Vous êtes sur la page 1sur 7

City-wide carbon finance Program

Monali Ranade World Bank Institute 07/27/2011

A city-wide Program
Program Coordinator Municipal Departments (By Sector) Implementation over time
Water Energy Mayor / City Manager Waste Transport Urban Forestry Water supply Street-light efficiency Composting Landfill Gas

Example of Projects

Public transport
Low-carbon vehicles

Parks

Management, Implementation, monitoring & reporting

Carbon markets

Climate finance

National/local institutions

Bi-lateral agencies

Private sector

Transport

Transportation of Waste

Waste

Traffic mgt

Biogas-toenergy

City-wide program

Pedestrian comfort

Energy

Sludge treatment

Heat island effect

Efficient water pumping

Urban Forestry Grey water reuse

Water

1. Define structure 2. Define boundary 3. Prepare inventory 4. Identify agencies 5. Define incentives 6. Identify activities 7. Establish database 8. Implement activities 9. Quantify GHG ER 10. Validate/verify

Air quality

Pollution reduction

Local jobs

Quality of life

Energy saving

GHG mitigation

Greater Amman Municipality

City-level GHG Inventory (10,256ktCO2e or 3.7tCO2e pc, 2008)

Transport (3889 tCO2e)

Waste
(1012 tCO2e

Energy
(3827 tCO2e)

Water

AR

AMMAN Green Growth Program (AGGP)

P u bl ic

Private transport
(incl. air, marine)

G o o d s

S e r

Household Solid Waste

I n d l

Buildings

S e r

F R W o a a r w s es t

Greater Amman Municipality

City-level GHG Inventory (10,256ktCO2e or 3.7tCO2e pc, 2008)

Transport (3889 tCO2e)

Waste
(1012 tCO2e

Energy
(3827 tCO2e)

Water

AR

AMMAN Green Growth Program (AGGP)

P u b

Private transport
(incl. air, marine)

G d s
3

S e r

Household SW
5 6 7

I n d
8

Buildings

S e r
1 1 1 2

R W a a w s
1 3

F o r

10

1 1 1 4 5 6

1. Improved public transport (BRT, LRT, MRTS) 2. Cycling, pedestrians, NMT 3. Vehicle improvement

5. Landfill gas 6. Composting 7. Recycling 8. Waste mgt

9. Renewable E 10. Appliances 11. EE buildings 12. EE services

13. EE equip 14. EE treatment 15. Green areas 16. Urban Forest

Creating a city-wide program


Establish a coordination office for the program
1

Establish the geographical and sector boundary for the program


2

Create an inventory of GHG emissions in the boundary


3

Identify responsible departments and agencies


4 5

Create appropriate incentives for relevant stakeholders (good practice) Identify interventions (technology/measure) and establish eligibility Establish system for documentation and quality control Implement and monitor the interventions Quantify emission reductions using established methodology Validate and verify GHG Emission Reduction benefit

10

THANK YOU!!

Vous aimerez peut-être aussi