Western Transport Corridor - Tumkur - Haveri Section NH -4 Project, Package : 4

Rehabilitation & Upgradation of Chitradurga - Haveri Section (Km.207 to 280Km) - Balance Works
RFI SUMMARY
SL.
N0

RFI.No

Date of Submission

Time of
Inspection

BOQ No.

21670/11

27-Jul-11

4:30pm

4.01

Providing of Prime coat for DBM 1st Layer

273+500

Median

28-Jul-11

21672/11

27-Jul-11

10:45am

4.04

Laying of DBM 1st Layer

227+850

Median

21674/11

27-Jul-11

4:00pm

4.04

Laying of DBM 2nd Layer

227+850

21676/11

27-Jul-11

11:00am

4.04

Laying of DBM 1st Layer

21678/11

27-Jul-11

4:30pm

4.04

11

21680/11

27-Jul-11

11:45am

13

21682/11

27-Jul-11

23

21692/11

25

Length

Width

28

1.50

28-Jul-11

7.5

1.50

Median

28-Jul-11

7.5

1.50

258+305

Median

28-Jul-11

7.5

1.50

Laying of DBM 2nd Layer

258+305

Median

28-Jul-11

7.5

1.50

4.04

Laying of DBM 1st Layer

273+500

Median

28-Jul-11

28.0

1.50

4:40pm

4.04

Laying of DBM 2nd Layer

273+500

Median

28-Jul-11

28.0

1.50

27-Jul-11

12:30pm

4.06

Laying of SDBC

248+975

249+000

LSR

28-Jul-11

25

4.00

21694/11

27-Jul-11

11:30am

4.06

Laying of SDBC

254+050

254+600

LSR

28-Jul-11

550

4.00

27

21696/11

27-Jul-11

11:30am

4.06

Laying of SDBC

266+150

266+200

RSR

28-Jul-11

50

4.00

29

21698/11

27-Jul-11

11:00am

4.06

Laying of SDBC

265+700

265+890

RSR

28-Jul-11

190

4.00

31

21700/11

27-Jul-11

11:00am

4.06

Laying of SDBC

248+350

248+725

RSR

28-Jul-11

375

4.00

33

21702/11

27-Jul-11

11:00am

4.06

Laying of SDBC

267+150

267+170

LSR

28-Jul-11

20

4.00

35

21704/11

27-Jul-11

11:00am

4.06

Laying of SDBC

249+600

249+700

RSR

28-Jul-11

100

4.00

37

21706/11

27-Jul-11

11:00am

4.03

Laying of BM

269+650

269+925

RSR

28-Jul-11

275

7.00

Contractor representative

Description

Chainage From

Chainage To

Side

Date of Inspection No.

Consultant representative

Western Transport Corridor - Tumkur - Haveri Section NH -4 Project, Package : 4


Rehabilitation & Upgradation of Chitradurga - Haveri Section (Km.207 to 280Km) - Balance Works
RFI SUMMARY
SL.
N0

RFI.No

Date of Submission

Time of
Inspection

BOQ No.

38

21707/11

27-Jul-11

10.00am

13.02

38

21707/11

27-Jul-11

10.00am

39

21708/11

27-Jul-11

15

21684/11

17

Chainage From

Chainage To

Side

Providing Road studs EL

260+000

260+600

LHS

28-Jul-11

13.02

Providing Road studs cL

260+000

260+027

LHS

28-Jul-11

10.00am

13.02

Providing Road studs EL&CL

260+600

261+800

LHS

28-Jul-11

27-Jul-11

11:45am

13.13

Laying of BC (Slip Road)

239+040

239+120

R/S

28-Jul-11

21686/11

27-Jul-11

12:50pm

13.13

Laying of BC (widening)

239+120

239+230

R/S

19

21688/11

27-Jul-11

10:40am

13.13

Laying of BC (Slip Road)

239+060

239+120

21

21690/11

27-Jul-11

4:00pm

13.13

Laying of BC (widening)

239+120

239+230

41

21710/11

27-Jul-11

10:00am

13.13

Laying of BC

43

21712/11

27-Jul-11

1:00pm

13.13

Laying of BC

Contractor representative

Description

Date of Inspection No.

Length

Width

80

4.50

28-Jul-11

110

3.50

L/S

28-Jul-11

60

4.50

L/S

28-Jul-11

110

3.50

262+650

Median

28-Jul-11

7.5

1.50

267+100

Median

28-Jul-11

7.5

1.50

Consultant representative

Western Transport Corridor - Tumkur - Haveri Section NH -4 Project, Package : 4


Rehabilitation & Upgradation of Chitradurga - Haveri Section (Km.207 to 280Km) - Balance Works
RFI SUMMARY
SL.
N0

RFI.No

Date of Submission

Time of
Inspection

BOQ No.

45

21714/11

27-Jul-11

4:00pm

13.13

Laying of BC

270+325

Median

28-Jul-11

21671/11

27-Jul-11

10:00am

4.02a

Applying of Tack coat for DBM 1st Layer

227+850

Median

21675/11

27-Jul-11

10:30am

4.02a

Applying of Tack coat for DBM 1st Layer

258+305

10

21679/11

27-Jul-11

11:20am

4.02a

Applying of Tack coat for DBM 1st Layer

273+500

36

21705/11

27-Jul-11

10:00am

4.02a

Applying of Tack coat for SDBC

269+650

21673/11

27-Jul-11

3:30pm

4.02b

Applying of Tack coat for DBM 2nd Layer

21677/11

27-Jul-11

4:00pm

4.02b

12

21681/11

27-Jul-11

4:15pm

14

21683/11

27-Jul-11

16

21685/11

18

Length

Width

50.0

1.50

28-Jul-11

7.5

1.50

Median

28-Jul-11

7.5

1.50

Median

28-Jul-11

28.0

1.50

RSR

28-Jul-11

275

7.00

227+850

Median

28-Jul-11

7.5

1.50

Applying of Tack coat for DBM 2nd Layer

258+305

Median

28-Jul-11

7.5

1.50

4.02b

Applying of Tack coat for DBM 2nd Layer

273+500

Median

28-Jul-11

28.0

1.50

11:00am

4.02b

Applying of Tack coat for BC (Slip Road)

239+040

239+120

R/S

28-Jul-11

80

4.50

27-Jul-11

12:20pm

4.02b

Applying of Tack coat for BC (Widening)

239+120

239+230

R/S

28-Jul-11

110

3.50

21687/11

27-Jul-11

10:00am

4.02b

Applying of Tack coat for BC (Slip Road)

239+060

239+120

L/S

28-Jul-11

60

4.50

20

21689/11

27-Jul-11

3:30pm

4.02b

Applying of Tack coat for BC (Widening)

239+120

239+230

L/S

28-Jul-11

110

3.50

22

21691/11

27-Jul-11

11:20am

4.02b

Applying of Tack coat for SDBC

248+975

249+000

LSR

28-Jul-11

25

4.00

24

21693/11

27-Jul-11

10:00am

4.02b

Applying of Tack coat for SDBC

254+050

254+600

LSR

28-Jul-11

550

4.00

26

21695/11

27-Jul-11

10:00am

4.02b

Applying of Tack coat for SDBC

266+150

266+200

RSR

28-Jul-11

50

4.00

28

21697/11

27-Jul-11

10:00am

4.02b

Applying of Tack coat for SDBC

265+700

265+890

RSR

28-Jul-11

190

4.00

30

21699/11

27-Jul-11

10:00am

4.02b

Applying of Tack coat for SDBC

248+350

248+725

RSR

28-Jul-11

375

4.00

32

21701/11

27-Jul-11

10:30am

4.02b

Applying of Tack coat for SDBC

267+150

267+170

LSR

28-Jul-11

20

4.00

Contractor representative

Description

Chainage From

Chainage To

269+925

Side

Date of Inspection No.

Consultant representative

Western Transport Corridor - Tumkur - Haveri Section NH -4 Project, Package : 4


Rehabilitation & Upgradation of Chitradurga - Haveri Section (Km.207 to 280Km) - Balance Works
RFI SUMMARY
SL.
N0

RFI.No

Date of Submission

Time of
Inspection

BOQ No.

34

21703/11

27-Jul-11

10:00am

4.02b

40

21709/11

27-Jul-11

9:00pm

42

21711/11

27-Jul-11

44

21713/11

27-Jul-11

Contractor representative

Description

Chainage From

Chainage To

Side

Date of Inspection No.

Length

Width

Applying of Tack coat for SDBC

249+600

249+700

RSR

28-Jul-11

100

4.00

4.02b

Applying of Tack coat for BC

262+650

Median

28-Jul-11

7.5

1.50

12:30pm

4.02b

Applying of Tack coat for BC

267+100

Median

28-Jul-11

7.5

1.50

3:30pm

4.02b

Applying of Tack coat for BC

270+325

Median

28-Jul-11

50.0

1.50

Consultant representative

Date :27.07.2011
Depth

Qty.

Unit

Eng. Name

42.00

Sqm

R.Reddy

0.080

0.90

Cum

R.Reddy

0.080

0.90

Cum

R.Reddy

0.080

0.90

Cum

R.Reddy

0.080

0.90

Cum

R.Reddy

0.080

3.36

Cum

R.Reddy

0.080

3.36

Cum

R.Reddy

0.025

2.50

Cum

R.Reddy

0.025

55.00

Cum

R.Reddy

0.025

5.00

Cum

R.Reddy

0.025

19.00

Cum

R.Reddy

0.025

37.50

Cum

R.Reddy

0.025

2.00

Cum

R.Reddy

0.025

10.00

Cum

R.Reddy

0.025

48.13

Cum

R.Reddy

Contractor representative

Consultant representative

Date :27.07.2011
Depth

Qty.

Unit

Eng. Name

200.00

Nos

Balaji

73.00

Nos

Balaji

Nos

Balaji

532

0.04

14.40

Cum

R.Reddy

0.05

19.25

Cum

R.Reddy

0.04

10.80

Cum

R.Reddy

0.05

19.25

Cum

R.Reddy

0.05

0.56

Cum

R.Reddy

0.05

0.56

Cum

R.Reddy

Contractor representative

Consultant representative

Date :27.07.2011
Depth

Qty.

Unit

Eng. Name

0.05

3.75

Cum

R.Reddy

11.25

Sqm

R.Reddy

11.25

Sqm

R.Reddy

42.00

Sqm

R.Reddy

1925.00

Sqm

R.Reddy

11.25

Sqm

R.Reddy

11.25

Sqm

R.Reddy

42.00

Sqm

R.Reddy

360.00

Sqm

R.Reddy

385.00

Sqm

R.Reddy

270.00

Sqm

R.Reddy

385.00

Sqm

R.Reddy

100.00

Sqm

R.Reddy

2200.00

Sqm

R.Reddy

200.00

Sqm

R.Reddy

760.00

Sqm

R.Reddy

1500.00

Sqm

R.Reddy

80.00

Sqm

R.Reddy

Contractor representative

Consultant representative

Date :27.07.2011
Depth

Qty.

Unit

Eng. Name

400.00

Sqm

R.Reddy

11.25

Sqm

R.Reddy

11.25

Sqm

R.Reddy

75.00

Sqm

R.Reddy

Contractor representative

Consultant representative

Date
SL.
N0

Date of Submission

Time of
Inspection

RFI.No

BOQ No.

21964/11

01-Aug-11

10:00am

6.01a

21965/11

01-Aug-11

11:00am

6.03b

Description

Excavtion for drain

Chainage From Chainage To

Side

Date of Inspection No.

Length

Width

259+860

259+922

RSR

02-Aug-11

62

1.10

259+860

259+922

RSR

02-Aug-11

62

1.10

259+860

259+922

RSR

02-Aug-11

259+860

259+922

RSR

02-Aug-11

62

0.90

259+860

259+922

RSR

02-Aug-11

259+860

259+922

RSR

03-Aug-11

62

0.15

M15 pcc for drain


3

21966/11

01-Aug-11

11:00am

6.06a
TMT rebars for drain

21967/11

01-Aug-11

04:00pm

6.03c
M20 Concrete for raft

21968/11

01-Aug-11

04:00pm

5.19
Weep hole for drain

21969/11

01-Aug-11

10:00am

6.03c
M20 Concrete for Wall

Date :27.07.2011
Depth

Qty.

Unit

Eng. Name

0.750

51.15

Cum

Nithyananda

0.100

6.82

Cum

Nithyananda

971.61

Kg

Nithyananda

8.37

Cum

Nithyananda

31.00

Nos

Nithyananda

12.56

Cum

Nithyananda

0.150

0.675