SABIC ENGINEERING AND PROJECT MANAGEMENT

E&PM Building Survey


Part1: Questionnaire

For each statement, select the agreement level and the importance level

Agreement Level Importance Level

importantVery

UnimportanVery
Agree Strongly

DisagreeStrongly

importantRelatively

UnimportanRelatively
State-

Don’t know

Don’t know
Cat.

Disagree
Neutral

Neutral
ment Statement

Agree
#
#

I have enough space in which


1 X X
to do my work.
I have the right tools to do my
2 X X
job.
Office layout can be better re- X X
3
positioned
Office Arrangement

Office furniture i.e. table and


4 X X
chairs are acceptable for our
workoffice
My environment
is equipped with latest
5 X X
IT hardware and software
Phone system available are
6 X X
acceptable
to our work
Blinds / Curtain available in my
7
office is acceptable
I have observed that corridors are more than the standard which is on
the account of offices sizes.
Remarks

The bathroom facilities


8 available in this building shall X X
be improved and renovated

Tea / Coffee services available


9 X X
are satisfactory and acceptable

Diversity and quality of food


10 available in our Cafeteria are X X
acceptable
Mosque carpet and air X
11
conditioning are satisfactory X
Travel Service provide by travel
12 X X
agent
Is acceptable Services
Janitorial are
Building Facilities

13 X X
acceptable
Transportation available in
14 X X
E&PM Pool are adequate
Mail services provided are
15
acceptable X X
Air conditioning in our office
16 X X
shall be improved

17 Safety equipment available in


this building is as per Safety X X
standard
Landscaping shall be improved
18 X X
for pleasant outlooking.

From hygienic point of view it is always advisable to replace


bathroom separation walls with PVC material.
Remarks
Agreement Level Importance Level

Agree Strongly

importantVery
DisagreeStrongly

importantRelatively

UnimportantRelatively

UnimportantVery
State-

Don’t know

Don’t know
Cat.

Disagree
Neutral

Neutral
ment Statement

Agree
#
#

E&PM Building requires Interior


19 X X
wall Painting
Indoor Plants has to be X
20
increased X
Windows glass to be replaced
Building Renovation

21 by double glass and film X X

Lamp fixture covers to be


replaced to improve
22 X X
illumination.

23 Floor Carpet is acceptable X X


From hygienic point of view it is always advisable to replace carpet
with tiles or even better with marble.
Remarks Floor marbles are never been polished where you can observe the
black stains on the separating joint between two marbles.

Part 2: Open Questions

24. Describe areas where improvement could take place within E&PM Building.

-Phone system is outdated, new technology incorporates phones with IT system in order to
Receive voice messages, faxes, SMS directly onto your outlook mailbox similar to SABIC_STC system that
uses VPN technology
-E&PM IT server is the only within SABIC that is not accessable from

https://rmail1.sabic.com. Instead it is accessable from CITRIX system which as you know


Is very slow.
25. Describe suggestion where improvement could take place within E&PM Office
Arrangement

-Eliminate conduits by concealing the electrical & communication wires.

-Install whiteboard at each office for small team discussion.

-Install postboard at each office for posting memorandums instead of using pins or tape.

26. Describe decoration ideas where improvement could take place within E&PM building

-Painting should consider the new trend of marble type of painting.

-Hand as many portraits of natural scenes (not industrial) in corridors, lobbies &

Management offices.

-Adapt the wireless networking technology (WIFI) instead of cable network connections.