Vous êtes sur la page 1sur 2

5

National Avenue

Madra Ave. M a d ra A v e. 8 c U nderground U tility P roject n derground d roject Hotel Circle North C om pleted p leted

Project Area
Sunset Boulevard

UTILITIES UNDERGROUNDING PROGRAM


DELCERRO-PROjECTBLOCk7CC
ve see A Gene

R idgem oor D r/O verlake id ge m e r/O verla ke r U nderground U tility P roject n derg round g ro je ct o C om pleted om

A AV EA EA AN WA WA WA DW

Washington Street
University Avenue

52
Lun aA ve nu e

DA FFO DIL LN

WELCOMETOTHEUTILITIESUNDERGROUNDINGPROGRAME-NEWS#8 CURRENT This is the eighth e-news update to inform you of the progress of the Utilities Undergrounding Program in the Del Cerro/7CC Project Block CONSTRUCTION AreaS area. Approximately once a month during construction, or when significant events occur, you will receive an e-mail update.
rd va ule Bo na re o

AV MA MADRAAV MADRA A

Lun aA ve nu e

u tla

Dr. nd

UTILITIESUNDERGROUNDINGPROGRAMDESCRIPTION The City of San Diego has been undergrounding utility lines since 1970. Approximately 1,200 miles of overhead utility lines remain to be undergrounded. The City, in cooperation with SDG&E, Cox Communications, Time Warner and AT&T, is currently undergrounding Y W the utilityINlines in your community. V
ve see A Gene

Skyline D r.

YO KOH AMA CT

Pa r

ad

M a nzana

LC CURRENT ER CONSTRUCTION RO Area


y Rd. Valle ise

DE

lloc k Dr. Bu

PROjECTBLOCk7CCCONSTRUCTIONACTIvITIES PROjECTBLOCk7CCHIGHLIGHTS CT Trenching Activities - Regis Avenue, Wesley Place and 3.8 miles of utilities will be undergrounded NORM ON AN LN Linfield Avenue 422 private residences will have their utilities undergrounded HL 56 Istreet lights will be installed LG vICINITYMAP:DELCERRO 67 shade trees will be installed RO Mad 40 curb ramps will be installed LAKE MURRAY Streets will be resurfaced or slurry sealed curb-to-curb RI en ue Project VE Area
CIUD AD LE
Murray Park Drive

L CA

PROjECTBLOCk7CCCONSTRUCTIONACTIvITYPHASES Construction start: September 2010 Panel and trench work: Sep. 2010 - Sep. 2011 Cabling, cut-overs and streetlights: Oct. 2011 - Jul. 2012 Overhead line removal: Summer 2012 LIND StreetAresurfacing: 2013 LN

ont Mes a Blv d. C l a irem

Mo r

levard Bou a ga

Clair Me s a B

Jut la

ou

em

ay

nd

Dri v

ont levard

Hig

hw

Clairemont

Wa sh ing

t tre e nS to

Project July 2011 Area


ive Dr

ont Mesa B lv d. C l airem

Ft. Stockton Drive

Goldfinch Street

D T DR MH M ELM ELMHURST

r. ont D Clairem

ve. ga A M o ra

Br o

ey Rd .

ave n okh

d.

Va ll

Way

Lak eM urr ay B

St. Alsacia
.

Rd

ul e

Dr .

A lt

ie

CER

RO B

ALTA IR C OU

OUL

Monte

EVA

zuma Rd

70th Street

REDITH A VEN ME UE

REG IS A VEN

HLA ND

E NU VE A

AY

UE

AS

L IN FIE LD

BROM LEY W AY

a en or Bl

Project Area

vd .

Lake Shore D r
ive

BO CURRENTCONSTRUCTIONAREAMAP:DELCERRO U
Br

VE

nue Ave ge lle Co

ra

Av

D D

Para d i se

TE MA ST

orthingto n S. W

LE
od

De lC err oB

iar

wo

VA RD

oule v

ard

CURRENT CONSTRUCTION Area


o

Sw e

54

rd va

et w
d. rR a te

HILL
DEL

aV

GRO

VE D

EDIN BUR GH

dman St. oo W

RIVE
.

RD

CAV ITE C

RT

E NU VE

Legend
Trenching activities
J JOB DIVIDIN G LINE

NORTH No Scale

Contact
ALVAR ADO R

Information
D

Information Line: (619) 533-3841 Email: undergrounding@sandiego.gov Website: www.sandiego.gov/undergrounding

PAG E
TE LAN DE A AV

Utilities Undergrounding Program: E-News #8


delcerro-Project Block7cc

July 2011
CORRECTIONNOTICES Currently, there are 28 residences that need to make corrections to their services or properties in the 7CC Project Block. Most of these corrections are minor and are the responsibility of the property owner. Corrections need to be completed before we can cut customers over to the new underground system. Customers who are not cut-over to the new underground system risk loss of service when the overhead system is removed. If you need to make a correction to your property in order to pass final inspection, you will receive a door hanger or letter from a City of San Diego inspector. The door hanger and letter have a description of the correction needed. Most of these corrections are minor. Please do not delay in contacting the inspector whose name and phone number appear on these notices, so that the problem can be resolved. SAfETY If you see anyone on your property that is not visibly wearing an identification badge, or if they are in a vehicle that is not marked with a contractor or utility company name, please call the Information Line at (619) 533-3841 or the San Diego Police Department. The construction crew must travel in marked vehicles and have proper identification at all times on the jobsite. CONTACTUS In the event that you are not satisfied or pleased with the work that was done on your property or your street, please let us know. Please do not attempt to make corrections, adjustments or improvements yourself. We promise to work with you on reaching a solution or creating an outcome that meets your needs and ours in this process. We will not be able to switch your services to the new underground system if any modifications were done to our work. If you are unsure about the status of the work that has taken place on your property or your street, contact us at: Information Line: (619) 533-3841 Email: undergrounding@sandiego.gov

PANELANDTRENCHINGACTIvITIES Panel work by Southern Contracting began in September 2010. Panel work is when electricians prepare the electrical panel at your home to receive underground service. Approximately two weeks prior to any work being performed on your property, you should receive a door hanger with the electrical contractors name and phone number on it. If you have any questions or concerns about the work, please do not hesitate to contact the electrical contractor. To date, approximately 98% of the paneling work has been completed. You have likely seen trenching crews working in the streets. Trench work is approximately 65% complete in Project Block 7CC. We ask for your patience as they complete this work, as it can be disruptive and distracting. Approximately two weeks prior to the start of the trench work on your property and in the street, you will receive a door hanger with the trenching contractors name and phone number on it. If you have any questions or concerns about the work, please do not hesitate to contact the contractor.

Trench work on the 5600 block of Meredith Avenue.

CABLING,CUT-OvERANDOvERHEADLINEREMOvAL After all trenching operations have been completed by our contractor, the cabling portion of the work will begin. Another contractor will perform the cabling work. Cabling involves technicians placing new utility lines in the new conduits, so that the new lines can be energized and brought into service. Once the new system has been energized, the process to cut-over customers from overhead to underground services will begin. Once customers have been cut-over, the overhead lines will be removed. We anticipate this process will move very swiftly and its not nearly as disruptive or distracting as the trenching work, which is why you may not even see us working. Contact Information

UTILITIESUNDERGROUNDINGPROGRAMvIDEO A video about the Utilities Undergrounding Program can be seen by visiting our web site at www.sandiego.gov/undergrounding and clicking on video. By watching it, you can see all the processes associated with our work and gain a better understanding of what is involved in completing those processes. We thank you in advance for your patience and support while we complete the Utilities Undergrounding Program project in the Del Cerro community.

Information Line: (619) 533-3841 Email: undergrounding@sandiego.gov Website: www.sandiego.gov/undergrounding

PAG E

Vous aimerez peut-être aussi