Académique Documents
Professionnel Documents
Culture Documents
District Living
Bending Lake iron deposit to go into productionlikely in 2015. The second processing facility could be ready in 2014. The only potential hold-up could be cabinet level approval to use the Steep Rock site, noted Wetelainen. Northern Development, Mines and Forestry minister Michael Gravelle indicated after the announcement that he would work with the ministries of environment and natural resources to garner a decision as quickly as possible. Rob Purdon, the MNRs Steep Rock rehabilitation manager, said BLIGs request would have to be determined to operate within the guidelines of the sites sustainable long-term management plan. A decision on whether the provincial government will re-open the old mine site should take place in the next few months. If the site is approved for access, Purdon said the MNR then would solicit proposals from interested parties in a fair, open, and transparent manner. As part of that process, parties interested in using the site would have to demonstrate an appropriate level of technical study to show that their proposal would provide both benefits to the local economy, and demonstrate synergies with the rehabilitation objectives for the Steep Rock site, he explained. The economic and environmental benefits are clear, said Wetelainen. The technology used at the facilities would produce low toxic emissions and the Atikokan site would be the second in North America to host the process. The process is called Iron-Making Technology Mark Three (ITMK3), and would produce merchant pig iron in the form of 97 percent iron concentrate pellets for use in steel production in small grey foundries, electric arc, and blast furnaces. The first facility of its kind on this continent has been constructed in Silver Bay, Mn. by a consortium of steel producers.
B1
One of those producers, Japanbased Kobe Steel, holds the ITMK3 patent and has made it available to BLIG. This is brand new technology in Northern Ontario, enthused Wetelainen. This type of technology will change the steel industry in North America; to be on the leading edge of this is fantastic. He said the tailings put into the Hogarth pit would be basically cooked sandstone, and that our companys plan is to treat that water and put it back into the river system at drinking water quality. Everything that were going to do at Hogarth is going to be a Please see Iron, B4