KAUSHIK ROY Dear Sir, Please receive the work report from my side as follows: 02/05/2011:1.

Along with Manikant & Somenath made the Sync Bible of the services provided by TSH consisting of Installation & commissioning of OSA products. Health Check up & Trouble Shooting of OSA products. Sync Audit & Planning for Telecom Network. Synchronization Clock Test for Telecom Network

2. Made a Comparison of OSA 3230B,OSA 3235B, OSA 5585B VS TC 4400 ,TC 4500 & give it to Maju Sir for final Check Up based on the following points: Performance Accuracy Input Specifications Output Specifications Power supply facility Battery Back up Management facility. Hardware configuration Environmental Condition

3. Had a discussion with Suresh Sir based on the following points: Cesium Tube & its operational principle Rubidium card & its principle of operation Quartz card & its principle of operation Working fundamentals of OSA 5330 PTP GM & OSA 5320 PTP Slave

4.

Read the datasheets of OSA 5241 based on the following points: Input specifications Output specifications Protection on outputs Power supply options Management facility Hardware configurations Environmental Conditions

04/05/2011:1. Studied the datasheets of OSA 5548C & OSA 5220 based on the following points: Input Specifications Output Specifications Protection on outputs Power supply facility Hardware configurations Management facility Environmental Conditions

2. Studied the datasheets of OSA 5565 STS based on the following points: Internal Reference External Reference Input Measurement Environmental Conditions Output Specifications Power supply facility Hardware configuration

3. As per the schedule Piyush Goyel gave us a valuable training of SDH analyzer based on the following topics: Working procedure of SDH analyzer Jitter measurement & its formal criteria of operation Jitter generation & its formal criteria of operation Jitter tolerance & its formal criteria of operation Fast Jitter tolerance & its formal criteria of operation Jitter transfer & its formal criteria of operation What kind of signal tag( Looping or live) is needed for Jitter test How we can do wander test on SDH analyzer

Thanks & Regards, Kausik 05-05-2011 Dear Sir, Please receive the work report from my part as follows: 05/05/2011:1. Read the datasheets of OSA 5210 based on the following points: Input specifications & its configuration. Output specification & its configuration. Protection on outputs. Management facility. Power supply options. Hardware configurations. Environmental Conditions

2.

Studied the following parameters related Synchronization: TIE( Time Interval Error) MTIE( Maximum Time Interval Error) MRTIE( Maximum Relative Time Interval) TDEV( Time Deviation) Parameters of Jitter & Wander

3.

Had a discussion with Somenath based on the following topics: Holdover quality of Rubidium & Quartz oscillator. Basics of soft loop & hard loop of Synchronization networks. Basics of SDH analyzer & its working principle.

4.

Co-ordinate with Debanjali mam to track 1no of 2E Rb clock( Sl No- 87133) whether it came from Symmetricom after repair or not. After a discussion with Mr. Nirmalya Ghosh it was confirmed that it has not come to us after repair till now. Correct & modify the Sync Bible & gave it to Shiv Sir. 06/05/2011:-

5.

1.

Aircel, Kolkata Issue: As per the instruction I along with Manikant & Somenath visit to Aircel, Kolkata office for taking out the following equipment which was installed there: LMR 400 Cable - 160 Mtrs. RG 59 Cable 10 Mtrs. DC Power Cable- 2 No. Inline Amplifier- 1 No. GPS Antenna- 1 No.

We take rest of the element except LMR 400 cable & DC power cable from there. 2. TTSL Kolkata Issue: As per the instruction visit to TTSL,Kolkata for doing NMS Integrity and done the following things: First log into the OSA 5581C which was installed there by LM 5581C software.

Then check the network configuration of it & found that the gateway of it has been changed & it was 10.112.24.65. Changed the gateway as per Mumbai TTSL NOC & set to 10.112.24.1 but it still invisible to TTSL NOC Then found that the physical connectivity from our equipment to router is not properly done & told this to TTSL officials. They told that as the routing is very much older they need some time to reroute the LAN cable connecting the equipment & Router & told me that they will make the site ready on Monday.

3.

PTP GM Installation( IDEA, Lucknow) issue: As per the schedule send the following equipment to IDEA, Lucknow which will be needed there to our Engineers: Inline Amplifier- 1 No. Rack Screw- 1 Box. Balloon Converter- 5 No. DB9 connecter- 5 No DB9 connecter cover- 5 No RG 58 cable -5 mtrs.

Thanks & Regards, Kausik 09-05-2011

Dear Sir, Please receive the work report from my side as follows:
1. Read the datasheets of OSA 3235B Cesium based on the following points: Input Specifications. Output Specifications. Power supply facility. Protection on power supply. Battery back up facility. Hardware configurations.

2.

Management Facility. Environmental Conditions.

Discussed with Somenath based on the following points: Operating principle of OSA 4532 GPS-SR. Interconnection between OSA 4531 with time watch & SMPS. Wander test using time watch. SDH analyzer. Oscilloscope Test. Frequency Counter test. Basics of E1/T1.

3.

Done a comparative study between TP1000 with OSA 5548C E60 & OSA 5581C based on the following points: Input Specifications Protection on Inputs Output Specifications. Redundancy on Outputs. Hardware Configurations. Power supply facility. Management facility. Environmental Criteria.

Thanks & regards, Kausik


09-05-2011

Dear Sir, Please receive the work report from my side as follows:

09/05/2011:-

1.

Read the datasheets of OSA 5225 & 5220 NTP server based on the following points: Input Specifications. Output Specifications. Protection on inputs & Outputs. Power supply facility. Hardware Configurations. Management Facility. Performance on timing. Environmental Conditions.

2.

Discussed with Somenath Based on the following points:


3. OLP switch Issue:

Types of service provided by TSH from synchronization point of view Synchronization clock testing & its activity report. Sync audit & planning SSU health check up & trouble shooting & its activity report Installation & commissioning of OSA equipment. Details of wander test & snap shot of that result. Snap shot of the jitter test. Types of jitter test. Basics of Time watch Basics of OSA 4531. TIE, MTIE, TDEV

Call Mr. Saundar of TTSL, Bhubaneswar & understand the problem about the OLP & then make him understand all the issues regarding OLP.

4. Had a discussion with Debanjali Mam about the repairment issue of 2E clock SL No- R87166 of Symmetricom.

10/05/2011:-

1. Read the datasheets of OSA 5548C based on the following points: 2. Input Specifications. Output Specifications. Protection on inputs & Outputs. Power supply facility. Hardware Configurations. Management Facility. Performance on timing. Environmental Conditions.

Read the following topics related to Synchronization:


3.

PCM (Pulse Code Modulation) PDH (Plesiochronous Digital Hierarchy) PDU (Protocol Data Unit) PPM (Parts per million) PPS (Pulse per second) PRC (Primary Reference Clock) PSTN (Public Switched Telephone Network) PSU (Power Supply Unit)

Dispatch the following equipment related to PTP GM installation: 6 pc. of Balloon Converter 6 pc. of DB9 male connecter. 6 pc. of DB9 connecter jacket. 1 packet of Rack screw.

PTP input cable -5 mtrs.

Thanks & Regards, Kausik


11-05-2011

Dear Sir, Please receive the work report from my part as follows:

1.

Read the datasheets of OSA 5340 GPS-SR based on the following points:


2.

input specification output specification no of output available hold over quality accuracy of the equipment power requirement physical specification typical application Management facility. Types of connector used in equipment

Had a discussion with Somenath based on the following topics:

Operation of OSA 4531 GPS SR. Interconnection between OSA 4531 GPS SR & time watch & SMPS.


3.

Time watch test. SDH Analyzer. C.R.O test Frequency counter test. E1/T1.

Read the following topics regarding Synchronization: Stratum Lavel ITU-T standards PRC SSU SEC Basics of SDH

Thanks & Regards, Kausik


14-05-2011

Dear Sir, Please receive the work report of myself as follows:

1. Rental Quote issue of Wipro: Go through the trail of mails for rental quote issue of Wipro where they need a GPS based rubidium clock. As no technical specification from Customer side is provided, as per my & Somenath technical observation we suggest OSA 5240 GPS-SR and ask suggestion from Maju Sir . Maju Sir write us that we can also quote OSA 5210 for the same reason. 2. Sync Clock testing issue of NSN: Go through the mails regarding the issue. Discussed with Rajat Subhra Dutta & Somenath about the details of it & found that some of its clauses are very heard to understand its exact point of notification.

Tell this to Mr. Soumya Ghosh & further known that the issue will be resolved soon. 3. Idea, Lucknow Issue: Analyzed the raw data coming from Idea, Lucknow site and it sent to Abhishek Anand accordingly. Discussed with Anand Sir about its quality as it showing a very bad output result crossing all the masks. Later they also send another raw data for analyze which was done by Somenath & Soumya Ghosh. 4. TTSL, Bhubaneswar OLP issue: Had a discussion with Maju Sir about the operation of LCT s/w of OLP. Maju sir gave us some training on that to operate it verbally but as the LAN cable could not connected with the OLP the practical training was not done. Maju Sir told us that the latter part will be done on Monday. 5. Studied the following topics related to Synchronization: STM PDH ATM PSTN Thanks & Regards, Kausik
16-05-2011

Dear Sir, Please receive the work report from my side as follows: 1. Wipro Rental Issue: Go through the mails which was given to us as a feedback for technical specifications which containing the datasheets of Symmetricom Rubidium Source 2000. Discussed the matter with Maju Sir and came to know that the customer need a Rubi Source for testing purpose & also discussed with him whether we can give our customer the same or not as it is available with us. After discussing with Shiv Sir, Maju Sir told me that we can give it only after the testing of its current condition as it had not been used for a long time. Based on that discussion arranged a testing programme on Tuesday for the Rubi source at G.H where Somenath will be along with me. 2. Areva Material Issue: I along with Somenath made a packing list for customer based on the product we quote i.e. OSA 4531 which is supposed to come at our Rubi office by today. 3. Read the datasheets of Rubidium Source 2000 based on the following points:

Input Specifications. Output Specifications. Connecter configuration & specifications. Management facility. Power supply options. Holdover quality. Warm-up time. Environmental conditions. 4. TTSL, Bhubeneswer OLP switch Issue: Me & Somenath Test an OLP switch with LCT software at our Lab for learning purpose. As the switch was not pinging with laptop we virtually learn how to operate the LCT software by its demo version. Go through the manuals of LCT software provided by Maju Sir. Had a discussion with Shamal Sir regarding this issue & also confirm him that Somenath will visit TTSL, Bhubeneswer site for the same issue on Wednesday. Give the Win XP SP3 C.D. to Somenath which he need for the site accordingly. 17/05/2011:1. Wipro Rental Issue: As per the schedule first report to our Rubi office and pick up Manikants Laptop from D.C. Ray sir as this will be needed for testing. Gone to our Baguiati store room where Somenath joined me & track 1 no of Rubi Source 2000(SL no), & its antenna kit. Took one time watch (SL no-SW100304) kit & SMPS for testing purpose from Baguiati office. Start the testing & the Rubi source start calibrating properly but it will take several hours to properly calibrate. 2. AREVA material Issue: Checked the materials coming for AREVA. Found the following thins on it: I. 1 No of OSA 4531 GPS-SR( SL No- 768). II. 1No of Lightening arrester kit containing- 1 No of Lightening Arrester, 10 Mtrs. Interconnecting cable. III. 2 no of Software C.D. of LM 4531 & 5240 IV. 1 No. of Balloon converter( BNC male to Crone connecter) V. 1 No of GPS antenna kit. Could not find 60 Mtrs LMR 400 GPS antenna cable. Notify the same in mail & inform it to Puja. Modify the customer packing list for the same. Thanks & Regards, Kausik

18-05-2011

Dear Sir, Please receive my Daily Activity Report as follows: 1. Aircel,Globsyn Cable Issue: As per the schedule first visit to Aircel, Globsyn office & meet Mr. Santu Mallick & tell him that we need to take out the 160 Mtrs LMR 400 cable from their office by today. In the meantime the labour which I fixed yesterday for dismantling of the cable joined me. As per the discussion with Mr. Mallick meet the Security incharge of the Globsyn building naming Mr. Chetri and told him the total scenario. After getting the keys of all the doors from where we can drag out the cable, done the job successfully i.e. drag the cable from 11th floor to 3rd floor. After getting the gate pass of the cable from security placed it in our Baguiati store room accordingly. 2. AREVA rental issue: Monitored the Rubi Source test using Time Watch which was start yesterday. Send the 14 hrs. Data of the test to Mr. Soumya Ghosh for analyzing. After getting the analyzed data from him, go through on it which showing a bad data quality as the data could not pass the G.811 mask. Set another new Rubi Source for testing accordingly which is supposed to on through the whole night. 3. TTSL, Bhubaneswar OLP Issue: Arranged gate pass for Somnath on the site after discussing with Mr. Saundar. Co-ordinate with Somnath regarding OLP LCT software demo in that site. Had a discussion with Mr. Saundar & told him to fix a proper laptop with Win XP SP3 by tomorrow as today they are facing some problems with their laptop. Had a discussion with Mr. Umesh, Site incharge regarding the same issue & after telling him the criteria for running the s/w told him to fix up proper arrangements. Thanks & Regards, Kausik
19-05-2011

Dear Sir, Please find my Daily Activity Report as follows: 1. Wipro Rental Issue: The test for another Rubi Source (Sl No-331) which was start yesterday is completed. Download the raw data of that test accordingly.

Put all the test equipment to our Baguiati store room. Install the Time Watch Analyzer software to Manikants Laptop. Analyzed the raw data & sent the same to Maju Sir accordingly. Discussed with Maju Sir & Shiv Sir about the quality of the data as it was not upto the mark. We came to the decision that we have to re test the equipments as may be it would take some more time to working properly. 2. PGCIL ,Orissa Tender Issue: Read the tender document carefully. Find out our scope on the tender. Made a compliance sheets based on the technical specification present in the tender. Send the compliance sheet to Maju Sir for finalization. Maju Sir send the final compliance sheet to our corporate team accordingly. 3. Railtel Tender Issue: Gave the datasheets of OSA 5548C E60 & OSA 5210 to Mr. Soumya Ghosh accordingly. 4. Sync Stock Updation: Update the stock based on the following changes done with the stock: Modify DB9 connecter with dust cover & Balloon converter from 108 pairs to 83 pairs in our Kolkata stock. Made an entry of OSA 4531(Sl No- 768) which is coming from OSA for AREVA, in our Kolkata stock. Made an entry of GPS antenna (Sl No- 08N90914) which was recovered from Aircel, Globsyn, in our Kolkata stock. Made an entry of LMR 400 cable (160 Mtrs), RG 59 cable (10 Mtrs) & 1 no of Inline Amplifier (Sl No- 10630172797) which was recovered from Aircel, Globsyn in our Kolkata stock. Made an entry of 1 no of OSA 5240(Sl No- 1078) which will go for repair soon in our Kolkata stock. 5. TTSL, Bhubeneswer OLP issue: Co-ordinate with Somnath for smooth completion of the demo of LCT software. Had a discussion with Mr. Umesh of TTSL for arranging the proper Laptop/desktop where we can smoothly run the software. Thanks & Regards, Kausik 20-05-2011 Dear Sir, Please receive the Daily Activity Report of myself as follows:

1. As per the schedule first report to our Rubi office & pick up Manikants laptop for testing purpose of Rubi Source. 2. Gone to Baguiati store & pick up the following things for testing & go to G.H: 2 no of Rubi Source(Sl No- 330 & 331) 1 no of Time Watch (SW100304) & its accessories. 1 no of SMPS. 80 Mtrs LMR 400 cable. GPS antenna kit for both the Rubi Source. 3. Tied the antennas of Rubi Source & Time Watch to the roof top. 4. Lay the 80 Mtrs LMR 400 cable properly. 5. Start the both Rubi Source & also switch on the Time Watch. 6. Both the Rubi source had been locked with GPS successfully after 2 hrs. 7. Fed the out put of Rubi Source (Sl-331) as Ref in of Time Watch & measure the quality of another one (Sl No-330). 8. After 2 hrs of testing download the raw data & sent to our team for analyze. 9. Puja sent me the analyzed data which was meeting the G.811 quality thus showing a preferable result of it. 10.That test was completed at 8 p.m. 11. Now taking Rubi Source (Sl No-330) as reference test the output of another one (Sl No-331). 12.That test was completed at 3 a.m. 13.Then measure the output of Rubi Source (Sl No- 331), taking GPS as feedback of Time Watch. Thanks & Regards, Kausik 21-05-2011 Dear Sir, Please receive the work report from my part as follows: 1. The measurement of Rubi Source(Sl No-331) taking GPS as reference is completed at 7 a.m. 2. Download the raw data of the out put & send to Puja for analyze. 3. Measure the output of Rubi Source(Sl No-330) taking GPS as refernce. 4. The test was completed at 10.30 a.m. & send the raw data of it to Puja accordingly. 5. After getting all the test result discussed with Shiv Sir & Maju Sir about the quality of both & come to the decision that 1 Rubi Source (Sl No- 330) is not working properly as its output was not good. 6. Then took another two Rubi Source which we have with us in our Baguiati stock, to our G.H. 7. Switch on the both Rubi Source for testing. 8. One of it couldnot power up & discussing with Maju Sir about the scenario come to the decision that that was faulty. 9. Another Rubi Source is powered on & it is now in tracking mode.

10.Till 6 p.m. it was still in tracking mode. Thanks & Regards, Kausik 23-05-2011 Dear Sir, Please receive the work report from my part as follows: 1. As per the schedule first gone to our G.H. where the test of Rubi source was going on. 2. The Rubi Source was still in tracking mode. 3. Had a discussion with Maju Sir about the Rubi Source, as it was not tracking till then Maju Sir told us that the equipment may be faulty. 4. We put all the testing equipment at Baguiati office & come back to Rubi Office. 5. Puja told me that the 60 Mtr LMR 400 cable is already arrived in our H.O. 6. Had a discussion with Jajoo Sir along with Mr. Soumya Ghosh, about the dispatch matter of OSA 4531 material to AREVA. 7. Correct the packing list for customer as directed by Jajoo Sir. 8. Pack the material for dispatch except the cable. Thanks & regards, Kausik 25-05-2011 Dear Sir, Please receive the work report from my part as follows: 1. As per the schedule first gone to our Baguiati Store where Manikant & Somnath joined with me for taking all the equipments & accessories for Bharti Synchronization Clock Testing. 2. Listed up & took the following things for Bharti Testing: LMR 400 GPS antenna Cable- 100 Mtrs. Time Watch (SW100304) - 1 No. OSA 4531 GPS-SR- 2 Nos. GPS Antenna (OSA Make) - 3 Nos.

CRO- 1 No. SDH Analyzer- 1 No. Frequency Counter- 1 No. TNC male to N- female adapter- 1 No. N- Female to BNC male Adapter- 1 No. Cross cable- 2 Nos. Straight Cable- 1 No. UTP cable- 5 Mtrs. RG 58 Cable- 5 Mtrs. BNC male to BNC male cable- 3 Nos. Multimeter- 1 No. DC power cable- 5 Mtrs. AC power adapter- 1 No.

3. Gone to our Rubi office & handed over the key of Baguiati Store to Mohta Sir & also took the declaration of the above listed things for road. 4. Set the journey for Wagwanpur BTS site from Howrah at 2. 30 p.m. & reached there at 6.30 p.m. 5. Had a discussion with the Site incharge Mr. Santanu Mondal & arranged electrician for D.C. power outage. 6. Had a discussion with Manjunath Sir for site activity. As the darkness is already there Manjunath Sir told us to start the Site preparance by tomorrow morning & also told us that he will notify the point which is to be tested by tomorrow. 7. We put all our equipments & accessories inside the BTS room safely & left the site. Thanks & Regards, Kausik 26-05-2011 Dear Sir, Please receive the work report from my side as follows:

26/05/2011:1. As per the schedule report to the Bhagbanpur,Airtel Site at 9 a.m. 2. Along with Manikant & Somnath completed the following Site Preparance i.e. Cable Layout, GPS antenna installation accordingly. 3. Set the arrangement for Wander test i.e. DC power connection, Time Watch Connection, OSA 4531 installation. 4. After getting the proper connection from ET terminal completed the test for waveform shape of output by CRO.

5. Completed the test for frequency recognization by Frequency Counter. 6. Completed the Jitter test of the same output by SDH Analyzer successfully. 7. Start the 24 hrs Wander test using Time Watch. 27/05/2011:1. 2. 3. 4. As per the schedule reached the site accordingly. Completed the 24 hrs Wander test. Download the RAW data of the same & sent to Puja for analyzation. I along with Somnath & Manikant had a discussion with Manjunath Sir with analyzed data of Wander test & of Jitter test. 5. Manjunath Sir told us to do a 24 hrs Wander test of another output which is of Vodafone as the said site is shared by Vodafone & Airtel. 6. Start the 24 hrs Wander test accordingly. 28/05/2011:Reached the site at 10 a.m. accordingly. As per the schedule Maju Sir joined with us. Completed the 24hrs Wander test for Vodafone accordingly. Download the raw data & sent to Puja for analyzation. Discussed with Manjunath Sir about the result of wander test. As per Manjunath sir test the Jitter test of the same output & discussued the same with Manjunath Sir. 7. Manjunath Sir told us to go for another 24 hrs Wander test of the same output for assurance. 29/05/2011:1. As per the schedule report to the site. 2. As per Manjunath Sir retest the Jitter test of the Output to be tested of Airtel node. 3. Completed the 2nd Wander test of the Vodafone output & got the analyzed data from Puja. 30/05/2011:1. Manjunath Sir discussed with us about the result of Vodafone & also told us to do another test in Martala Airtel site. 2. 3. 4. Done the site preparance at Martala site with Maju Sir & Somnath. Completed test from the output given by the site engineer. Start the Wander test accordingly. 1. 2. 3. 4. 5. 6.

31/05/2011:1. We completed the 12 hrs Wander test accordingly.

2. Download the raw data & sent the same to Puja for analyzation. 3. Done the Frequency test with Frequency Counter & as well as output waveform shape by CRO. 4. Manjunath Sir discussed with us about the results. 5. Manjunath Sir told us to move for Keshpur BSC of Airtel. 6. We set the journey for Keshpur BSC & after reaching the site done the site preparance accordingly. 7. Completed the Jitter test of the output (ET 320 ,BSC88) given by the concerning site enginner. 01/06/2011:1. As per the schedule reached the site in the morning. 2. Start the Wander test of the same output. 3. Manjunath Sir joined us on the site & told us that Airtel yet not confirmed their site planning & also told us to hold the Airtel testing for further notification & also told us to move for Pashkura BSC of Vodafone for doing the Sync. Clock testing. 4. He also gave us the address for another 5 Vodafone site to be tested. 5. Completed another set of Jitter test of the same output using Loop & live line. 6. After getting confirmation from Manjunath Sir, we left the site. Thanks & Regards, Kausik 02-06-2011

02/06/2011:1. As per the schedule first reached the Vodafone, Panskura site. 2. Meet with Mr. Kalyan Makhal, BSS engineer of Vodafone accordingly. 3. Had a discussion with him about the point to be tested there & also told him the ET number i.e. ET 2M1 & MUX name i.e. XDM 100 BG 20. 4. Completed the site preparance i.e. cable lay outing, installation of Time Watch, installation of OSA 4531, DC power connection successfully. 5. Manjunath Sir joined us & told us to start the 24 hrs stability test(Wander Test). 6. Getting his confirmation we start the wander test & monitor the test for 4 hrs. 03/06/2011:-

1. As per the work plan completed the 24 hrs Wander test at 4 30 p.m. 2. Then Mr. Kalyan Makhal gave us the softloop for the E1 point to be tested. 3. Completed the Jitter test of the output node to be tested. 4. Completed the experiment for taking out the exact frequency of the same Mux output by Frequency Counter 5. In the meantime we downloaded the raw data of 24 hrs wander test sent to our corporate team & Rajat Da revert on the same. 6. Completed the CRO test accordingly. 7. Inform the same to Mr. Manjunath Sir & he told us to re test Bhagbanpur Vodafone site. 04/06/2011:1. As per the schedule report to Bhagbanpur, Vodafone site. 2. Completed the site preparance activity accordingly. 3. Start the Jitter test of the desired E1 output to be tested. 4. After completion of Jitter test, as per Manjunath Sir Start the 24 hrs wander test of the exact output to be tested. 5. Monitor the result for 5 hrs. 05/06/2011:1. As per the work plan completed the 24 hrs Wander test. 2. Download the raw data of the test accordingly. 3. Completed the Frequency counter test for taking out the exact frequency of the output. 4. Successfully completed the CRO test. 5. Took all the joint signed report of Vodafone as well as of Bharti testing from respective BSS engineer & left the site.

06-06-2011 Dear Sir, Please receive the work report from my part as follows:

06/06/2011:1. As per the schedule return back from Bhagbanpur as the activity of that site was completed successfully. 2. Handedover 1 no of GPS antenna (Sl No- 05060129) to Mr. Rajat Subhra Dutta as that had to be send to our Delhi office by today. 3. Contact with Mr. Anujit Saha of TSH Lab for sending the same & after proper packing of the antenna handedover to him. 4. Handedover all the joint signed report to Mr. Rajat Subhra Dutta which we had completed till date of Bharti & of Vodafone. 5. Gone to our G.H. with Somnath where already Maju Sir & Manikant waiting for us. 6. Configure the Time Watch which Somnath will take to Bhubaneswar. 07/06/2011:1. At first report to our Rubi office accordingly. 2. Had a discussion with Mr. Shikhar of our Delhi team about the OSA GPS antenna stock & get the confirmation of 2 GPS antenna coming from Delhi office to Rubi by Shiv Sir on 25th February 2011. 3. Had a discussion with Mohta Sir about all the dispachment of OSA GPS antenna from Kolkata office. 4. Gone to our Baguiati store & find two healthy antennas (Sl No- 160100387 & 160100354). 5. Took two no of Rubi Source (SL no 331 & 330) 7 its antennas to our G.H. which will be tested by Maju Sir. 6. Had a discussion with Shiv Sir, Maju Sir & Puja about our OSA GPS antenna stock & close the issue as we are able to match all the antennas with our stock.

Thanks & Regards, Kausik