolts, nuts, rubber inserting, white lead and including filling with water lead upto 500 m and testing to required pressure etc., complete as per BIS 3114/85 (b) 100 mm dia

10

Each

384.66

3846.6

13 14 15

Labour charges for lowering and keeping in position of the flowing sizes of CI sluice valves, reflux valves and scour valves (a) 150 mm dia Labour charges for lowering and keeping in position of the flowing sizes of CI sluice valves, reflux valves and scour valves (b) 100 mm dia Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities. (a) Earth work excavation in loamy and clayey soils like black cotton soils, red earth and ordinary gravel for sluice valve pits.

3 1 10

Each Each Cum

68.13 44 93.76

204.39 44 937.6

16

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(b) CC (1:4:8) mix using 40 mm m/c HBG (SS5) metal

0.8

Cum

3113.51

2490.81

17

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(c) Brick masonry work in CM (1:5) mix using bricks second class

Cum

3399.1

20394.6

18

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(d) plastering in CM (1:3) mix 12 mm thick

30

Sqm

113.23

3396.75

19

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(e) RCC (1:11/2:3) mix using 20 mm m/c HBG metal

1.2

Cum

5789.39

6947.27

20

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(f) Fe415 steel for cover slab.

215

Kg

50.63

10885.45

21

Construction of brick masonry sluice valve pit as per type design drawing including seinarage charges and cost of all materials like steel, cement, sand, aggregate, bricks and labour charges etc., complete as per directions of departmental authorities.(g) Refilling and leveling with excavated earth.

10

Cum

21.88

218.8

22

Providing additional quantity of VRCC M 30 grade using 20 mm HBG graded metal as per IS 303 including cost of materials, centering, curing, conveyance, machine mixing, vibrating, labour charges etc., complete for finished item of work for seismic design.

69

Cum

10156.81

700819.89

23

Providing additional quantity of FE 415 grade steel including cost of materials, fabrication, binding wire etc., complete for finished item of work for seismic design. ECV(INR): 3,786,388.00 ( Rupees thirty seven lacs eighty six thousand three hundred eighty eight only )

6.9

MT

40500

279450

3786387.26

percentage

BOQ 1- 3 of 3 | First | Previous | Next | Last |

S.No.

Specification Qty No. 1 ss

Unit

Rate(INR)

Amount(INR)

125000 1 liter

12.54 (Rupees twelve and fifty four paise only )

1567000

Construction of 1 no 125 KL RCC ELSR of Suitable design in a single compartment with a staging of 15 mts dead storage of 0.15 Mts and 0.30mts free board above MWL. The salient features of the ELSR are 1. Average G.L -- + 11.00 M 2. L.W.L -- + 26.00 M 3. M.W.L -- + 30.00 M The minimum thickness for top roof slab/dome shall be 100 mm. The minimum thickness of bottom flat slab & dome shall be 200 mm (with reinforcement on both faces) and uncracked section shall be adopted. All R.C.C components shall be m.30 grade. PCC Base course shall be in (1:3:6) of 150mm thick with 150mm projection on either side of the annular raft footing. Minimum depth of foundation shall be 2.50mts. (Measured at top of the base course). The SBC shall be adopted as per the report of soil investigation agency or the SBC report to be got done by contractor separately which ever is less and shall be restricted to a certain value as per the site conditions to be decided by the Superintending Engineer. Sand cushion 0.60 mts shall be provided below PCC as leveling course in case of clayey soils, galleries of 0.75 mts width and hand railing shall be provided both at floor level and at roof level. Braces and ring beams shall be of uniform cross section with 1st brace at GL. Wind forces shall be considered as 350 kg per sqm on all columns & containers. Age factor and redistribution of moments are not allowed. Roof slab shall also be designed as uncracked section. Reservoir construction shall include fixtures and accessories. Finishings of the ELSR should be done as per the specifications. Hosting, Laying, jointing and testing of CI pipe connections includes pipes, specials, bell mouths valves, bends, etc., for inlet, outlet, scour over flow connection including construction of masonry pits, surface boxes, etc., The pipes shall be cleaned after fixing and provided with 2 coats of anticorrosive black paint. Supply, delivery and fixing of the following Specification Qty Unit Rate(INR) Amount(INR) accessories of best quality and as per specification or any other higher quality. 1. C.I. Light type manhole covers of 600 mm No. as per I.S. make - 2 nos. 2. RCC Aluminum ladders of 450 mm width inside the reservoir--2 Nos. 3. Water level indicators of float operated2 ss with brass pulley, bracket, Nylon thread, PVC float,208668 gauge numbered in Mts. And 1/10th of mt, type enamel 1 1 Job 208668 with moving index -- 1 No. 4. Lightening arrestor as per IS; 3070/1974 - 1 No 5. RCC phenol ventilators of 600 mm size (Rupees two with copper or stainless steel fly proof mesh- 1 No. 6. RCC / MS ventilators of 150 mm dia manufactures out of MS 8mm lacs eight sheet and fixed with mosquito proof wire mesh of copper or stainless steel and painted with 2 coats of anticorrosive black thousand six paint -- 6 Nos. 7. Spiral stair case 1.0 m width for access to the top of service reservoir out side with necessary hand railing 1 No 8. Providing 2 coats of whether proof paint of approved hundred sixty outer surface of reservoir, columns, braces, quality to the eight only ) staircase, etc over the primary coat of white cement wash. 9. Applying four coats of corroseal apoxy based coating system to the inner faces of side walls, floor slab and all round inner columns up to MWL in base coat and 3 top coats on thoroughly prepared concrete sub surface. Each coat not exceeding 60 microns in dry film thickness, total thickness 240 microns including cost of all labour charges etc., complete for finished item of work. 10. Testing of the reservoir for water tightness including cost and conveyance of water per CI.10 of IS 3370 (part-i) of 1965 and shall satisfy the water tightness requirements as per Cl.10,12 of 3370/1965, emptying the service reservoir after testing, cleaning, finishing etc., complete. Supply and delivery of the C.I pipes of surplus earth etc. The contractorand over flow his own arrangements for conveyance Levelling the site including disposal and specials for inlet, outlet scour has to make connections to site confirming to IS 1538- 1993 specials, valves and its conveyance to site. The tentative details of pipe connections are as etc., complete 150 of CI pipes, of standard / non standard including cost and conveyance, packing forwarding, transit risk follows: 1. Inlet including cost and 150 mm dia 3. Over flow 150all taxes 4. Scour 100 mm dia 11. turn over tax for vertical connection ( as in mm dia 2. Out let conveyance to site including mm dia and duties but excluding Railing with 32mm dia GI pipes (A class per separate sheet enclosed) in RCC (1:2:4) posts of size 100 x 75 x 75 mm with 1.5m intervals around periphery on top of two rows around OHSR fixed the OHSR 12. Leveling the site including disposal of surplus earth. The tender has to quote amount for completing the Specification which Unit Rate(INR) Amount(INR) service reservoir in all respects Qty will be taken as act value. 13. Fixing of CI D/F pipes, specials, and valves, including No. valve pits and painting all the pipes and specials, valves with 2 coats of anticorrosive black paint. 14. RCC balcony of 0.75 m width at middle ring beam level and roof slab level with necessary RCC/G.I pipes hand railing. 15. Man hole frame & cover 0.75 m x 0.75mss 3 with frame as per specification10 sqm 100 light duly 2 Nos Note: 1) Wind pressure 350 kg / sqm 2) The contractor 3670.88 36708.8 has to furnish his own design and get approved by the department. 3) Bearing capacity may be taken as per soil analysis report at the proposed site. 4) The contractor has to construct (Rupees threeELSR with above fixtures and as per above capacity RCC thousand six specifications. Wherever centering is to be done it should be done with steel centering only. hundred seventy and eighty eight paise only )

Providing Flooring the reservoir area with CC(1:3:6)100mm thick top plastered with CM(1:3)20mm thick etc completed as directed by the departmental officer in charge of the work as per ss

Sl no
1 2

Description
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m Filling foundation with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with initial lead upto 50m and all lifts. Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(a) For column footings

Qty
16 26

Unit
Cum Cum

Rate
76 1651

Amount
1175 42387

3 4

2 5

Cum Cum

3147 5016

6104 22775

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(b) For pedelstals

Cum

5027

1810

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(c) For columns

Cum

5260

9416

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(d) For plinth beam

Cum

5903

13991

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(e) For lintel beam

Cum

5830

7754

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(f) For sunshades of 0.60Mts wide with 0.075m thick at fixed end and 0.05m at free end .

13

Rm

145

1925

10

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(g) For sajjas of 0.60Mts wide with 0.075m thick.

14

Rm

174

2362

11

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade (h) For roof beams.

Cum

5830

10552

12

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade. (i) For roof slab (125mm thick)

46

1sqm

964

44132

13

Plastering with CM (1:3), 20 mm thick using acco proof compound

46

1sqm

134

6124

14 15 16 17

Brick Masonry in CM (1:5) with Bricks traditional size 23 x 11 x 7 cms 2nd class Plastering with CM (1:3), 12 mm thick(A)For inside plastering Plastering with CM (1:3), 12 mm thick(B) For out side plastering Flooring with cement concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12mm thick in CM (1:3) White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

22 166 106 30

Cum 1sqm 1sqm 1 sqm

3320 83 83 401

71480 13850 8855 11894

18

166

1sqm

23

3832

19 20 21 22 23 24

Distempering, 2 Coats with Water Bound Distemper Painting 2 coats over a primary coat on new wood work Painting 2 coats over a primary coat on new Iron work Supply and fabrication of HYSD steel Supply and fixing of iron grills Supply, fabrication and transportation of G.I. Pressed section doors and door frame of size 105 x 60 mm / 1.25 mm thick hallow metal pressed section and shutters made 1.0 mm thick two GI sheets having front sheet vertical embossing and rear sheet horizontal embossing both together spot welded. The rate is inclusive of hold pasts, MS. Oxidized hinges, tower blots, aldrop, handles etc., inclusive all taxes and of one coat of epoxy primer with heat treatment.

106 16 9 4000 200 8

1sqm 1sqm 1sqm Kg Kg Sqm

43 82 77 38 52 3500

4556 1330 667 151688 10363 26460

25

Supply, fabrication and transportation of G.I. Pressed section doors and door frame of size 105 x 60 mm / 1.25 mm thick hallow metal pressed section and shutters made 1.0 mm thick two GI sheets having front sheet vertical embossing and rear sheet horizontal embossing both together spot welded. The rate is inclusive of hold pasts, MS. Oxidized hinges, tower blots, aldrop, handles etc., inclusive all taxes and of one coat of epoxy primer with heat treatment.

Sqm

3500

7350

26

Supply, fabrication and transportation of GI sheet pressed section windows with hallow metal section frame of 65 x 40 mm of 1.25 mm thick having vertical centrally portion with F4 8 section and shutter consists of Z or angle section frame and 0.8 mm thick vertically embossed GI sheet providing guard bars of 12 mm round MS bars at 110 mm c/c and handles, stays etc., inclusive all taxes and of one coat of epoxy primer with heat treatment.

Sqm

3750

27000

27

Collection and supply of Gravel including cost and conveyance of materials to work site, stacking to dept., gauge and labour charges etc., complete-1cum Spreading and compaction of Gravel including watering, rolling with 2T hand roller and barricading etc., complete with irrespective of thickness -10 cum

1440

1 Cum

239

343613

28

1440

1 Cum

23

33324

886768

Sl no
1 2

Description
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m Filling foundation with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with initial lead upto 50m and all lifts. Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(a) For column footings

Qty
16 26

Unit
Cum Cum

Rate
76 1651

Amount
1175 42387

3 4

2 5

Cum Cum

3147 5016

6104 22775

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(b) For pedelstals

Cum

5027

1810

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(c) For columns

Cum

5260

9416

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(d) For plinth beam

Cum

5903

13991

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for M-25 Grade(e) For lintel beam

Cum

5830

7754

17

Flooring with cement concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12mm thick in CM (1:3) Supply and fabrication of HYSD steel

30

1 sqm

401

11894

22

1000

Kg

38

37922

155227