Vous êtes sur la page 1sur 6

CURRICULAM VITAE

GYANENDRA BAHADUR SHAHI. B.E., (Mech) Address for Communication: R. K.Mallick, B-983, Sec. A Mahanagar, Lucknow, 226006 U.P. (INDIA) 00966 - 500090736 (KSA)

e-mail: gbs2007_mr@rediffmail.com Mobile : 0091 94151 71041 (India) 00966 - 533971966 (KSA)

Personal Details Name Nationality Date of Birth Passport Details Passport No Place of Issue Date of Issue Date of Expiry Qualification : : : : G515181 Muscat,Oman 15.01.08 14.01.2008 : Gyanendra Bahadur Shahi : Indian : 01-11-1965

: B. E (Mechanical) from University of Pune, India.

Computer Knowledge : Familiar with computer applications like M.S. Word, M.S. Excel and M.S.Access. Total Experience India Abroad : 15 Years : 10 Years : 05 Years

Summary of Experience
15 years construction experience in various projects of oil-Refineries, petrochemical plants, chemical plants and fertilizers plants. The present and past experience includes the project co-ordination, field engineering, hydrotest packages, construction, installation, testing and precommissioning of various pumps, piping, headers and flow lines, fired heaters, reformers, Heat exchangers, vessels, columns, mechanicals equipments related to Oil field and petrochemical plants. Follow up project execution schedules and expediting various stages of detail engineering, procurement, fabrication and erection to meet the customer delivery schedule.

Page 1 of 6

Site planning, execution, monitoring manpower and material control, coordination with project / inspection departments of clients and subcontractors. Overall responsible for construction activities and project completion in all aspects.

Familiar with related construction codes.

EXPERIENCE DETAILS
current assignment)

(Stating

with

Duration Company Position

: MAY 2008 TO TILL DATE : Snamprogetti S.A. Ltd., K.S.A. : Project Engineer (Field Engg.) Project : KHURAIS CRUDE CONTRACT, KHURAI S, K.S.A.

Responsibilities :

Working as a FBE COATED PIPING COORDINATOR -

Spooling of piping. Material co-ordination. Fabrication of piping. FBE coating & delivered to site. Working as a HYDROTEST PACKAGE COORDINATOR o Preparation,final checking of hydrotest packages. Working as a PMCC Mech. Engineer o Guiding our cheching team. o Co-ordination with client & our construction team to complete punch items. o o o o

EXPERIENCE DETAILS
Duration Company Position Project Responsibilities : Ensure correct and sufficient resources on site to achieve programme and budget requirements. Obtain a clear understanding of extent of works and contracts documents. Ensure construction is proceeding in accordance with; o Drawings o Specification Page 2 of 6 : : : : APRIL 2007 till date Dodsal Co & LLC, Oman Sr. Piping Engineer CPFS Project,OXY Mukhaizna.Oman

o Programme o Quality Assurance Plan o Safety Plan Coordinate the planning and organizing of resources, with own subcontractors, to maximise productivity/progress. Prepare Production Reports. Maintain an accurate daily site diary of all activities and progress. delays, plant, labour and all matters that may have implication on contract with the client or with subcontractors. Check foremens site diaries on a dialy basis and countersign with subcontractors. Responsible for selection of appropriate plant; both hired and purchased. Ensure optimum use of plant and that plant is off hired when not required. Ensure plant and equipment is maintained. Maintain schedules of o Plant Working Hours. o Maintenance schedule. o Fuel/Oil Consumption. : 13-03-2006 to 30-03-2007 : M/s. Integral Services Company WLL, Kuwait. : Sr. Mechanical Engineer : Hazop Study Implementation for FCC,ARD & HCR units In MAA Refinery,Kuwait & Waste Water Treatment Plant (WWTP),EQUATE,Kuwait

Period Company Position Project

Responsibilities : Preparation of quantities as per Engineering Specification for pipe fittings, valves, gasket and studs & bolts and necessary procedures for procurement. Project co-ordination and execution of the job as per Standard specifications & Standard Drawings. Overall responsible of all mechanical works. Fabrication, welding, installation & hydro testing & pre-commitioning. Preparation of lift plan, erection & alignment of structures and equipments. Co-ordination & preparation for pre-commissioning work. : : : : : 15-01-02 to 28-02-06 M/s. Punj Lloyd Ltd. India. Deputy Manager M/s. Jindal Power Ltd, India. 4x250 MW Super Thermal Power Project, India.

Period Company Position Client Project Responsibilities

Page 3 of 6

Supervision of project execution schedules and follow up, expediting various stages of detail engineering, procurement, fabrication and erection to meet the customer delivery schedule. Fabrication, welding, installation & hydro testing of headers and flow lines along with their fittings. Preparation of lift plan, erection & alignment of structures and equipments. Overall responsible for construction activities and project completion in all aspects. Man power machines & tool control. Related Billing. : : : : 16-04-99 to 25-04-2001 M/s. M.R. Al-Khathlan Est, K.S.A. Project Engineer Riyadh Refinery Expansion Project, K.S.A.

Period Company Position Project Responsibilities

Fabrication,welding,installation & hydro testing of U/G &A/G piping &structures. Preparation of lift plan, erection & alignment of structures and equipments. Overall responsible for construction activities and project completion in all aspects. Co-ordination with our other groups/departments to complete project within schedule. Man power machines & tool control. Hydro testing & inspection of Valves & Emergency Isolation Valves. Co-ordination for shutdown work. Column Trays erection. : : : : 11-04-98 to 31-03-99 M/s .Reliance Petroleum Ltd., INDIA Sr. Mechanical Engineer Jamnagar Refinery Project, Jamnagar, INDIA

Period Company Position Project Responsibilities

Planning supervision & inspection of all construction activities related to U/G piping systems. pre-commissioning of U/G systems. Inspection of wrapping & coating of U/G piping systems. Erection of. U/G piping. Co-ordination with contractors. Overall responsible for construction activities and project completion in all aspects. Pre commissioning jobs coordination. Man power,machines & tool control. Page 4 of 6

Related Billing.

Period Company Position Project Responsibilities

: : : :

01-01-97 to 26-03-98 M/s. Dodsal Ltd., India Sr. Mechanical Engineer Panipat Refinery Project, Panipat, INDIA

Supervision of project execution schedules ,follow up and expediting various stages of detail engineering, procurement, fabrication and erection to meet the customer delivery schedule. Fabrication, welding, installation & hydro testing of headers and flow lines along with their fittings. Preparation of lift plan, erection & alignment of structures and equipments. Overall responsible for construction activities and project completion in all aspects. Erection of Column Trays. Man power machines & tool control. Related Billing. : : : : 01-01-93 to 31-12-96 M/s .Chem Contract Pvt. Ltd. India Mechanical Engineer Indian Petrochemical Co. Ltd., Gujarat State Power Co. Ltd., Gujarat State Fertilizer Co. Ltd.

Period Company Position Project Responsibilities

Preparation of project execution schedules, follow up and expediting various stages of detail engineering, procurement, fabrication and erection to meet the customer delivery schedule. Fabrication of BUILT-UP structures, welding & erection. Fabrication, welding, installation & hydro testing of headers and flow lines along with their fittings. Preparation of lift plan, erection & alignment of structures and equipments. Overall responsible for construction activities and project completion in all aspects. Erection of Column Trays. Man power machines & tool control. Related Billing.

Page 5 of 6

G. B. Shahi

Date:

Page 6 of 6

Vous aimerez peut-être aussi