CIP 2011 Project Outline Project Scope Project 1 Electrical Engineering (Code : E1) 1. 2.

Internship Category: Summer Intern Internship Period: June 2011 Aug 2011 Preferred University Disciplines: First Priority : Electrical Engineering Project Name: Study to compare HVAC Vs HVDC for bulk power transfer in an interconnected system. Project Description(s): Collect, analyze and compare the pros and cons of various types of interconnectors such as EHV AC, HVDC, HVDC Light/Plus, etc. to identify the most appropriate one for bulk power transmission. Project Deliverables: A detailed study report with appropriate reference materials and a technical presentation to CLP planning engineers. Special skills required: Information collection and analysis skills

3.

4.

5.

6.

7.

CIP 2011 Project Outline

Project Scope Project 2

Electrical Engineering (Code : E1) 1. 2. Internship Category: Summer Intern Internship Period: June 2011 Aug 2011 Preferred University Disciplines: First Priority : Electrical Engineering Project Name: 11kV Overhead Line Automatic Restoration System Project Description(s): Explore smart switches for applications in the overhead line network. Design schemes for usage in different types of overhead line configurations. Devise project implementation plan. Project Deliverables: Produce project reports, conduct knowledge transfer workshop. Special skills required: Knowledge on power distribution.

3.

4.

5.

6.

7.

CIP 2011 Project Outline

Project Scope Project 3

Electrical Engineering (Code : E1) 1. 2. Internship Category: Summer Intern Internship Period: June 2011 August 2011 Preferred University Disciplines: Electrical Engineering Project Name: Productivity Review of Frontline Workforce Project Description(s): Review the existing productivity of frontline workforce (jointers, fitters and linesmen) in North Region and identify opportunities for productivity improvement. Provide recommendations on how to improve the productivity.

3.

4.

5.

6.

Project Deliverables: A report on productivity review on frontline workforce, including current situation analysis, opportunities indentified for improvement and recommendations to North Region management.

7. Special skills required: Knowledge of Resources Management

CIP 2011 Project Outline Project Scope Project 4 Electrical Engineering (Code : E1) 1. 2. 3. Internship Category: Summer Intern Internship Period: June 2011 August 2011 Preferred University Disciplines: Electrical Engineering Project Name: Power Supply and Circuit Diversion Work to XRL Projects Project Description(s): About 22km of 11kV cable will be installed to commission several substations for the provision of supply to various XRL work sites in Yuen Long. Overhead line & cable diversion will also be carried out in phase with the construction work.

4.

5.

6.

Project Deliverables:
Work planning formulate a work plan through

liaison with external parties like MTR and other utilities Site activities trenching work, plant erection and commissioning Safety Project management timely completion with budget 7. Special skills required:

Fluency in computer skill Strong electrical engineering background Like to communicate with others

CIP 2011 Project Outline

Project Scope Project 5

Electrical Engineering (Code : E1) 1. 2. 3. 4. Internship Category: Summer Intern Internship Period: June 2011 August 2011 Preferred University Disciplines: Electrical Engineering Project Name: Develop a Monitoring check point System for the Implementation of Supply Point System. Project Description(s): Implement the Supply Point System from Start to End, no missing error or otherwise with ban function before moving to next step.

5.

6.

Project Deliverables: At the Supply Point End stage, to study the possibility of auto-checking function onto various CLP IT system such as AMFM, DMS-Substation Number, with counterchecking function with MACS CS end-code activity i.e., activation of account, meter number & meter locality with possible enhancement to an auxiliary help function of some universally adopted common platform.

7.

Special skills required:

Basic knowledge of CLP new supply administrative and engineering procedures/steps from submission of a new supply application to the final installation of an electric meter. Proficiency in using PC application with some knowledge of PC Programming

CIP 2011 Project Outline

Project Scope Project 6

Electrical Engineering (Code : E1) 1. 2. 3. Internship Category: Summer Intern Internship Period: June 2011 Aug 2011 Preferred University Disciplines: First Priority: Electrical Engineering Second Priority: Civil Engineering Project Name: Identify Green Initiatives in Transmission Cable Projects Project Description(s): Identify the potential green initiatives in transmission cable projects and analysis the cost effectiveness of the initiatives.

4.

5.

6.

Project Deliverables: A proposal to summaries the findings and making recommendation on the green initiatives that are worthwhile to implement with justification and timetable.

7.

Special skills required: Good communication skill to interview stakeholders (including CLP staff, contractors, cable suppliers, etc), good engineering judgment, and analytical mind.

CIP 2011 Project Outline

Project Scope Project 7

Electrical Engineering (Code : E1) 1. 2. 3. 4. Internship Category: Sandwich Intern Internship Period: June 2011 May 2012 Preferred University Disciplines: Electrical Engineering Project Name: Distribution Management System Enhancement Project Description(s): Increase the number of Remote Terminal Units (RTU) channels on the Distribution Management System by adding new front-end processors and integrate them with the existing ones.

5.

6.

Project Deliverables:

New front-end processors commissioned to the system Some existing RTU channels diverted to the new frontend processors Prepare documentation and training materials for the O&M of the new equipment

7.

Special skills required:


Logical thinking Good project planning Strong English writing skills

CIP 2011 Project Outline

Project Scope Project 8

Electrical Engineering (Code : E1) 1. 2. 3. Internship Category: Sandwich Intern Internship Period: June 2011 May 2012 Preferred University Disciplines: Electrical Engineering Project Name: PC Application for Transbution System Outage Preparation Project Description(s):

4.

5.

Streamline outage preparation for the transbution circuit connecting multiple transformers through automation. Improve efficiency of outage preparation and quality of the end product with the use standardized complex switching program with automated features to cater for different requirements and equipment.

6.

Project Deliverables: Develop user-friendly applications to enhance and automate the existing outage template to streamline outage preparation for multi-ends transbution circuits under different combination of outage requirements and equipment.

7.

Special skills required: Simple Visual Basic Programming or excel marco programming.

CIP 2011 Project Outline

Project Scope Project 9

Electrical Engineering (Code : E1) 1. 2. 3. 4. Internship Category: Sandwich Intern Internship Period: June 2011 May 2012 Preferred University Disciplines: Electrical Engineering Project Name: Development of Digital Substation for Smart Grid Project Description(s): Under supervision of senior engineer, the successful candidate will be assigned as project team member of the digital substation project and go through key processes in the project life cycle from engineering design to final testing and commissioning.

5.

6.

Project Deliverables: Final project report documenting the development of digital substation including business drivers, systems architecture, engineering design, construction supervision, testing and commissioning requirements, etc.

7.

Special skills required: Basis knowledge on power engineering and protection.

CIP 2011 Project Outline Project Scope Project 10 Electrical Engineering (Code : E1) 1. 2. 3. Internship Category: Sandwich Intern Internship Period: June 2011 May 2012 Preferred University Disciplines: First Priority: Electrical Engineering Second Priority: Electronic Engineering Project Name: Power Quality Evaluation and Applications Project Description(s):

4.

Mitigation

Solution

5.

Evaluate a new no-break voltage dip tester. Design and evaluate a standard LV changeover scheme. After completing evaluation tests, full test reports needed to be produced.

6.

Project Deliverables: All the evaluation tests shall be completed with test reports for the submission to supervisor.

7.

Special skills required: Use of test equipment and knowing of simple computer programs.

CIP 2011 Project Outline Project Scope Project 11 Electrical Engineering (Code : E1) 1. 2. 3. Internship Category: Sandwich Intern Internship Period: June 2011 May 2012 Preferred University Disciplines: First Priority: Electrical Engineering Second Priority: Electronic Engineering Project Name: Operational Database Project Description(s):

4. 5.

Develop a user-friendly human-machine-interface for operators to use. Develop a central database to capture all the data and compress the data for storage purpose

6.

Project Deliverables: Find out and interlink the key unit planning information from different platforms. Design a user-friendly humanmachine-interface for operators to use.

7.

Special skills required:


Analytical & critical thinking Good IT skill Good interpersonal skill

GBG

Vous aimerez peut-être aussi