Vous êtes sur la page 1sur 419
Public Attachments. SACE on July 11, 2011 [Total Number of Pages [Original Location File Name Number of Pages Ken Cestari-page 45 [T- Alexander 3 Ken Cestari-page 45 [Berson Bio 2 Ken Cestari-page 162 {8-12-10 Energy Agenda i [Ken Cestari-page 162 {8-12-10 Telecom Agenda ci ken Cestari-page 162 8-12-10 Facilities Protection Agenda 4 {8-12-10 Transportation Agenda z Docket No. 27800 2 [Docket No. 25849- Procedural and Scheduling Order 9 Docket No, 29849 - Procedural and Scheduling Order 8 Ken Cestari-page 419 [20091113142853900.00 W Markus Popa-page 23, 100520. Georgia Power recieves loan guarantee extension ‘ Markus Popa-page 24 [Calvert ANS Capacity Factors 052110 3 Ed Davis-page 3 Nw 20103603 10 Ed Davis-page 3 INNF_2010102013) zZ Ed Davis-page 3 INNF_20101024 4 Ed Davis-page 5 INNF_201009%5{1] 6 Ed Davis-page 9 NNE_20110111 8 Ed Davis-page 9 NNF_20210112 21 Ed Davis-page 9 INNE_20110110 18 Ed Davis-page 9 Nw_20110113 a7 Ed Davis-page $ NNE_20110113, 7 [Susan Richardson-page 9 __|EnergyNewsBriefing100430, 7 [Susan Richardson-page 9 __|EnergyNewsClips100430 72 iSusan Richardson-page 25 _ [MEAG Power Press Release DOE 1 Nick Whitcombe-51 Directions to MPR 2 [Nick Whitcombe-51 DC Metro 1 Nick Whitcombe-96 jimageOo1 1 Nick Whitcombe-128 IS&P's Key Credit Factors (Nov 26, 2008) 1s Nick Whitcombe-227 EnergyNewsClips091112 45 (Nick Whitcombe-227 [EnergyNewsBriefing091112 7 ‘Whitcombe-433 [et_000520 2 Nick Whitcombe-652 [doc00i_20091103_25208 3 Nick Whitcombe-912 ARTICLE-tustice asks for justification for nuclear prepayment] 1 Dave Frantz-page 10 PSC Staffers Criticize Georgia Power public 3 [Dong Kim-page 21 SOCOLOGO 1 a8 KC pg45.T. Alexander (3 pages} CHADBOURNE PARKE Toop E. ALEXANDER PARTNER 30 Rockefeller laza ereinonne New York, NY 10112 mar 710-5269 ’ trail islerande @chadoourecom United States of America online www.chadboure.com/talexander Practice Description Todd Alexander's practice includes representing developers of and lenders to energy related proects, including biofuel, biomass, wind, solar and clean coal facilities, He has participated in limited recourse financings in the United States, Latin America, Asia and Africa. He has also represented both the sellers and purchasers of ownership interests in several power projects and biofuel facies. Representative Matters + Representing a lead arranger in connection with the financing of the 174 MW Oilton and Randado wind projects In Texas. + Representing Sithe Global Power in connection with the development of an 800 MW combined cycle natural-gas fired power plant in Ontario, Canada, «Representing ADAGE (a joint venture between Duke Energy and Areva) in connection with the development of a 50 MW woody biomass project in Florida + Representing the lender in connection with a loan to Fronteraf RST in ‘connection with their municipal financing program for rooftop solar and ather ‘energy efficiency programs in the City of San Diego and San Diego County. + Represented a private equity fund in connection with the acquisition of a power barge in Jamaica and a majority interest in a power plant in Panama, together with the restructuring of the existing debt on these assets. + Represented Bujagali Energy Limited as developer of an $880 milion, 250 megawatt hydroelectric project in Uganda, + Represented North American Development Bank as senor lender to Global Alternative Fuels in connection with the financing of a biodiesel facility in él Paso, Texas + Represented WestLB as arranger for the expansion financing of a biodiesel facility in Texas. + Represented WestLB as arranger for the financing of three 100 millon gallon ethanol facilities to be located in Ohio, Indiana and Nebraska. + Represented WestLB as arranger for the financing of a 123 million gallon ethanol facility in Oregon, «Represented Jamaica Energy Partners in connection with the expansion of its cexisting power barge. Topp E. ALEXANDER + Represented CMS/Endesa in a joint venture in connection with the financing by the International Finance Corporation (IFC) of a 1,165 km pipeline and a 740 megawatt power plant in Argentina and Chite. ‘+ Represented El Paso Corporation in connection with the financing by the Overseas Private Investment Corporation (OPIC), IFC and BNDES of a 928 megawatt power project in Brazil ‘= Represented EGE Haina In connection with the financing by export credit agencies ofits 150 megawatt power barge in the Dominican Republic. ‘+ Represented the owner in connection with the financing by IFC of a 110 megawatt power project in Bangladesh, ‘= Represented a consortium led by Alcoa in connection with the development of a 1,450 megawatt hydroelectric project in Brazil Honors (Mr. Alexander is listed in Chambers USA — America's Leading Lawyers for Business for project finance and renewable energy, The Best Lawyers in America for project finance, in the Legal 500 for project finance, in Euromoney's Guide to the World's Leading Project Finance Lawyers, in “The New York Area's Best Lawyers’ by New York Magazine Publications IM. Alexander isa regular contributor to Chadbourne’ Project Finance NewsWire, published bimonthly ‘+ “The Case for Cellulosic Ethanol,” (co-author), Daily Deal, March 2, 2009 "The Risks of Greasing the Wheel," Journal of International Peace Operations, March-April 2009 “Overcoming Hurdles to Commercializing Cellulosic Ethanol,” Profec Finance NewsWire, (co-author), January 2009 “Analysis: Why Aren't the Financial Markets Coming to the Aid of the Ethanol industry?," (co-author), Biofuels Journal, November 18, 2008 Frozen Credit Markets and Falling Oil Prices Create Challenges for Renewable Projects, (moderator), Project Finance NewsWire, November 2008, Biofuels Strategies to Survive Loan Defaults, (co-author), Projet Finance NewsWire, Novernber 2008 Harvest of Gain: Private Equity Can Help Solve the Global Food Crisis, Despite Legal and Social Challenges,” (co-author), The Deal, July 21-August 8, 2008 ‘Speeches and Events «+ *Recent Energy and Finance Developments in the EPC Market,” Rice Global Annual Forum for Engineering, and Construction, Houston, TX, September 15, 2009 «# "Status and Outlook for Game-Changing Technology Upgrades," Biomass Boilers and Gasification for Ethanol Plants Web Conference, September 15, 2003 + “Equity Sourcing and Financing in a Credit-Starved Environment,” Waste-to-Energy Finance & Investment Summit, San Diego, CA, July 23-25, 2009 «+ "Financing Strategies for Biomass Power Projects ina Credit-Starved Environment,” BioPower Generation USA, Chicago, Illinois, July 8-9, 2009 + "Biofuel Strategies to Survive Loan Defaults,” Ethanol: The 2009 Market Dynamics, New York City, New York, April 28-28, 2008 «Smart Grid: Vision and Strategy for the Modernization of the Nation's Electricity Network, New York City, New York, April 22, 2009 x3 690

Vous aimerez peut-être aussi