Lead charges as per SSR- 2021-22

pipes 1000 pipes 900 pipes 600 pipes 450


Metal Earth, Gravel & Sand
lead Rate lead lead Rate lead Rate Rate Rate

extra from 6 to
16.20 16.20 30 km 11.65 11.65 5.31 2.39
extra above 30
13.50 13.50 km

0.5 38.90 0.5 40.40 0.5 241.83 0.5 200.74 0.5 114.51 0.5 69.50
1 38.90 1 40.40 1 241.83 1 200.74 1 114.51 1 69.50
2 54.50 2 56.60 2 241.83 2 200.74 2 114.51 2 69.50
3 75.40 3 75.40 3 241.83 3 200.74 3 114.51 3 69.50
4 91.60 4 91.60 4 241.83 4 200.74 4 114.51 4 69.50
5 107.80 5 107.80 5 241.83 5 200.74 5 114.51 5 69.50
6 124.00 6 124.00 6 253.48 6 212.39 6 119.82 6 71.89
7 140.20 7 140.20 7 265.13 7 224.04 7 125.13 7 74.28
8 156.40 8 156.40 8 276.78 8 235.69 8 130.44 8 76.67
9 172.60 9 172.60 9 288.43 9 247.34 9 135.75 9 79.06
10 188.80 10 188.80 10 300.08 10 258.99 10 141.06 10 81.45
11 205.00 11 205.00 11 311.73 11 270.64 11 146.37 11 83.84
12 221.20 12 221.20 12 323.38 12 282.29 12 151.68 12 86.23
13 237.40 13 237.40 13 335.03 13 293.94 13 156.99 13 88.62
14 253.60 14 253.60 14 346.68 14 305.59 14 162.30 14 91.01
15 269.80 15 269.80 15 358.33 15 317.24 15 167.61 15 93.40
16 286.00 16 286.00 16 369.98 16 328.89 16 172.92 16 95.79
17 302.20 17 302.20 17 381.63 17 340.54 17 178.23 17 98.18
18 318.40 18 318.40 18 393.28 18 352.19 18 183.54 18 100.57
19 334.60 19 334.60 19 404.93 19 363.84 19 188.85 19 102.96
20 350.80 20 350.80 20 416.58 20 375.49 20 194.16 20 105.35
21 367.00 21 367.00 21 428.23 21 387.14 21 199.47 21 107.74
22 383.20 22 383.20 22 439.88 22 398.79 22 204.78 22 110.13
23 399.40 23 399.40 23 451.53 23 410.44 23 210.09 23 112.52
24 415.60 24 415.60 24 463.18 24 422.09 24 215.40 24 114.91
25 431.80 25 431.80 25 474.83 25 433.74 25 220.71 25 117.30
26 448.00 26 448.00 26 486.48 26 445.39 26 226.02 26 119.69
27 464.20 27 464.20 27 498.13 27 457.04 27 231.33 27 122.08
28 480.40 28 480.40 28 509.78 28 468.69 28 236.64 28 124.47
29 496.60 29 496.60 29 521.43 29 480.34 29 241.95 29 126.86
30 512.80 30 512.80 30 533.08 30 491.99 30 247.26 30 129.25
31 526.30 31 526.30 31 544.73 31 503.64 31 252.57 31 131.64
32 539.80 32 539.80 32 556.38 32 515.29 32 257.88 32 134.03
33 553.30 33 553.30 33 568.03 33 526.94 33 263.19 33 136.42
34 566.80 34 566.80 34 579.68 34 538.59 34 268.50 34 138.81
35 580.30 35 580.30 35 591.33 35 550.24 35 273.81 35 141.20
36 593.80 36 593.80 36 602.98 36 561.89 36 279.12 36 143.59
37 607.30 37 607.30 37 614.63 37 573.54 37 284.43 37 145.98
38 620.80 38 620.80 38 626.28 38 585.19 38 289.74 38 148.37
39 634.30 39 634.30 39 637.93 39 596.84 39 295.05 39 150.76
40 647.80 40 647.80 40 649.58 40 608.49 40 300.36 40 153.15
41 661.30 41 661.30 41 661.23 41 620.14 41 305.67 41 155.54
42 674.80 42 674.80 42 672.88 42 631.79 42 310.98 42 157.93
43 688.30 43 688.30 43 684.53 43 643.44 43 316.29 43 160.32
44 701.80 44 701.80 44 696.18 44 655.09 44 321.60 44 162.71
45 715.30 45 715.30 45 707.83 45 666.74 45 326.91 45 165.10
pipes 1000 pipes 900 pipes 600 pipes 450
Metal Earth, Gravel & Sand
lead Rate lead lead Rate lead Rate Rate Rate
46 728.80 46 728.80 46 719.48 46 678.39 46 332.22 46 167.49
47 742.30 47 742.30 47 731.13 47 690.04 47 337.53 47 169.88
48 755.80 48 755.80 48 742.78 48 701.69 48 342.84 48 172.27
49 769.30 49 769.30 49 754.43 49 713.34 49 348.15 49 174.66
50 782.80 50 782.80 50 766.08 50 724.99 50 353.46 50 177.05
51 796.30 51 796.30 51 777.73 51 736.64 51 358.77 51 179.44
52 809.80 52 809.80 52 789.38 52 748.29 52 364.08 52 181.83
53 823.30 53 823.30 53 801.03 53 759.94 53 369.39 53 184.22
54 836.80 54 836.80 54 812.68 54 771.59 54 374.70 54 186.61
55 850.30 55 850.30 55 824.33 55 783.24 55 380.01 55 189.00
56 863.80 56 863.80 56 835.98 56 794.89 56 385.32 56 191.39
57 877.30 57 877.30 57 847.63 57 806.54 57 390.63 57 193.78
58 890.80 58 890.80 58 859.28 58 818.19 58 395.94 58 196.17
59 904.30 59 904.30 59 870.93 59 829.84 59 401.25 59 198.56
60 917.80 60 917.80 60 882.58 60 841.49 60 406.56 60 200.95
61 931.30 61 931.30 61 894.23 61 853.14 61 411.87 61 203.34
62 944.80 62 944.80 62 905.88 62 864.79 62 417.18 62 205.73
63 958.30 63 958.30 63 917.53 63 876.44 63 422.49 63 208.12
64 971.80 64 971.80 64 929.18 64 888.09 64 427.80 64 210.51
65 985.30 65 985.30 65 940.83 65 899.74 65 433.11 65 212.90
66 998.80 66 998.80 66 952.48 66 911.39 66 438.42 66 215.29
67 1012.30 67 1012.30 67 964.13 67 923.04 67 443.73 67 217.68
68 1025.80 68 1025.80 68 975.78 68 934.69 68 449.04 68 220.07
69 1039.30 69 1039.30 69 987.43 69 946.34 69 454.35 69 222.46
70 1052.80 70 1052.80 70 999.08 70 957.99 70 459.66 70 224.85
71 1066.30 71 1066.30 71 1010.73 71 969.64 71 464.97 71 227.24
72 1079.80 72 1079.80 72 1022.38 72 981.29 72 470.28 72 229.63
73 1093.30 73 1093.30 73 1034.03 73 992.94 73 475.59 73 232.02
74 1106.80 74 1106.80 74 1045.68 74 1004.59 74 480.90 74 234.41
75 1120.30 75 1120.30 75 1057.33 75 1016.24 75 486.21 75 236.80
76 1133.80 76 1133.80 76 1068.98 76 1027.89 76 491.52 76 239.19
77 1147.30 77 1147.30 77 1080.63 77 1039.54 77 496.83 77 241.58
78 1160.80 78 1160.80 78 1092.28 78 1051.19 78 502.14 78 243.97
79 1174.30 79 1174.30 79 1103.93 79 1062.84 79 507.45 79 246.36
80 1187.80 80 1187.80 80 1115.58 80 1074.49 80 512.76 80 248.75
81 1201.30 81 1201.30 81 1127.23 81 1086.14 81 518.07 81 251.14
82 1214.80 82 1214.80 82 1138.88 82 1097.79 82 523.38 82 253.53
83 1228.30 83 1228.30 83 1150.53 83 1109.44 83 528.69 83 255.92
84 1241.80 84 1241.80 84 1162.18 84 1121.09 84 534.00 84 258.31
85 1255.30 85 1255.30 85 1173.83 85 1132.74 85 539.31 85 260.70
86 1268.80 86 1268.80 86 1185.48 86 1144.39 86 544.62 86 263.09
87 1282.30 87 1282.30 87 1197.13 87 1156.04 87 549.93 87 265.48
88 1295.80 88 1295.80 88 1208.78 88 1167.69 88 555.24 88 267.87
89 1309.30 89 1309.30 89 1220.43 89 1179.34 89 560.55 89 270.26
90 1322.80 90 1322.80 90 1232.08 90 1190.99 90 565.86 90 272.65
91 1336.30 91 1336.30 91 1243.73 91 1202.64 91 571.17 91 275.04
92 1349.80 92 1349.80 92 1255.38 92 1214.29 92 576.48 92 277.43
93 1363.30 93 1363.30 93 1267.03 93 1225.94 93 581.79 93 279.82
94 1376.80 94 1376.80 94 1278.68 94 1237.59 94 587.10 94 282.21
95 1390.30 95 1390.30 95 1290.33 95 1249.24 95 592.41 95 284.60
96 1403.80 96 1403.80 96 1301.98 96 1260.89 96 597.72 96 286.99
97 1417.30 97 1417.30 97 1313.63 97 1272.54 97 603.03 97 289.38
98 1430.80 98 1430.80 98 1325.28 98 1284.19 98 608.34 98 291.77
99 1444.30 99 1444.30 99 1336.93 99 1295.84 99 613.65 99 294.16
100 1457.80 100 1457.80 100 1348.58 100 1307.49 100 618.96 100 296.55
pipes 1000 pipes 900 pipes 600 pipes 450
Metal Earth, Gravel & Sand
lead Rate lead lead Rate lead Rate Rate Rate
101 1471.30 101 1471.30 101 1360.23 101 1319.14 101 624.27 101 298.94
102 1484.80 102 1484.80 102 1371.88 102 1330.79 102 629.58 102 301.33
103 1498.30 103 1498.30 103 1383.53 103 1342.44 103 634.89 103 303.72
104 1511.80 104 1511.80 104 1395.18 104 1354.09 104 640.20 104 306.11
105 1525.30 105 1525.30 105 1406.83 105 1365.74 105 645.51 105 308.50
106 1538.80 106 1538.80 106 1418.48 106 1377.39 106 650.82 106 310.89
107 1552.30 107 1552.30 107 1430.13 107 1389.04 107 656.13 107 313.28
108 1565.80 108 1565.80 108 1441.78 108 1400.69 108 661.44 108 315.67
109 1579.30 109 1579.30 109 1453.43 109 1412.34 109 666.75 109 318.06
110 1592.80 110 1592.80 110 1465.08 110 1423.99 110 672.06 110 320.45
111 1606.30 111 1606.30 111 1476.73 111 1435.64 111 677.37 111 322.84
112 1619.80 112 1619.80 112 1488.38 112 1447.29 112 682.68 112 325.23
113 1633.30 113 1633.30 113 1500.03 113 1458.94 113 687.99 113 327.62
114 1646.80 114 1646.80 114 1511.68 114 1470.59 114 693.30 114 330.01
115 1660.30 115 1660.30 115 1523.33 115 1482.24 115 698.61 115 332.40
116 1673.80 116 1673.80 116 1534.98 116 1493.89 116 703.92 116 334.79
117 1687.30 117 1687.30 117 1546.63 117 1505.54 117 709.23 117 337.18
118 1700.80 118 1700.80 118 1558.28 118 1517.19 118 714.54 118 339.57
119 1714.30 119 1714.30 119 1569.93 119 1528.84 119 719.85 119 341.96
120 1727.80 120 1727.80 120 1581.58 120 1540.49 120 725.16 120 344.35
121 1741.30 121 1741.30 121 1593.23 121 1552.14 121 730.47 121 346.74
122 1754.80 122 1754.80 122 1604.88 122 1563.79 122 735.78 122 349.13
123 1768.30 123 1768.30 123 1616.53 123 1575.44 123 741.09 123 351.52
124 1781.80 124 1781.80 124 1628.18 124 1587.09 124 746.40 124 353.91
125 1795.30 125 1795.30 125 1639.83 125 1598.74 125 751.71 125 356.30
126 1808.80 126 1808.80 126 1651.48 126 1610.39 126 757.02 126 358.69
127 1822.30 127 1822.30 127 1663.13 127 1622.04 127 762.33 127 361.08
128 1835.80 128 1835.80 128 1674.78 128 1633.69 128 767.64 128 363.47
129 1849.30 129 1849.30 129 1686.43 129 1645.34 129 772.95 129 365.86
130 1862.80 130 1862.80 130 1698.08 130 1656.99 130 778.26 130 368.25
131 1876.30 131 1876.30 131 1709.73 131 1668.64 131 783.57 131 370.64
132 1889.80 132 1889.80 132 1721.38 132 1680.29 132 788.88 132 373.03
133 1903.30 133 1903.30 133 1733.03 133 1691.94 133 794.19 133 375.42
134 1916.80 134 1916.80 134 1744.68 134 1703.59 134 799.50 134 377.81
135 1930.30 135 1930.30 135 1756.33 135 1715.24 135 804.81 135 380.20
136 1943.80 136 1943.80 136 1767.98 136 1726.89 136 810.12 136 382.59
137 1957.30 137 1957.30 137 1779.63 137 1738.54 137 815.43 137 384.98
138 1970.80 138 1970.80 138 1791.28 138 1750.19 138 820.74 138 387.37
139 1984.30 139 1984.30 139 1802.93 139 1761.84 139 826.05 139 389.76
140 1997.80 140 1997.80 140 1814.58 140 1773.49 140 831.36 140 392.15
141 2011.30 141 2011.30 141 1826.23 141 1785.14 141 836.67 141 394.54
142 2024.80 142 2024.80 142 1837.88 142 1796.79 142 841.98 142 396.93
143 2038.30 143 2038.30 143 1849.53 143 1808.44 143 847.29 143 399.32
144 2051.80 144 2051.80 144 1861.18 144 1820.09 144 852.60 144 401.71
145 2065.30 145 2065.30 145 1872.83 145 1831.74 145 857.91 145 404.10
146 2078.80 146 2078.80 146 1884.48 146 1843.39 146 863.22 146 406.49
147 2092.30 147 2092.30 147 1896.13 147 1855.04 147 868.53 147 408.88
148 2105.80 148 2105.80 148 1907.78 148 1866.69 148 873.84 148 411.27
149 2119.30 149 2119.30 149 1919.43 149 1878.34 149 879.15 149 413.66
150 2132.80 150 2132.80 150 1931.08 150 1889.99 150 884.46 150 416.05
151 2146.30 151 2146.30 151 1942.73 151 1901.64 151 889.77 151 418.44
152 2159.80 152 2159.80 152 1954.38 152 1913.29 152 895.08 152 420.83
153 2173.30 153 2173.30 153 1966.03 153 1924.94 153 900.39 153 423.22
154 2186.80 154 2186.80 154 1977.68 154 1936.59 154 905.70 154 425.61
155 2200.30 155 2200.30 155 1989.33 155 1948.24 155 911.01 155 428.00
pipes 1000 pipes 900 pipes 600 pipes 450
Metal Earth, Gravel & Sand
lead Rate lead lead Rate lead Rate Rate Rate
156 2213.80 156 2213.80 156 2000.98 156 1959.89 156 916.32 156 430.39
157 2227.30 157 2227.30 157 2012.63 157 1971.54 157 921.63 157 432.78
158 2240.80 158 2240.80 158 2024.28 158 1983.19 158 926.94 158 435.17
159 2254.30 159 2254.30 159 2035.93 159 1994.84 159 932.25 159 437.56
160 2267.80 160 2267.80 160 2047.58 160 2006.49 160 937.56 160 439.95
161 2281.30 161 2281.30 161 2059.23 161 2018.14 161 942.87 161 442.34
162 2294.80 162 2294.80 162 2070.88 162 2029.79 162 948.18 162 444.73
163 2308.30 163 2308.30 163 2082.53 163 2041.44 163 953.49 163 447.12
164 2321.80 164 2321.80 164 2094.18 164 2053.09 164 958.80 164 449.51
165 2335.30 165 2335.30 165 2105.83 165 2064.74 165 964.11 165 451.90
166 2348.80 166 2348.80 166 2117.48 166 2076.39 166 969.42 166 454.29
167 2362.30 167 2362.30 167 2129.13 167 2088.04 167 974.73 167 456.68
168 2375.80 168 2375.80 168 2140.78 168 2099.69 168 980.04 168 459.07
169 2389.30 169 2389.30 169 2152.43 169 2111.34 169 985.35 169 461.46
170 2402.80 170 2402.80 170 2164.08 170 2122.99 170 990.66 170 463.85
171 2416.30 171 2416.30 171 2175.73 171 2134.64 171 995.97 171 466.24
172 2429.80 172 2429.80 172 2187.38 172 2146.29 172 1001.28 172 468.63
173 2443.30 173 2443.30 173 2199.03 173 2157.94 173 1006.59 173 471.02
174 2456.80 174 2456.80 174 2210.68 174 2169.59 174 1011.90 174 473.41
175 2470.30 175 2470.30 175 2222.33 175 2181.24 175 1017.21 175 475.80
176 2483.80 176 2483.80 176 2233.98 176 2192.89 176 1022.52 176 478.19
177 2497.30 177 2497.30 177 2245.63 177 2204.54 177 1027.83 177 480.58
178 2510.80 178 2510.80 178 2257.28 178 2216.19 178 1033.14 178 482.97
179 2524.30 179 2524.30 179 2268.93 179 2227.84 179 1038.45 179 485.36
180 2537.80 180 2537.80 180 2280.58 180 2239.49 180 1043.76 180 487.75
181 2551.30 181 2551.30 181 2292.23 181 2251.14 181 1049.07 181 490.14
182 2564.80 182 2564.80 182 2303.88 182 2262.79 182 1054.38 182 492.53
183 2578.30 183 2578.30 183 2315.53 183 2274.44 183 1059.69 183 494.92
184 2591.80 184 2591.80 184 2327.18 184 2286.09 184 1065.00 184 497.31
185 2605.30 185 2605.30 185 2338.83 185 2297.74 185 1070.31 185 499.70
186 2618.80 186 2618.80 186 2350.48 186 2309.39 186 1075.62 186 502.09
187 2632.30 187 2632.30 187 2362.13 187 2321.04 187 1080.93 187 504.48
188 2645.80 188 2645.80 188 2373.78 188 2332.69 188 1086.24 188 506.87
189 2659.30 189 2659.30 189 2385.43 189 2344.34 189 1091.55 189 509.26
190 2672.80 190 2672.80 190 2397.08 190 2355.99 190 1096.86 190 511.65
191 2686.30 191 2686.30 191 2408.73 191 2367.64 191 1102.17 191 514.04
192 2699.80 192 2699.80 192 2420.38 192 2379.29 192 1107.48 192 516.43
193 2713.30 193 2713.30 193 2432.03 193 2390.94 193 1112.79 193 518.82
194 2726.80 194 2726.80 194 2443.68 194 2402.59 194 1118.10 194 521.21
195 2740.30 195 2740.30 195 2455.33 195 2414.24 195 1123.41 195 523.60
196 2753.80 196 2753.80 196 2466.98 196 2425.89 196 1128.72 196 525.99
197 2767.30 197 2767.30 197 2478.63 197 2437.54 197 1134.03 197 528.38
198 2780.80 198 2780.80 198 2490.28 198 2449.19 198 1139.34 198 530.77
199 2794.30 199 2794.30 199 2501.93 199 2460.84 199 1144.65 199 533.16
200 2807.80 200 2807.80 200 2513.58 200 2472.49 200 1149.96 200 535.55
extra for every km
beyond 5 km

Up to 5.00 km
GENARAL ABSTRACT
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.

Estimate amount: Rs in Lakhs 58.00


GST MORD GST State TotalGST
Share Share
S.N
Description Nos Amount MoRD Share State Share
o.
PART - A ( Construction Part )
1 Road portion as per Sub-estimate 0.640 Km 2927289.00 210765.00 140510.00 351275.00 1967138.00 1311426.00
Higher specification cost providing BC
2 30mm instead of SDBC 25mm
617849.00 44485.00 29657.00 74142.00 415194.00 276797.00
Extracost due to BC provision(total BC
3 cost((Slno 2+3) 3545138.00 111996.00 13440.00 13440.00 125436.00

4 Total 3657134.00 255250.00 183607.00 438857.00 2382332.00 1713659.00


5 CD works 2 Nos 549878.00 39591.00 26394.00 65985.00 369518.00 246345.00
6 Road Furniture + Road Safety 258227.00 18592.00 12395.00 30987.00 173528.00 115686.00
7 Side Drains 0.00 0.00 0.00 0.00 0.00 0.00
8 Total Rs. 808105.00 58183.00 38789.00 96972.00 543046.00 362031.00
9 Provision for DPR Charges@20000/Km 0.640 20000 12800.00 922.00 614.00 1536.00 8602.00 5734.00
Add Seigniorage Charges (including
10 DMF+SMET)
161557.00 11632.00 7755.00 19387.00 108566.00 72378.00
11 174357.00 12554.00 8369.00 20923.00 117168.00 78112.00
12 PART - A Construction Total 4639596.00 325987.00 230765.00 556752.00 3042546.00 2153802.00
13 PART - A Construction Total+GST 5196348.00 325987.00 230765.00 556752.00 3042546.00 2153802.00

14 Tender Premium @ 5% on Construction cost 5.00% 4639596.00 231980.00 27838.00 27838.00 259818.00

15 Price Adjustment @ 5% on Construction cost 5.00% 4639596.00 231980.00 27838.00 27838.00 259818.00

16 NAC @ 0.1% on Construction cost 0.10% 4639596.00 4640.00 557.00 557.00 5197.00
DGPS Charges for forest survey and CA
17 land survey + 18% GST
0.640 20000.00 12800.00 2304.00 2304.00 15104.00

18 Avaghahanasadassu 10000.00 10000.00 10000.00


19 Unforeseen items LS 53715.00 53715.00
20 545115.00 0.00 58537.00 58537.00 0.00 603652.00
21 5800000.00 325987.00 289302.00 615289.00 3042546.00 2757454.00
22 PART - B ( 5-Years Routine Maintenance )
23 Routine maintenance cost for 5 Years 3.39
24 Add Labour Cess @ 1.00% on 1.00% 3 0.00
25 Add GST on Maintanence @ 12.00% 12.00% 3 0.00
26 Add LS For U/F items 0.00
27 PART - B Routine Maintenance Total 3.39
PART - C ( After 5th Year Periodic
28
Maintenance )
29 Periodic Maintenance after 5thYears 758037.00
30 Add Labour Cess @ 1.00% on 1.00% 758037 7580.00
31 Add GST on Maintenance @ 12.00% 12.00% 765617 91874.00
32 Add LS For U/F items 42509.00
33 PART - C Periodic Maintenance Total 900000.00
34 PART - (A+B+C) Total TOTAL Rs.. 6700003.39

Assistant Execitive Engineer Dy.Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
PMGSY
GOVERNMENT OF TELANGANA
ROADS AND BUILDINGS DEPARTMENT

DETAILED ESTIMATE
GoRt.No. 16 of P.R & RD (Prog.II) Dept. Dated :15-5-2020 Of Govt. Of Telangana. Under PMGSY-
III, Batch-I Sl.No. 25

T.S.No. /2020-21 Dt: -5 -2020 of CE,PMGSY,Hyderabad

Name of The Construction of BT Road from NH 163


Work: road to R&B Road Shankarrajupally via
toddy trees of Eturunagaram(M),Mulugu
Dist.
PMGSY RCP LWEA
Grant :

Length of road : 0.64-Kms


ESTIMATE AMOUNT : 58.00

Name of the Disrtict Mulugu


Name of the Mandal Eturunagaram
Format - B
PRADHAN MANTRI GRAM SADAK YOJANA
PACKAGE SUMMARY
Package No: TS31RCP16 State : Telangana District : Mulugu
Total Estimated Average Cost per
Cost of Cost(in Lakhs). KM(in Lakhs).
Type of No. of CD Cost of CD
Name of the Road Proposed length Pavement Drains Others
proposal works works
Sl. No. Name of the Block (in Lakhs). Constructi Maintenan Construct Maintenan
on ce ion ce

From *N/U BT CC Total Rs. Nos. Rs. Rs. Rs. Rs.


1 2 3 4 5 6 7 8 8 9 10 11 12

Construction of BT Road
from NH 163 road to R&B
Road Shankarrajupally
1 Eturunagaram U 0.640 0.000 0.640 40.96 2 6.16 0.00 10.88 58.00 13.78 90.63 21.53
via toddy trees of
Eturunagaram(M),Mulug
u Dist.

0.640 40.96 2 6.16 58.00 13.78 90.63 21.53

U - Up gradation

Prepared By:

Checked by: Scrutinized By:

Assistant Execitive Engineer Dy.Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
Existing Surface (Km) Proposed length in Km Item wise cost (Rs. in Lakhs) Item wise cost (Rs. in Lakhs

Traffic category
Earth work

Carriageway in mtrs
Carriageway width
Sl

Gravel/ WBM
District Block Name of Road

Prime Coat
Total

Tack coat
No

Earthen

Embankment
Grubbing &
Length

Total

Clearing &

Scarifying

Shoulders
BT CC BT CC Sub Base Base BM BC

Cutting
Col 12 +
13

1 2 3 4
Construction of BT Road
5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26
from NH 163 road to R&B
Road Shankarrajupally via
8 Mulugu Eturunagaram toddy trees of
T4 0.64 0.00 0.00 0.00 0.64 3.75 0.64 0.00 0.64 3.75 0.04 0.00 3.77 1.90 10.22 11.81 1.24 0.29 0.00 7.30
Eturunagaram(M),Mulugu
Dist.
53.57
= CTSB

= Profile correction in GSB


27
CC road

0.00
m wise cost (Rs. in Lakhs)

28
Pavement cost

36.57
29
GST

4.39
30
Total Pavement cost

40.96
2
31
No.

32
Cost

5.50
CDs

33

GST
0.66
34

Total CD cost
6.16
35

Length (m)
0.00
36

Cost
0.00
Drain

37

GST
0.00
38

Total Drain cost


0.00
-

Length (m)
-
39 40

height in m
41

Cost
0.00
42

GST
0.00
Toe wall/Guard wall

Total Toe wall / Guard


43

0.00

wall cost

Length (m)
-
44

-
45

height (m)
46

Cost
0.00
47

GST
0.00
Protection works

Total Protection works


48

0.00

cost
49

DPR preparation
0.13
50

Road furnitures
2.58
51

seigniorage charges
1.62
52

0.52
GST (of
columns
49,50,51)

Price escalation,
Tender Premium , DGPS Survey,
53

6.04

NAC (to be borne by the State


including its GST)
Total

54

58.00

4912.94
55
Avg

91.71
90.62
Cost/km

56
GST)

6.18
uding
SDBC(Excl

57
Metal Lead in Kms

86.00
58 Borrowed Earth lead in Km

5.00
59

Sand Lead in km
10.00
60

Formation Width in mtrs


7.50
61

Side Earth in Cum


0.00

Borrowed Earth
EW Quantity

62

including shoulders in
Cum
2410.00
63

EW quantity per Km
3765.63
64

Reused Qty in Cum


0.00
65

MORD cost in Lakhs


30.43
66

State Cost in Lakhs


27.57

Difference cost of BC and


67

1.25

SDBC(incl GST)
68

Amount in Colum 42
6.04
in Lakhs

69

Total
7.29
Additional Cost by State Govt

Total cost of Project in Lakhs


70

excluding State Addl Cost (Col.43 -


50.71

Col.58)

Avg Cost/km(excluidng state


71

additional cost)
79.23
72

CBR%
5-6%
73

Remarks
proposed for the entire BT length of the road.
Technology designed and proposed. iii) BC in BT is
i) The existing road is a Earthern road. ii) No any New
74

Total Cost As per DPR


61.00
75
Cost Difference(63-43)

3.00
Proforma C (2021)- Part-1
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR PIU & STA
( For Indvidual Road Works )
Final Proposal Details (To be filled by PIU & Verified by STA)

1. Location State: Telangana District : Mulugu Block: Eturunagaram

2. Package Number TS31RCP16

3. Name of the Road (as


Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.
per OMMAS)

4. Planning (Check from CUCPL and GeoSadak)


Is the road a part of DRRP and Approved CUCPL (Mark ✔ as appropriate)
a Yes No -

<
b Is the road proposal uploaded on GeoSadak (Mark ✔ as appropriate) Yes No -

<
Screenshot of the proposed alignment from the GeoSadak to be attached with the DPR

c Indicate coordinates of Starting and Ending point of the Proposed Road Starting Point Ending Point

Latitude 18.3937 18.3968

Longitude 80.4454 80.4412


d Details regarding the components of the candidate road?
DRRP Length
Component Roads DRRP Road Number Road Name Trace Map Rank PCI
considered (km)
Construction of BT Road from NH 163 road to R&B Road
Component Road 1 1` 5 0.64 Km
Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.
Component Road 2 - - - - - - -

Component Road 3 - - - - - - -

Total 0.64 Km

e Through Route/ MRL Number T- - OR MRL- -

f Name of benefited habitations (benefited habitation report generated from OMMAS to be attached with the DPR)

Sl. No. Name of Habitation Population Sl. No. Name of Habitation Population Sl. No. Name of Habitation Population

1 - 0 6 - 0 11

2 - 0 7 - 0 12

3 - 0 8 - 0 13

4 - 0 9 - 0 14

5 - 0 10 Total 0

g Names of facilities along the Candidate road (For PMGSY-III facilities, report generated from OMMAS to be attached with the DPR)
Name of Facilities Name of Facilities
Name of the other Name of the other
Sl. No. (as per Sl. No. (as per Sl. No. Sl. No.
Facilities Facilities
PMGSY-III Objectives) PMGSY-III Objectives)
1 - 6 - 1 - 6 -
2 - 7 - 2 - 7 -
3 - 8 - 3 - 8 -
4 - 9 - 4 - 9 -
5 - 10 - 5 - 10 -

h Utility value NA

i CUCPL Rank NA

Whether the proposed road leads to (Mark ✔ as appropriate)


j MDR SH NH
<

k Average PCI of the road to which proposed TR or MRL will be connected 5

l Average PCI value of proposed road 3

If PCI of MDR / SH / NH is 3 or below , whether the State is undertaking for Yes No


m
<

upgrading it from State fund available (Mark ✔ as appropriate)

5. Eligible CUCPL length (km) - 0.640

6. Total Proposed Length (km) - 0.640 In Built up area (km) - 0.000 In Open Area (km) - 0.640

7. Is there any variation between eligible CUCPL length and Proposed length (Mark ✔ as appropriate) Yes No
<

If Yes, Reason for variation to be mentioned


-

8. Existing status of proposed road (PMGSY/ Non-PMGSY Portion)


Corresponding
Corresponding
Chainage Length (km) Year of Construction* Design Traffic
existing PCU/day
Category
PMGSY Portion 0/0 Km to 0.64/0 Km 0.64 1996 289 T4

Non-PMGSY Portion
Note : *Actual date of completion of previous construction/ upgradation.

9. Existing Surface Status of proposed road


Existing Surface Status
Bituminous Wearing
Track/ Earthen Gravel/ Moorum WBM Brick Soling CC total span of culvert
Course
Total
Length Length Length Length Length Length
Chainage Chainage Chainage Chainage Chainage Length (km) Chainage Chainage
(km) (km) (km) (km) (km) (km)
0 to640 640.00 0 to640 0 0 to640 0 0 to640 0 0 to640 0 0 to640 0 0 to640 0 640.00

Total 640.00 Total 0.00 Total 0.00 Total 0.00 Total 0.00 Total 0.00 0.00 0.00 640.00
10. Type of proposal
Chainage Length (km)

Riding Quality Improvement (RQI)

Upgradation without widening - -

Upgradation with widening 0/0 Km to 0.64/0 Km 0.64

New Construction (From existing non-BT portion) - -

11. Type of Pavement Proposed PROPOSED SURFACE STATUS


RIGID FLEXIBLE No Provision length Total span of culverte
Total
Chainage Length chainage length chainage length chainage length
0 to640 0 0 to640 640 0 to640 0 0 to640 0 640

Total 0 Total 640 640 0 0 640

Whether the Proposed Road has the desired Road Land Width (RLW ) to Yes No
12. a. -

<
accommodate required carriageway/ roadway (Mark ✔ as appropriate)

If No, what measure has been taken in DPR chainage wise Chainage
Measures taken
From To
- - -
- - -
Existing Widths (m) Proposed Widths (m)
b Indicate the widths of the following for the proposed road
In the Built Up Area In the Open Area In the Built Up Area In the Open Area
i) Carriageway 3.75 3.75 3.75 3.75
ii) Roadway 4.80 4.80 7.50 7.50
iii) Road Land Width 12.00 15.00 12.00 15.00

13. INDEX MAP (not to scale ) : To be attached saperately


MDR-42

Shankarrajupally
NH 163 Road
R&B road

H- Habitation
F-Facilities name

0.64 Km
0.00 Km

14. Traffic Data


Month & Year of Traffic Volume Count =
Motorised Traffic Non Motorised Traffic
Animal Drawn
Light Commercial Vehicle Trucks Agricultural Tractors Trallers Buses
Cars, Jeep, Vechicle
Days Motorised
Vans,
two Cycles Animal
Three Over Over Bullock
Wheelers Loaded Unloaded Loaded Unloaded Loaded Unloaded Over Ladden Loaded Unloaded drawn
Wheelers Ladden Ladden carts
vehicles
Day 1 17 17 0 0 0 18 18 0 17 17 0 0 0 11 10 0
Day 2 15 28 0 0 0 15 15 0 19 19 0 0 0 24 9 0
Day 3 19 14 0 0 0 12 12 0 15 15 0 0 0 11 12 0
Total 51 59 0 0 0 45 45 0 51 51 0 0 0 46 31 0
Average 17 20 0 0 0 15 15 0 17 17 0 0 0 15 10 0
a Traffic Details in case design is done as per SP IRC 72:2015

ADT in the year of Traffic Count = 126

Growth rate adopted (%) = 6% Base Year Traffic AADT (T) = 63

Design Life (Years) = 10

Number of Harvesting Seasons = 1

No. of Days in Each Harvesting Season (t) = 75 Cumulative ESAL = 181,149.00

Value of (n) assumed = 1 Traffic Category = T4

b Traffic Details in case design is done as per IRC 37-2018

A= Intitial traffic in the year of completion of construction in terms of the number of commericial vehicles per day -

D= Lane distribution factor -

F= Vehicle damage factor -

n= Design life in years -

r= growth rate adopted % -

N= The cumulative number of standard axles to be catered for the design in terms of msa -

Projected Commercial Vehicle Per Day -

c Projected Passenger Car Unit (PCU/day) -

15. Design Subgrade CBR ( for Different Sections atleast one Test/km ) =

Chainage-wise 0.00 0.60

Subgrade CBR % 5.34 5.59


16. Relavant Method & Codes used for Pavement Design

a Method Used for Designing of Pavement ((Mark ✔ as appropriate) Conventional New Technology _

-
If New Technology is used, indicate the name (Please indicate New
b Technology used in Subgrade, Sub-Base, Base, Surface Course layer
separately) _

c Code used for designing Flexible pavement (Mark ✔ as appropriate) IRC:SP:72-2015 IRC:37-2018

<
d Code used for designing Rigid Pavement (Mark ✔ as appropriate) IRC:SP:62-2014 IRC:58-2011

e Any other Codes used for New Technology/ Other, please indicate -

17. Existing and Proposed Pavement Cross Section drawing & details both for flexible and rigid (Separately Chainage-wise)

i) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.

Chainage From 0.00 Km To 0.64 Km


(Drawing should be as per Existing Pavement) Pavement Thickness (Drawing should be as per actual provisions made in DPR) Pavement Thickness
Layer (mm) Layer (mm)
SG 0 SG 0
Gravel 0 GSB 150
WMM 0 WMM 150
BC 30
Gravel Shoulders 300

ii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.

Chainage From 0 To 0
(Drawing should be as per Existing Pavement) Pavement Thickness (Drawing should be as per actual provisions made in DPR) Pavement Thickness
Layer (mm) Layer (mm)
SG 0
Gravel 0
WMM 0

iii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.

Chainage From 0 To 0
(Drawing should be as per Existing Pavement) Pavement Thickness (Drawing should be as per actual provisions made in DPR) Pavement Thickness
Layer (mm) Layer (mm)

iv) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.

Chainage From 0 To 0
(Drawing should be as per Existing Pavement) Pavement Thickness (Drawing should be as per actual provisions made in DPR) Pavement Thickness
Layer (mm) Layer (mm)

v) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.

Chainage From 0 To 0
(Drawing should be as per Existing Pavement) Pavement Thickness (Drawing should be as per actual provisions made in DPR) Pavement Thickness
Layer (mm) Layer (mm)

Separate cross section drawings along with tabular details of the pavement layers should be repeated (chainage wise) for each type of cross section encountered.
18. Sources and the Lead distances of Materials are as under (Lead to be measured from the mid-point of the proposed road)

Sl. No. Material Source Lead Distance (km) Sl. No. Material Source Lead Distance (km)

Earth for embankment


1 Local 10 6 M-Sand Local 10
construction

2 Murrum/ Carted soil (Subgrade) Local 10 7 Cement Local -

Murrum/ Gravel for shoulder


3 Local 10 8 Emulsion - 442
(Subgrade)

4 Aggregate - 86 9 Bitumen - 442

5 Sand Local 10 10 Steel Local -

19. Cost Details of proposal (Please fill all the entries or write "NA" wherever applicable )
a Pavement Components
Amount (I/C GST) in Average cost/ km in
Description of layer Quantity Unit Rate in Rs. Amount in Rs. GST in Rs.
Lakhs Lakhs
Flexible pavement
Preparatory & Earthwork
i Clearing & scarifying 1920.00 Sqm 2.29 4397.00 528.00 4925.00 7695.00
ii Earth Work - in Excavation/ Cutting 0.00 Cum 46.71 0.00 0.00 0.00
iii Earthwork- in Filling (Embankment) 1618.00 Cum 233.00 376994.00 45239.00 422233.00 659739.00
Subgrade (if provided seperately)
a. Subgrade (Using local Soil) Cum
iv
b. Subgrade (Carted Soil) Cum
c. Treated Subgrade (Stabilized Subgrade) Cum
Shoulders
a. Earthen Shoulder 792.00 Cum 240.00 190080.00 22810.00 212890.00 332641.00
v
b. Gravel Shoulder Cum
c. GSB Quality Shoulder Cum
Sub-Base Course
vi Granular Sub base 400.50 Cum 2550.95 1021655.00 122599.00 1144254.00 1276701.00
vii Soil + Aggregate Mix Cum
viii Stabilised sub base Cum
Base Course
ix WBM Gr -II Cum
x WBM Gr -III Cum
xi WMM 371.70 Cum 3177.22 1180973.00 141717.00 1322690.00 2066703.00
xii Stabilised base Cum
Bituminous Course
xiii Prime Coat 2478.00 Sqm 50.00 123900.00 14868.00 138768.00 216825.00
xiv Tack Coat 2478.00 Sqm 11.82 29290.00 3515.00 32805.00 51258.00
Indicate Type
xv Binder Course (BM/ DBM ) Cum
Surface Course (OGPC/ SDBC/ BC
xvi Sqm/ Cum 9816.34 729845.00 87581.00 817426.00
BC) 74.35 1277228.00
xvii Seal Coat Sqm
Surface Course with Surface Dressing
a. Single Coat Surface Dressing Sqm
xviii Indicate Type
b. Double Coat Surface Dressing
(with or without Pre-Coating Sqm
indicate)

Total cost of Flexible pavement (a) 3657134.00 438857.00 4095991.00 5888790.00


Cement Concrete Road

xix GSB Cum

xx WBM/ WMM Cum

xxi Concrete for Pavement (M30) on existing CC Pavement Cum 7266.55 0.00 0.00 0.00
0.00 0.00
Concrete for Pavement (M30) for newly proposed CC
xxii Cum
Pavement portion
xxiii ICBP Sqm

xxiv Cell Filled Concrete Pavement Cum

xxv Panelled Cement Concrete Pavement 0.00 Cum 8366.89 0.00 0.00 0.00
0.00
Total cost of Concrete Pavement (b) 0 0 0
Total cost of Pavement (a + b) 3657134.00 438857.00 4095991.00 6399986.00

Cost deduction due to higher specification in pavement design** 111996.00 13440.00 125436.00 195994.00

Final Pavement Cost after deduction 3545138.00 425417.00 3970555.00 6203992.00


Note : ** The details of Higher Specification considered in pavement design over & above admissible guidelines need to be provided under 19 (g) and detailed calculation of the same to be
attached with the DPR separately.

b Cross Drainage (CD) Works


i Existing CD (requiring repair)

Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs

- - - - -
- - - - -
- - - - -
ii Existing CD (requiring replacement)
Type of Proposed
Type of Existing CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
CD

- - - - - -

- - - - - -
- - - - - -
iii New proposed CD

Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs

HP Culvert 1V of 1000mm Dia.NP3 Pipe 0/620. 2 549878.00

Slab culverts 0 0.00

road dam 0 0.00

Note: Similar type of CDs may be grouped together for each category
Amount (I/C GST) in Average cost/ km in
Amount in Rs. GST in Rs.
Lakhs Lakhs
Total Cost of CD works 549878.00 65985.00 615863.00 962285.9375

c Protection works Chainage (Expand as applicable)

Average cost/ m in
From To Length( m) Amount in Lakhs
Lakhs
i - - - - - - - - - - -
ii - - - - - - - - - - -
Retaining wall
iii - - - - - - - - - - -
iv - - - - - - - - - - -
i - - - - - - - - - - -
ii - - - - - - - - - - -
Breast wall
iii - - - - - - - - - - -
iv - - - - - - - - - - -
i - - - - - - - - - - -
ii - - - - - - - - - - -
Toe wall
iii - - - - - - - - - - -
iv - - - - - - - - - - -
i - - - - - - - - - - -
ii - - - - - - - - - - -
Gabbion
iii - - - - - - - - - - -
iv - - - - - - - - - - -
i - - - - - - - - - - -
ii - - - - - - - - - - -
Pitching / turfing for slopes
iii - - - - - - - - - - -
iv - - - - - - - - - - -

Amount (I/C GST) in Average cost/ km in


Amount in Rs. GST in Rs.
Lakhs Lakhs
Total cost of Protection works - - - - - - - -

d Side Drains (if Provided) Chainage (Expand as applicable)


Average cost / m in
From To Length( m) Amount in Rs.
Lakhs
(Indicate Type)
i 0 0.00 0.00

Pucca Drain (U/ V/ Trapezoidal/ ii


etc) iii
iv
i
ii
Earthen/ Kacha Drain
iii
iv

Amount (I/C GST) in Average cost/ km in


Amount in Rs. GST in Rs.
Lakhs Lakhs
Total cost of Side Drains works 0.00 0.00 0.00 0.00
e Road Logo, other Road Furniture including Road safety signs (Expand as applicable)
Amount (I/C GST) in Average cost/ km in
Sl. No. Type of Road Furniture Chainage Number Amount in Rs. GST in Rs.
Lakhs Lakhs
i 5Th KM Stones 0 0 0 0 0

ii Ordinary KM Stones 2 4848.00 582 5430 8484

iii 200M H.M Stones 3 2111.00 253 2364 3694

iv Guid Posts 5 3474.00 417 3891 6080

v Typical PMGSY Title informatory s 2 23686.00 2842 26528 41450

vi Citizen Informatory sign board 3 58643.00 7037 65680 102625

vii Semi reflective sign boards 10 29563.00 3548 33111 51736

viii Cautionery and mandatory boards 16 34292.00 4115 38407 60011

ix RSA 101610.00 12193 113803 177817

Total cost of Road Furniture 258227 30987 289214 451897


Amount (I/C GST) in Average cost/ km in
Sl. No. Items (Please Specify) Amount in Rs. GST in Rs.
Lakhs Lakhs
i DPR Preparation Charges 12800.00 1536.00 14336.00

ii Seignorage 161557.00 19387.00 180944.00

iii Tender Premium @ 5% on Construction cost 231980.00 27838.00 259818.00

Price Adjustment @ 5% on Construction cost 231980.00 27838.00 259818.00

NAC @ 0.1% on Construction cost 4640.00 557.00 5197.00

DGPS Charges for forest survey and CA land survey + 18% GST 12800.00 2304.00 15104.00

Avaghahanasadassu 10000.00 10000.00

iv LS 53715.00 53715.00

Total cost of Other Provisions 719472.00 79460.00 798932.00 0.00

g Other Items under Higher Specifications (Additional Cost to be borne by the State, apart from those under 19(a) to 19(f))
Amount (I/C GST) in Average cost/ km in
Sl. No. Items Amount in Rs. GST in Rs.
Lakhs Lakhs
i Land Acquisition - - - -
ii Shifting of Utilities - - - -
iii Plantation - - - -
Any other (Please specify)
a - - - -
iv
b - - - -
c - - - -

Total cost of Higher Specification 111996.00 13440.00

Amount (I/C GST) in Average cost/ km in


h Total Construction Cost - Sum of 19 (a) to 19 (g) Amount in Rs. GST in Rs.
Lakhs Lakhs
Total Construction Cost of the Project 5184711.00 615289.00 5800000.00 91
20. Five Year Routine Maintenance 70800
To be estimated as per provision of Operation % of Total
Manual Year Cost (I/C GST) in Lakhs Cost /km in Lakhs
construction cost
I 0.34 10.00% 0.53

II 0.51 15.00% 0.80

III 0.68 20.00% 1.06

IV 0.85 25.00% 1.33

V 1.01 30.00% 1.58

Renewal coat after 5 years 10.39 100.00% 16.23

Total Maintenance Cost 13.78

Maintenance after 6th years renewal coat I 0.34 10.00% 0.53

II 0.51 15.00% 0.80

III 0.68 20.00% 1.06

IV 0.85 25.00% 1.33

V 1.01 30.00% 1.58

Total Maintenance Cost 3.39

Grand Total of maintenance 17.17

21.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase
Vetted at NRIDA Year of SoR
(Mark ✔ as appropriate)
Yes No 2021-22

22. Final Project Cost Abstract :

Cost sharing pattern between MoRD and State (Mark ✔ as appropriate) General Area (60:40) Special Area (90:10)

Total Cost (I/C GST) Average Cost/ km


Item as per Entry 19 above Total Cost in Lakhs GST in Lakhs MoRD Share in Lakhs State Share in Lakhs
in Lakhs (I/C GST) in Lakhs
19(a) Pavement 3545138.00 425417.00 3970555.00 2382333 1588222 62.04

19(b) CD Structures 549878.00 65985.00 615863.00 369518 246345 9.62

19(c) Protection Works 0 0.00 0.00 0 0 0.00

19(d) Drains 0.00 0.00 0.00 0 0 0.00

19(e) Road Furniture 258227.00 30987.00 289214.00 173528 115686 4.52

19(f) Other Provisions 719472.00 79460.00 798932.00 0 798932.00 12.48

19(g) Higher Specifications 111996.00 13440.00 125436.00 125436.00 1.96


Total Project Construction Cost (Excluding
5184711.00 615289.00 5800000.00 2925379 2874621 91.00
Maintenance Cost)

Note : In calculating MoRD and State Share for items 19 (a) to 19 (f) above, a proper calculation sheet should be attached if specifications/ provisions higher than those prescribed
in the guidelines have been taken in the estimate e.g. extra width of road or crust thickness or provisions of bituminous layer over & above that allowed in the guidelines. In such
cases, the extra cost should be fully booked under State Share. All such extra amount, over and above the sharing pattern between Centre and the State, so booked in the state
share for items 19(a) to 19(f) above, plus the amount under 19(g) will become the total amount of higher specification.

Certified that the source of materials & lead distance is shortest, and other information provided above is correct

Checked By at PIU/
Prepared By Technical Scrutiny at
Circle office
(Signature) STA by: (Signature)
(Signature)
Name Name Name
Designation Assistant Execitive Engineer Designation Dy.Executive Engineer Designation
Date Date Date

Counter Signatures of
Co-ordinator STA :

Name
Designation Executive Engineer Designation Superintending Engineer Designation
Date Date Date
Proforma C (2021)- Part-2
PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR PIU (To be filled handwritten by PIU Head)
Name of Work Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist. Reference
wherever
To be filled
applicable
Sl No Items by PIU
(Page no.
(Yes/No)
in the
1 Whether the transect walk photographs, Minutes of Transect walk, Grama Sabha approval attached with the DPR ? YES DPR)
2 Whether the benefited habitations and PMGSY-III facility report generated from OMMAS attached with the DPR ? YES
3 Whether the proposal uploaded on GeoSadak and screenshot of the proposed alignment is attached with the DPR ? YES
4 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ? YES
5 Is the PCI value (as in CUCPL) for the proposed road is in corroboration with photographs attached? (Approved CUCPL to be attached in DPR)
6 Is the road eligible for upgradation based on PCI value ?
7 Is any portion/ road proposed under Riding Quality Improvement (RQI) ? YES

Is any portion of the road is within design life period of 10 years or PCI more than 3? NO
8 a If yes, whether the additional cost for such portion of length uploaded under Higher Specification Cost on OMMAS?
b If not, whether detailed reasons indicated in the DPR?
Whether required roadway land width of 9 m and 7.50 m for 5.50 m and 3.75 m carriageway width respectively available througout or as per codal provision depending upon terrain ? YES
9 a If no, whether chainage wise details of available land width is attached with the DPR? YES

b If no, whether land acquisition proposed for obtaining required land width? YES
10 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA? YES

Whether the radius of the curves provided are adequate as per codal provisions for design speed on rural roads? YES
11
If not, whether precautions have been taken and included in the DPR?
12 Is Road Plan, L & X section and Junction design drawings attached ? YES
13 Whether soil test report showing (a) Gradation (b) Plasticity limits (LL, PL & PI) (c) Standard Proctor Compaction (MDD & OMC) (d) CBR tests on existing subgrade soil is attached ? YES
14 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement in widening portion or for new pavement construction? NO
15 If stabilisation of subgrade is proposed, whether the test report of stabilised subgrade for determining 'Optimum stabiliser content' and 'subgrade strength achieved after stabilisation' is attached ?
Whether any carted soil is proposed for improvement of sub grade/ shoulder? YES
16
If yes, whether test results of carted soil is attached with the DPR? YES
17 Whether the test results of GSB material is attached with the DPR? YES
18 Whether 3 days/ 7 days traffic survey details attached with the DPR? YES
19 Whether 3rd party Traffic verification using ATCC is carried out for more than 1 MSA traffic as per guidelines/ as per latest circular and reports attached with the DPR? YES
20 Whether Axle load Surveys carried out for more than 1 MSA traffic and reports attached with the DPR? YES
21 Is the carriageway width (single lane or intermediate lane) of the proposed road is as per PCU/day consideration? (Refer to IRC 64:1990)
Whether existing road pavement has been divided into different sections (chainage starting from and chainage up to) depending upon extent of distress for strengthening/ rehabilitation of the
YES
22 proposed road section-wise?
If not, whether detailed reasons indicated in the DPR ?
23 Is the Pavement design done as per latest version of IRC Code? IRC SP:72-2015 and IRC SP:62-2014 or IRC 37-2018 and IRC 58-2011 YES

Whether earth obtained from cutting section has been propsed for using in filling section? (Cutting from High embankment, side drains, protection work, CD work, etc.)
24
If not, whether detailed reasons indicated in the DPR ?
Whether hard rock or ordinary rock classification and quantity of hard rock or ordinary rock cutting proposed are justified based on previous experiences and rock outcrops seen in that area?
25
If yes, whether due credit given to hard rock ?
26 Whether the km wise existing pavement crust details (pavement layer details and their thickness, year of construction) are properly filled in Part-1 of Proforma C ?
27 Whether the proper weightage is given for the existing crust thickness while designing overlay thickness?
28 Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category ? YES

Whether the Binder Course/ Surfacing Course has been proposed as per IRC SP:72 - 2015 or IRC 37-2018 ? YES
29
If not, whether detailed reasons indicated in the DPR ?
30 Is Location of CDs, drains and Protections marked in L and X section drawings? YES
31 Whether length of existing/ proposed CDs/ Bridges deducted from pavement quantity calculation? YES
32 Whether the clear coloured photographs at the location of existing and Proposed CD structures, and protection structures are attached ? YES
33 Whether hydraulic calculation for each CD structures attached? YES
34 Whether latest rainfall data used for the design ? YES
35 Is the provision of CD structures and design is as per site requirement and as per relevant IRC codes? YES
36 In case of CD structures which have been proposed for replacement, whether you have ensured that such CDs are beyond repair and hence they need to be replaced? YES
37 Is the provision of Protection work and design is as per site requirement and as per relevant IRC codes? YES
38 Whether drainage plan attached with the DPR? YES
39 Whether Road Safety Audit (RSA) report attached and uploaded on OMMAS ? NO
40 Is the provision of road safety furniture proposed as per RSA and site requirement? YES
Is the road safety furniture items (Retroreflective road signs, thermoplastic reflective paint for road markings, Advance warning signs, Traffic calming measures, Crash barriers, hazard markers and
41 YES
parapets on bridges, etc.) proposed in DPR marked in the road plan
Whether any New technology has been proposed ? YES

a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of technology ? If yes, date on which site inspection was made. YES Date:
42
b If proposed, whether the requisite test results and other data is attached with the DPR ? YES

c Whether the comparative statement using conventional method and new technology is attached with the DPR ? YES
43 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ? YES
44 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS?
45 Whether Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ? YES
46 Whether the head of PIU inspected the site? If yes, date on which site inspection was made YES Date:
47 If yes, are you satisfied with the provisions made in the DPR as per site requirement and duly following guidelines/ IRC Codes ? YES

Total cost of construction after scrutiny by PIU/Circle-Office and before scrutiny at STA (I/C of GST) in Lakhs 58.00

Total Average cost/ km ( in Lakhs) 90.63


a Average Pavement cost/ km ( in Lakhs) 64.00
b Average CD Structures cost/ km ( in Lakhs) 9.62
c Average Other cost/ km ( in Lakhs) 17.00
Describe how the proposal meets PMGSY-III objectives (Maximum 100 words)

Signature of PIU Head


Name
Designation
Date

Note: Part-2 of Proforma C to be filled personally by concerned PIU Head


PRADHAN MANTRI GRAM SADAK YOJANA ( PMGSY-III)
CHECKLIST FOR STA (To be filled handwritten by STA)
Name of work Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist. Reference
Name of the STA: wherever
To be filled
applicable
Sl No Items by STA
(Page no.
(Yes/No)
Is the Part -I and Part-2 of Proforma C completely filled with signature? (Scrutiny by STA should only be done after it is completely filled and duly signed by the PIU officials) in the
1 DPR)
If "Yes"- are you satisfied with overall entries made by PIU?
2 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ?
3 Have you satisfied yourself that the proposed road is part of Candidate roads and approved CUCPL ? (Approved CUCPL to be attached in DPR)
4 Whether the benefited habitations and PMGSY-III facility report generated from OMMAS attached with the DPR ?
Whether the screenshot of the proposed alignment is attached with the DPR and have you verified the alignment from the GeoSadak ?
5 If yes, are you satisfied with the proposed alignment as Through Route/ Major Rural Link providing access to facilities viz. Education/ Hospitals/ Markets etc. to rural population as per the objectives
of PMGSY-III?
6 Is the road eligible for upgradation based on PCI value ?
7 Is the PCI value (as in CUCPL) for the proposed road is in corroboration with photographs attached?
Is any portion/ road proposed under Riding Quality Improvement (RQI) ?
8
If yes, whether only wearing coat (OGPC and Seal Coat, SDBC, Surface dressing or BC) with some patch filling work proposed?
9 Have you verified the Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ?
Is any discrepancies/ abnormalities found in the soil test reports attached with the DPR? (if yes, STA can re-verify again from the STA laboratory). Are all the four requisite test results on subgrade
10
soil (Gradation, plasticity limits, compaction and CBR) reported in DPR?
11 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement widening portion or for new pavement construction?
12 Are you satisfied with the type of stabilization proposed and its test results attached with the DPR ?
13 If stabilization is not proposed for the subgrade CBR less than 5, are you satisfied with the reasons provided by the PIU ?
14 Whether 3 days/ 7 days traffic survey details attached with the DPR ?
Have you analysed the ATCC report and Axle load test data and yourself satisfied with the design traffic recommended for the projected traffic more than 1 MSA as per guidelines/ as per latest
15
circular?
Whether existing road pavement has been divided into different sections (chainage starting from and chainage up to) depending upon extent of distress for strengthening/ rehabilitation of the
16 proposed road section-wise?
If not, are you satisfied detailed reasons indicated in the DPR?
17 Whether the km wise existing crust details (layer thickness) properly entered in Part-1 of Proforma C?
18 Whether the proper weightage is given for the existing crust thickness during overlay design?
19 Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category?
20 If bituminous macadam usage is proposed, whether the design traffic is of T9 category as per IRC SP:72 - 2015.
21 Is hard shoulder proposed is as per IRC SP:72:2015 ?
22 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA?
Whether the radius of the curves provided are adequate for design speed on rural roads?
23
If not, are you satisfied with the precautions taken and included in the DPR?
24 Is L and X section drawings, Junction design drawings attached ?
25 Is location of CDs, drains and Protections marked in L and X section drawings ?
26 Are you satisfied with the location and type of CDs proposed as per photographs and Hydraulic calculations ?
27 Are you satisfied with the location and type of Protection work proposed as per photographs and site requirement?
28 Whether Road Safety Audit Report attached and uploaded on OMMAS ?
29 Whether the road safety provisions in the DPR are as per RSA report?
Have you verified and satisfied yourself regarding the provisions in the DPR such as junction improvements, requirement of major CDs structures, pucca drains in habitation area, etc. from the
30
satellite imagery of the proposal in GeoSadak?
Whether any New technology has been proposed ?
a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of new technology ?
31 b If proposed, whether the requisite test results and other data is attached with the DPR ?
c Whether the requisite pavement design based on Mix design/ test results attached in the DPR?
d Whether the comparative statement using conventional method and new technology is attached with the DPR ?
32 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ?
33 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS?
34 Are you satisfied with the provisions made in the DPR as per site reqirements and duly following guidelines/ IRC Codes ?
35 Is the Part-1 of Proforma C- "Final Proposal Details" properly/ completely filled with signatures after scrutiny at STA?
Total cost of construction after scrutiny by STA (Should match with Total Cost at Part-1 (I/C of GST)) in Lakhs
Total Average cost/ km ( in Lakhs) 58.00
a Average Pavement cost/ km ( in Lakhs) 90.63
b Average CD Structures cost/ km ( in Lakhs) 64.00
c Average Other cost/ km ( in Lakhs) 9.62
Specific Remarks, if any, by STA

Signature of STA Member Signature of STA Coordinator

Name Name

Designation Designation

Date Date

Note: Part-3 of Proforma C to be filled personally by concerned STA member responsible for scrutiny of DPR
CD. Works General Abstract
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via
toddy trees of Eturunagaram(M),Mulugu Dist.
Estimate amount: Rs: 58.00 Lakhs

S.No. Description Nos Rate Per Amount

Construction of HP Culvert 1V of 1000mm


1 2 274939.00 549878.00
Dia.NP3 Pipes 1 Nos at KM 0/220,0/620

CD Works Part Total 549878.00

549878.00

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal


Page 24 of 249

DETAILED AND ABSTRACT ESTIMATE FOR ROAD CONSTRUCTION


Name of the work: Construction of BT Road from NH 163 road to R&B Road
Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.
Sl. Description No.s Measurments Quantity Rate / per Amount
N L B D
o
1 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass,
bushes, shrubs, saplings and trees of girth upto 300 mm, removal of
stumps of such trees cut earlier and disposal of unserviceable materials
and stacking of serviceable material to be used or auctioned, upto a lead of
1000 m including removal and disposal of top organic soil not exceeding
150 mm in thickness as per Technical Specification Clause 201 MORD .
including contractors profit & Over head charges, but excluding GST etc,.
Complete. .

0.00 Km to 0.64 Km 1 x 2 640.00 2.50 3200.00


3200.00
Deduct for Voids@ 40% -1280.00
1920.00 2.29 sqm 4397.00

2 Construction of Embankment with Material Obtained from Borrow pits


by Machinery

Construction of embankment with borrowed useful earth from outside road


boundary by mechanical means upto SDR with a lead of 10 km including
pre-watering of soil at borrow area, removal of top soil, excavation of soils
at borrowed area, conveyance ofsoil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet
requirement of table 300-2 of MoRT&H, including all hire andoperational
charges of T&P ,contractors profit & Over head charges and , complete for
finished0.00
itemKmof to
work
0.64as
Kmper MoRT&H specification 305 (5th revision) but 1618.00
excluding Seigniorage charges, GST Complete . (Payment will be made
based Ason
per Calculation
level sheet
for finished item of work). With borrowed earth from 10 km 1618.00 233.00 cum 376994.00
lead.
3 Granular Sub-base with Well Graded Material (Table 400.1)- Grading- III

Construction of granular sub-base by providing well graded material(Table


400.1) with Grading III Material(HBG M/C chips) CBR Value not less than
20 and PI Value less than 6 spreading in uniform layers with Tractor
grader on prepared surface, mixing by mix in place method with rotaor at
OMC, and compacting with Vibratory Roller to achieve the desired
density, complete as per Technical Specification Clause 401 MORD
including contractors profit & Over head charges, but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

OVER EXISITNG CRUST


1.er/bt- 0 to 640 1 x 1 640.00 4.05 0.150 388.80
WIDENING PORTION
1.er/bt- 0 to 640 1 x 0 640.00 0.000 0.150 0.00
Curves
30 1 x 1 36.00 0.60 0.150 3.24
130 1 x 1 31.00 0.60 0.150 2.79
220 1 x 1 31.00 0.60 0.150 2.79
600 1 x 1 32.00 0.60 0.150 2.88
400.50 2550.95 cum 1021655.00
Page 25 of 249

Sl. Description No.s Measurments Quantity Rate / per Amount


N L B D
o
4 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the material with water
at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper
to site, laying in uniform layers in sub-base/base course on a well prepared
sub-base and compacting with Vibratory Roller 80-100 kN weight to
achieve the desired density including lighting, barricading and maintenance
of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification
Clause 406 MORD/ MORTH, including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

OVER EXISITNG CRUST


1.er/bt- 0 to 640 1 x 1 640.00 3.75 0.150 360.00

WIDENING PORTION

1.er/bt- 0 to 640 1 x 0 640 0.000 0.150 0.00

CURVES

30 1 x 1 36.00 0.60 0.150 3.24

130 1 x 1 31.00 0.60 0.150 2.79

220 1 x 1 31.00 0.60 0.150 2.79

600 1 x 1 32.00 0.60 0.150 2.88

371.70 3177.22 cum 1180973.00

5 Earth Shoulders
Construction of sub grade & earthen shoulders with borrowed useful earth
from outside road boundary by mechanical means upto SDR with a lead of
10 km including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance ofsoil, depositing the soil
on the embankment, spreading soil, breaking clods, sectioning, grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet
requirement of table 300-2 of MoRT&H, including all hire andoperational
charges of T&P ,contractors profit & Over head charges and , complete for
finished item of work as per MoRT&H specification 305 (5th revision) but
excluding Seigniorage charges, GST Complete . (Payment will be made
based on level for finished item of work). With borrowed earth from 10 km
1.er/bt- 0 to 640
lead. 1 x 2 640 1.875 0.330 792.00
792.00 240.00 cum 190080.00

6 Prime Coat
Providing and applying prime coat with bitumen emulsion (SS-2) Grade on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.85 kg/sqm using mechanical means as per
Technical Specification Clause 502 MORD (for use on Wet mix
macadam) ,including contractors profit & Over head charges but excluding
Seigniorage charges, GST Complete .

1.er/bt- 0 to 640 1 x 1 640.00 3.75 2400.00


CURVES
30 1 x 1 36.00 0.60 21.60
130 1 x 1 31.00 0.60 18.60
220 1 x 1 31.00 0.60 18.60
600 1 x 1 32.00 0.60 19.20
2478.00 50.00 Sq 123900.00
m
7 TACK COAT
Page 26 of 249

Sl. Description No.s Measurments Quantity Rate / per Amount


N L B D
o
Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
granular surfaces treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 503 MORD, including contractors profit
& Over head charges, but excluding GST etc,. Complete. for Tack Coat

1.er/bt- 0 to 640 1 x 1 640 3.75 2400.00


CURVES
30 1 x 1 36.00 0.60 21.60
130 1 x 1 31.00 0.60 18.60
220 1 x 1 31.00 0.60 18.60
600 1 x 1 32.00 0.60 19.20
2478.00 11.82 Sq 29290.00
m
8 Bituminous concrete
Providing and laying Bituminous concrete with 100- 120 TPH batch type
HMP producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to
5.6 % per cent of mix and filler, transporting the hot mix to work site,
laying with a Mechanical paver finisher to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH specification clause No.
509 complete in all respects, including overhead charges & Contractors
profit. but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1.er/bt- 0 to 640 1 x 1 640 3.75 0.030 72.00


CURVES
30 1 x 1 36.00 0.60 0.030 0.65
130 1 x 1 31.00 0.60 0.030 0.56
220 1 x 1 31.00 0.60 0.030 0.56
600 1 x 1 32.00 0.60 0.030 0.58
74.35 9816.34 Cu 729845.00
m
TOTAL Rs.. 3657134.00

Assistant Execitive Engineer Dy.Executive Engineer Executive EngineerSuperintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
DETAILED AND ABSTRACT ESTIMATE FOR
onstruction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulug
Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 1 Nos at KM 0/220,0/620

Measurements
Sl no Description of work No.s Quantity Rate. Per Amount
L B D
1 2 3 4 5 6 7 8 9
No. of Vents & Dia of Pipes 1 V of 1000 mm Dia H= Distance between Road crust level to Bottom of pipe
Body Wall Length.-> L = ( 2H + ( ND + (N-1) D/2) + 0.60 ) = 5500.00 mm N= No.of Vents , Depth of Foun=1.00m
C.C Bed Below Pipes -> W = ( ( ND + (N-1) D/2) + 0.30 ) = 1500.00 mm D= Outer Dia of NP3 Pipes =Inner Dia+200mm

1 Earthwork excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excaed suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.. - For Foundations
Body wall 1 x 2 5.65 1.40 1.20 18.984
Under Pipes 1 x 1 7.50 1.50 0.60 6.750

25.734 114.91 2,957.00


cum 1 cum
2 Filling in foundation trenches / Pipe bedding with Sand as per drawing
and technical specification Clause 305.3.9 MORD & 304
MORTH ,including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Body wall Foundation 1 x 2 5.65 1.40 0.10 1.582
Under Pipes 1 x 1 7.50 1.50 0.10 1.125

2.707 900.81 2,438.00


cum 1cum
3 Plain cement concrete M 10 grade using 40,20 & 10mm metal (HBG)
mechanically mixed in Foundation complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including contractors profit &
Over head charges,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.

Body wall Foundation 1 x 2 5.65 1.40 0.15 2.373


Under Pipes 1 x 1 7.50 1.50 0.15 1.688
4.061 4942.51 20,069.00
cum 1cum
4 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG)
mechanically mixed in Substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including contractors profit &
Over head charges,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.
Body wall Below sill 1 x 2 5.50 (1.00+0.40/2 1.80 13.860
Body wall above Sill 1 x 2 5.50 (1.25+1.00/2 0.95 11.756

P.P walls 1 x 2 5.50 0.40 0.45 1.980

Deduct Pipe Portion 22 x -2 1.20 1.20 1.00+0.60/2 -1.810


7 4
26.000 5674.26 147,531.00
cum 1cum
1 2 3 4 5 6 7 8 9
5 Providing and laying boulder apron for bed protection with stone boulders
of minimum size and weight as per Table 1300.1, no fragment weighing
less than 25 / 40 kg laid dry complete as per drawing and technical
specifications Clause 1301 MORD / 2503 MORTH including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess &
GST etc,. Complete. - For Protection Work

Up stream Side 1 x 5.50 1.50 0.30 0.000

Down stream Side 1 x 5.50 3.00 0.30 0.000


( width equal to body wall length )
0.000 2535.69 -
cum 1cum
6 Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with cement
mortar 1:2 but excluding excaion, protection works, backfilling, concrete
and masonry works in head wall and parapets. Tech Specification Clause
1106 MORD ,including contractors profit & Over head charges, but
excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with

- 1000 mm dia Pipes 1 x 1 10.00 -- -- 10.000


10.000 10194.41 101,944.00
Rm Rm
274,939.00

TOTAL Rs.. 274,939.00

stant Execitive Engineer Dy.Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
SUB-ESTIMATE FOR ROAD FURNITURE FORMAT-7

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy
trees of Eturunagaram(M),Mulugu Dist.

S.No Description Quantity Rate Amount

1 Reinforced cement concrete M15 grade Kilometre/Hectametre stone of standard


design as per IRC:8 fixing in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703 MORD / 804 MORTH including
contractors profit & Over head charges, but excluding GST

5Th KM Stones 0 Nos 4088.90 / No. 0


Ordinary KM Stones 2 Nos 2424.00 / No. 4848
200M H.M Stones 3 Nos 703.61 / No. 2111
5
0 Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20
mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical
RCC posts not to exceed 1 in 500 as per drawing and Technical Specification
Clause 1608.2 including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

Guid Posts 5 Nos 694.78 / No. 3474


2 Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as
per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and
middle plate duly welded with MS flat iron 25mmx5mm size on black on edges.
The lower plate will be welded with MS angle iron frame of lower most plate and
flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG
sheet tubes posts duly embedded in CC M15 grade blocks of
450mmx450mmx600mm, 600mm below ground level. The top most diamond
plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube.
All MS will be stove enmeled on both sides. Lettering and paining of superior
quality in required shede and colour. All sections of framed posts and sheet tube
will be painted with primer and two coats of epoxy paint as per drawing clause
1701 and annexure 1700.1 if MORD including contractors profit & Over head
charges,But excluding GST

Typical PMGSY Title informatory 2 Nos


sign board
2 Nos 11843.01 / No. 23686
3 Providing and fixing of typical PMGSY Citizen informatory sign board as per
MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top
and lower plate duly welded with MS flat iron 40mm x 5m size on back on
edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm
dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade
blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will
be stove enameled on both sides. Lettering and printing arrows, border etc., will
be pointed with ready mixed synthetic enamel paint of superior quality in required
shade and colour. All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing clause 1701 MORD
including contractors profit & Over head charges,But excluding GST

3 Nos 19547.55 / No. 58643


S.No Description Quantity Rate Amount FORMAT-7

4 Providing and erecting direction and place identifications of semi reflective sign
boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet
duly stove enameled paint in white colour in front and grey colour on back with
red reflective border of 70 mm width and required message, letters, figures with
reflective engineering grade tape as per MORD specifications of required shade
and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of
3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on
back firmly fixed to the ground by means of properly designed foundation with
M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below
ground level as per drawings and Technical Specification Clause 1701 MORD
including contractors profit & Over head charges, But Excluding GST.

0/030,0/130,0/220,0/600 10 Nos 2956.26 / No. 29563


5 Providing and fixing of semi-reflective cautionery, mandatory and informatory
boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size
MS sheet duly stove enamelled paint in white colour in front and grey colour on
back with red reflective boarder of 65mm width and required letters and figures
with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural
roads specification of required shade and colour supported and welded on
47x47mm of 12 SWG square tube of 3050mm height duly strenthened by
25x5mm MS flat iron on edges on back firmly fixed to ground by means of
properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm
below ground level as per approved drawings and technical specification Clause
1701.2.2 of MORD including contractors profit & Over head charges, But
Excluding GST

0/030,0/130,0/220,0/600 16 Nos 2143.27 / No. 34292

TOTAL Rs.. 156617

Assistant Execitive Engineer Dy.Executive Engineer Executive Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu

Superintending Engineer
R&B Warangal
ROAD SAFETY INVERVENTIONS - SUB ESTIMATE

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
Eturunagaram(M),Mulugu Dist.
Measurments
S.No Description No Quantity Rate Amount
L B D

1 2 3 4 5 6 7 8 9
1 Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded
Shanks) including cost and conveyance and all labour charges and
including contractors profit & Over head charges, but excluding GST etc,.
Complete.

At village portions 1 x 4 7 28
ii) At curves to be provided in both edges @
1.00 mts intervals of curve potion
curves 4 x 2 20 160

188 364.61 / Each 68547.00


Nos
2 Cost, supply and Painting on road of Thermoplastic Paint including cost
and conveyance and all labour charges and including contractors profit &
Over head charges, but excluding GST etc,. Complete.
i) At Junctions to be provided two rows latral
to branch road
At village portions 1 x 25 3.75 0.10 9.38
ii) At curves to be provided in both edges
single line of curve potion
curves 4 x 2 50 0.10 40.00
Lt

49.38 669.63 / Sqm 33063.00

Total Rs. 101610.00

Assistant Execitive Engineer Dy.Executive Engineer Executive Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu

Superintending Engineer
R&B Warangal
LEAD STATEMENT AS PER-SSR- 2021-22
Name of the Work:- Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.
Seigneorage
Deduct 13.615% Blastin Machine Manual
Conveya Net Loading Basic excluding
Sl Lead Initial over Heads and Net g Crushin OH,CP,Labo Total
Description in Material Name of the Quarry nce Lead Charges Seignora
No. in Km rate contract profit on Lead Charge g (Excl.OH&
ur Cess & Amount
charges LEAD Charges ge incl. DMF &
s Charges CP)
SMET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
FOR ROAD WORKS Dividing F
1 Selected Earth Cost Local 10.00 71.00 188.80 22.62 166.18 166.18 0.00 0.00 237.18
2 Gravel Local 10.00 98.00 188.80 22.62 166.18 166.18 0.00 0.00 264.18
3 Sand for filling Local 10.00 600.00 188.80 22.62 166.18 166.18 0.00 0.00 766.18
4 60-63mm HBG metal IRC, MORTH & MORD - 86.00 400.00 1268.80 152.05 1116.75 1116.75 0.00 150.33 0.00 0.00 1667.08

5 50 -55mm HBG Metal IRC, MORTH & MORD - 86.00 440.00 1268.80 152.05 1116.75 1116.75 0.00 150.33 0.00 0.00 1707.08

6 40-45mm HBG M/c Metal IRC, MORTH & - 86.00 520.00 1268.80 152.05 1116.75 1116.75 0.00 130.00 0.00 0.00 1766.75 2004.67
MORD
7 40-45mm HBG hand broken Metal - 86.00 520.00 1268.80 152.05 1116.75 1116.75 0.00 150.33 0.00 0.00 1787.08
IRC, MORTH & MORD
8 25-27mm M/c HBG Metal IRC, MORTH & - 86.00 790.00 1268.80 152.05 1116.75 1116.75 0.00 197.50 0.00 0.00 2104.25 2043.77
MORD
9 19 - 22mm HBG M/c metal IRC, MORTH & - 86.00 821.00 1268.80 152.05 1116.75 1116.75 0.00 205.25 0.00 0.00 2143.00 1894.50
MORD
10 19 - 22mm HBG Hand broken metal IRC, - 86.00 821.00 1268.80 152.05 1116.75 1116.75 0.00 150.33 0.00 0.00 2088.08
MORTH & MORD
11 12-14 mm HBG M/c Metal IRC, MORTH & - 86.00 700.00 1268.80 152.05 1116.75 1116.75 0.00 175.00 0.00 0.00 1991.75 1941.75
MORD
12 9.5-11.2 mm HBG M/c Metal IRC, MORTH & - 86.00 620.00 1268.80 152.05 1116.75 1116.75 0.00 155.00 0.00 0.00 1891.75 1807.38
MORD
13 5-7 mm HBG M/c Metal IRC, MORTH & - 86.00 485.00 1268.80 152.05 1116.75 1116.75 0.00 121.25 0.00 0.00 1723.00 1723.00
MORD
14 2.36 - 5 mmHBG M/c Metal IRC, MORTH & - 86.00 485.00 1268.80 152.05 1116.75 1116.75 0.00 121.25 0.00 0.00 1723.00 1779.25
MORD
FOR CD WORKS
15 Sand for Concrete Local 10.00 600.00 188.80 22.62 166.18 166.18 0.00 0.00 766.18
16 Sand for mortar/ plastering Local 10.00 800.00 188.80 22.62 166.18 166.18 0.00 0.00 966.18

17 40 mmHBG M/c Metal-SS5 - 86.00 505.00 1268.80 152.05 1116.75 1116.75 0.00 126.25 0.00 0.00 1748.00

18 20 mm HBG M/c Metal-SS5 - 86.00 870.00 1268.80 152.05 1116.75 1116.75 0.00 217.50 0.00 0.00 2204.25

19 12 mm HBG M/c Metal-SS5 - 86.00 781.00 1268.80 152.05 1116.75 1116.75 0.00 195.25 0.00 0.00 2093.00

20 10 mm HBG M/c Metal-SS5 - 86.00 657.00 1268.80 152.05 1116.75 1116.75 0.00 164.25 0.00 0.00 1938.00

21 2.36 mm Below HBG chips (crusher stone - 86.00 485.00 1268.80 152.05 1116.75 1116.75 0.00 0.00 1601.75 1662.375
dust)
22 Rough stone 300 mm thick (Revetment) - 86.00 131.00 1268.80 152.05 1116.75 1116.75 150.33 0.00 0.00 1398.08

23 Soling stone 150mm Trap - 86.00 63.00 1268.80 152.05 1116.75 1116.75 0.00 0.00 1179.75
24 Jeddy stone 450-600mm - 86.00 179.00 1268.80 152.05 1116.75 1116.75 150.33 0.00 0.00 1446.08
Seigneorage
Deduct 13.615% Blastin Machine Manual
Conveya Net Loading Basic excluding
Sl Lead Initial over Heads and Net g Crushin OH,CP,Labo Total
Description in Material Name of the Quarry nce Lead Charges Seignora
No. in Km rate contract profit on Lead Charge g (Excl.OH&
ur Cess & Amount
charges LEAD Charges ge incl. DMF &
s Charges CP)
SMET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
25 BT Emulsion SS1-Bulk ( Excuding GST )- 01- Chennai 442.00 45940.00 1768.00 47708.00 47708.00
08-2021
26 BT Emulsion RS1- Bulk ( Excuding GST ) - 01- Chennai 442.00 30060.00 1768.00 31828.00 31828.00
08-2021
BT Emulsion SS2-Bulk ( Excuding GST )- 01- Chennai 442.00 48892.00 1768.00 50660.00 50660.00
08-2021
27 BT VG-30 (60/70 grade)-Bulk ( Excl. GST ) - Chennai 442.00 38070.00 1768.00 39838.00 39838.00
01-08-2021
28 Plastic Waste 27000.00 27000.00 27000.00
29 Coldmix bitumen emulsion (CSS-1) Packed - Rates - 250.00 34165.00 500.00 34665.00 34665.00
(Excl.GST) as on
17-11-2020

30 Coldmix Bitumen emulsion (RS-1) Packed - -- - 250.00 32342.00 500.00 32842.00 32842.00
do --
31 CRRI - Cold Mix Binder -Packed - -- do -- - 250.00 41241.00 500.00 41741.00 41741.00
32 1000mm Dia NP3 Class - 110.00 7011.00 1465.08 Price
variation=
0.00 8476.08 8476.08
33 1000mm Dia Collar - 110.00 1150.00 0.00 1150.00 1150.00
34 900mm Dia NP3 Class - 110.00 5662.00 1423.99 Price
variation=
0.00 7085.99 7085.99
35 900mm Dia Collar - 110.00 917.00 0.00 917.00 917.00
36 600mm Dia NP3 Class - 110.00 2733.00 672.06 Price 0.00 3405.06 3405.06
variation=
37 600mm Dia Collar - 110.00 461.00 0.00 461.00 461.00
38 450mm Dia NP3 Class - 110.00 1673.00 320.45 Price 0.00 price variation due to 1993.45 1993.45
variation= cement and steel rates
39 Cement 19-08-2021 5600.00 increase/ decrease 5600.00 5600.00
CED 12%+cess3%+ST
40 Slaked Lime (1 MT) SSR Rate 2616.00 @5% 2616.00 2616.00
= Rs. 940/640 Sp. weight price variation due
41 HYSD Steel Fe-500 19-08-2021 57000.00 to cement and steel 57000.00 57000.00
rates increase/
42 6mm MS rods 19-08-2021 52000.00 decrease 52000.00 52000.00
43 Structure Steel 19-08-2021 52000.00 price variation
price variation due
due to CED 12%+cess3% 52000.00 52000.00
to cement
cement andand
steel rates +ST @5%
44 HR Sheets 1.60mm 19-08-2021 72000.00 steel rates
increase/
price decrease
variation due to 72000.00 72000.00
increase/ decrease
cement and steel rates
45 Fly Ash per Cum (Sp Wt. 0.90 to 1.40 - 270.00 0.00 2807.80 336.47 2471.33 2471.33
increase/ decrease
2471.33
MT/Cum)
46 Filter media - 86.00 345.00 1268.80 152.05 1116.75 1116.75 0.00 86.25 0.00 0.00 1548.00
price variation
price variation due
due
1) Certified that the HBG metal obtained by Blasting. to cement and
to cement and steel
steel
rates rates
price increase/
variation
increase/ due
decrease
2) Certified that the above leads are true and nearer to the site to the best of my Knowledge. decrease
to cement and
Agency area allowence /MAA 0% steel rates
increase/ decrease
price variation due
to cement and steel
Assistant Execitive Engineer Dy.Executive Engineer rates increase/
Executive Engineer Superintending Engineer
R&B AK Ghanpur R&B Mulugu decrease R&B Mulugu R&B Warangal

M012 (I&CAD SoR)


excuding seigneoarage
Asper- SSR-2015-16 sine
rate not availble in later
SSRs
36 RBR- Semi-Dense Bituminous Concrete
BASC-8
(SDBC)
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by 100-120 TPH Batch Type hot
mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of
Grading -II as per table 500-15 of specification of MoRT&H , premixed with bituminous binder VG 30
grade @ 5.0 % of mix and filler, transporting the hot mix to work site, laying with mechanical paver
finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRT&H Specification complete for
finished item of work in all respects including contractors profit & Over head charges excluding
Seigniorage charges, GST Complete . as directed by Engineer-in-charge

Page 135,136,137 of MoRT&H SDB


Unit = cum
Taking output = 195 cum (450 tones.)
(A) Labour
Mate nos. 0.84 515.00 432.60
Mazdoor working with HMP, Mechanical
broom,

paver, roller, asphalt cutter and assistance for


setting outlines, levels and layout of constru nos. 14.00 515.00 7210.00
Skilled Mazdoor for checking line and lev nos. 5 515.00 2575.00
0.00
TOTAL 10217.60
(B) Machinery
hour 27072.00
Batch mix plant HMP 6.00 162432.00
Mechanical Paver finisher @ 100 TPH hour 6.00 2519.00 15114.00
Generator 250 KVA hour 6.00 2072.00 12432.00
Front end loader 1 cum capacity hour 6.00 1844.00 11064.00
smooth wheeled roller 8 ton for initial 0.00
break down rolling hour 3.90 1625.80 6340.62
Pnematic Road roller for intermediate rol hour 3.9 1437.00 5604.30
Finish rolling with 6-8 ton hour 1844.00
3.90 7191.60
smooth wheeled tandem roller.

TOTAL 220178.52
(C) Material
Bitumen VG 30 Grade@ 5 % of 22.5 39838.00 896355.00
weight of mix=205x2.2=450 ton
(ii) Aggregate 0.00
TOTAL weight of mix = 450 tones
Weight of bitumen - 22.50 tones
Weight of aggregate = 450-22.50 = 427.50 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
Grading - II (10 mm nominal size)
13.2- 10 mm IRC & MORT&H HBG/HBG Chips @20 %
Avg. of (9.5-11.2),(5-7),(2.36-5), Cum 162.45 1941.75 315437.29
10mm- 5.0 mm IRC & MORT&H HBG/HBG Chips @ 38 %
Avg. of (9.5-11.2),(5-7) cum 0 0 0.00
5mm & below IRC & MORT&H HBG/HBG Chips@ 40 %
Avg. of (2.36-5),( 2.36mm & below) cum 116.85 1723.00 201332.55
Filler @ 2% of weight of aggregates. cum 1601.75
(8.62 T) 5.70 1601.75
TOTAL 1414726.59
(A + B +C) 1645122.71

(D) Over Head charges & Contractor


12.50% 1645122.71 205640.34
profit @ 12.5 % on A+B+C
37 TOTAL Cost for 195 cum = 195.00 1850763.05
(A+B+C+D+E+F)
Rate per 1 cum 9491.09
Rate per 1 cum 9491.00
Cum
Page 39 of 249

DATA (ROAD WORK) - SSR- 2021-22

Agency area allowence /MAA 0% Seig Charges&


GST

Over heads & Contractor's profit 12.500% GST


Water (Y/N) Y 73.00 Rate per kL
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
S. Index Eturunagaram(M),Mulugu
Description of item Dist.
Unit Qty Rate Amount
No. Code

1 Clearing and Grubbing Road Land


RBR- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
STCL-2 shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and stacking of serviceable material to
be used or auctioned, upto a lead of 1000 m including removal and disposal of top
organic soil not exceeding 150 mm in thickness as per Technical Specification Clause
201 MORD . including contractors profit & Over head charges, but excluding GST
etc,. Complete. .

By Machanical Means
In area of non Throny Jungle (Light Jungle)
Unit =10 Sqm
Out put = 1 Hectare
a) Labour
Mate day
Mazdoor (un-skilled) day 4.16 515.00 2,142.40
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D-50 with attachment or suitable machinery hour 10.00 1758.00 17,580.00
for removal of trees & stumps
Tractor with trolley 3t hour 1.00 465.00 465.00
Total hour 20,187.40
c) Over heads & Contractor's profit 12.500% 2,523.43
Add Labour welfare Cess @ 1% 1.000% 227.11
Rate for hectare 22,937.94
Rate per 1 Sqm = (a+b+c)/10000 Rs. 2.29
1 RBR- Construction of embankment with material obtained from road way cutting by using Machinery
EECD-3
Construction of embankment with approved materials deposited at site from roadway
cutting and excaion from drain (not exceeding 0.6 m depth) and foundation of other
structures including breaking clods, ramming, spreading, sectioning, grading
compacting with vibratory roller 80-100KN to OMC compaction including to a top
width of 7.5m and raising to required height complete etc.as per requirement of
Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305
MORTH including contractors profit & Over head charges, but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

Taking Out put = 100 Cum


a) Labour
Mate
Mazdoor day 0.52 515.00 267.80
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D-50 for spreading @200 cum per hour hour 0.50 1758.00 879.00
Tractor with grader for grading @ 25 cum per hour hour 4.00 473.00 1,892.00

Water tanker 6kl capacity hour 2.00 699.00 1,398.00


Page 40 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Vibratory roller 80-100 KN capacity @ 100 cum per hour hour 1.00 3292.40 3,292.40

c) Material
Compensation for earth taken from private cum 100.00 0.00 0.00
land/Seignarage
Water kl 12.00 73.00 876.00
Total 8,605.20
d) Over heads & Contractor's profit 12.500% 1,075.65
Add Labour welfare Cess @ 1% 1.000% 96.81
Rate for 100 cum 9,777.66
Rate per cum Rs 97.78
2 RBR- Construction of Embankment with Material
EECD-4 Obtained from Borrow pits by Machinery

Construction of embankment with approved material obtained from borrow pits with all
lifts, transporting to site, spreading, grading to required slope and compacting with
vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead
upto 1000 m as per Technical Specification Clause 301.5 MORD including
contractors profit & Over head charges,but excluding Seig Charges, Labour Cess &
GST etc,. Complete.

Unit = cum
Taking output = 100 cum
a) Labour
Mazdoor (Unskilled) day 1.04 515.00 535.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic Excaor 0.9 cum bucket capacity @ 60 cum per Cum 1.67 3331.20 5,563.10
hour
Tipper 5.5cum with 10T capacity hour 4.50 1,185.60 5,335.20
Dozer D50 for spreading @ 200 cum per hour hour 0.50 1758.00 879.00
Tractor with Grader @ 25 cum per hour hour 4.00 473.00 1,892.00
Water tanker 6 KL capacity hour 2.00 699.00 1,398.00
Vibratory roller 80-100 KN capacity @ 100 cum per hour hour 1.00 3292.40 3,292.40

c) Material
Water kl 12.00 73.00 876.00
Compensation for earth taken from private land/Seignarage Cum 100.00 0.00 0.00

Basic rate of formation of road with borrow soils per Cum 19,771.30

d) Over heads & Contractor's profit 12.500% 2,471.41


Add Labour welfare Cess @ 1% 1.000% 222.43
Rate per 100 cums 22,465.14
Rate per cum Rs 224.65
2 MoRD- Excavation in Hard Rock ( requiring blasting)
302.3.5-i with Disposal upto 1000m
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and
breaking, trimming of bottom and side slopes in accordence with requirements of
line,grade and cross-sections, loding and disposal of cut roack with all lifts and lead
upto 1000 m as per Technical Specification Clause 302.3.5 MORD including
contractors profit & Over head charges,but excluding Seig Charges, Labour Cess &
GST etc,. Complete.

Unit = cum
Taking output = 180 cum
a) Labour
Page 41 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Mazdoor (Unskilled) day 3.22 515.00 1,658.30


Driller day 2.00 625.00 1,250.00
Blaster day 0.25 645.00 161.25
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D50 @ 30 cum per hour hour 6.00 1758.00 10,548.00
Air compressor 210 cfm hour 6.00 619.50 3,717.00
Front end loader 1 cum capacity hour 6.00 1844.00 11,064.00
Tipper 5.5cum with 10T capacity hour 16.00 1,185.60 18,969.60
c) Material
Gelatine 80 per cent Kg 70.00 74.00 5,180.00
Electric Detonators @1 Detonator for 2 gelatine each 252.00 11.00 2,772.00
sticks of 285 gm each
Credit for excavated rock found suitable for resuse cum 0.00
@50% quantity blasted
Compensation for earth taken from private land/Seignarage Cum 180.00 0.00 0.00

Basic rate of formation of road with borrow soils per Cum 55,320.15

d) Over heads & Contractor's profit 12.500% 6,915.02


Add Labour welfare Cess @ 1% 1.000% 622.35
Rate per 180 cums 62,857.52
Rate per cum Rs 349.21

2 302.3.5-iii Excavation in Ordinary Rock using Hydrulic


Excavator and Tipper with Disposal upto 1000m

Excavation for roadway in prdinary rock with hydrulic excavator of 0.90cum bucket
capacity including cutting and loding in tipper, transpoertin to embankmen site with all
lifts, and lead upto 1000 m. trimming bottom nad side slopes in accordance with
requirements of line, grade and cross section as per Technical Specification Clause
302.3.5 MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 240 cum
a) Labour
Mazdoor (Unskilled) day 2.08 515.00 1,071.20
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic Excaor 0.9 cum bucket capacity @ 40 cum per Cum 6 3331.20 19,987.20
hour
Tipper 5.5cum with 10T capacity hour 11.00 1,185.60 13,041.60
c) Material
Compensation for earth taken from private land/Seignarage Cum 240.00 0.00 0.00

Basic rate of formation of road with borrow soils per Cum 34,100.00

d) Over heads & Contractor's profit 12.500% 4,262.50


Add Labour welfare Cess @ 1% 1.000% 383.63
Rate per 240 cums 38,746.13
Rate per cum Rs 161.44
3 Trench Cutting both sides for widenining,
RBR- Excavation in Soil with Dozer with lead upto
EECD-5 100m
Page 42 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Excavation for roadway in soil by mechanical means including cutting and pushing the
earth to site of embankment upto a distance of 100 m, including trimming bottom and
side slopes in accordance with requirements of lines, grades and cross-sections as
per Technical Specification Clause 302.3 MORD including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 180 cum
a) a)  Labour
Mazdoor (Unskilled) day 2.08 515.00 1,071.20
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing) hour 3.600 1758.00 6,328.80

c) Material
Compensation for earth taken from private land/Seignarage Cum 180.00 0.00 0.00

Basic rate for 180 cum 7,400.00


d) Over heads & Contractor's profit 12.500% 925.00
Add Labour welfare Cess @ 1% 1.000% 83.25
Rate per 180 cums 8,408.25
Rate per cum Rs 46.71
5 Construction of embankment with borrowed useful earth from outside road
boundary by mechanical means upto SDR with a lead of 10 km including pre-
watering of soil at borrow area, removal of top soil, excavation of soils at
borrowed area, conveyance ofsoil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to
10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of
MoRT&H, including all hire andoperational charges of T&P ,contractors profit &
Over head charges and , complete for finished item of work as per MoRT&H
specification 305 (5th revision) but excluding Seigniorage charges, GST
Complete . (Payment will be made based on level for finished item of work).
With borrowed earth from 10 km lead.

Unit : Cum
Taking out put = 100 Cum Page 68,69 of MoRT&H SDB
(A) Labour
Mate day 0.04 515.00 20.60
Mazdoor unskilled day 1.00 490.00 490.00
Agency area allowance 0% 0.00
510.60
(B) Machinery
Hydraualic Excavator 1 Cum bucket capacity @ 60
hr 1.67 3331.20 5563.10
cum/hr
Rate as per G.O. Ms No 10, Dt 26/7/2005 cum 100.00 0 0.00
Tipper (for 5Kms=160x5=800) t.km 800.00 8.00 6400.00
Add 10% of cost of carriage to cover cost of loading
640.00
and unloading
Dozer 50 HP for spreading @ 200 cum per hour hr 0.50 1758.00 879.00
Motor Grador for Grading @ 100 cum per hour hr 0.50 3602.00 1801.00
Water tanker 6 KL hr 2.00 699.00 1398.00
Vibratory roller 8T hr 1.00 3292.40 3292.40
19973.50
(C) Over head charges & Contractor profit
Over head charges & Contractor profit @12.5% on
12.5% 20484.10 2560.51
(A) + (B)
(D) Total of (A) + (B)+( C) 23044.61
Page 43 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

(E) Add Contractors Profit at 10% on (D) 0


Cost per 100 cum (D) + (E) 23044.61
Rate per Cum 230.4461
Rate per 1 cum 230.00
4 RBR- Improved Subgrade/ Selected earth Shoulders
SBBS-1 Construction of improved subgrade/ Shoulders by providing selected earth having
(iii) minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40%
and 20 respectively and spreading in uniform layers with tractor grader on prepared
surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement
of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH,
by using machinery including contractors profit & Over head charges, but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

Taking out put = 100 cum


a) Labour
Mate day 0.00
Mazdoor (Un-Skilled) day 1.04 515.00 535.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D50 for spreading @ 200 cum per hour hour 0.50 1,758.00 879.00
Tractor with grader @ 25 cum per hour hour 4.00 473.00 1892.00
Vibratory roller 80-100 kN hour 1.25 3292.40 4,115.50
Water tanker 6 kl capacity hour 2.00 699.00 1398.00
c) Material
Selected earth cum 100.00 237.18 23718.00
Water Kl 12.00 73.00 876.00
Basic rate for 100 cum 33,414.10
a) Basic rate for 1 cum 334.14
c) Over heads & Contractor's profit 12.500% 41.77
Add Labour welfare Cess @ 1% 1.000% 3.76
379.67
Rate per cum Rs 379.67
4 Construction of sub grade & earthen shoulders with borrowed useful earth
from outside road boundary by mechanical means upto SDR with a lead of 10
km including pre-watering of soil at borrow area, removal of top soil, excavation
of soils at borrowed area, conveyance ofsoil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet
requirement of table 300-2 of MoRT&H, including all hire andoperational
charges of T&P ,contractors profit & Over head charges and , complete for
Unit : Cum
finished item of work as per MoRT&H specification 305 (5th revision) but
Taking outSeigniorage
excluding put = 100 Cumcharges, GST Complete . Page 68,69will
(Payment of MoRT&H
be made SDB
based
(A) on level for finished item of work). With borrowed earth from 10 km lead.
Labour
0.04 Mate day 0.04 515.00 20.60
1.00 Mazdoor unskilled day 1.00 490.00 490.00
0% Agency area allowance 0%
510.60
(B) Machinery
Hydraualic Excavator 1 Cum bucket capacity @ 60
1.67 hr 3331.20 5563.10
cum/hr 1.67
100.00 Rate as per G.O. Ms No 10, Dt 26/7/2005 cum 100.00 0 0.00
1750.00 Tipper (for 5Kms=175x5=875) t.km 875.00 8.00 7000.00
Add 10% of cost of carriage to cover cost of loading
700.00
and unloading

0.50 Dozer 50 HP for spreading @ 200 cum per hour hr 1758.00 879.00
0.50
Page 44 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

0.50 Motor Grador for Grading @ 100 cum per hour hr 0.50 3602.00 1801.00
2.00 Water tanker 6 KL hr 2.00 699.00 1398.00
1.00 Vibratory roller 8T hr 1.00 3292.40 3292.40
20633.50
(C) Over head charges & Contractor profit
Over head charges & Contractor profit @12.5%
12.5% 12.50% 21144.10 2643.01
on (A) + (B)
(D) Total of (A) + (B)+( C) 23787.11
Cost per 100 cum (D) + (E) 23787.11
Rate per Cum 237.8711
Rate per 1 cum 238.00
Construction of granular sub-base by providing well graded material(Table 400.1) with
Grading II Material(HBG M/C Metal +Stone dust) spreading in uniform layers with Motor
grader on prepared surface, mixing by mix in place method with rotavator at OMC, and
compacting with Vibratory Roller to achieve the desired density, complete as per
Technical Specification Clause 401 MORD including contractors profit & Over head
charges, but excluding Seigniorage charges, GST Complete .

Unit = cum
Taking output = 300 cum
(A) Labour
Mate 0.48 day 515.00 247.20
Mazdoor skilled 2.00 day 515.00 1030.00
Mazdoor unskilled 10.00 day 490.00 4900.00
Agency area allowance 0% 0.00
Total 6177.20
(B) Machinery
Motor grader 3.35 M Blade @50 cum/Hr 6.00 hr 3602.00 21612.00
Tractor with Rotavator 12.00 hr 473.00 5676.00
Vibratory roller 8T @ 60 Cum per hour 5.00 hr 3292.40 16462.00
Water tanker 6 KL 5.00 hr 699.00 3495.00
Total 47245.00
(C) Material
Well Graded/Close Graded granular sub- base material as
per Table 400-1 (Grading -II)
26.5 mm to 9.5mm @ 35% (metal) (Av. rate of 25-
134.00 Cum 2043.77 273864.7
27mm, 19-22mm, 12-14mm, 9.5 -12mm )
9.5 mm to 2.36mm @ 25 % (metal) (Av. rate of 9.5 -
96.00 Cum 1723.00 165408.0
12mm , 5-7mm, 2.36-5mm )
2.36mm and below @ 40%
153.00 Cum 1601.75 245067.8
(Rate of 2.36mm & below HBG metal)

Total 684340.45
(D) Over head charges
Over head charges & contractor profit @12.5% on (A) +
737762.65 12.50% 92220.33
(B)+(C)
(E) Total of (A) + (B)+( C)+(D) 829982.99
(F) Add Contractors Profit at 10% on (E) 0.00
Cost per 300 cum (E) + (F) 829982.99
Rate per 1 cum 2766.61
Rate to be adopted 2767.00
1 Cum
5 RBR- Granular Sub-base with Well Graded Material
SBBS-1-A (Table 400.1)- Grading- III
(iii)
Page 45 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code
RBR-
SBBS-1-A
(iii) Construction of granular sub-base by providing well graded material(Table 400.1)
with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value
less than 6 spreading in uniform layers with Tractor grader on prepared surface,
mixing by mix in place method with rotaor at OMC, and compacting with Vibratory
Roller to achieve the desired density, complete as per Technical Specification Clause
401 MORD including contractors profit & Over head charges, but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

For Grading III Material (CBR Value minimum 20)


Unit = cum
Taking output = 300 cum
a)  Labour
Mate day -
Mazdoor (Skilled) day 2.40 515.00 1236.00
Mazdoor (Unskilled) day 8.00 515.00 4120.00
Agency area allowence /MAA 0.000% 5356.00 0.00
b) Machinery
Tractor with grader @ 25 cum hour 12.00 473.00 5676.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR

Vibratory roller 80-100 kN hour 6.00 3292.40 19,754.40


Tractor with Rotaor 25 cum per hour hour 12.00 473.00 5676.00
Water tanker 6 kl capacity hour 3.00 699.00 2097.00
c) Material
Well graded/ Close Graded granular sub-base
material as per Table 400.1
9.5 mm to 4.75 mm @66% (metal chips) 237.60 1779.25 422749.80
4.75mm to 2.36mm @34% (metal chips) 122.40 1723.00 210895.20
2.36 mm below @ 0% (stone dust) 0.00 1601.75 0.00
Water kl 18.00 73.00 1314.00
Total 673518.40
Over heads & Contractor's profit 12.500% 84189.80
Add Labour welfare Cess @ 1% 1.000% 7,577.08
Cost for 300cum = a+b+c+d+e 765285.28
Rate per cum = (a+b+c+d+e)/300 Rs. 2550.95
5 RBR- Gravel / Soil - Aggregate Base (Table 400.2)
SBBS-1 Grading C (Gravel + Stone dust)
(iii) Construction of Granular Sub base by providing well graded meterial Grading C
(Gravel + Stone dust) (i.e 9.5 mm to 4.75 mm size Gravel of 66% and crusher dust
of size < 2.36mm @ 34% ) having soaked CBR not less than 15% and Plasticity Index
< 6 and stacking at site to the departmentel gauge for pre measurements and mixing
them and spreading the same with Tractor grader in uniform layers of loose thickness
of not more than 225mm including mixing by mix in place method with rotaor and
compacting at OMC with Vibratory roller 8 to 10 Tonnes capacity to achieve the
desired density, complete as per IRC technical specification clause 402 (3) (iii) of
MORD including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

Taking out put = 300 cum


a) Labour
Mazdoor (Skilled) day 2.40 515.00 1,236.00
Mazdoor (Un-Skilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Page 46 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Tractor with grader @ 25 cum per hour hour 12.00 473.00 5676.00
Three wheel 80-100 kN static roller @ 10 cum per hour 30.00
hour
OR
Vibratory roller 80-100 kN hour 6.00 3292.40 19,754.40
Tractor with Rotaor 25 cum per hour hour 12.00 473.00 5676.00
Water tanker 6 kl capacity hour 5.00 699.00 3495.00
c) Material
Well graded granular sub-base material as per table
400.2
Cost of materials
9.5 mm to 4.75 mm @ 66% (Gravel) cum 237.60 264.18 62769.17
2.36 mm below @ 34% (Stone dust) cum 122.40 1601.75 196054.20
water Kl 30.00 73.00 2,190.00
Basic rate of Granular sub base for 300 cum 300,970.77
a) Basic rate of Granular sub base cum 1,003.24
c) Over heads & Contractor's profit 12.500% 125.41
Add Labour welfare Cess @ 1% 1.000% 11.29
1,139.94
Rate per cum Rs. 1,139.94
5 RBR- WBM Grading 2 (using Graded Metal)
SBBS-9 A Providing, laying, spreading and compacting stone aggregates of specific sizes for
II (i) Grading 2 material to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with Vibratory roller 80-100 kN in stages to
proper grade and camber, applying and brooming, stone screening/binding materials
to fill-up the interstices of coarse aggregate, watering and compacting to the required
density grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH.
For compacted thickness of 75 mm. including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.,. Complete.
for Grade II

By Manual means
Taking out put = 360 cum
a) Labour
Mazdoor (Skilled) day 12.08 515.00 6,221.20
Mazdoor (unskilled) day 250.00 515.00 128,750.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Vibratory roller hour 6.00 3292.40 19,754.40
Water tanker 6kl capacity hour 24.00 699.00 16,776.00
c) Material (Total Qty 435.60 Cum) -0.91 Cum/ 10sqm

60-63 mm IRC HBG Metal (50% of 435.60 cum) Cum 217.80 1667.08 363,090.52

50-55 mm IRC HBG Metal (35% of 435.60 cum) Cum 152.46 1707.08 260,261.76

40-45 mm IRC HBG Metal (11% of 435.60 cum) Cum 47.92 1787.08 85,629.83

19-22 mm IRC HBG Metal (4% of 435.60 cum) Cum 17.42 2088.08 36,374.39
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20 cum 86.40 1723.00 148,867.20
cum/10sqm average of 5-7mm & 2.36-5mm
Binding Material @ 0.06 cum per 10 sqm for cum 28.80 1601.75 46,130.40
Grading 2 material (2.36 mm below stonedust)
Water kl 144.00 73.00 10,512.00
Page 47 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Basic rate for 360 Cum 1,122,367.70


Rate per Cum 3,117.69
d) Over heads & Contractor's profit 12.500% 389.71
Add Labour welfare Cess @ 1% 1.000% 35.07
Rate per cum Rs. 3,542.47
5 RBR- WBM Grading 3 (using Graded Metal)
SBBS-9 A Providing, laying, spreading and compacting stone aggregates of specific sizes HBG
III (i) Machine Crushed metal to water bound macadam Grade III specification including
spreading in uniform thickness, hand packing, rolling with Vibratory roller 80-100 kN in
stages to proper grade and camber, applying and brooming, stone screening to fill-up
the interstices of coarse aggregate, watering and compacting to the required density
Grading 3 as per Technical Specification Clause 405 MORD/ 404 MORTH. For
compacted thickness of 75 mm. including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

By Manual means
Taking out put = 360 cum
a) Labour
Mazdoor (Skilled) day 12.08 515.00 6,221.20
Mazdoor (unskilled) day 250.00 515.00 128,750.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Vibratory roller hour 6.00 3292.40 19,754.40
Water tanker 6kl capacity hour 24.00 699.00 16,776.00
c) Material (total Qty of Metal 435.60 Cum)
40-45 mm IRC HBG M/c Metal ( 82% of 435.60 Cum 357.19 1766.75 631,065.43
Cum)
19-22.40 mm IRC HBG M/c Metal ( 18% of 435.60 Cum 78.41 2143.00 168,032.63
cum)
Stone Screening
Type B 11.2mm for Grading 2 @ 0.18 / 0.20 cum 86.40 1723.00 148,867.20
cum/10sqm average of 5-7mm & 2.36-5mm
Binding Material @ 0.06 cum per 10 sqm Cum 28.80 1601.75 0.00
(2.36mm below stonedust)
Water kl 144.00 73.00 10,512.00
Basic rate for 360 Cum 1,129,978.86
Rate per Cum 3,138.83
d) Over heads & Contractor's profit 12.500% 392.35
Add Labour welfare Cess @ 1% 1.000% 35.31
Rate per cum Rs. 3,566.49
6 RBR- Wet Mix Macadam
SBBS-11
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and compacting
with Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12
and Technical Specification Clause 406 MORD/ MORTH, including contractors profit
& Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

By Machanical Means
A Rural Works
Taking out put = 100 cum
a) Labour
Page 48 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Dresser (skilled) for alignment day 8.00 515.00 4,120.00


Mazdoor (Skilled) day 2.40 515.00 1,236.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Front end loader 1 cum capacity hour 4.00 1844.00 7,376.00
Wet mix plant (Pug Mill) hour 4.00 1844.00 7,376.00
Tipper or dumper (10 t) Capacity hour 5.00 1185.60 5,928.00
Tractor with grader @ 25 cum capacity hour 4.00 473.00 1,892.00
Vibratory Roller 80-100 KN @60cum per hour hour 1.67 3292.40 5,498.31
Water tanker 6kl capacity hour 1.33 699.00 929.67
c) Material
Coarse aggregate 45 to 22.4 mm using M/C metal @ cum 39.90 2004.67 79,986.20
30% (Average of 40-45 mm, 25-27 mm & 19-22 mm
metal)
Aggregates 22.4 mm to 2.36 mm using M/C metal @ cum 53.20 1894.50 100,787.40
40% (Average of 19-22mm, 12-14mm, 9.5-11.20
mm, 5-7mm & 2.36-5 mm metal)
Fine aggregate/crushed sand 2.36 mm to 75 mm cum 39.90 1601.75 63,909.83
micron @ 30%
Water kl 8.00 73.00 584.00
Basic rate of WMM for 100Cum 279,623.41
Basic rate of WMM per Cum 2,796.23
e) Over heads & Contractor's profit 12.500% 349.53
Add Labour welfare Cess @ 1% 1.000% 31.46
Rate per cum Rs. 3,177.22
7 RBR- Cement Concrete Pavement
CCPV-5
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
a) Labour
Mason (1st class) day 5.00 545.00 2,725.00
Mason (2nd class) day 5.00 515.00 2,575.00
Mazdoor (unskilled) day 150.00 515.00 77,250.00
Mazdoor(skilled) day 6.00 515.00 3,090.00
Surveyor day 2.00 925.00 1,850.00
Mazdoor (semi-skilled) day 6.00 515.00 3,090.00
Page 49 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Black smith for cutting of dowel bars including day 1.00 515.00 515.00
removal of burrs, fabrications & fixing of dowel bars

Agency area allowence /MAA 0.000% 0.00


b) Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) Hour 36.00 627.60 22,593.60
with weight batcher and suitable capacity calibrated
water tank
Needle vibrator Hour 9.00 0.00 0.00
Screed vibrator Hour 9.00 0.00 0.00
Plate vibrator Hour 9.00 54.00 486.00
Water tanker 6 Kl. Capacity Hour 5.00 699.00 3,495.00
Air compressor ( 1 hour initial + 1 hour final) Hour 2.00 619.50 1,239.00
c) Material
(i) Crushed stone coarse aggregates, grading will be as
per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete
20mm Cum 44.55 2204.25 98,199.34
10mm Cum 22.95 1938.00 44,477.10
(ii) Sand as per IS:383 and conforming to clause cum 33.75 766.18 25,858.58
1500.2.4.2. @ 0.45 cum of concrete
(iii) Cement @ 350 Kg/cum of concrete t 26.25 5600.00 147,000.00
(v) Polythene sheet 125 micron sqm 412.50 17.00 7,012.50
(vi) Mild steel dowel bar 25mm dia of grade S 240.500
mm long 20 Nos. at culvert/bridge slab and at
construction joiont including 5 percent wastage

(4x20x0.500) + 5 per cent wastage = 42m @ 3.85 Kg Kg 162.00 57.00 9,234.00


per m = 162 kg.
Bitumen primer @ 200ml. Per joint for 23 joints kg or lt 5 82.00 410.00
Bitumenous sealant 800 ml. Per joint for 23 joints Litre 19.00 115.00 2,185.00

Jute rope 12mm dia including 5 per cent wastage m 90.00 8.30 747.00

Debonding strips 3.75m. (length) x 10mm (width) x 5 m 90.00 10.00 900.00


mm (thick) cut-out of rubber fillter board of similar
material including 5 per cent wastage

Polythene sheathing, covering 2/3rd dowel bars No 483.00 0.50 241.50


(20x23) and tight fit including 5 per cent wastage

Plasticizer 0.5 per cent by weight of cement BMT Litre 122.00 61.00 7,442.00
H63
Water for Curing kl 18.00 73.00 1,314.00
Joint filler board 20mm thick as per IS:1838 - BMT sqm 3.00 580.00 1,740.00
U02
(4x3.75x0.200 = 3 sqm)
465,669.62
(d) Form work @ 3% on (a+b+c) 13,970.09
Cost for 75 cum = a+b+c+d 479,639.71
Rate per Cum = (a+b+c+d+e)/75 6,395.20
(e) Over heads & Contractor's profit 12.500% 799.40
Add Labour welfare Cess @ 1% 1.000% 71.95
7,266.55
Rate per Cum Rs. 7,266.55
Page 50 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

8 RBR- Prime Coat


BASC-1 - I Low porosity
a Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface
of granular base including cleaning of road surface and spraying primer at the rate of
0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. for Prime Coat

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Bitumen emulsion pressure distributor @ 1750 hour 1.000 963.00 963.00
sqm/hour
Water tanker 6 kl capacity 1 trip per hour hour 0.500 699.00 349.50
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.480 47708.00 70,607.84
Water kl 3.000 73.00 219.00
74,102.24
Over heads & Contractor's profit 12.500% 9262.78
Add Labour welfare Cess @ 1% 1.000% 833.65
Cost of 1750 sqm = a+b+c+d+e 84,198.67
Rate per sqm = (a+b+c+d+e)/1750 Rs. 48.11
9 Providing and applying prime coat with bitumen emulsion (SS-2) Grade on prepared
surface of granular base including cleaning of road surface and spraying primer at the
rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause
502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head
charges but excluding Seigniorage charges, GST Complete .

unit = sqm
Taking output = 1750 sqm
(A) Labour
Mate day 0.04 515.00 20.60
Mazdoor day 1.00 515.00 515.00
Agency area allowance 0% 0.00
Total 535.60
(B) Machinery
Mechanical broom Hydraulic @ 1250 sqm/hr. hr 1.40 400.00 560.00
Air compressor 250 cfm hr 1.40 619.50 867.30
Water tanker 6KL capacity @ one trip hr 0.50 699.00 349.50
Emulsion pressure distributor @1750 sqm/hr hr 1.00 963.00 963.00
Total 2739.80
(C) Material
Bitumen Emulsion @ 0.85 Kgs/sqm MT 1.48 50660.00 74976.80
Total 74976.80
(D) Over head charges
Over head charges 12.5% on (A) + (B)+(C) 12.50% 78252.20 9781.53
(E) Total of (A) + (B)+( C)+(D) 88033.73
(F) Add Contractors Profit at 10% on (E) 0.00
Page 51 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Cost per 1750 sqm (E) + (F) 88033.73


Rate per 1 sqm 50.30
Rate to be adopted 50.00
1 Sqm
9 RBR- TACK COAT
BASC-2 ii Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as per Technical Specification
Clause 503 MORD, including contractors profit & Over head charges, but excluding
GST etc,. Complete. for Tack Coat
Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Emulsion pressure distributor @1750 sqm per hour hour 1.000 963.00 963.00

c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480 31828.00 15,277.44
Cost of 1750 sqm = (a+b+c+d+e) 18,203.34
Rate per sqm = a+b+c+d+e/1750 10.40
(e) Over heads & Contractor's profit 12.500% 1.30
Add Labour welfare Cess @ 1% 1.000% 0.12
Rate per Sqm Rs. 11.82
9 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder using Mixall
Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20
mm thick composed of 13.20 mm to 5.60 mm size machine crushed hard blasted
Granite chips (Table 500.13 of MORD) using bitumen of VG 30 grade at the rate of
14.60 kgs per 10 sqm area of road surface over tack coat to required line, level, grade
to serve as wearing course on previously prepared base including mixing in a Mixer of
6 to 10 T capacity,trasporting the mixer to point of use and rolloing with three
RBR- wheeled 8-10 Tonnes capacity power roller and finishing to required level and grades
BASC-14 - including cost, conveyance, leads and lifts of all materials from approved sources,
I (II) labour charges and hire and operational charges of power road roller and all other
machinery, tools and plants, providing barricading for diversion of traffic, erecting red
flags other incidental and operational charges etc., complete for finished item of work
as per technical specifications clause 508 (ii) of MORD. including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

By manual means as per 508 (II) of MORD


(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mazdoor (Unskilled) day 21.00 515.00 10,815.00
Mazdoor (semi-Skilled) day 7.08 515.00 3,646.20
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Mixall 6/10 T capacity hour 4.00 727.00 2,908.00
Bitumen boiler oil fired 1000 lts capacity fitted with hour 4.00 234.00 936.00
spray set
Page 52 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Three wheel 80-100 kN static roller hour 2.00 1,625.80 3,251.60


Material
c) Bitumen VG30 grade(S-65) @ 14.60 kg per 10 sqm t 0.73 39,838.00 29,081.74

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum 13.50 1,929.06 26,042.31
cum per 10 sqm
Basic rate for 500 Sqm 76,680.85
Basic rate per Sqm 153.36
d) Over heads & Contractor's profit 12.500% 19.17
Add Labour welfare Cess @ 1% 1.000% 1.73
174.26
Rate per sqm Rs. 174.26
9 RBR- 20mm thick Open-Graded Premix Carpet using Bituminous (penetration
BASC-14 grade/modified bitumen) Binder using HMP
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration
grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm to required line, grade and
level to serve as wearing course on a previously prepared base, including mixing in a
Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver and rolling with a
three wheel 0-100 kN static roller capacity, finished to required level and grades to be
followed by seal coat including cost and conveyance of all materials from approved
sources, , labour charges and hire and operational charges of power road roller and
all other machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for finished
item of work as per clause 508 MORD including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 10.00 515.00 5150.00
Mazdoor (Skilled) day 3.52 515.00 1812.80
Agency area allowence /MAA 0.000% 0.00
b) Machinery
HMP 30/40 t per hour hour 4.50 21414.00 96363.00
Electric generator set 125 KVA hour 6.00 1478.00 8868.00
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11064.00
Tipper 5.5 cum - 10 t capacity hour 3.64 1185.60 4315.58
Paver finisher hour 6.00 2519.00 15114.00
Three wheel 80-100 kN static roller hour 16.00 1625.80 26012.80
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 5.84 39838.00 232653.92
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum 108.00 1,868.83 201834.00
cum per 10 sqm
Over heads & Contractor's profit 12.500% 75398.51
Add Labour welfare Cess @ 1% 1.000% 6,785.87
Cost of 4000 sqm = a+b+c+d+e 685372.48
Rate per sqm = (a+b+c+d+e)/4000 Rs. 171.34
9 509/5.11 Mix Seal Surfacing - 20 mm thick
Page 53 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing)
material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-B) aggregates as
per Table 500.15 of MORD using penetration grade bitumen to required line, grade
and level to serve as wearing course on a previously prepared base, including mixing
in a suitable plant by manual means, laying and rolling with a three wheel 8-10 kN
static roller and finishing to required level and grades as per Technical Specification
Clause 509 MORD, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

By Manual Means (Type-B)


Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 21.000 515.00 10,815.00
Mazdoor (Skilled) day 8.400 515.00 4,326.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Mixall 6-10 t capacity hour 6.000 727.00 4,362.00
Oil fired bitumen boiler 1000 litre capacity fitted with hour 6.000 234.00 1,404.00
spray set
Three wheel 80-100 kN static roller hour 6.000 1625.80 9,754.80
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm t 0.950 39838.00 37,846.10
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum 13.500 1779.25 24,019.88
0.27 cum per 10 sqm
Over heads & Contractor's profit 12.500% 11565.97
Add Labour welfare Cess @ 1% 1.000% 1,040.94
Cost of 500 sqm = a+b+c+d+e 105,134.69
Rate per sqm for 20 mm thick 210.27
Rate per sqm for 20 mm thick Rs. 210.27
9 509/5.11 Mix Seal Surfacing - 20 mm thick (HMP)
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing)
material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-B) aggregates as
per Table 500.15 of MORD using penetration grade bitumen to required line, grade
and level to serve as wearing course on a previously prepared base, including mixing
in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three
wheel 8-10 kN static roller and finishing to required level and grades as per Technical
Specification Clause 509 MORD, including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

By Mechanical means (Type-B)


Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 10.000 515.00 5,150.00
Mazdoor (Skilled) day 3.520 515.00 1,812.80
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Page 54 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

HMP of appropriate capacity (40-60 TPH) considered hour 6.000 21414.00 128,484.00

Electric generator set 125 KVA hour 6.000 1478.00 8,868.00


Tipper 5.5 cum - 10 t capacity hour 3.600 1185.60 4,268.16
Paver finisher hour 6.000 2519.00 15,114.00
Three wheel 80-100 kN static roller hour 18.000 1625.80 29,264.40
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm t 7.600 39838.00 302,768.80
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum 108.00 1779.25 192,159.00
0.27 cum per 10 sqm
Over heads & Contractor's profit 12.500% 85986.15
Add Labour welfare Cess @ 1% 1.000% 7,738.75
Cost of 4000 sqm = a+b+c+d+e 781,614.06
Rate per sqm for 20 mm thick 195.40
Rate per sqm for 20 mm thick Rs. 195.40
9 SEAL COAT
Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined in table
500.16 of MOST at of Crushed stone chipping of 6.7 mm size 100% passing through
11.2mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm chips to be
laid simultaneously along with the bitumunous course using 9.80 kgs of bitumen VG 30
grade for 10 sqm and rolling with power roller including of required line, level, grade to
serve as wearing course on previously prepared surface and finishing to rquired level and
grades including cost and conveyance of all materials from approved sources and stacking
at site to departmental gauge for premeasurements, seigniorage, labour charges and hire
and operational charges of power road roller 8 to 10 tonnes capacity and all other
machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags
other incidental and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD. including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

By Manual Means
Taking out put = 1100 Sqm
Labour
Bitumen Sprayer day 1.00 515.00 515.00
Mazdoor (un-skilled) day 22.00 515.00 11,330.00
Mazdoor (semi-skilled) day 7.15 515.00 3,682.25
Agency area allowence /MAA 0.000% 0.00
Machinery
Bitumen boiler oil fired, capacity1000 lts fitted with hour 2.20 234.00 514.80
spray set
Three wheel 80-100 kN static roller hour 2.20 1625.80 3,576.76
Materials
Bitumen (S-65) 60/70 grade @ 9.80 kgs per 10 sqm. t 1.078 39838.00 42,945.36

Crushed stone chipping of 6.7 mm size 100% cum 9.90 1723.00 17,057.70
passing 11.2mm seive and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm.
Basic rate of Seal coat Type-A for 1100 Sqm 79,621.87
Final Rate per sqm 72.38
Over heads & Contractor's profit 12.500% 9.05
Add Labour welfare Cess @ 1% 1.000% 0.81
82.24
Rate per sqm Rs. 82.24
Page 55 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

9 RBR- Liquid seal coat (Type A) - By Mechanical Means


BASC-17
Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined in table
500.16 of MOST at of Crushed stone chipping of 6.7 mm size 100% passing through
11.2mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm chips to be
laid simultaneously along with the bitumunous course using 9.80 kgs of bitumen 60/70
grade for 10 sqm and rolling with power roller including of required line, level, grade to
serve as wearing course on previously prepared surface and finishing to rquired level and
grades including cost and conveyance of all materials from approved sources and stacking
at site to departmental gauge for premeasurements, labour charges and hire and
operational charges of power road roller 8 to 10 tonnes capacity and all other machinery,
tools and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as per technical
specification clause 510 of MORD. including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.,. Complete. Using Hot mix
plant

By Mechanical Means
(II) Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 6.24 515.00 3213.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic self propelled chips spreader hour 6.00 2875.00 17250.00
Tipper 5.5 cum capacity hour 6.00 1185.60 7113.60
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11064.00
Bitumen pressure distributor hour 6.00 1678.00 10068.00
Three wheel 80-100 kN static roller hour 15.00 1625.80 24387.00
c) Material
Bitumen (S-65) @ 9.80 kg per 10 sqm t 7.35 39838.00 292809.30
Crushed stone chipping of 6.7 mm size 100 per cent cum 67.50 1723.00 116302.50
passing 11.2 mm sieve and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm

Over heads & Contractor's profit 12.500% 60276.00


Add Labour welfare Cess @ 1% 1.000% 5,424.84
Cost of 7500 sqm = a+b+c+d+e 547908.84
Rate per sqm = (a+b+c+d+e)/7500 Rs. 73.05
Page 56 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

9 RBR- Providing and laying bituminous premixed Seal coat (Type B) comprising of a thin
BASC-17 application of fine aggregate premixed with bituminous binder of grading as defined in
table 500.16 of MOST Crushed sand defined as passing through 2.36 mm sieve and
retained on 180 micron seive applied @ 0.06 cum per 10 sqm.to be laid
simultaneously along with the bitumunous course using 6.80 kgs of bitumen 60/70
grade for 10 sqm and rolling with power roller including of required line, level, grade to
serve as wearing course on previously prepared surface and finishing to rquired level
and grades including cost and conveyance of all materials from approved sources and
stacking at site to departmental gauge for premeasurements, seigniorage, labour
charges and hire and operational charges of power road roller 8 to 10 tonnes capacity
and all other machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for finished
item of work as per technical specification clause 510 of MORD. including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.,. Complete. with Mixall 6-10t Capacity

(II) Bitumen (S-65) By manual means


Unit = sqm
Taking output = 1250 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 15.00 515.00 7725.00
Mazdoor (semiskilled) day 2.85 515.00 1467.75
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Mixall6/10tcapacity hour 2.50 727.00 1817.50
Three wheel 80-100 kN static roller hour 2.50 1625.80 4064.50
Bitumen boiler oil fired, capacity1000 lts fitted with hour 2.50 234.00 585.00
spray set
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 0.85 39838.00 33862.30
Crushed sand defined as passing through 2.36 mm cum 7.50 766.18 5746.35
sieve and retained on 180 micron seive applied @
0.06 cum per 10 sqm.
Over heads & Contractor's profit 12.500% 6908.55
Add Labour welfare Cess @ 1% 1.000% 621.77
Cost of 1250 sqm = a+b+c+d+e 62798.72
Rate per sqm = (a+b+c+d+e)/1250 Rs. 50.24
9 RBR- Bituminous premixed Seal coat (Type B) - By
BASC-17 Mechanical Means
Page 57 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Providing and laying bituminous premixed Seal coat (Type B) comprising of a thin
application of fine aggregate premixed with bituminous binder of grading as defined in
table 500.16 of MOST Crushed sand defined as passing through 2.36 mm sieve and
retained on 180 micron seive applied @ 0.06 cum per 10 sqm.to be laid simultaneously
along with the bitumunous course using 6.80 kgs of bitumen 60/70 grade for 10 sqm and
rolling with power roller including of required line, level, grade to serve as wearing course
on previously prepared surface and finishing to rquired level and grades including cost
and conveyance of all materials from approved sources and stacking at site to
departmental gauge for premeasurements, seigniorage, labour charges and hire and
operational charges of power road roller 8 to 10 tonnes capacity and all other machinery,
tools and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD Using Hot mix plant including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

(II) Bitumen (S-65) By mechanical means


Unit = sqm
Taking output = 5000 sqm (30 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 4.16 515.00 2142.40
Agency area allowence /MAA 0.000% 0.00
b) Machinery
HMP of 30/40 t per hour hour 1.50 21414.00 32121.00
Electric generator set 125 KVA hour 2.00 1478.00 2956.00
Front end loader 1 cum bucket capacity hour 2.00 1844.00 3688.00
Tipper 5.5 cum - 10 t capacity hour 1.36 1185.60 1612.42
Paver finisher hour 2.00 2519.00 5038.00
Three wheel 80-100 kN static roller hour 10.00 1625.80 16258.00
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 3.40 39838.00 135449.20
Crushed sand defined as passing through 2.36 mm cum 30.00 766.18 22985.40
sieve and retained on 180 micron seive applied @
0.06 cum per 10 sqm.
Over heads & Contractor's profit 12.500% 27781.30
Add Labour welfare Cess @ 1% 1.000% 2,500.32
Cost of 5000 sqm = a+b+c+d+e 252532.04
Rate per sqm = (a+b+c+d+e)/5000 Rs. 50.51
9 SEAL COAT
Page 58 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

RBR- Providing and laying bituminous premixed seal coat (Type C) comprising of stone
BASC-17- chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of
I -A - Case 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve
III -(II) applied @ 0.09 cum per 10 sqm, chips to be premixed with the bitumunous binder
using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with power roller
including of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to required level and grades including cost and
conveyance of all materials from approved sources and stacking at site to
departmental gauge for premeasurements, labour charges and hire and operational
charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools
and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD including contractors profit & Over head
charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.for seal
coat.

Bitumen (S-65) By manual means


Taking out put = 1100 Sqm
a) Labour
Bitumen Sprayer day 1.00 515.00 515.00
Mazdoor (un-skilled) day 22.00 515.00 11,330.00
Mazdoor (semi-skilled) day 6.15 515.00 3,167.25
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Bitumen boiler oil fired, capacity1000 lts fitted with hour 2.20 234.00 514.80
spray set
Three wheel 80-100 kN static roller hour 2.20 1625.80 3,576.76
c) Materials
Bitumen VG30 grade @ 6.500 kgs per 10 sqm. t 0.715 39838.00 28,484.17

Crushed stone chipping of 6.7 mm size 100% cum 9.90 1723.00 17,057.70
passing 9.50mm seive and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm.
Basic rate of Seal coat Type-C for 1100 Sqm 64,645.68
Final Rate per sqm 58.77
c) Over heads & Contractor's profit 12.500% 7.35
Add Labour welfare Cess @ 1% 1.000% 0.66
66.78
Rate per sqm Rs. 66.78
9 RBR- Bituminous premixed seal coat (Type C)
BASC-17-
I -A - Case
III -(II)
Page 59 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code
RBR-
BASC-17- Providing and laying bituminous premixed seal coat (Type C) comprising of stone
I -A - Case chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of
III -(II) 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means .with the
bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with
power roller including of required line, level, grade to serve as wearing course on
previously prepared surface and finishing to required level and grades including cost
and conveyance of all materials from approved sources and stacking at site to
departmental gauge for premeasurements, labour charges and hire and operational
charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools
and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for seal
coat.

Bitumen (S-65) By mechanical means


Taking output = 7500 sqm (67.5 cum)
a) a)  Labour
Mate day 0.00
Mazdoor (Unskilled) day 5.20 515.00 2,678.00
Agency area allowence /MAA 0.000% 0.00
b) b) Machinery
Hydraulic self propelled chips spreader hour 6.00 2875.00 17,250.00
Tipper 5.5 cum capacity hour 6.00 1185.60 7,113.60
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11,064.00
Bitumen pressure distributor hour 6.00 1678.00 10,068.00
Three wheel 80-100 kN static roller hour 15.000 1625.80 24,387.00
c) Materials
Bitumen (S-65) @ 6.50 kg per 10 sqm t 4.88 39838.00 194,409.44
Crushed stone chipping of 6.7 mm size 100 per cent cum 67.50 1723.00 116,302.50
passing 9.5 mm sieve and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm

Basic rate of Seal coat Type-C for 7500 Sqm 383,272.54


Final Rate per sqm 51.10
d) Over heads & Contractor's profit 12.500% 6.39
Add Labour welfare Cess @ 1% 1.000% 0.57
58.06
Rate per sqm Rs. 58.06
9 Scarifying existing granular surface to a depth of
50 mm and disposal of scarified material

Scarifying existing granular surface to a depth of 50 mm and disposal of scarified


material with a lift upto 3 m and leads upto 1000 m as per Technical Specification
Clause 301.4. MORD including contractors profit & Over head charges, but excluding
GST etc,. Complete.
Unit = sqm
Taking output = 100 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 4.16 515.00 2142.40
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Tractor with Trolley hour 1.50 465.00 697.50
Page 60 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

2839.90
Over heads & Contractor's profit 12.500% 354.99
Add Labour welfare Cess @ 1% 1.000% 31.95
Cost for 100sqm = a+b+c+d+e 3226.84
Rate per cum = (a+b+c+d+e)/100 Rs. 32.27
9 Scarifying existing granular surface to a depth of
50 mm and spreading scarified material

Scarifying existing granular surface to a depth of 50 mm and spreading scarified


material in uniform layers with Tractor grader and compacting with Vibratory Roller to
achieve the desired density as per Technical Specification Clause 301.4.
MORD ,including contractors profit & Over head charges, but excluding GST etc,.
Complete.
Unit = sqm
Taking output = 100 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 4.16 515.00 2142.40
Agency area allowence /MAA 0.000% 0.00
b) Machinery
for 300 cum output of GSB
Tractor with grader @ 25 cum hour 12.00 473.00 5676.00
Three wheel 80-100 kN static roller @ 10 cum per hour 30.00
hour
OR
Vibratory roller 80-100 kN hour 6.00 3292.40 19,754.40
Water tanker 6 kl capacity hour 3.00 699.00 2097.00
27527.40
For 5 cum out put (100 sqmx50mm) 458.79
2601.19
Over heads & Contractor's profit 12.500% 325.15
Add Labour welfare Cess @ 1% 1.000% 29.26
Cost for 100sqm = a+b+c+d+e 2955.60
Rate per sqm = (a+b+c+d+e)/100 Rs. 29.56
9 Scarifying the existing bituminous road surface
to a depth of 50 mm and disposal of scarified
materia
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of
scarified material with all lifts and lead upto 1000 m as per Technical Specification
Clause 305.4.3 MORTH including contractors profit & Over head charges, but
excluding GST etc,. Complete.
Unit = sqm
Taking output = 100 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.26 515.00 133.90
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Tractor with ripper attachment @ 60 cum per hour hour 0.08 473.00 37.84
Front end loader 1 cum bucket capacity @ 50 cum per hour 0.20 1844.00 368.80
Tipper 5.5 cum capacity, 4 trips per hour hour 0.23 1185.60 272.69
813.23
Over heads & Contractor's profit 12.500% 101.65
Add Labour welfare Cess @ 1% 1.000% 9.15
Page 61 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Cost for 100 sqm = a+b+c+d 924.03


Rate per sqm = (a+b+c+d)/100 Rs. 9.24
9 RBR-BSC-04 Bituminous Macadam

Providing and laying bituminous macadam with hot mix plant using crushed
aggregates of grading as per Table 500.4 premixed with bituminous binder of 3.30%,
transported to site and laid over a previously prepared surface with paver finisher to
the required grade, level and alignment and rolled to achieve the desired compaction
as per Technical Specification Clause 504.including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 102.5 cum (225 t)
a) Labour
Mate day 0.52
Mazdoor (Skilled) day 10.00 515.00 5,150.00
Mazdoor (Un Skilled) day 3.00 515.00 1,545.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Batch mix HMP 40-60 THP @ 40 t per hour actual hour 6.00 21414.00 128,484.00
output
Hydraulic broom @ 1250 sqm per hour hour 1.10 400.00 440.00
Air compressor 210 cfm hour 1.10 619.50 681.45
Paver finisher hour 6.00 2519.00 15,114.00
Generator 125 KVA hour 6.00 1478.00 8,868.00
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11,064.00
Tipper 5.5 cum, 10 t capacity hour 6.21 1185.60 7,362.58
Three wheel 80-100 kN static roller for intial break hour 12.00 1625.80 19,509.60
down rolling, final and finishing rolling
Vibratory roller 80-100 kN for intermediate rolling hour 6.00 3292.40 19,754.40

c) Material
i)  Bitumen VG30 grade(S-65) @ 3.3 per cent of mix t 7.425 39838.00 295,797.15
(Weight of mix = 102.5 x 2.2 = 225 t)
ii) Aggregate
Total weight of mix = 225 t
Weight of bitumen = 7.425 t
Weight of aggregate = 225 – 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
25 -10 mm - 40 per cent cum 58.02 2043.77 118,579.33
10– 5 mm - 40 per cent cum 58.02 1807.38 104,863.90
5 mm and below - 20 per cent cum 29.01 1723.00 49,984.23
Basic rate of BM for 102.5Cum 787,197.64
Basic rate of BM per Cum 7,679.98
e) Over heads & Contractor's profit 12.500% 960.00
Add Labour welfare Cess @ 1% 1.000% 86.40
Rate per cum Rs. 8,726.38
9 RBR- TACK COAT Over BM
BASC-2 ii
Page 62 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code
RBR-
BASC-2 ii Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.2 to 0.25 kg per sqm on the existing Bitume surfaces &
cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,
including contractors profit & Over head charges, but excluding GST etc,. Complete.
for Tack Coat on Bitumen surface.

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Emulsion pressure distributor @1750 sqm per hour hour 1.000 963.00 963.00

c) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.390 31828.00 12,412.92
Cost of 1750 sqm = (a+b+c+d+e) 15,338.82
Rate per sqm = a+b+c+d+e/1750 8.77
(e) Over heads & Contractor's profit 12.500% 1.10
Add Labour welfare Cess @ 1% 1.000% 0.10
Rate per Sqm Rs. 9.97
9 RBR- 20mm thick Open-Graded Premix Carpet using
BASC-14 Bituminous (penetration grade/modified bitumen)
Binder and 8% of Waste Plastic using HMP

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using 8% of waste
Plastic (1.17kgs/10Sqm) and penetration grade bitumen to required line bitumen
60/70 grade at the rate of 13.43 kg/10 sqm to required line, grade and level to serve
as wearing course on a previously prepared base, including mixing in a Hot Mix plant
of 30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel
0-100 kN static roller capacity, finished to required level and grades to be followed by
seal coat including cost and conveyance of all materials from approved sources, ,
labour charges and hire and operational charges of power road roller and all other
machinery, tools and plants, providing barricading for diversion of traffic, erecting red
flags other incidental and operational charges etc., complete for finished item of work
as per clause 508 MORD including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 10.00 515.00 5150.00
Mazdoor (Skilled) day 3.52 515.00 1812.80
Agency area allowence /MAA 0.000% 0.00
b) Machinery
HMP 30/40 t per hour hour 4.50 21414.00 96363.00
Electric generator set 125 KVA hour 6.00 1478.00 8868.00
Page 63 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Front end loader 1 cum bucket capacity hour 6.00 1844.00 11064.00
Tipper 5.5 cum - 10 t capacity hour 3.64 1185.60 4315.58
Paver finisher hour 6.00 2519.00 15114.00
Three wheel 80-100 kN static roller hour 16.00 1625.80 26012.80
c) Material
13.43 Bitumen (S-65) @ 13.43 kg per 10 sqm t 5.370 39838.00 213930.06
1.17 Waste Plastic @ 1.17 Kg per 10 sqm t 0.470 27000.00 12690.00
14.6 Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum 108.00 1,868.83 201834.00
cum per 10 sqm
Over heads & Contractor's profit 12.500% 74644.28
Add Labour welfare Cess @ 1% 1.000% 6717.99
Cost of 4000 sqm = a+b+c+d+e 678516.51
Rate per Sqm Rs. 169.63
9 RBR- SEAL COAT ( Type A ) With using (8% of Waste
BASC-17 Plastic )
Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined in
table 500.16 of MOST at of Crushed stone chipping of 6.7 mm size 100% passing
through 11.2mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10
sqm chips to be laid simultaneously along with the bitumunous course using either
using 8% of waste Plastic (0.78kgs/10Sqm) and 9.02 kgs of bitumen 60/70 grade for
10 sqm and rolling with power roller including of required line, level, grade to serve as
wearing course on previously prepared surface and finishing to rquired level and
grades including cost and conveyance of all materials from approved sources and
stacking at site to departmental gauge for premeasurements, labour charges and hire
and operational charges of power road roller 8 to 10 tonnes capacity and all other
machinery, tools and plants, providing barricading for diversion of traffic, erecting red
flags other incidental and operational charges etc., complete for finished item of work
as per technical specification clause 510 of MORD. including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. Hot
mix plant

By Mechanical Means
(II) Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 6.24 515.00 3213.60
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Hydraulic self propelled chips spreader hour 6.00 2875.00 17250.00
Tipper 5.5 cum capacity hour 6.00 1185.60 7113.60
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11064.00
Bitumen pressure distributor hour 6.00 1678.00 10068.00
Three wheel 80-100 kN static roller hour 15.00 1625.80 24387.00
c) Material
Bitumen (S-65) @ 9.02 kg per 10 sqm t 6.77 39838.00 269703.26
Waste Plastic @ 0.78 Kg per 10 sqm t 0.59 27000.00 15930.00
Crushed stone chipping of 6.7 mm size 100 per cent cum 67.50 1723.00 116302.50
passing 11.2 mm sieve and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm
Page 64 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Over heads & Contractor's profit 12.500% 59379.00


Add Labour welfare Cess @ 1% 1.000% 5344.11
Cost of 7500 sqm = a+b+c+d+e 539755.07
Rate per sqm = (a+b+c+d+e)/7500 Rs. 71.97
9 Bituminous concrete with 8% per cent of waste
Plastic
Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with waste plastic @0.40% & bituminous binder @ 5.00
to 5.20 % per cent of mix and filler, transporting the hot mix to work site, laying with a
Mechanical paver finisher to the required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as
per MORTH specification clause No. 509 complete in all respects, including overhead
charges & Contractors profit. but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

Taking output = 191 Cum (450 tones.) Page 138, 139 of MoRT&H SDB
(A) Labour
Mate nos. 0.84 515.00 432.60
Mazdoor working with HMP, Mechanical broom, 16.00 515.00 8240.00
paver, roller, asphalt cutter and assistance for setting
outlines, levels and layout of construction.
nos.
Skilled Mazdoor for checking line and levels. nos. 5.00 515.00 2575.00
Agency area allowence /MAA 0.000% 0.00
TOTAL 11247.60
(B) Machinery
Batch type HMP 75 tonne per hour hour 6.00 24268.00 145608.00
Mechanical Paver finisher @ 100 TPH hour 6.00 2519.00 15114.00
Generator 250 KVA hour 6.00 2072.00 12432.00
Front end loader 1 cum capacity hour 6.00 1844.00 11064.00
Tipper 10tonne capacity per t-km hour 450.00 8.00 0.00
Smooth wheeled roller 8-10 Tonnes for initial break 3.90 1625.80 6340.62
down rolling hour
Vibratory roller 8 Tonnes for inter mediate rolling 3.90 3292.40 12840.36
hour
Finish rolling with 6-8 tonne smooth wheeled tandem 3.90 1844.00 7191.60
roller hour
TOTAL 210590.58
(C) Material
GradingII: 13 mm (Nominal Size)
i) Bitumen (60/70) @ 5.0 per cent of weight of mix MT 20.70 39838.00 824646.60

ii).Waste Plastic @0.40 Per cent of weight of Mix MT 1.800 27000.00 48600.00

iii) Aggregate
Total weight of mix = 450 tones
Weight of bitumen = 22.50 tones
Weight of aggregate = 450-22.50 = 427.5 tones

Taking density of aggregate = 1.5 ton/cum


Volume of aggregate = 285.0 cum
13.2 - 10 mm 30 per cent cum 85.50 1941.75 166019.63
10 - 5 mm 25 per cent cum 71.25 1807.38 128775.47
5 mm and below 43 per cent cum 122.55 1723.00 211153.65
Page 65 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Filler @ 2% weight of aggregates ( Stone Dust) cum 5.70 9129.98


1601.75
( If Cement used it is 8.62Tonnes) 1388325.33
(A + B +C) 1610163.51
Over heads & Contractor's profit 12.500% 201270.44
Add Labour welfare Cess @ 1% 1.000% 18,114.34
1,829,548.29
Rate per 1 cum Rs. 9578.79
10 Bituminous concrete
Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 5.4 to 5.6 % per cent of mix
and filler, transporting the hot mix to work site, laying with a Mechanical paver finisher
to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MORTH specification clause
No. 509 complete in all respects, including overhead charges & Contractors profit. but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Taking output = 191 Cum (450 tones.) Page 138, 139 of MoRT&H SDB
(A) Labour
Mate nos. 0.84 515.00 432.60
Mazdoor working with HMP, Mechanical broom, 16.00 515.00 8240.00
paver, roller, asphalt cutter and assistance for setting
outlines, levels and layout of construction.
nos.
Skilled Mazdoor for checking line and levels. nos. 5.00 515.00 2575.00
Agency area allowence /MAA 0.000% 0.00
TOTAL 11247.60
(B) Machinery
Batch type HMP 75 tonne per hour hour 6.00 27072.00 162432.00
Mechanical Paver finisher @ 100 TPH hour 6.00 2519.00 15114.00
Generator 250 KVA hour 6.00 2072.00 12432.00
Front end loader 1 cum capacity hour 6.00 1844.00 11064.00
Tipper 10tonne capacity per t-km hour 450.00 8.00 0.00
Smooth wheeled roller 8-10 Tonnes for initial break 3.90 1625.80 6340.62
down rolling hour
Vibratory roller 8 Tonnes for inter mediate rolling 3.90 3292.40 12840.36
hour
Finish rolling with 6-8 tonne smooth wheeled tandem 3.90 1844.00 7191.60
roller hour
TOTAL 227414.58
(C) Material
GradingII: 13 mm (Nominal Size)
i) Bitumen (60/70) @ 5.0 per cent of weight of mix MT 22.50 39838.00 896355.00

ii) Aggregate
Total weight of mix = 450 tones
Weight of bitumen = 22.50 tones
Weight of aggregate = 450-22.50 = 427.5 tones

Taking density of aggregate = 1.5 ton/cum


Volume of aggregate = 285.0 cum
13.2 - 10 mm 30 per cent cum 85.50 1941.75 166019.63
10 - 5 mm 25 per cent cum 71.25 1807.38 128775.47
5 mm and below 43 per cent cum 122.55 1723.00 211153.65
Page 66 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Filler @ 2% weight of aggregates ( Stone Dust) cum 5.70 9129.98


1601.75
( If Cement used it is 8.62Tonnes) 1411433.73
(A + B +C) 1650095.91
Over heads & Contractor's profit 12.500% 206261.99
Add Labour welfare Cess @ 1% 1.000% 18,563.58
1,874,921.48
Rate per 1 cum Rs. 9816.34

MAINTANANCE DATAS
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
11 Maintenance of bituminous Eturunagaram(M),Mulugu Dist. to pot holes filled with 75mm B.M
surface road Repair

Maintenance of bituminous surface road - Repair to pot holes by removal of failed


material, trimming the sides to vertical and leveling the bottom, cleaning the same with
compressed air or any appropriate method filled with 75mm B.M, applying bitumen
emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on
bottom as per technical specifications Clauses 502 and 503 and 1904 MORD,
including contractors profit & Over head charges, but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

Unit = cum
Taking output = 187.5x0.075 = 14.06 cum = (30.94
Tonne)
(5% area of one km)
(a) Labour
Mate day -
Mazdoor (Unskilled) day 20.800 515.00 10,712.00
Agency area allowence /MAA 0.000% 0.00
(b) Machinery
Jack hammer 25 kg with tractor hour 4.000 444.00 1,776.00
Compressor 210 cfm with tractor hour 2.000 619.50 1,239.00
Emulsion pressure distributor hour 4.000 963.00 3,852.00
Mixall 6/10 t capacity hour 4.000 627.60 2,510.40
Three wheeled 80-100 kN Static Roller hour 4.000 1625.80 6,503.20
(c) Materials
Primer with bitumen emulsion @ 9 kg/10 sqm Tonne 0.168 47708.00 8,014.94
187.5x9 = 168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg/ 10 sqm

Bottom = 187.5
Sides = 28.27 Tonne 0.064 31828.00 2,036.99
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix = 30.94 x Tonne 1.082 39838.00 43,104.72
3.5 / 100 = 1.082
Weight of mix (BM) 14.06 cum = (30.94 tonne)
Weight of Bitumen = 1.082
Weight of aggregate 30.94 -1.082 = 29.86
Taking density of aggregate 1.5 t per cum
Volume of aggregate 29.86 / 1.5 = 19.90 cum
Grading (1) (40 mm nominal size)
37.5 - 25 mm 15% cum 2.985 1935.50 5,777.47
Page 67 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

25 - 10 mm 45% cum 8.955 2008.83 17,989.10


10 - 5 mm 25% cum 4.975 1723.00 8,571.93
5 mm and below 15% cum 2.985 1662.38 4,962.19
117,049.94
Over heads & Contractor's profit 12.500% 14631.24
Add Labour welfare Cess @ 1% 1.000% 1,316.81
Cost of 14.06 cum = a+b+c+d+e 132,997.99
Rate per cum = a+b+c+d+e/14.06 Rs. 9,459.32
12 Maintenance of Earthen shoulder (stripping of excess soil)
Maintenance of Earthen shoulder - Stripping excess soil from the shoulder surface to
achieve the approved level and compacting with plate compactor at OMC as per
drawings and Technical Specification Clause 1903 MORD / 3003 MORTH including
contractors profit & Over head charges, but excluding Seig Charges, Labour Cess &
GST etc,. Complete.

Unit = sqm
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
(a) Labour
Mate day -
Mazdoor (Unskilled) day 2.600 515.00 1,339.00
Agency area allowence /MAA 0.000% 0.00
(b) Machinery
Plate compactor @ 25 sqm per hour hour 4.000 54.00 216.00
1,555.00
Over heads & Contractor's profit 12.500% 194.38
Add Labour welfare Cess @ 1% 1.000% 17.49
Cost of 100 sqm = 1,766.87
Rate per sqm = Rs. 17.67
Maintenance of bituminous surface road Repair to pot holes filled with 20mm thick Pre-mix
Carpet & Seal Coat Type-B
13 Repair to pot holes and removal of loose material, trimming of sides, cleaning of
surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B
specification Clause 1904.2 MORD including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = sqm
Taking output = 200 sqm
(a) Labour
Mate day -
Mazdoor (Unskilled) day 20.800 515.00 10,712.00
Agency area allowence /MAA 0.000% 0.00
(b) Machinery
Air compressor 210 cfm with tractor hour 2.000 619.50 1,239.00
Bitumen pressure distributor hour 2.000 1678.00 3,356.00
Mixall 6/10t capacity hour 2.000 727.00 1,454.00
Three wheeled 80-100 kN Static Roller hour 4.000 1625.80 6,503.20
(c) Materials
Bitumen for tack coat @ 3kg per 10 sqm 200 x 3 / 10 t 0.064 31828.00 2,036.99
= 60 kg
Bitumen for pre-mix carpet @ 14.60 kg per 10 sqm = t 0.292 39838.00 11,632.70
200 x 14.6 / 10 = 292 kg
Page 68 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Bitumen for seal coat @ 6.8 kg per 10 sqm t 0.136 39838.00 5,417.97
= 200 x 6.8 / 10 = 136 kg
Crushed stone aggregate 13.2 mm to 5.6 mm @ cum 5.400 1,929.06 10,416.92
0.27 cum per 10 sqm= 200x0.27/10=5.4cum

Crushed sand passing 2.36 mm sieve and retained cum 1.200 766.18 919.42
on 180 micron sieve @ 0.06 cum per 10 sqm
200 x 0.06 / 10 = 1.20 cum

53,688.20
Over heads & Contractor's profit 12.500% 6711.03
Add Labour welfare Cess @ 1% 1.000% 603.99
Cost for 200 sqm = a+b+c+d+e 61,003.22
Rate per sqm = a+b+c+d+e/200 Rs. 305.02
14 RBR-MTRD- Maintenance of WBM road including filling up of
15
pot holes, ruts with Grading-III material 75mm
thick
Maintenance of WBM road including filling up of pot holes, ruts and rectifying
corrugated surface, damaged edges and ravelling as per technical specification
clause 1906 MORD For Grading III material 75mm thick compacting with Smooth
wheel roller 80-100 kN including contractors profit & Over head charges, but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

Unit = Sqm
Out put - Taking affected area @5% in 1 km
Quantity 187.5x0.075 = 14.06 cum
By Manual means
For WBM Grading III out put = 360 cum
a) Labour
Mazdoor (Skilled) day 12.08 515.00 6221.20
Mazdoor (unskilled) day 250.00 515.00 128750.00
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Vibratory Roller 80-100 KN @60cum per hour hour 6.00 3292.40 19754.40
Water tanker 6kl capacity hour 24.00 699.00 16776.00
a+b 171501.60
c) Add 50% for extra efforts involved as maintenance is 85750.80
to be done in small reaches
d) Material (total Qty of Metal 435.60 Cum)
40-45 mm IRC HBG m/c Metal ( 82% of 435.60 Cum 357.19 1766.75 631065.43
Cum)
19-22.40 mm IRC HBG m/c Metal ( 18% of 435.60 Cum 78.41 2143.00 168032.63
cum)
Stone Screening
Type -B 11.2mm @ 0.18 cum per 10 sqm cum 86.40 1723.00 148867.20
(rate of 2.36 mm & below)
Binding Material @ 0.06 cum per 10 sqm
947965.26
e) The cost of 25% retrieved material may be deducted -236991.32
from the rates
Basic rate for 360 Cum (a+b+c+d+e) 968226.34
Rate per Cum 2689.52
Over heads & Contractor's profit 12.500% 336.19
Add Labour welfare Cess @ 1% 1.000% 30.26
Rate per Cum 3055.97
Page 69 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Cost of 187.5 Sqm Cum 14.06 3055.97 42966.90


Rate per Sqm Rs. 229.16
15 Excaion in Soil with Dozer with lead upto 100m

Excaion for roadway in soil by mechanical means including cutting and pushing the
earth to site of embankment upto a distance of 100 m, including trimming bottom and
side slopes in accordance with requirements of lines, grades and cross-sections as
per Technical Specification Clause 302.3 MORD / 301 MORTH. including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

Unit = cum
Taking output = 180 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 2.08 515.00 1071.20
Agency area allowence /MAA 0.000% 0.00
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with hour 3.60 1758.00 6328.80
pushing)
Seignorage cum 180.00 30.00 5400.00
Over heads & Contractor's profit 12.500% 1600.00
Add Labour welfare Cess @ 1% 1.000% 144.00
Cost for 180 cum = a+b+c+d 14544.00
Rate per cum = (a+b+c+d)/180 Rs. 80.80
16 Restoration of Rain Cuts
Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the
loose soil, benching for 300mm width laying fresh material in layers not exceeding 250
mm and compaction with plate compactor or power rammer to restore the original
alignment, level and slopes as per drawings and technical specifications Clause 1902
MORD / 3002 MORTH including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

Manual Means
Unit = cum
Taking output = 10 cum
(a) Labour
Mate day -
Mazdoor (Unskilled) day 6.24 515.00 3213.60
Agency area allowence /MAA 0.000% 0.00
(b) Machinery
Plate compactor hour 3.00 54.00 162.00
(c) Materials
Compensation for earth Taken from prie land cum 7.50 80.80 606.00
3981.60
Over heads & Contractor's profit 12.500% 497.70
Add Labour welfare Cess @ 1% 1.000% 44.79
Cost for 10 cum = a+b+c+d 4524.09
Rate per cum = a+b+c+d/10 Rs. 452.41
Note : Only 75% of fresh material has been provided as
25% can be retrieved from site from earth i.e. flown down
the slop in the form of slurry and deposited at the foot of
rain cuts.

17 Manday including contractors profit & Over head


charges,
Page 70 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Mazdoor day 1.00 515.00 515.00


Agency area allowence /MAA 0.000% 0.00
515.00
Over heads & Contractor's profit 12.500% 64.38
Add Labour welfare Cess @ 1% 1.000% 5.79
Total Per Day Rs. 585.17
18 Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping,
regarding, deepening of side drains as well as catch water drains as per technical
specification Clause 1907 MORD. including contractors profit & Over head charges,
but excluding & GST etc,. Complete.

Unit - Per Metre


Taking output one km = 1000 metre
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.32 515.00 4284.80
Agency area allowence /MAA 0.000% 0.00
4284.80
Over heads & Contractor's profit 12.500% 535.60
Add Labour welfare Cess @ 1% 1.000% 48.20
Cost for 1000 metre = a+b+c 4868.60
Rate per Metre = a+b+c/1000 Rs. 4.87
19 Trimming of grass and weeds from the shoulders/berms and disposing off the same to
suitable locations as per technical specifications Clause 1914 MORD including
contractors profit & Over head charges, but excluding GST etc,. Complete.

Unit = sqm
Taking output = 1500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.40 515.00 5356.00
Agency area allowence /MAA 0.000% 0.00
5356.00
Over heads & Contractor's profit 12.500% 669.50
Add Labour welfare Cess @ 1% 1.000% 60.26
Cost for 1500 sqm = a+b+c 6085.76
Rate per sqm = a+b+c/1500 Rs. 4.06
20 Cutting of branches of trees shrubs and trimming of
grass and weeds
Cutting of branches of trees and shrubs from the road way or with in R.O.W including
disposal of wood and leaves to suitable location as per technical specification Clause
1914 MORD including contractors profit & Over head charges, but excluding GST
etc,. Complete.
Unit = one tree
Taking output = 10 trees of 900 mm average girth
a) Labour
Mate day -
Mazdoor (Skilled) day 1.120 515.00 576.80
Mazdoor (Unskilled) day 2.000 515.00 1030.00
Agency area allowence /MAA 0.000% 0.00
1606.80
Over heads & Contractor's profit 12.500% 200.85
Add Labour welfare Cess @ 1% 1.000% 18.08
Page 71 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Cost for 10 trees = (a+b+c) 1825.73


Rate per tree = (a+b+c)/10 Rs. 182.57
21 White washing of parapet walls of CD work and tree
truncks
White washing two coats on parapet walls and tree trunks including preparation of
surface by cleaning scraping etc. as per technical specifications Clause 1915 MORD
including contractors profit & Over head charges, but excluding GST etc,. Complete.

Unit = sqm
Taking output = 9 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.153 515.00 78.80
White washer day 0.143 515.00 73.57
Agency area allowence /MAA 0.000% 0.00
b) Material
Lime quintal 0.045 2.62 11.77
Fevicol adhesive kg 0.100 236.00 23.60
Indigo kg 0.013 46.00 0.60
188.34
Over heads & Contractor's profit 12.500% 23.54
Add Labour welfare Cess @ 1% 1.000% 2.12
Cost for 9 sqm = a+b+c+d 214.00
Rate per sqm = a+b+c+d/9 Rs. 23.78
22 Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair,
repairs to cracks, parapet wall and protection work as per drawing and technical
specification Clause 1908 MORD. including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = One No. Hume pipe (1000 mm dia)


Taking output = One No.H.P. Culvert
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.100 515.00 566.50
Mason 2nd Class day 1.400 515.00 721.00
Agency area allowence /MAA 0.000% 0.00
b) Material
Cement, Sand, Brick, Boulder etc. .( 1/4 bag LS 0.025 5600.00 140.00
cement+equalent cost for other materils)
1,427.50
Over heads & Contractor's profit 12.500% 178.44
Add Labour welfare Cess @ 1% 1.000% 16.06
Cost for one No. Hume pipe culvert = a+b+c+d 1622.00
Rate per hume pipe Culvert = a+b+c+d Rs. 1622.00
23 Maintenance of Culverts Slab type
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair,
repairs to cracks, parapet walls and Protection works as per drawing and technical
specification Clause 1908 MORD including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = One No. Culvert (2 m span)


Taking output = one No. Slab Culvert
a) Labour
Mate day -
Page 72 of 249

S. Index Description of item Unit Qty Rate Amount


No. Code

Mazdoor (Unskilled) day 4.200 515.00 2163.00


Mason 2nd Class day 1.000 515.00 515.00
Agency area allowence /MAA 0.000% 0.00
b) Material
Cement, Sand, Brick, Boulder etc. .( 1/2 bag LS 0.050 5600.00 280.00
cement+equalent cost for other materils)
2,958.00
Over heads & Contractor's profit 12.500% 369.75
Add Labour welfare Cess @ 1% 1.000% 33.28
Cost for One Slab Culverts =a+b+c+d 3361.03
Rate per Culvert = a+b+c+d Rs. 3361.03
24 Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts,
repair of flood gauges, removal of debris, providing boulders and protection work and
painting as per technical specification Clause 1909 MORD including contractors profit
& Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.
Unit = One metre
Taking output = 50 metre causeway
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.400 515.00 1236.00
Mason 1st Class/Painter 1st Class day 4.000 515.00 2060.00
Agency area allowence /MAA 0.000% 0.00
b) Material
Supply of cement, paint, sand, aggregate, boulder etc. LS 0.100 5600.00 560.00
( 1bag cement+equalent cost for other materils)

3,856.00
Over heads & Contractor's profit 12.500% 482.00
Add Labour welfare Cess @ 1% 1.000% 43.38
Cost for 50 metre = a+b+c+d 4381.38
Rate per metre = a+b+c+d/50 Rs. 87.63
25 Maintenance of Road Signs
Maintenance of road signs by way of cleaning and repainting of mandatory /
regulatory / cautionary / informatory and place identifications sign board as per
drawings and technical specification Clause 1910 MORD including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = 1 km
All types of signs in one Km
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.090 515.00 1076.35
Painter 1st Class day 0.125 625.00 78.13
Agency area allowence /MAA 0.000% 0.00
b) Material
Synthetic Enamel Paint, Engineering grade tape, welding LS 6.000 264.00 1584.00
machine etc. (3 Litters paint cost per Km + equalent cost
for other mateils)
2,738.48
Over heads & Contractor's profit 12.500% 342.31
Add Labour welfare Cess @ 1% 1.000% 30.81
Cost for one Km = a+b+c+d 3111.60
Rate per km = a+b+c+d Rs. 3111.60
Hire/ Usage charges for plant and machinery as per SSR- 2021-22

S.No. Machine Unit Hire charges in Rs.


Basic Basic
1 Dozer ( D50) hour 1758.00 1758.00
2 Mortor Grader hour 3602.00 3602.00
3 Hydraulic Excacator Shovel 0.5 cum hour 2013.10 2013.10
4 Hydraulic Excacator Shovel 0.9 cum hour 3331.20 3331.20
5 Front end loader hour 1844.00 1844.00
6 Tipper- 5.5 cum hour 1185.60 1185.60
7 Vibratory roller 8t hour 3292.40 3292.40
8 Smooth wheeled roller 8t hour 1625.80 1625.80
9 Water tanker 8KL 1113.30 1113.30
10 Water tanker 6KL hour 699.00 699.00
11 Tractor hour 465.00 465.00
12 Tractor with rotavator/ grader/ ripper hour 473.00 473.00
13 Air compressor 5cmm electric hour 619.50 619.50
14 Wet mix plant 60 TPH hour 1844.00 1844.00
15 Mechanical broom Hydraulic hour 400.00 400.00
16 Bitumen pressure Distributor hour 1678.00 1678.00
17 Emulsion pressure Distributor hour 963.00 963.00
18 Hot mix plant - 120 TPH hour 31556.00 31556.00
19 Hot mix plant - 100 TPH hour 27072.00 27072.00
20 Hot mix plant - 60 TPH hour 24268.00 24268.00
21 Hot mix plant -40 to 60 TPH hour 21414.00 21414.00
22 Paver finisher Hydrostatic with sensor hour 3427.00 3427.00
23 Paver finisher Mechanical hour 2519.00 2519.00
24 Hydraulic chip spreader hour 2875.00 2875.00
25 Tandem Road roller hour 1844.00 1844.00
26 Pneumatic road roller hour 1437.00 1437.00
27 Pot hole repair machine hour 946.00 946.00
28 Bitumen boiler oil fired hour 234.00 234.00
29 GSB Plant 50 cum hour 1280.00 1280.00
30 Mastic cooker hour 73.00 73.00
31 Batching & Mixing plant- 50 cum hour 1380.00 1380.00
32 Batching & Mixing plant- 15-20 cum hour 1205.80 1205.80
33 Transit mixer hour 2532.40 2532.40
34 Concrete pump hour 899.00 899.00
35 Concrete bucket hour 15.80 15.80
S.No. Machine Unit Hire charges in Rs.

36 Kerb casting machine hour 348.00 348.00


37 concrete mixer/ mixall- 0.28 cum hour 627.60 627.60
38 concrete mixer/ mixall- 1.0 cum hour 727.00 727.00
39 Concrete paver hour 3248.00 3248.00
40 Integrated stone crusher- 100 TPH hour 9757.00 9757.00
41 Integrated stone crusher- 200 TPH hour 20573.00 20573.00
42 Generator- 250 KVA hour 2072.00 2072.00
43 Generator- 125 KVA hour 1478.00 1478.00
44 Generator- 100 KVA hour 1261.00 1261.00
45 Generator- 35 KVA hour 1237.40 1237.40
per
tonne
46 Truck 5.5 cum per 10t Km 8.00 8.00
47 Truck 5.5 cum per 10t hour 1142.60 1142.60
48 Road marking machine hour 124.00 124.00
49 Mobile slurry seal equipment hour 1261.00 1261.00
50 Plate compactor hour 54.00 54.00
51 Drilling equipment hour 1052.10 1052.10
52 Jack hammer hour 444.00 444.00
53 Mixall 0.28 cum capcity hour 627.60 627.60
54 Concrete Joint cutting Machine or Road marking hour 124.00 124.00
55 Mixall 1.00cum capacity hour 727.00 727.00
SSR- 2021-22
Labour per Rate singh: Rate
Same as Mazdoor
Basic Basic Basic Basic

Mate day 515 515.00 W.I with I.T.I day 655.00 655.00

Mazdoor day 515 515.00 painter 2nd day 515.00 515.00


Class *
Mason(1st day 545 545.00 painter 1st day 625.00 625.00
class) Class *
Mason(2nd day 515 515.00 Surveyor day 925.00 925.00
class)
Blacksmith day 540 540.00 Asphalt Spryer / day 515.00 515.00
Bitumen Sprayer

Drillier day 625 625.00 Blaster day 645.00 645.00

Mazdoor day 490 490.00


unskilled
Blasting charges 0.00 0.00

Stacking for metal and Stone


Stacking for earth, Sand and gravel

Mechanicl means Loading Loading unloading unloading


Loading and Unloading for metal & St 126.20 126.20 20.30 20.30 146.50

Loading and Unloading for 67.00 67.00 20.30 20.30 87.30


earth,Sand and gravel

Manual means Loading Loading unloading unloading

Loading and Unloading for metal & 170.80 170.80 85.40 85.40 256.20
Stone
Loading and Unloading for 144.40 144.40 52.40 52.40 196.80
earth,Sand and gravel

Seignarage Charges in Seignarage Charges in DATAs


Estimate -> Y/N -> Y/N

Y N
Basic Basic
Earth/Grave 30 30.00 Earth/Gravel 0.00
Sand 40 40.00 Sand 0.00
Metal 75 75.00 Metal 0.00

161557.00
Initial Rates Basic Basic

1 60-63 mm size HBT metal (IRC&MOST) 400.00 400.00

2 50 - 55 mm size HBT metal (IRC&MOST) 440.00 440.00

3 40-45 mm size HBT metal (IRC&MOST) 520.00 520.00

4 25-27 mm size HBT metal (IRC&MOST) 790.00 790.00

5 40-45 mm size HT M/C metal (IRC&MOST) 520.00 520.00

6 19-22 mm size HT M/C metal (IRC&MOST) 821.00 821.00

7 12-14 mm size HT M/C metal (IRC&MOST) 700.00 700.00

8 9.5-11.2 mm size HT M/C metal (IRC&MOST) 620.00 620.00

9 5-7 mm size HT M/c metal (IRC&MORTH) 485.00 485.00

10 2.36 mm to 5mm HBT M/C 485.00 485.00


11 2.36 mm down and Stone Dust 485.00 485.00

12 Gravel 98.00 98.00

13 Sand for blindage/Filling 600.00 600.00

14 40 mm size HBT metal (SS 5) 505.00 505.00

15 20 mm size HBT metal (SS 5) 870.00 870.00

16 12 mm size HBT metal (SS 5) 781.00 781.00

17 10 mm size HBT metal (SS 5) 657.00 657.00

18 Rough stone 300 mm thick (OTG) Revetment 131.00 131.00

19 Rough stone 300 mm thick (Trap) Revetment 148.00 148.00

20 Jeddy stone 450-600mm 179.00 179.00

21 Soling stone 150 mm OTG 63.00 63.00

22 Sand for Concrete 600.00 600.00


23 Sand for mortar/ plastering 800.00 800.00

24 Quarry Rubbish 77.00 77.00

25 1000mm Dia NP3 Class Plain end 7011.00 7011.00


26 1000mm Dia Collar 1150.00 1150.00
25 900mm Dia NP3 Class Plain end 5662.00 5662.00
26 900mm Dia Collar 917.00 917.00
27 600mm Dia NP3 Class Plain end 2733.00 2733.00
28 600mm Dia Collar 461.00 461.00
29 450mm Dia NP3 Class Plain end 1673.00 1673.00
30 Binding wire 66.00 66.00
31 Cement primer exterior grade kg 201.00 201.00
32 Red oxide(lt) 164.00 164.00
33 Coal tar Epoxy paint(lt) 223.00 223.00
34 Synthetic enamel paint- 1st 264.00 264.00
35 RR masonry stone OTG 152.00 152.00
36 Water 73.00 73.00
37 Filter media 345.00 345.00
38 25.4 mm joint filler board (20mm ) 580.00 580.00
39 12.7 mm joint filler board ( 12mm ) 379.00 379.00
40 110mm PVC pipe Basic rate 6.00 Kg/Sq.cm 232.00 232.00
41 Fevicol Adhesive/ Synthetic wood adhesive compound 236.00 236.00
42 Unitek Fine grade (25 Kg) 0.00
43 Unslaked lime (1 kg) 2.62 2.62
44 Dry powder distemper (kg) 46.00 46.00
45 Super Plasticizer 61.00 61.00
46 Bitumen primer @ 200ml. Per joint for 23 joints 82.00 82.00
47 Bitumenous sealant 800 ml. Per joint for 23 joints 115.00 115.00
48 Jute rope 12mm dia including 5 per cent wastage 8.30 8.30
49 Debonding strips 10.00 10.00
50 Polythene sheathing, 0.50 0.50
51 125 micron polythin sheet 17.00 17.00
52 Earth Cost or compensation for earth taken from private 71.00 71.00
land (Excluding Seigniorage Charges)
53 Cement Cost in Pipes 5600.00 5600.00
54 Steel Cost in Pipes 52000.00 52000.00
55 Geletine 80 per cent ( Exposive ANFO High strangth 74.00 74.00
booster)
56 Electric Detonators @1 Detonator for 2 gelatine sticks of 11.00 11.00
285 gm each
Page 79 of 249

DATA (ROAD WORK) -SSR- 2021-22


Agency area allowence /MAA 0%
Over heads & Contractor's profit 12.500%
Water (Y/N) Y 73.00 Rate per kL
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

25 402 Cement Stabilisation for Improving Subgrade


Laying and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotaor with 2.4 per cent quantity of
cement by weight of materials( i.e, 42 Kgs per cum of finished qty of item) grading with
motor grader and compacting with the smooth wheel road roller at OMC to the
desired density to form a layer of improved Sub-grade and PI value should be less
than 10 and to achive CBR not less than 5% as per Technical Specification Cluase ###
403, including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

(B)By Mechanical Means


Taking output = 300 cum (525 t)
For 2.4 per cent quantity of Cement by weight of soil
a) Labour

Mate day 0.36 515.00 185.40


Mazdoor (Skilled) day 1.00 515.00 515.00
Mazdoor (Unskilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in hour 12.00 473.00 5,676.00
place of motor grader, for grading @ 25 cum per hour

Three wheel 80-100 kN static roller @ 70 cum per hour hour 4.30 1,625.80 6,990.94
Tractor with rotaor and blade @ 25 cum per hour hour 12.00 473.00 5,676.00
Water tanker 6 kl capacity hour 5.00 699.00 3,495.00
c) Material
Cement at site @ 2.4 % t 12.60 5,600.00 70,560.00
Water kl 30.00 73.00 2,190.00
d) Over heads & Contractor's profit 12.500% 12,426.04
Add Labour welfare Cess @ 1% 1.000% 1,118.34
Cost for 300 cum = a+b+c+d 112,952.72
Rate per cum =(a+b+c+d)/300 376.51
25 404 Cement Treated Soil Sub-Base
Page 80 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Construction of Cement treated Gravel Sub base using 4.7 per cent quantity of
cement by weight of materials( i.e, 82.25 Kgs per cum of finished qty of item) by
Providing, laying and spreading well graded material (i.e. 9.5 mm to 4.75 mm size
Gravel of 66% and crusher dust of size < 2.36mm @ 34%) having LL < 45, PI < 20 &
Uniformity coefficient (Cu) > 5 on a prepared sub-grade, pulverising, adding the
designed quantity of cement to the spreaded materials, mix shall be designed for a
minimum laboratory test for 7 days unconfined compressive strength and not less
than 1.7 MPa (17 Kg/cm2) for sub-base and mixing in place with rotavator, grading
with the tractor grader and compacting with the vibratory roller 8-10 tonnes capacity at
###
OMC to achieve the desired unconfined compressive strength and to form a layer of
sub-base as per MORD Technical Specification Clause 404, including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete. For Cement Treated sub-base.

Unit = cum
Taking output = 300 cum (525 t)
For 4.7 % quantity of cement by weight of soil

a) Labour

Mazdoor (Skilled) day 2.40 515.00 1,236.00


Mazdoor (Unskilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in hour 12.00 473.00 5,676.00
place of motor grader, for grading @ 25 cum per hour

Vibratory Roller 80-100 kN @ 100 Cum per Hr hour 6.00 3,292.40 19,754.40
Tractor with rotaor and blade @ 25 cum per hour hour 12.00 473.00 5,676.00
Water tanker 6 kl capacity hour 5.00 699.00 3,495.00
c) Material
9.5 mm to 4.75 mm @ 66.00% (Gravel) cum 237.60 264.18 62,769.17
2.36 mm below @ 34% (Stone dust) cum 122.40 1,601.75 196,054.20
Cement at site @ 4.7 % (of 525 t) t 24.675 5,600.00 138,180.00
Water kl 30.00 73.00 2,190.00
d) Over heads & Contractor's profit 12.500% 54,893.85
Add Labour welfare Cess @ 1% 1.000% 4,940.45
Cost for 300 cum = a+b+c+d 498,985.07
Rate per cum =(a+b+c+d)/300 1,663.28
25 MORT Cement Treated Crushed Rock or combination as per
H 403
clause 403.2 and table 400.4 in Base
Page 81 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Construction of Cement treated Granular Base by providing, laying and spreading


crushed rock materials ( as per table 400.4 of MoRTH i.e.., using crushed stone
materials of 37.5 to 9.50mm @ 32.50%, 9.50 to 4.75mm @5% and 4.75mm to 75
microns @62.50% ) on a prepared sub base by adding 5.5 per cent quantity of
cement by weight ( i.e.., at 110 Kgs/Cum of finished qty of item, the mix shall be
designed for a minimum laboratory test for 7 days unconfined compressive strength
and not less than 3.00 MPa (30 Kg/cm2) ) for base course and mixing in place with
rotavator, grading with the tractor grader and compacting with the vibratory roller 8-10
Tonnes capacity at OMC to achieve the desired unconfined compressive strengthand ###
to form a layer of Base, as per MORTH specification 403, including contractors profit
& Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete.as per clause 403.2 and Table 400.4 for Cement Treated crushed rock base

Unit = cum
Taking output = 300 cum (600 t)
Quantity of cement is 5.5 per cent of quantity of
crushed rock by weight.
a) Labour

Mate day 0.48 515.00 247.20


Mazdoor (Skilled) day 2.00 515.00 1,030.00
Mazdoor (Unskilled) day 10.00 515.00 5,150.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in hour 12.00 473.00 5,676.00
place of motor grader, for grading @ 25 cum per hour

Vibratory roller 8 - 10 tonne hour 6.00 3,292.40 19,754.40


Tractor with rotaor and blade @ 25 cum per hour hour 12.00 473.00 5,676.00
Water tanker 6 kl capacity hour 10.00 699.00 6,990.00
c) Material
Cement at site @ 5.5 per cent by weight of crushed tonne 33.00 5,600.00 184,800.00
aggregate (600 tonne)
Grading of material for sub-base course
37.5 mm to 9.5 mm @ 32.5 per cent cum 124.80 2,043.77 255,062.05
9.5 mm to 4.75 mm @ 5 per cent cum 19.20 1,807.38 34,701.60
4.75 mm to 75 micron @ 62.5 per cent cum 240.00 1,662.38 398,970.00
Cost of water KL 60.00 73.00 4,380.00
d) Over heads & Contractor's profit 12.500% 115,304.66
Add Labour welfare Cess @ 1% 1.000% 10,377.42
Cost for 300 cum = a+b+c+d 1,048,119.33
Rate per cum =(a+b+c+d)/300 3,493.73
25 1500 Cement Concrete cell fill Pavement
Page 82 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Construction of un-reinforced, plain cement concrete pavement, thickness as per


design, over a prepared sub base, and using high density plastic (HDPE) cells
consist of 200-220 micron HDPE sheet having cell of size of 150mmx150mm
&100mm deep with 43 grade cement or any other type as per Clause 1501.2.2
M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of
coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer
of not less than 0.2 cum capacity and appropriate weigh batcher using approved
mix design, laid in approved fixed side formwork (steel channel, wedges, steel
plates including levelling the formwork and HDPE plastic cell streighting,
threading, string, iron nailing, lacing etc complete as per drawing), spreading the
concrete with shovels, rakes, labours compacted using needle, screed and plate
vibrators and finished in continuous operation, admixtures as approved, curing of
concrete cell for 14-days, using curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical Specification Clause
1501 including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 37.5 cum (86.25 t)
(100 x 3.75 x 0.100)
a) Labour
Mate day 3.50 515.00 1,802.50
Mason (1st class) day 2.50 545.00 1,362.50
Mason (2nd class) day 2.50 515.00 1,287.50
Mazdoor (Unskilled) day 64.50 515.00 33,217.50
Mazdoor (Skilled) day 3.00 515.00 1,545.00
Surveyor day 1.00 925.00 925.00
Mazdoor (Semi-Skilled) day 3.00 515.00 1,545.00
Bhisti day 7.00 515.00 3,605.00
9,058.00
Extra labour for laying, streighting , threding, string, iron
nailing, lacing of plastic cell.(20% of labour expenditure)

Agency area allowence /MAA 0% 0.00


b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with hour 18.00 627.60 11,296.80
weigh batcher and suitable capacity calibrated water tank

Needle vibrator hour 4.50 0.00 0.00


Screed vibrator hour 4.50 0.00 0.00
Plate vibrator hour 4.50 54.00 243.00
Water tanker 6 kl capacity hour 2.50 699.00 1,747.50
Air Compressor (1 hour initial + 1 hour final) hour 1.00 619.50 619.50
c) Material
Crushed stone coarse aggregates, grading will be as per
Clause 1501.2.4.1 (Table 1500.1) of specifications @
0.90 cum/cum of concrete
20mm cum 22.28 2,204.25 49,099.67
Page 83 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

10mm cum 11.48 1,938.00 22,238.55


Sand as per IS:383 and conforming to Clause 1500.2.4.2 cum 16.88 766.18 12,929.29
@ 0.45 cum/cum of concrete
Cement @ 350 kg/cum of concrete t 13.13 5,600.00 73,500.00
Plasticizer 0.5 per cent by weight of cement litre 61.00 61.00 3,721.00
Curing compound (if used) @ 0.33 litre per sqm litre 65.63 0.00 0.00
Water for curing kl 9.00 73.00 657.00
HDPE cells @ 100mm depth sqm 375.00 106.00 39,750.00
d) Formwork @ 3% of (a+b+c) 8,104.51
e) Over heads & Contractor's profit 12.500% 34,781.85
Add Labour welfare Cess @ 1% 1.000% 3,130.37
Cost for 37.5 cum = a+b+c+d+e 316,167.04
Rate per cum = (a+b+c+d+e)/37.5 8,431.12
26 1500 Paneled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts)
Construction of un-reinforced, panneled cement concrete pavement, thickness as per
design, over a prepared sub base, with 43 grade cement or any other type as per
Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383,
maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a
concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel channel, wedges,
steel plates including levelling the formwork etc complete as per drawing), spreading
the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators
and finished in continuous operation, admixtures as approved, curing of concrete slab
for 14-days, using curing compound (where specified) and water and cutting the
grooves of 1/3rd depth of the slab thickness for forming the panels of 0.75 X 0.75 mts
size as per drawing and Technical Specification Clause 1501 including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

Unit = cum
Taking output = 37.5 cum (86.25 t)
(100 x 3.75 x 0.100)
a) Labour
Mate day 3.50 515.00 1,802.50
Mason (1st class) day 2.50 545.00 1,362.50
Mason (2nd class) day 2.50 515.00 1,287.50
Mazdoor (Unskilled) day 64.50 515.00 33,217.50
Mazdoor (Skilled) day 3.00 515.00 1,545.00
Surveyor day 1.00 925.00 925.00
Mazdoor (Semi-Skilled) day 3.00 515.00 1,545.00
Bhisti day 7.00 515.00 3,605.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with hour 18.00 627.60 11,296.80
weigh batcher and suitable capacity calibrated water tank
Page 84 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Needle vibrator hour 4.50 0.00 0.00


Screed vibrator hour 4.50 0.00 0.00
Plate vibrator hour 4.50 54.00 243.00
Water tanker 6 kl capacity hour 2.50 699.00 1,747.50
Air Compressor (1 hour initial + 1 hour final) hour 1.00 619.50 619.50
c) Material
Crushed stone coarse aggregates, grading will be as per
Clause 1501.2.4.1 (Table 1500.1) of specifications @
0.90 cum/cum of concrete
20mm cum 22.28 2,204.25 49,099.67
10mm cum 11.48 1,938.00 22,238.55
Sand as per IS:383 and conforming to Clause 1500.2.4.2 cum 16.88 766.18 12,929.29
@ 0.45 cum/cum of concrete
Cement @ 350 kg/cum of concrete t 13.13 5,600.00 73,500.00
Plasticizer 0.5 per cent by weight of cement litre 61.00 61.00 3,721.00
Curing compound (if used) @ 0.33 litre per sqm litre 65.63 0.00 0.00
Water for curing kl 9.00 73.00 657.00
18.99 Bitumen primer @ 26.67ml. Per meter joint for 712 mts. kg or lt 0.00 82.00 0.00
of Joint length.
75.95 Bitumenous sealant @ 106.67ml. Per meter joint for 712 Litre 0.00 115.00 0.00
mts. of Joint length.
Concrete Groove Cutting Charges for (400+450 = 850 mts Rm 850.00 55.00 46,750.00
d) Formwork @ 3% of (a+b+c) 8,042.77
e) Over heads & Contractor's profit 12.500% 34,516.88
Add Labour welfare Cess @ 1% 1.000% 3,106.52
Cost for 37.5 cum = a+b+c+d+e 313,758.48
Rate per cum = (a+b+c+d+e)/37.5 8,366.89
26 1500 Cement - Flyash Concrete Pavement.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade Ordinary Portland Cement and replacing cement by Fly Ash to the extent of 30% by
weight of the cement as per Clause 1502.3.2 of Specification for Rural Roads (First
Revision) 2014, M30 (Grade), coarse and fine aggregates conforming to IS : 383, mixing in
a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed
and plate vibrators and finished in continuous operation including provision of contraction
and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars,
near approaches to bridge / culvert and construction joints, admixtures as approved, curing
of concrete slabs for 14- days, curing compound (where specified) and water finishing to
lines and grade as per drawing and Technical Specification Clause 1501 MORD including
contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.

Unit = cum
Taking output = 75cum (172.50 t)
Page 85 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

(100x3.75 x 0.200)
a) Labour
Mason (1st class) day 5.00 545.00 2,725.00
Mason (2nd class) day 5.00 515.00 2,575.00
Mazdoor (unskilled) day 150.00 515.00 77,250.00
Mazdoor(skilled) day 6.00 515.00 3,090.00
Surveyor day 2.00 925.00 1,850.00
Mazdoor (semi-skilled) day 6.00 515.00 3,090.00
Bhisti day 14.00 515.00 7,210.00
Black smith for cutting of dowel bars including removal of day 1.00 540.00 540.00
burrs, fabrications & fixing of dowel bars
Agency area allowence /MAA 0% 0.00
b) Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with Hour 36.00 627.60 22,593.60
weight batcher and suitable capacity calibrated water
tank
Needle vibrator Hour 9.00 0.00 0.00
Screed vibrator Hour 9.00 0.00 0.00
Plate vibrator Hour 9.00 54.00 486.00
Water tanker 6 Kl. Capacity Hour 5.00 699.00 3,495.00
Air compressor ( 1 hour initial + 1 hour final) Hour 2.00 619.50 1,239.00
c) Material
(I) Crushed stone coarse aggregates, grading will be as per
clause 1501.2.4.1 (Table 1500.1) of specifications @
0.90 Cum/cum of concrete
20mm Cum 44.55 2,204.25 98,199.34
10mm Cum 22.95 1,938.00 44,477.10
(ii) Sand as per IS:383 and conforming to clause 1500.2.4.2. cum 33.75 766.18 25,858.58
@ 0.45 cum of concrete
(iii) Cement @ 270 Kg/cum of concrete t 20.25 5,600.00 113,400.00
(iv) Fly Ash @ 81 Kg/cum of concrete t 6.08 2148.98 13,055.07
(v) Polythene sheet 125 micron sqm 412.50 17.00 7,012.50
(vi) Mild steel dowel bar 25mm dia of grade S 240.500 mm
long 20 Nos. at culvert/bridge slab and at construction
joiont including 5 percent wastage
(4x20x0.500) + 5 per cent wastage = 42m @ 3.85 Kg per Kg 162.00 52.00 8,424.00
m = 162 kg.
Bitumen primer @ 200ml. Per joint for 23 joints kg or lt 5 82.00 410.00
Bitumenous sealant 800 ml. Per joint for 23 joints Litre 19.00 115.00 2,185.00
Jute rope 12mm dia including 5 per cent wastage m 90.00 8.30 747.00
Debonding strips 3.75m. (length) x 10mm (width) x 5 mm m 90.00 10.00 900.00
(thick) cut-out of rubber fillter board of similar material
including 5 per cent wastage
Polythene sheathing, covering 2/3rd dowel bars (20x23) No 483.00 0.50 241.50
and tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement BMT H63 Litre 122.00 61.00 7,442.00

Water for Curing kl 18.00 73.00 1,314.00


Joint filler board 20mm thick as per IS:1838 - BMT U02 sqm 3.00 580.00 1,740.00

(4x3.75x0.200 = 3 sqm)
451,549.69
Page 86 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

(d) Form work @ 3% on (a+b+c) 13,546.49


Cost for 75 cum = a+b+c+d 465,096.18
(e) Over heads & Contractor's profit 12.500% 58,137.02
Add Labour welfare Cess @ 1% 1.000% 5,232.33
Sum of (a+b+c+d+e) 528,465.53
Rate per Cum = (a+b+c+d+e)/75 7,046.21
26 509 Mix Seal Surfacing - 20 mm thick (HMP) - Using 8% of Plastic Waste
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing)
material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-B) aggregates
as per Table 500.15 of MORD using 8% of Plastic waste and penetration grade
bitumen to required line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable Hot Mix plant (By mechanical means),
laying and rolling with a three wheel 8-10 kN static roller and finishing to required level
and grades as per Technical Specification Clause 509 MORD, including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

By Mechanical means (Type-B)


Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000 515.00 5,150.00
Mazdoor (Skilled) day 3.520 515.00 1,812.80
Agency area allowence /MAA 0% 0.00
b) Machinery
HMP of appropriate capacity (40-60 TPH) considered hour 6.000 21414.00 128,484.00

Electric generator set 125 KVA hour 6.000 1478.00 8,868.00


Tipper 5.5 cum - 10 t capacity hour 3.600 1185.60 4,268.16
Paver finisher hour 6.000 2519.00 15,114.00
Three wheel 80-100 kN static roller hour 18.000 1625.80 29,264.40
c) Material
Bitumen (S-65) @ 17.48 kg per 10 sqm t 6.992 39838.00 278,547.30
Plastic Waste @ 1.52 kg per 10 sqm t 0.608 27000.00 16,416.00
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum 108.000 1779.25 192,159.00
cum per 10 sqm
d) Over heads & Contractor's profit 12.500% 85,010.46
Add Labour welfare Cess @ 1% 1.000% 7,650.94
Cost of 4000 sqm = a+b+c+d 772,745.06
Rate per sqm for 20 mm thick193.19
26 RBR Prime Coat with BitChem bitumen emulsion (CSS-1)
- Providing and applying primer coat with BitChem bitumen emulsion (CSS-1) on
BAS prepared surface of granular base including cleaning of road surface and spraying
C-1 - primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical
I a Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including all
over heads, Contractor's profit, But Excluding GST etc,. Complete.

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Page 87 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Bitumen emulsion pressure distributor @ 1750 sqm/hour hour 1.000 963.00 963.00

Water tanker 6 kl capacity 1 trip per hour hour 0.500 699.00 349.50
c) Material
BitChem bitumen emulsion (CSS-1) @ 0.85 kg per sqm t 1.480 34665.00 51,304.20

Water kl 3.000 73.00 219.00


54,798.60
Over heads & Contractor's profit 12.500% 6,849.83
Add Labour welfare Cess @ 1% 1.000% 616.48
Cost of 1750 sqm = a+b+c+d+e 62,264.91
Rate per sqm = (a+b+c+d+e)/1750 35.58
26 RBR TACK COAT with BitChem Bitumen emulsion (RS-1)
- Providing and applying tack coat with BitChem Bitumen emulsion (RS-1) using
BAS emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
C-2 granular surfaces treated with primer & cleaned with Hydraulic broom as per
ii Technical Specification Clause 503 MORD, including all over heads, Contractor's
profit, But Excluding GST etc,. Complete.
Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Emulsion pressure distributor @1750 sqm per hour hour 1.000 963.00 963.00
c) Material
BitChem Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480 32842.00 15,764.16

Cost of 1750 sqm = (a+b+c+d+e) 18,690.06


Rate per sqm = a+b+c+d+e/1750 10.68
(e) Over heads & Contractor's profit 12.500% 1.34
Add Labour welfare Cess @ 1% 1.000% 0.12
Rate per Sqm 12.02
26 BASC- OGPC using CRRI-BitChem tailor made cold mix binder
RBR-

14
Page 88 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


composed of 13.2 mm to 5.6 mm aggregates machine crushed hard blasted Granite
chips either using CRRI - Bitchem Cold Mix Binder of 20.00 kgs per 10 sqm area of
road surface over tack coat to required line, grade and level to serve as wearing
course on a previously prepared base, including mixing a concrete mixer, laying and
rolling with a three wheel 80-100 kN static roller capacity, finished to required level
and grades including cost and conveyance of all materials from approved sources,
seigniorage, labour charges and hire and operational charges of power road roller and
all other machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for finished
item of work to be followed by seal coat of either Type A or B or C as per technical
specifications IRC,SP-100:2014 including all over heads, Contractor's profit,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

CRRI-BitChem tailor made cold mix binder


Unit = sqm
Taking output = 900 sqm (10 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 18.00 515.00 9270.00
Mazdoor (Skilled) day 2.88 515.00 1483.20
Agency area allowence /MAA 0% 0.00
b) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 2.50 627.60 1569.00
Three wheel 80-100 kN static roller hour 3.60 1625.80 5852.88
c) Material
CRRI - Bitchem Cold Mix Binder of 20.00 kgs per 10 sqm t 1.80 41741.00 75133.80

Crushed stone chips of 13.2mm to 5.6mm size @ 0.27 cum 24.30 1868.83 45412.65
cum per 10 sqm
Over heads & Contractor's profit 12.500% 17340.19
Add Labour welfare Cess @ 1% 1.000% 1560.62
Cost of 900 sqm = a+b+c+d+e 157622.34
Rate per sqm = (a+b+c+d+e)/900 175.14
26 RBR Seal Coat Type B using CRRI-BitChem tailor made cold mix binder
-
BAS
C-
17- I
-A -
Cas
e III -
(II)
Page 89 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

RBR
- Providing and laying Seal Coat Sealing the voids in a bituminous surface laid to the
BAS specified levels, grade and cross fall using Type B comprising of a layer of
C- bitumuneous binder followed by a cover of stone chipping of grading as defined in
17- I table 500.16 of MORD of crushed Sand defined as passing 2.36 mm sieve and
-A - retained on 180 micron sieve applied @ 0.06 cum /10 sqm to be laid simultaneously
Cas along with the bitumunous course using 10.00 kgs of CRRI - Bitchem Cold Mix Binder
e III - for 10 sqm mixing in a concrete mixer and rolling with 80-100KN Statick roller
(II) including of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to rquired level and grades including cost and
conveyance of all materials from approved sources and stacking at site to
departmental gauge for premeasurements, seigniorage, labour charges and hire and
operational charges of power roller and all other machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental and
operational charges etc., complete for finished item of work as per technical
specification IRC, SP:100-2014 including all over heads, Contractor's profit,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

By Manual Means
Unit = Sqm
Taking out put = 1250 Sqm
a) a)  Labour
Mazdoor (Unskilled) day 14.80 0.00
Mazdoor (Skilled) day 4.00 515.00 2,060.00
Agency area allowence /MAA 0% 0.00
b) b) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 2 1678.00 3,356.00
Three wheel 80-100 kN static roller hour 2 1625.80 3,251.60
c) Materials
CRRI - Bitchem Cold Mix Binder of 10.00 kgs per 10 sqm t 1.25 41741.00 52,176.25

Crushed sand defined as passing 2.36 mm sieve and cum 7.5 1601.75 12,013.13
retained on 180 micron sieve applied @ 0.06 cum /10
sqm - Sand
Basic rate for 1250 Sqm 72,856.98
Final Rate per sqm 58.29
d) Over heads & Contractor's profit 12.500% 7.29
Add Labour welfare Cess @ 1% 1.000% 0.66
Rate per sqm 66.24
26 507.2. Pre-coating of chips with 1 per cent of CRRI - Bitchem Cold Mix Binder
5
MOR
D

Pre-coating of chips with 1 per cent of paving bitumin by weight of chips in


suitable mixer asper technical specification of MoRD caluse 507.2.5 using CRRI -
Bitchem Cold Mix Binder, complete for finished item and as directed by the
Engineer-in-charge. including contractors profit & Over head charges, but
excluding GST etc,. Complete.
By Manual Means
Taking out put = 30 cum
a) Labour

Mate day 0.60 515.00 309.00


Mazdoor (un-skilled) day 15.00 515.00 7,725.00
Page 90 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Agency area allowence /MAA 0% 0.00


b) Machinery

Mix All 6-10 t capacity hour 6.00 627.60 3,765.60


c) Materials
CRRI - Bitchem Cold Mix Binder @ 1% of weight of chips (30*1.6)/100 t 0.480 41741.00 20,035.68

Rate per 30.00 Cum 31,835.28


Rate per Cum 1,061.18
Over heads & Contractor's profit 12.500% 132.65
Add Labour welfare Cess @ 1% 1.000% 11.94
Rate per Cum 1205.77
26 507 Surface dressing with CRRI - Bitchem Cold Mix Binder
MOR
D

Providing and laying surface dressing as wearing course consisting of a layer of


bitumen CRRI - Bitchem Cold Mix Binder @ 1.40 kg / sqm laid on prepared
surface followed by a cover of Pre coated crushed stone chippings of 9.5 mm size
@ 0.008 cum per Sqm and rolling with 8-10 T Power Road Roller etc., complete
for finished item of work as per MoRD Specification 507 and as directed by the
Engineer-in-charge. including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

By Manual Means
Taking out put = 1000 Sqm
a) Labour

Mate day 2.36 515.00 1,215.40


Bitumen Sprayer day 1.00 515.00 515.00
Mazdoor (Unskilled) day 58.00 515.00 29,870.00
Agency area allowence /MAA 0% 0.00
b) Machinery

Emulsion sprayer, capacity 1000 litre fitted with spray set hour 2.00 963.00 1,926.00

Three wheel 80-100 kN static roller hour 2.00 1625.80 3,251.60


c) Materials
CRRI - Bitchem Cold Mix Binder @ 1.40 kgs per 1 sqm.t 1.400 41741.00 58,437.40
Crushed stone chipping, 9.5 mm nominal size (pre- cum 8.00 1723.00 13,784.00
coated) @ 0.008 cum per sqm
Basic rate for 1000 Sqm 108,999.40
Final Rate per sqm 109.00
Over heads & Contractor's profit 12.500% 13.63
Add Labour welfare Cess @ 1% 1.000% 1.23
Rate per sqm 123.86
26 404 ANTStabilizer Treated Soil Sub-Base
Page 91 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Construction of Cement treated Gravel Sub base using 2.5% per cent quantity of
cement and 1.3% ANT Stabiliser by weight of materials by Providing, laying and
spreading well graded material (i.e. 9.5 mm to 4.75 mm size Gravel of 66% and
crusher dust of size < 2.36mm @ 34%) having LL < 45, PI < 20 & Uniformity
coefficient (Cu) > 5 on a prepared sub-grade, pulverising, adding the designed
quantity of cement to the spreaded materials, mix shall be designed for a minimum
laboratory test for 7 days unconfined compressive strength and not less than 1.7 MPa
(17 Kg/cm2) for sub-base and mixing in place with rotavator, grading with the tractor
grader and compacting with the vibratory roller 8-10 tonnes capacity at OMC to
achieve the desired unconfined compressive strength and to form a layer of sub-base
as per MORD Technical Specification Clause 404, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. For
Cement Treated sub-base.

Unit = cum
Taking output = 300 cum (525 t)
For 0 % quantity of cement by weight of soil
a) Labour

Mazdoor (Skilled) day 2.40 515.00 1,236.00


Mazdoor (Unskilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in hour 12.00 473.00 5,676.00
place of motor grader, for grading @ 25 cum per hour

Vibratory Roller 80-100 kN @ 100 Cum per Hr hour 6.00 3,292.40 19,754.40
Tractor with rotaor and blade @ 25 cum per hour hour 12.00 473.00 5,676.00
Water tanker 6 kl capacity hour 5.00 699.00 3,495.00
c) Material
9.5 mm to 4.75 mm @ 66% (Gravel) cum 237.60 264.18 62,769.17
2.36 mm below @ 34% (Stone dust) cum 122.40 1,601.75 196,054.20
Cement at site @ 2.5 % (of 525 t) t 13.13 5,600.00 73,500.00
ANT Stabiliser @ 1.3% (of 525 t) lt 6.83 12,500.00 85,312.50
Water kl 30.00 73.00 2,190.00
d) Over heads & Contractor's profit 12.500% 57,472.91
Cost for 300 cum = a+b+c+d 517,256.18
Add Labour welfare Cess @ 1% 1.000% 5,172.56
522,428.74
Rate per cum =(a+b+c+d)/300 1,741.43
26 404 ANTStabilizer Treated Soil Base
Page 92 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Construction of Cement treated Gravel Sub base using 5% per cent quantity of
cement and 2.7% ANT Stabiliser by weight of materials by Providing, laying and
spreading well graded material (i.e. 9.5 mm to 4.75 mm size Gravel of 66% and
crusher dust of size < 2.36mm @ 34%) having LL < 45, PI < 20 & Uniformity
coefficient (Cu) > 5 on a prepared sub-grade, pulverising, adding the designed
quantity of cement to the spreaded materials, mix shall be designed for a minimum
laboratory test for 7 days unconfined compressive strength and not less than 3.0 MPa
(30 Kg/cm2) for sub-base and mixing in place with rotavator, grading with the tractor
grader and compacting with the vibratory roller 8-10 tonnes capacity at OMC to
achieve the desired unconfined compressive strength and to form a layer of sub-base
as per MORD Technical Specification Clause 404, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. For
Cement Treated sub-base.

Unit = cum
Taking output = 300 cum (525 t)
a) Labour

Mazdoor (Skilled) day 2.40 515.00 1,236.00


Mazdoor (Unskilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in hour 12.00 473.00 5,676.00
place of motor grader, for grading @ 25 cum per hour

Vibratory Roller 80-100 kN @ 100 Cum per Hr hour 6.00 3,292.40 19,754.40
Tractor with rotaor and blade @ 25 cum per hour hour 12.00 473.00 5,676.00
Water tanker 6 kl capacity hour 5.00 699.00 3,495.00
c) Material
9.5 mm to 4.75 mm @ 66% (Gravel) cum 237.60 264.18 62,769.17
2.36 mm below @ 34% (Stone dust) cum 122.40 1,601.75 196,054.20
Cement at site @ 5 % (of 525 t) t 26.25 5,600.00 147,000.00
ANT Stabiliser @ 2.7% (of 525 t) lt 14.18 12,500.00 177,187.50
Water kl 30.00 73.00 2,190.00
d) Over heads & Contractor's profit 12.500% 78,144.78
Cost for 300 cum = a+b+c+d 703,303.05
Add Labour welfare Cess @ 1% 1.000% 7,033.03
710,336.08
Rate per cum =(a+b+c+d)/300 2,367.79
26 RBR Prime Coat Low porosity with Nano Technology
-
BAS
C-1 -
Ia
Page 93 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

RBR
- Providing and applying primer coat with bitumen emulsion (SS-1) Preparing and
BAS applying of water soluble silane nanotechnology (for bitumen emulsion
C-1 - application, IRC approved) with cationic bitumen emulsion CSS1 and water
I a (<1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion :
200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water
while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion
under circulation. Mix the solution completely. Spray the solution at the rate of 1
liter per sqm on compacted stone base. Check quality of bitumen emulsion before
bulk use using mechanical means as per Technical Specification Clause 502
MORD , including contractors profit & Over head charges, but Excluding GST
etc,. Complete." for Prime Coat

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 515.00 535.60
Agency area allowence /MAA 0% 0.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 400.00 560.00
Air compressor 210 cfm hour 1.400 619.50 867.30
Bitumen emulsion pressure distributor @ 1750 sqm/hour hour 1.000 963.00 963.00

Water tanker 6 kl capacity 1 trip per hour hour 0.200 699.00 139.80
c) Material ( 1kg of mixture per sqm)
( ratio >1:100:200 )1750 kg mixture

Bitumen emulsion (SS-1) @ 0.33 kg per sqm t 0.582 47708.00 27,766.06


Water kl 1.164 73.00 84.97
Terraprime (Rate as per Invoice) (Qty as per Zydex Kg 5.813 1059.32 6,157.83
Industries)
37,074.56
Over heads & Contractor's profit 12.500% 4,634.32
Cost of 1750 sqm = a+b+c+d+e 41,708.88
Add Labour welfare Cess @ 1% 1.000% 417.09
42,125.97
Rate per sqm = (a+b+c+d+e)/1750 24.07
26 RBR- 20mm thick Open-Graded Premix Carpet using
BASC-
14 Bituminous (penetration grade/modified bitumen) Binder
using HMP (Binder With Nano Technology based Organo
Silane Compound -Zycotherm @0.10% of Bitumen)
Page 94 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration
grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm Mixed with Nano Technology
Based Organo Silane Compound Zycotherm @0.10% by the weight of bitumen for
enhansed performance and durability to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a Hot Mix plant of
30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel 0-
100 kN static roller capacity, finished to required level and grades to be followed by
seal coat including cost and conveyance of all materials from approved sources, ,
labour charges and hire and operational charges of power road roller and all other
machinery, tools and plants, providing barricading for diversion of traffic, erecting red
flags other incidental and operational charges etc., complete for finished item of work
as per clause 508 MORD including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)  Labour
Mate day -
Mazdoor (Unskilled) day 10.00 515.00 5150.00
Mazdoor (Skilled) day 3.52 515.00 1812.80
Agency area allowence /MAA 0% 0.00
b) Machinery
HMP 30/40 t per hour hour 4.50 21414.00 96363.00
Electric generator set 125 KVA hour 6.00 1478.00 8868.00
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11064.00
Tipper 5.5 cum - 10 t capacity hour 3.64 1185.60 4315.58
Paver finisher hour 6.00 2519.00 15114.00
Three wheel 80-100 kN static roller hour 16.00 1625.80 26012.80
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 5.84 39838.00 232653.92
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum cum 108.00 1,868.83 201834.00
per 10 sqm
Zycotherm @0.10% of Bitumen (Rate as per Invoice) Kg 5.84 1144.07 6681.37

Over heads & Contractor's profit 12.500% 76233.68


Cost of 4000 sqm = a+b+c+d+e 686103.15
Add Labour welfare Cess @ 1% 1.000% 6,861.03
Rate per Sqm Rs. 173.24
26 RBR Seal Coat Type C (Zycotherm @0.10% of Bitumen)
-
BAS
C-
17- I
-A -
Cas
e III -
(II)
Page 95 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

RBR
- Providing and laying bituminous premixed seal coat (Type C) comprising of stone
BAS chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of
C- 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve
17- I applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means .with the
-A - bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm Mixed with
Cas Nano Technology Based Organo Silane Compound Zycotherm @0.10% by the
e III - weight of bitumen for enhansed performance and durability and rolling with power
(II) roller including of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to required level and grades including cost and
conveyance of all materials from approved sources and stacking at site to
departmental gauge for premeasurements, labour charges and hire and operational
charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools
and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for seal
coat.

Bitumen (S-65) By mechanical means


Taking output = 7500 sqm (67.5 cum)
a) a)  Labour
Mate day 0.00
Mazdoor (Unskilled) day 5.20 515.00 2,678.00
Agency area allowence /MAA 0% 0.00
b) b) Machinery
Hydraulic self propelled chips spreader hour 6.00 2875.00 17,250.00
Tipper 5.5 cum capacity hour 6.00 1185.60 7,113.60
Front end loader 1 cum bucket capacity hour 6.00 1844.00 11,064.00
Bitumen pressure distributor hour 6.00 1678.00 10,068.00
Three wheel 80-100 kN static roller hour 15.000 1625.80 24,387.00
c) Materials
Bitumen (S-65) @ 6.50 kg per 10 sqm t 4.88 39838.00 194,409.44
Zycotherm @0.10% of Bitumen (Rate as per Invoice) Kg 4.88 1144.07 5583.06

Crushed stone chipping of 6.7 mm size 100 per cent cum 67.50 1723.00 116,302.50
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
Basic rate of Seal coat Type-C for 7500 Sqm 388,855.60
Final Rate per sqm 51.85
d) Over heads & Contractor's profit 12.500% 6.48
58.33
Add Labour welfare Cess @ 1% 1.000% 0.58
Rate per sqm Rs. 58.91
Page 96 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

26 Stabilized Sub base : WITH NANO TECHNOLOGY -(Bottom layer)


xx Stabilized Sub base: Providing, laying, Spreading and compacting selecteed
Earth 70% having CBR >=5% mixed with 30% of GSB Grade-II (Gradation as per
MORD Specification) material as per Mix design Pre-Mixed soil with GSB Gr-II&
Cement @2.50% in yard/Borrow area, Mix Throughly using tractor operated
ripper/rotavator in the soil to form a cement modified Soil-aggregate Mix. Apply
0.75 kg /cum of Nano Technology organo silane and 0.75 kg/cum of nano
acrylic Co-Polymer with OMC water (<1000 ppm TDS) on loose soil-aggregate-
cement mix . Grade the soil with motor grader. Compact the soil-aggregate
surface with 8-10 tonne vibratory power roller to achive the desired
density .Rates including all materials, labour, hire Charges of machery etc.
complete as per MoRD specifications & direction of Engineer-in-Charge. including
contractors profit & Over head charges, but excluding Seig Charges, Labour Cess
& GST etc,. Complete.

Unit = Cum
Taking out put = 300 cum
a) Labour
Mate day 0.00 515.00 0.00
Mazdoor (Skilled) day 2.48 515.00 1,277.20
Mazdoor (Un Skilled) day 10.00 515.00 5,150.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @100cum hour 3.90 3331.20 12,991.68
per hour
Tractor with grader @ 25 cum per hour hour 12.00 472.64 5,671.68
Vibratory roller 80-100 kN hour 6.00 3,292.40 19,754.40
Water tanker 6 kl capacity hour 9.00 699.00 6,291.00
Tipper 5.05cum with 10t capacity hour 19.30 1,185.60 22,882.08
Dozer for spreading !200cum per hour hour 1.50 1,758.00 2,637.00
c) Material
Cement @2.50% by MDD of Soil-Aggregatemix Tonne 15.00 5600.00 84,000.00
Terrasil-S @0.750Kg/cum (Rate as per Invoice) (Qty Kg 225.00 466.10 104,872.50
as per Zydex Industries)
Zycobond @0.750Kg/cum (Rate as per Invoice) (Qty Kg 225.00 152.54 34,321.50
as per Zydex Industries)
GSB material Grading-II @30% of total volume as cum 115.20
follows
26.50mm to 9.50mm @35% cum 40.32 2043.77 82,404.66
9.50mm to 2.36mm @25% cum 28.80 1779.25 51,242.40
2.36mm and below @40% cum 46.08 1601.75 73,808.64
Cost of Specified soil (carted earth) @70% of Total cum 268.80 237.18 63,753.98
volume
Water kl 54.00 73.00 3,942.00
Basic rate for 300Cum 575,000.72
Basic rate of Zydex Nano technology Base coarse per 1,916.67
Cum
e) Over heads & Contractor's profit 12.500% 239.58
Add Labour welfare Cess @ 1% 1.000% 21.56
Rate per cum 2,177.81
26 Stabilized Base: WITH NANO TECHNOLOGY (Top layer) (Top layer)
Page 97 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

xx Stabilized Base: Providing, laying, Spreading and compacting 60%


in-situ/borrow area Moorum of CBR >=5% mixed with 40% of GSB Grade-II as
per mix design. Application: (1).Rip and loosen Morum with excavator/tractor
operated ripper and scarify with tractor operated rotavator to achive desired
thickness. Mix aggregates/GSB Gr-II material as per mix design with rotavator.
(2).Spread required percntage of Cement @ 4.50% by weight of soil aggregate
mix as per mix design provided and mix with tractor operated rotavator (3).
prepare and apply 0.75kg/cum Organo Silane Nano technology and 0.75kg/cum
acrylic copolymer mix in OMC water (<1000 ppm TDS) on loose Mix. scarify the
treated mix with rotavtor.(4).compact the stabilised soil-aggregate-cement base
with 8-10 tonnes vibratory roller to achive stabilized layer with desired density
and thickness. Rates including all materials, labour, hire Charges of machery etc.
complete as per MoRD specifications & direction of Engineer-in-Charge.including
contractors profit & Over head charges,but excluding Seig Charges, Labour Cess
& GST etc,. Complete.

Unit = Cum
Taking out put = 300 cum
a) Labour
Mate day 0.00 515.00 0.00
Mazdoor (Skilled) day 2.48 515.00 1,277.20
Mazdoor (Un Skilled) day 10.00 515.00 5,150.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @100cum hour 3.90 3331.20 12,991.68
per hour
Tractor with grader @ 25 cum capacity hour 12.00 473.00 5,676.00
Tractor with rotavator @ 25 cum capacity hour 12.00 473.00 5,676.00
Tractor with ripper @ 60 cum capacity hour 5.00 473.00 2,365.00
Vibratory roller 80-100 kN hour 3.00 3,292.40 9,877.20
Water tanker 6kl capacity hour 9.00 699.00 6,291.00
c) Material
Cement @ 4.50% by MDD of soil-Aggregate mix Tonne 27.00 5600.00 151,200.00
Terrasil-S @0.75Kg/cum (Rate as per Invoice) (Qty as Kg 225.00 466.10 104,872.50
per Zydex Industries)
Zycobond @0.75Kg/cum (Rate as per Invoice) (Qty as Kg 225.00 152.54 34,321.50
per Zydex Industries)
GSB material Grading-II @ 40% of total volume cum 153.60

26.50mm to 9.50mm @35% cum 53.76 2043.77 109,872.88


9.50mm to 2.36mm @25% cum 38.40 1779.25 68,323.20
2.36mm and below @40% cum 61.44 1601.75 98,411.52
Cost of Specified soil (carted earth) @60% of Total cum 230.40 237.18 54,646.27
vaolume
Water kl 54.00 73.00 3,942.00
Basic rate for 300Cum 674,893.95
Basic rate of Zydex Nano technology Base coarse per 2,249.65
Cum
e) Over heads & Contractor's profit 12.500% 281.21
Add Labour welfare Cess @ 1% 1.000% 25.31
Rate per cum 2,556.17
Page 98 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

26 509/ Mix Seal Surfacing - 20 mm thick -BitChem tailor made cold mix Binder
5.11

xx Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing)
material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-B)
aggregates as per Table 500.15 of MORD using CRRI-BitChem tailor made cold
mix Binder to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant by manual means,
laying and rolling with a three wheel 8-10 kN static roller and finishing to required
level and grades as per Technical Specification Clause 509 MORD, including
contractors profit & Over head charges, but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

By Manual Means (Type-B)


Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a)  Labour
Mate day - 515.00
Mazdoor (Unskilled) day 21.000 515.00 10,815.00
Mazdoor (Skilled) day 8.400 515.00 4,326.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Mixall 6-10 t capacity hour 6.000 727.00 4,362.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour 6.000 234.00 1,404.00
set
Three wheel 80-100 kN static roller hour 6.000 1625.80 9,754.80
c) Material
CRRI-BitChem tailor made cold mix Binder @ 30 kg per mt 1.500 41741.00 62,611.50
10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum 13.500 1779.25 24,019.88
cum per 10 sqm
Over heads & Contractor's profit 12.500% 14,661.65
Add Labour welfare Cess @ 1% 1.000% 1,319.55
Cost of 500 sqm = a+b+c+d+e 133,274.38
Rate per sqm for 20 mm thick Rs 266.55
26 Bottom Layer CBR 3-6% - For Terrazyme and application only with 1L for
12cum existing subgrade
Construction of 1st layer Bio enzyme based soil stabilised to a required thickness
as per manufacturer design with locally available road formation soil and treating
it with TerraZyme in the ratio 1L for 12.0 cum soil, spreading in uniform layer with
tractor grader on prepared surface. mixing by mix in place method with rotavator
at OMC and compacting with smooth wheel vibratory roller to achieve the desired
density complete as per technical specification incl all labour, equipments etc.,
complete. as per the directions of the Engineer incharge of the work . except
materials like soil and metal including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output =300 cum UNIT FACTOR SR RATE
For TerraZyme material and application incl machinery and water, excl soil and metal
a Labour :
Mate day 0.48 515.00 247.20
Mazdoor ( skilled ) day 2.00 515.00 1,030.00
Page 99 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Mazdoor ( Un skilled ) day 8.00 515.00 4,120.00


5,397.20
Agency area allowence /MAA 0% 0.00
5,397.20
b Machinery pre treatment
Tractor with a plough@ 25 cum/hr PM - 28 hr 6.00 473.00 2,838.00
Tractor with a rotavator@ 25 cum/hr PM - 31 hr 6.00 473.00 2,838.00
Water tanker 6 Kl capacity PM - 34 hr 5.00 699.00 3,495.00
9,171.00
b Machinery post treatment
Tractor motor Grader @ 50 cum per hour PM - 18 hr 6.00 473.00 2,838.00
Three wheel 80-100 KN vibro roller @ 60 cum/hr PM - 33 hr 5.00 1625.80 8,129.00
Tractor with a plough@ 25 cum/hr PM - 28 hr 6.00 473.00 2,838.00
Tractor with a rotavator@ 25 cum/hr PM - 31 hr 6.00 473.00 2,838.00
Water tanker 6 Kl capacity PM - 34 hr 5.00 699.00 3,495.00
20,138.00
d Material
Cost of Bioenzyme - 300/12 Litre 25.00 14,000.00 350,000.00
Water kl 30.00 73.00 2,190.00
352,190.00
386,896.20
LABOUR+MACHINERY+MATERIAL
d Over heads & Contractor's profit 12.500% 48,362.03
435,258.23
Add Labour welfare Cess @ 1% 1.000% 4,352.58
Cost of Labour+Machinery+Material+Overheads+Profit for 300 cum 439,610.81
[(a+b+c+d)/300Cu M] Rate per cum---------------------> 1,465.37
26 Top Layer CBR above 8% - murram/gravel - for TerraZyme with borrow soil
material in the ratio 1L for 15.0 cum soil with 25% metal
Construction of 2nd layer Bio enzyme based soil stablised layer to a required
thickness as per manufacturer design with borrow soil material/gravel/murram,
having CBR greater than 8% and treating it with TerraZyme in the ratio 1L for
15.0 cum soil with 25% metal in design mix, spreading in uniform layer with
tractor grader on prepared surface. mixing by mix in place method with rotavator
at OMC and compacting with smooth wheel roller to achieve the desired density
complete as per technical specification incl all labour, materials, like soil and
metal, equipments etc., complete. as per the directions of the Engineer incharge
of the work, including contractors profit & Over head charges, but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output =300 cum UNIT FACTOR SR RATE
For TerraZyme material and application incl machinery and water, excl soil and metal
a Labour :
Mate day 0.48 515.00 247.20
Mazdoor ( skilled ) day 2.00 515.00 1,030.00
Mazdoor ( Un skilled ) day 8.00 515.00 4,120.00
b 5,397.20
Agency area allowence /MAA 0% 0.00
5,397.20
Machinery pre treatment
Tractor with a plough@ 25 cum/hr PM - 28 hr 6.00 473.00 2,838.00
Page 100 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Tractor with a rotavator@ 25 cum/hr PM - 31 hr 6.00 473.00 2,838.00


Water tanker 6 Kl capacity PM - 34 hr 5.00 699.00 3,495.00
9,171.00
b Machinery post treatment
Tractor motor Grader @ 50 cum per hour PM - 18 hr 6.00 473.00 2,838.00
Three wheel 80-100 KN vibro roller @ 60 cum/hr PM - 33 hr 5.00 1625.80 8,129.00
Tractor with a plough@ 25 cum/hr PM - 28 hr 6.00 473.00 2,838.00
Tractor with a rotavator@ 25 cum/hr PM - 31 hr 6.00 473.00 2,838.00
Water tanker 6 Kl capacity PM - 34 hr 5.00 699.00 3,495.00
20,138.00
d Material
Cost of Bioenzyme 300*0.75/15 litre 15.00 14,000.00 210,000.00
Cost of specified soil 300*.75*1.2 cum 270.00 237.18 64,038.60
Cost of Metal 40mm down 300*0.25 cum 75.00 2004.67 150,350.00
Water kl 30.00 73.00 2,190.00
426,578.60
461,284.80
e Over heads & Contractor's profit 12.500% 57,660.60
518,945.40
Cost of 300 cum =a+b+c+d+e+f 518,945.40
Add Labour welfare Cess @ 1% 1.000% 5,189.45
Cost of Labour+Machinery+Material+Overheads+Profit for 300 cum 524,134.85
[(a+b+c+d)/300Cu M] Rate per cum---------------------> 1,747.12
26 Polymer Treated Base Course Compound ( PTBC) viz. SoilTech MK III
Supplying Polymer Treated Base Course Compound ( PTBC) viz. . SoilTech MK
III at a dosage of 10 Litres per Cubic metre with minimum Specific Gravity of 0,98,
Ph Value of 8-9, Solid content more than 53, Viscocity at 25 Deg within 25.5-26.5
and Toxicity Limit for Lead/ Arsenic less than 5 & Cadmium/Mercury less than 1
as per pre-approved Water PTBC Ratio (Water + PTBC Compound) F.O.R site
inclusive of all taxes and duties, to the Technical Specification of PTBC
Manufacturer and as directed by Engineer in Charge.
Page 101 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Application of Polymer Treated Base Course (150 mm thick) - Supplying good quality
soil of approved quality having desired grading, CBR & PI values or mixing the borrow
soil with suitable soil to have consistent desired grading, CBR & PI values with all lead
and lift and spreading the same in layers not exceeding around 180 mm thickness,
alternatively ripping the existing soil to 180 mm depth if same soil meets the desired
grading, CBR & PI values or else mixing same with suitable approved soil from borrow
area with all lead and lift to have consistent desired grading, CBR & PI values.
Spreading this approved soil layer evenly. SoilTech liquid of desired dosage (0.5%
weight of Optimum density of soil) is premixed with water to ensure moisture content
of soil to achieve 1% excess of OMC when mixed properly and consistently. This
premixed Soiltech liquid is sprayed over the evenly spread soil at controlled manner
and mixed with tractor plougher to achieve desired consistency and followed by
grader blade to required profile & levels and compacted with 10 ton capacity vibratory
power roller to achieve the desired dry density of 95-98% and to ensure a minimum
consistent thickness of 150 mm of treated soil layer all through, complete as per IS
2720-part 8, with all labour, hire charges for tools and plants employed and other
incidentals charges to completed the work as a whole as per the specification and as
directed by the engineer in charge. including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = Cum
Taking out put = 300 cum
a) Labour
Mate day 0.00 515.00 0.00
Mazdoor (Skilled) day 2.40 515.00 1,236.00
Mazdoor (Un Skilled) day 8.00 515.00 4,120.00
Agency area allowence /MAA 0% 0.00
b) Machinery
Tractor with grader @ 25 cum hour 12.00 473.00 5,676.00
Tractor with Rotavator 25 cum per hour hour 12.00 473.00 5,676.00
Vibratory roller 80-100 kN hour 6.00 3292.40 19,754.40
Water tanker 6 kl capacity hour 5.00 699.00 3,495.00
c) Material
Polymer Treated Base Course Compound ( PTBC) Litre 3000.00 310.00 930,000.00
viz. SoilTech MK III (Rate as per Invoice)

Cost of Specified soil (carted earth) cum 360.00 237.18 85,384.80


Water kl 30.00 73.00 2,190.00
Basic rate for 300Cum 1,057,532.20
e) Over heads & Contractor's profit 12.500% 132191.53
Add Labour welfare Cess @ 1% 1.000% 11,897.24
Rate per cum 4,005.40
26 RBR Granular Sub-base with Well Graded Material (Table 400.1) using 100 mm
- Geocell
SBB
S-1
(iii)
Page 102 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica (Rs.)
RBR
tions

-
SBB Construction of granular sub-base by providing well graded material(Table 400.1)
S-1 with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI
(iii) Value less than 6 using a layer of three dimensional honeycomb like cellular
confinement system, STRATAWEB GEOCELL, made of ultrasonically welded HDPE
strips, which act as sub / sub-base improving reinforcement mat for road pavements,
made of high density polyethylene (HDPE) with density of 0.935 – 0.965 g/cc, and
spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in
place method with rotaor at OMC, and compacting with Vibratory Roller to achieve
the desired density, complete as per Technical Specification Clause 401 MORD
including contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

For Grading III Material (CBR Value minimum 20)


a) Unit = cum
Taking output = 300 cum
a)  Labour
Mate day - 515.00
b) Mazdoor (Skilled) day 2.40 515.00 1236.00
Mazdoor (Unskilled) day 8.00 515.00 4120.00
Agency area allowence /MAA 0% 5356.00 0.00
b) Machinery
Tractor with grader @ 25 cum hour 12.00 473.00 5676.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00

OR
Vibratory roller 80-100 kN hour 6.00 3292.40 19,754.40
c) Tractor with Rotaor 25 cum per hour hour 12.00 473.00 5676.00
Water tanker 6 kl capacity hour 3.00 699.00 2097.00
c) Material
Well graded/ Close Graded granular sub-base material
as per Table 400.1
9.5 mm to 4.75 mm @ 35 per cent(metal) 126.00 1807.38 227729.25
4.75 mm to 2.36 mm @ 12.5 per cent(metal) 45.00 1723.00 77535.00
2.36 mm below @ 52.5 per cent (stone dust) 189.00 1601.75 302730.75
StrataWeb SW 356, 125 mm Geocell including Sqm 535.00 360.00 192,600.00
transportation charges (Rate as per Invoice)
Water kl 18.00 73.00 1314.00
a) Total 840468.40
c) Over heads & Contractor's profit 12.500% 105058.55
Add Labour welfare Cess @ 1% 1.000% 9,455.27
Cost for 300cum = a+b+c+d+e 954982.22
Rate per cum = (a+b+c+d+e)/300 Rs. 3183.27
Rate per cum Rs. 3,183.27
Page 103 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

26 COIR GEO-TEXTILES ( Asper Observed DATA)


Supply, Providing and laying of Woven Coir Geotextile fabric of 700GSM with mesh
size of 7.50x7.30mm and thickness at 2 kPa is 6.50mm with technical Specifications
as per the table 3. requirement of Woven Coir Geotextiles and instalation of Coir Geo-
textile on the prepared road Subgrade surface by fixing with U shape 6mm dia MS
steel pegs of 0.45m total length @ 1nos per Sqm area as per the technical
guidelines of the Technology providers including cost and conveyence,contractors
profit & Over head charges etc comple, but excluding Charges &GST.

Over Sub-Grade
a) Unit = Sqm
Taking output = 500m Length x4.00m wide -> 2000 Sqm 375
a)  Labour
Mate day -
Mazdoor (Skilled) day 4.00 515.00 2060.00
Mazdoor (Unskilled) day 4.00 515.00 2060.00
Agency area allowence /MAA 0% 4120.00 0.00
b) Machinery
Tractor hour 8.00 473.00 3784.00
c) Material
Geo-Textiles 700 GSM incluidng tranportaion Sqm 2000 78.20 156400.00
U Shape 6mm Dia iron Pegs( 0.45mlength ) for fixing of Mt 0.198 64622.00 12795.16
Geo Textile with Ground @ 1 hooks per Sqm=
(2000*1=2000 Nos =2000*.45m*0.22kg/m =198Kgs

Total 177099.16
d) Over heads & Contractor's profit 12.500% 22137.40
Add Labour welfare Cess @ 1% 1.000% 1,992.37
Cost for 2000 Sqm = a+b+c+d+e 201228.93
Rate per Sqm = (a+b+c+d+e)/2000 Rs. 100.61
Rate per Sqm Rs. 100.61
26 Bituminous concrete ((Binder With Nano
Technology based Organo Silane Compound
-Zycotherm @0.10% of Bitumen)

Providing and laying Bituminous concrete with 100-120 TPH batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 5.40 to 5.60 % per cent of
mix,filler and Mixed with Nano Technology Based Organo Silane Compound
Zycotherm @0.10% by the weight of bitumen for enhansed performance and
durability and transporting the hot mix to work site, laying with a Mechanical
paver finisher to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects, including overhead
charges & Contractors profit,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.

Taking output = 191 Cum (450 tones.) Page 138, 139 of MoRT&H SDB
(A) Labour
Mate nos. 0.84 515.00 432.60
Page 104 of 249

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),M

Referenc
Sr. e to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Specifica
tions
(Rs.)

Mazdoor working with HMP, Mechanical broom, paver, 16.00 515.00 8240.00
roller, asphalt cutter and assistance for setting outlines,
levels and layout of construction. nos.
Skilled Mazdoor for checking line and levels. nos. 5.00 515.00 2575.00
Agency area allowence /MAA 0.000% 0.00
TOTAL 11247.60
(B) Machinery
Batch type HMP 75 tonne per hour hour 6.00 24268.00 145608.00
Mechanical Paver finisher @ 100 TPH hour 6.00 2519.00 15114.00
Generator 250 KVA hour 6.00 2072.00 12432.00
Front end loader 1 cum capacity hour 6.00 1844.00 11064.00
Tipper 10tonne capacity per t-km (dis allowed since 450.00 8.00 0.00
materils leads allowed up to work site) hour
Smooth wheeled roller 8-10 Tonnes for initial break down 3.90 1625.80 6340.62
rolling hour
Vibratory roller 8 Tonnes for inter mediate rolling hour 3.90 3292.40 12840.36
Finish rolling with 6-8 tonne smooth wheeled tandem 3.90 1844.00 7191.60
roller hour
TOTAL 210590.58
(C) Material
GradingII: 13 mm (Nominal Size)
i) Bitumen (60/70) @ 5.0 per cent of weight of mix MT 22.50 39838.00 896355.00

Zycotherm @0.10% of Bitumen (Rate as per Invoice) Kg 22.500 1144.07 25741.58

ii) Aggregate
Total weight of mix = 450 tones
Weight of bitumen = 22.50 tones
Weight of aggregate = 450-22.50 = 427.5 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285.0 cum
13.2 - 10 mm 30 per cent cum 85.50 1941.75 166019.63
10 - 5 mm 25 per cent cum 71.25 1807.38 128775.47
5 mm and below 43 per cent cum 122.55 1723.00 211153.65
Filler @ 2% weight of aggregates ( Stone Dust) cum 5.70 1601.75 9129.98
( If Cement used it is 8.62Tonnes) 1437175.31
(A + B +C) 1659013.49
Over heads & Contractor's profit 12.500% 207376.69
Add Labour welfare Cess @ 1% 1.000% 18,663.90
1,885,054.08
Rate per 1 cum Rs. 9869.39
Page 105 of 249

RATE ANALYSIS (CD - WORKS) - SSR- 2021-22


Agency area allowence /MAA 0%
Over heads & Contractor's profit 12.50%
Water (Y/N) Y 73.00 Rate per kL
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
S.No DescriptionEturunagaram(M),Mulugu
of item Dist. Unit Qty Rate Amount
.
Excaion for Structures
27 RBR- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1
FND including setting out, construction of shoring and bracing, removal of stumps and other deleterious
N-1 material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
1B i with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.. - For Foundations

Note : Classifications of Earth Work Specification are as per


302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary soil
Mechanical Means
i Upto 3 m depth
Unit = cum
Taking output = 240 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 8.32 515.00 4,284.80
Agency area allowence /MAA 0.00% 0.00
b) Machinery
Hydraulic Excaor 1 cum bucket capacity hour 6.00 3331.20 19,987.20
Seignorage Cum 240.00 0.00 0.00
24,272.00
Over heads & Contractor's profit 12.50% 3,034.00
Add Labour welfare Cess @ 1% 1.00% 273.06
Cost for 240 cum = a+b+c+d 27,579.06
27,579.06
Rate per cum 114.91
Note : 1. Cost of dewatering upto 5% of a+b may be added,
where required, up to 10 per cent of labour cost. Assessment
for dewatering shall be made as per site conditions.

ii B ii 3 m to 6 m depth
Mechanical Means
Unit = cum
Taking output = 210 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.32 515.00 4,284.80
Agency area allowence /MAA 0.00% 0.00
b) Machinery
Hydraulic excaor 1.0 cum bucket capacity hour 6.00 3331.20 19,987.20
Seignorage Cum 210.00 0.00 0.00
24,272.00
Over heads & Contractor's profit 12.50% 3,034.00
Add Labour welfare Cess @ 1% 1.00% 273.06
Cost for 210 cum = a+b+c+d 27,579.06
Rate per cum = (a+b+c+d)/210 131.33
Note : Cost of dewatering upto 5 per cent of (a+b) may be
added, where required. Assessment for dewatering shall be
made as per site conditions.
Page 106 of 249

S.No Description of item Unit Qty Rate Amount


.
2. Cost of shoring and shuttering, where needed, may be
taken @ 10 per cent on cost of excaion for open foundation.
ii) Ordinary soil - under water
Mechanical Means
Upto 3 m depth
Unit = cum
Taking output = 240 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 8.32 515.00 4,284.80
Add Municipal/ Agency Allowance 0.00% 0.00
b) Machinery
Hydraulic Excaor 1 cum bucket capacity hour 6.00 3331.20 19,987.20
Seignorage Cum 240.00 0.00 0.00
24,272.00
Add 5% on Labour charges for dewatering 5.00% 1,213.60
Over heads & Contractor's profit 12.50% 3,185.70
Add Labour welfare Cess @ 1% 1.00% 286.71
Cost for 240 cum = a+b+c+d 28,958.01
28,958.01
Rate per cum 120.66
Back Filling with Sand
28 RBR- Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause
FND 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges,
N-2 Labour Cess & GST etc,. Complete.

Sand filling
Unit = 6cum ( Asper Ammendments) unit:
6cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 515.00 159.65
Agency area allowence /MAA 0.00% 0.00
b) Material
Sand cum 6.00 766.18 4,597.08
4,756.73
Over heads & Contractor's profit 12.50% 594.59

Add Labour welfare Cess @ 1% 1.00% 53.51

Rate per 6 cum 5,404.83


Rate per cum = a+b+c+d 900.81
29 RBR- Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded
FND hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration
N-4 including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

to Pipe / Slab Culverts


1 ( i ) P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 5600.00 1,232.00
Coarse sand cum 0.45 766.18 344.78
40 mm aggregate cum 0.9 1748.00 1,573.20
Water kl 1.20 73.00 87.60
Page 107 of 249

S.No Description of item Unit Qty Rate Amount


.
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.00% 0.00
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with hour 0.40 627.60 251.04
water measuring device and preferably also with load cell.
Water tanker 6 kl capacity hour 0.13 699.00 90.87
4,349.84
(d) Formwork @ 4% on cost of material, labour and 0.00% 0.00
machinery (a+b+c)(Since PCC will be laid for full width
centering charges will be zero)
4,349.84
Over heads & Contractor's profit 12.50% 543.73
Add Labour welfare Cess @ 1% 1.00% 48.94
4,942.51

Rate per cum = a+b+c+d+e+f 4,942.51


30 RBR- Providing concrete for plain concrete M 15 grade for Pipe bedding using 40,20 & 10mm metal
FND (HBG) , mechanically mixed, placed in Foundation and compacted by vibration including curing
N-4 for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 &
I(iii) 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head
charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

P.C.C grade M 15
Nominal mix 1:2.5:5
Unit = cum
(a) Material
Cement t 0.275 5600.00 1540.00
Coarse sand cum 0.480 766.18 367.77
40 mm aggregate cum 0.480 1748.00 839.04
20 mm aggregate cum 0.240 2204.25 529.02
10 mm aggregate cum 0.080 1938.00 155.04
Water kl 1.20 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.00% 0.00
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with hour 0.40 627.60 251.04
water measuring device and preferably also with load cell.

4539.86
(d) Formwork @ 4% on cost of material, labour and 0.00% 0.00
machinery (a+b+c) (Since PCC will be laid for full width
centering charges will be zero )
4539.86
Over heads & Contractor's profit 12.50% 567.48
Add Labour welfare Cess @ 1% 1.00% 51.07
Rate per cum = a+b+c+d+e+f 5158.41
Page 108 of 249

S.No Description of item Unit Qty Rate Amount


.
31 RBR- Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation
FND complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
N-4 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig
I(iii) Charges, Labour Cess & GST etc,. Complete.

For Head walls of pipe culverts & footings of culverts

Note : Water for concrete : A provision for cost of water may


be added at 1.2 kl / 1 cum (including curing purpose) keeping
the site conditions
Coarse Aggregate : Single grade nominal size can also be
used instead of graded metal, keeping the site conditions in
view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.275 5600.00 1,540.00
Coarse sand cum 0.480 766.18 367.77
40 mm aggregate cum 0.480 1748.00 839.04

20 mm aggregate cum 0.240 2204.25 529.02


10 mm aggregate cum 0.080 1938.00 155.04
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.100 545.00 54.50
Mazdoor (Unskilled) day 1.390 515.00 715.85
Agency area allowence /MAA 0.00% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 627.60 251.04
4,539.86
(d) Formwork @ 4% on cost of material, labour and 4.00% 181.59
machinery (a+b+c) (For head walls/footings only 4%)
4,721.45
Over heads & Contractor's profit 12.50% 590.18
Add Labour welfare Cess @ 1% 1.00% 53.12
5,364.75
Rate per cum = a+b+c+d+e+f 5,364.75
32 RBR- Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure
SBST complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
-5 I MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

For Abutments & wing walls of slab culvert, Retaining


walls
Note : Water for concrete : A provision for cost of water may
be added at 1.2 kl / 1 cum (including curing purpose) keeping
the site conditions
Coarse Aggregate : Single grade nominal size can also be
used instead of graded metal, keeping the site conditions in
view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Page 109 of 249

S.No Description of item Unit Qty Rate Amount


.
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.275 5600.00 1,540.00
Coarse sand cum 0.480 766.18 367.77
40 mm aggregate cum 0.480 1748.00 839.04

20 mm aggregate cum 0.240 2204.25 529.02


10 mm aggregate cum 0.080 1938.00 155.04
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.100 545.00 54.50
Mazdoor (Unskilled) day 1.390 515.00 715.85
Agency area allowence /MAA 0.00% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 627.60 251.04
4,539.86
(d) Formwork @ 10% on cost of material, labour and 10.00% 453.99
machinery (a+b+c)
4,993.85
Over heads & Contractor's profit 12.50% 624.23
Add Labour welfare Cess @ 1% 1.00% 56.18
5,674.26
Rate per cum = a+b+c+d+e+f 5,674.26
33 RBR- Providing and Laying Reinforced Cement Concrete Pipe
PCV NP3 as per design.
T-3
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular
material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including
contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe
Culverts

Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
B i 1000 mm dia
a)  Labour
Mate day -
Mason (1st Class) day 0.25 545.00 136.25
Mazdoor (Unskilled) day 2.09 515.00 1,076.35
Agency area allowence /MAA 0.00% 0.00
Laying & fixing of Pipes with colors in position including lifting, rm
aligning etc.,
b) Material
Sand for mortar cum 0.04 966.18 38.65
Cement at site t 0.03 5600.00 168.00
RCC pipe NP3 pipe at site m 7.50 8476.08 63,570.60
RCC pipe NP3 collar at site nos 2.00 1150.00 2,300.00
67,289.85
Over heads & Contractor's profit 12.50% 8,411.23
Add Labour welfare Cess @ 1% 1.00% 757.01
76,458.09
Cost for 7.5 m = a+b+c+d 76,458.09
Rate per m = (a+b+c+d)/7.5 10,194.41
B i 900 mm dia
Page 110 of 249

S.No Description of item Unit Qty Rate Amount


.
Data for 1000 mm dia
a)  Labour
Mate day -
Mason (1st Class) day 0.25 545.00 136.25
Mazdoor (Unskilled) day 2.09 515.00 1,076.35
Agency area allowence /MAA 0.00% 0.00
Laying & fixing of Pipes with colors in position including lifting, rm
aligning etc.,
b) Material
Sand for mortar cum 0.04 966.18 38.65
Cement at site t 0.03 5600.00 168.00
For 1000 mm dia 1419.25
Proportinate For 900 mm dia 1277.33
RCC pipe NP3 pipe at site m 7.50 7085.99 53,144.93
RCC pipe NP3 collar at site nos 2.00 917.00 1,834.00
56,256.26
Over heads & Contractor's profit 12.50% 7,032.03
Add Labour welfare Cess @ 1% 1.00% 632.88
63,921.17
Cost for 7.5 m = a+b+c+d 63,921.17
Rate per m = (a+b+c+d)/7.5 8,522.82
ii) 600 mm dia
Data for 750 mm dia
a)  Labour
Mate day -
Mason (1st Class) day 0.15 545.00 81.75
Mazdoor (Unskilled) day 1.25 515.00 643.75
Laying & fixing of Pipes with collars in position including rm
lifting, aligning etc.,
Agency area allowence /MAA 0.00% 0.00
b) Material
Sand for mortar cum 0.024 966.18
23.19
Cement at site t 0.018 5600.00
100.80
For 750 mm dia 849.49
For 600 mm dia 679.59
RCC pipe NP3 pipe m 7.50 3405.06 25537.95
RCC pipe NP3 collar at site nos 2 461.00 922.00
27139.54
Over heads & Contractor's profit 12.50% 3392.44
Add Labour welfare Cess @ 1% 1.00% 305.32
Cost for 7.5 m = a+b+c+d 30837.30
Rate per m = (a+b+c+d)/7.5 4111.64
34 RBR- Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like
FND TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical
N-7 specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including
over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but
excluding GST etc,. Complete. - For Foundation

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage t 1.05 57000.00 59,850.00
Binding wire kg 6.00 66.00 396.00
(b) Labour for cutting, bending, shifting to site, tying and
placing
Mate in position day -
Blacksmith day 2.00 540.00 1,080.00
Mazdoor (Unskilled) day 6.40 515.00 3,296.00
Page 111 of 249

S.No Description of item Unit Qty Rate Amount


.
Agency area allowence /MAA 0.000% 0.00
64,622.00
Over heads & Contractor's profit 12.500% 8,077.75

Add Labour welfare Cess @ 1% 1.000% 727.00

73,426.75

Rate per t = a+b+c+d 73,426.75


35 RBR- Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like
SBST TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical
-6 specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36
mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Sub Structures

Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage t 1.05 57000.00 59,850.00
Binding wire kg 6.00 66.00 396.00
(b) Labour for cutting, bending, shifting to site, tying, and
placing in position
Mate day -
Blacksmith day 2.00 540.00 1,080.00
Mazdoor (Unskilled) day 6.84 515.00 3,522.60
Agency area allowence /MAA 0.000% 0.00
64,848.60
Over heads & Contractor's profit 12.500% 8,106.08
Add Labour welfare Cess @ 1% 1.000% 729.55
73,684.23
Rate per t = a+b+c+d 73,684.23

36 RBR- Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like
SPST TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical
-2 specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including
over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but
excluding GST etc,. Complete. - For Super Structures

Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage t 1.05 57000.00 59,850.00
Binding wire kg 8.00 66.00 528.00
(b) Labour for cutting, bending, tying and placing in position

Mate day -
Blacksmith/ Rod Binder day 3.00 540.00 1,620.00
Mazdoor (Unskilled) day 8.44 515.00 4,346.60
Agency area allowence /MAA 0.00% 0.00
66,344.60
Over heads & Contractor's profit 12.50% 8,293.08
Add Labour welfare Cess @ 1% 1.00% 746.38
75,384.06
Rate per t = a+b+c+d 75,384.06
37 RBR- Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in
SBST Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
-5 VI 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete. (upto 5m height)
Page 112 of 249

S.No Description of item Unit Qty Rate Amount


.
For foundation of Abutments & piers
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement t 0.403 5600.00 2,256.80
Coarse sand cum 0.450 766.18 344.78
20 mm aggregate cum 0.540 2204.25 1,190.30
10 mm aggregate cum 0.360 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
Generator 33 KVA hour 0.40 1237.40 494.96
Vibrator hour 0.00
6,093.51
(d) Formwork @ 10% on (a+b+c) 4.00% 243.74
6,337.25
Over heads & Contractor's profit 12.500% 792.16
Add Labour welfare Cess @ 1% 1.000% 71.29
7,200.70
Rate per cum = a+b+c+d+e+f 7,200.70
38 RBR- Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in
SBST substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202
-5 VI and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height)
For piers, side walls, bed blocks
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement t 0.403 5600.00 2,256.80
Coarse sand cum 0.450 766.18 344.78
20 mm aggregate cum 0.540 2204.25 1,190.30
10 mm aggregate cum 0.360 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Page 113 of 249

S.No Description of item Unit Qty Rate Amount


.
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
Generator 33 KVA hour 0.40 1237.40 494.96
Vibrator hour 0.00
6,093.51
(d) Formwork @ 10% on (a+b+c) 10.00% 609.35
6,702.86
Over heads & Contractor's profit 12.500% 837.86
Add Labour welfare Cess @ 1% 1.000% 75.41
7,616.13
Rate per cum = a+b+c+d+e+f 7,616.13
39 RBR- Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in
SBST substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202
-5 VI and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but
(ii) excluding Seig Charges, Labour Cess & GST etc,. Complete. ( 5 to 10m height)

R.C.C. grade M 25 (Design Mix)


Height 5m to 10m
Case I : Using concrete Mixer
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) cum 1 6,093.51
of Item VI (i) Case I excluding of Formwork
d) formwork
Add on cost of material, labour and machinery (a+b+c) for 11.80% 719.03
Formwork
Add on cost of material, Labour and machinery excluding 1.80% 109.68
formwork to cater for extra lift
6,922.22
Over heads & Contractor's profit 12.500% 865.28
Add Labour welfare Cess @ 1% 1.000% 77.88
7,865.38
Rate perm (a+b+c+d+e+f) 7,865.38
40 RBR- Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
SPST mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and
-1- II 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete. upto 5m height. - For Super Structure (Deck
slab)

R.C.C M 25 Grade (Design Mix)


Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement t 0.40 5600.00 2,240.00
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.00% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour/cum 0.40 627.60 251.04
Page 114 of 249

S.No Description of item Unit Qty Rate Amount


.
Generator 33 KVA hour 0.40 1237.40 494.96
6,076.71
d) For formwork and staging refer to sub-item I (B) case I
above
d) Formwork and staging of (a+b+c) 20.00% 1,215.34
7,292.05
Over heads & Contractor's profit 12.50% 911.51
Add Labour welfare Cess @ 1% 1.00% 82.04
8,285.60
Rate per cum = a+b+c+d+e+f 8,285.60
41 RBR-
SPST Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
-1 mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and
1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete. 5 to 10m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
Height 5m to 10m
Case I : Using Concrete Mixer.
(a) Material
Cement t 0.40 5600.00 2,240.00
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour/cum 0.40 627.60 251.04

Generator 33 KVA hour 0.40 1237.40 494.96


6,076.71
d) For formwork and staging refer to sub-item I (B) case I
above
d) Formwork and staging of (a+b+c) 25.00% 1,519.18
7,595.89
Over heads & Contractor's profit 12.500% 949.49
Add Labour welfare Cess @ 1% 1.000% 85.45
Rate per cum = a+b+c+d+e+f 8,630.83
8,630.83
42 RBR- Providing and laying cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal
SPST (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications
-5 (i) Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
(a) Material
Cement t 0.407 5600.00 2,279.20
Sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
HYSD bar reinforcement including binding wire (Rate as per t 0.075
item 13.2) except OH & CP
Water kl 1.200 73.00 87.60
(b) Labour
Page 115 of 249

S.No Description of item Unit Qty Rate Amount


.
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Mazdoor (Unskilled) for cleaning deck slab concrete surface day 0.15 515.00 77.25
Agency area allowence /MAA 0.00% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
Generator 33 KVA. hour 0.40 1237.40 494.96
6,193.16
(d) Formwork @ 3% of cost of concrete 3.00% 185.79
6,378.95
Over heads & Contractor's profit 12.50% 797.37
Add Labour welfare Cess @ 1% 1.00% 71.76
Rate per cum = a+b+c+d+e+f 7,248.08
43 RBR- Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm
SPST nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500,
-7 centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical
specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = Running m
Taking output = 4x12 m
Span = 48 m
(a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 = 0.069
sqm
Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum cum 6.252 6667.53 41,685.40
(b) HYSD bar reinforcement (Rate as per item 13.2) t 1.36 0.00 0.00
41,685.40
Over heads & Contractor's profit 12.500% 5,210.68
Add Labour welfare Cess @ 1% 1.000% 468.96
Cost for 48 m = (a+b+c+d) 47,365.04
Rate per m = (a+b+c+d)/48 986.77
Sub Analysis for Rate of Concrete
(a) Material
Cement t 0.40 5600.00 2,240.00
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day
Mason (1st Class) day 0.12 545.00 65.40
Mazdoor (Unskilled) day 2.09 515.00 1,076.35
Agency area allowence /MAA 0.000% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
5,953.15
Formwork @ 12% 12.00% 714.38
Total (a+b+c+d) 6,667.53
Page 116 of 249

S.No Description of item Unit Qty Rate Amount


.
44 RBR- P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course
SPST below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD &
-12 2700 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess &
GST etc,. Complete.

Leveling Coarse below Approch Slab

Unit = cum
(a) Material
Cement t 0.275 5600.00 1,540.00
Coarse sand cum 0.48 766.18 367.77
40 mm aggregate cum 0.54 1748.00 943.92
20 mm aggregate cum 0.27 2204.25 595.15
10 mm aggregate cum 0.09 1938.00 174.42
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class0 day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
Generator 33 KVA. hour 0.40 1237.40 494.96
5,225.21
Over heads & Contractor's profit 12.500% 653.15
Add Labour welfare Cess @ 1% 1.000% 58.78
Rate per cum = a+b+c+d+e+f 5,937.14
45 RBR- Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm metal (HBG) mechanically mixed
SPST excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211
-13 MORD / 1500, 1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges, but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
(a) Material
Reinforced cement concrete M 25 grade
Cement t 0.407 5600.00 2,279.20
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.1 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Bhisti day
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / cum 0.4 627.60 251.04

5,620.95
(d) Formwork @ 2.00% on (a+b+c) 2.00% 112.42
5,733.37
Over heads & Contractor's profit 12.500% 716.67
Add Labour welfare Cess @ 1% 1.000% 64.50
Rate per cum = (a) 6,514.54
Page 117 of 249

S.No Description of item Unit Qty Rate Amount


.
46 Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour
charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

Initial cost BMS-W.20 sqm 1.00 580.00 580.00


Over heads & Contractor's profit 12.500% 72.50
Add Labour welfare Cess @ 1% 1.000% 6.53
659.03
Rate per sqm = a+b+c+d+e+f 659.03
47 Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and conveyance and all labour
charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

Initial cost BMS-W.20 sqm 1.00 379.00 379.00


Over heads & Contractor's profit 12.500% 47.38
Add Labour welfare Cess @ 1% 1.000% 4.26
430.64
Rate per sqm = a+b+c+d+e+f 430.64
48 RBR- Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification
SBS Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head
T-10 charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

Unit = cum
Taking output = 10 cum
I Granular material
(a) Material
Granular material cum 12.000 264.18 3170.16
(b) Labour
Mate day -
Mazdoor (Unskilled) day 7.280 515.00 3749.20
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Plate compactor / power rammer hour 2.500 54.00 135.00
Water Tanker hour 0.050 699.00 34.95
7089.31
Over heads & Contractor's profit 12.500% 886.16
Add Labour welfare Cess @ 1% 1.000% 79.75
Cost for 10 cum of granular backfill = a+b+c+d+e 8055.22
Rate per cum = (a+b+c+d+e)/10 805.52
49 RBR- Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not
SBS less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the
T-11 entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete
as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH,
including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.
Unit = cum
Taking output = 10 cum
(a) Material
Filter media as per specification cum 12.000 1548.00 18576.00
(b) Labour
Mate day -
Mazdoor (Unskilled) day 7.320 515.00 3769.80
Mazdoor (Skilled) day 1.000 515.00 515.00
Agency area allowence /MAA 0.000% 0.00
c) Machinery
Water Tanker of 6 KL capacity hour 0.060 699.00 41.94
22902.74
Over heads & Contractor's profit 12.500% 2862.84
Page 118 of 249

S.No Description of item Unit Qty Rate Amount


.
Add Labour welfare Cess @ 1% 1.000% 257.66
Cost for 10 cum of granular backfill = a+b+c+d+e 26023.24
Rate per cum = (a+b+c+d+e)/10 2602.32
Note : Suitable Grade of Filter media shall be proposed as per
Specification in said IRC.
50 Gravel Backing for Revetments as per APSS including cost and conveyance of all materials and all labour
charges etc., complete including contractors profit & Over head charges, but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
Unit = cum
(a) Material
Gravel cum 1.160 264.18 306.45
(b) Labour
Mazdoor (Unskilled) day 1.100 515.00 566.50
Agency area allowence /MAA 0.000% 0.00
Cost for 10 cum of granular backfill = a+b+c+d+e 872.95
Over heads & Contractor's profit 12.500% 109.12
Add Labour welfare Cess @ 1% 1.000% 9.82
Cost for 1 cum 991.89
Rate per cum = (a+b+c+d+e)/1 991.89
51 Jeddy Stone Dry Packing for Aprons and Revetments Section 1300 MORD including cost and conveyance of
all materials and all labour charges etc., complete including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.
Unit = cum
(a) Material
Jeddy Stone (Including small stone for wedging) cum 1.200 1446.08 1735.30
(b) Labour
Mason 1st Class day 0.350 545.00 190.75
Mazdoor (Unskilled) day 1.050 515.00 540.75
Agency area allowence /MAA 0.000% 0.00
Cost for 10 cum of granular backfill = a+b+c+d+e 2466.80
Over heads & Contractor's profit 12.500% 308.35
Add Labour welfare Cess @ 1% 1.000% 27.75
Cost for 1 cum 2802.90
Rate per cum = (a+b+c+d+e)/1 2802.90
52 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical
specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all
labour charges etc., complete including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg) cum 1.00 1398.08 1398.08
Stone spalls of minimum 25 mm size cum 0.20 264.18 52.84
(b) Labour
Mason 1st Class day 0.35 545.00 190.75
Mazdoor (Unskilled) day 0.79 515.00 406.85
Agency area allowence /MAA 0.000% 0.00
Cost for 1 cum 2048.52
Over heads & Contractor's profit 12.500% 256.07
Add Labour welfare Cess @ 1% 1.000% 23.05
Cost for 1 cum 2327.64
Rate per cum = (a+b+c+d+e)/1 2327.64
53 RBR- Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per
PTW Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical
K-1 specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work
Page 119 of 249

S.No Description of item Unit Qty Rate Amount


.
Unit = cum
(a) Material
Rough stone for revetment 300 mm thick cum 1.00 1398.08 1,398.08
Stone spalls/Gravel cum 0.20 1179.75 235.95
(b) Labour
Mate day
Mason 1st Class day 0.35 545.00 190.75
Mazdoor (Unskilled) day 0.79 515.00 406.85
Agency area allowence /MAA 0.00% 0.00
Total 2,231.63
c) Over heads & Contractor's profit 12.50% 278.95

Add Labour welfare Cess @ 1% 1.00% 25.11

Total 2,535.69
Rate per cum = a+b+c+d 2,535.69
54 RBR- Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment,
SBST wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm pipe extending through the full width of
-9 the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and
technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

Unit = Nos
Taking output = 30 Nos
(a) Material
AC pipe 100 mm dia including wastage @ 5 per cent. m 31.500 273.71 8,621.83
Average length of weep hole is taken as one metre for the
purpose of estimating incl 12%CED&3% Cess &
transportation charges
MS clamps Nos. 30.000 0.00

Collar for AC pipe (average taking 10% of above pipe rate) 10.00% 0.00

Cement mortar 1:3 (For rate refer to item 11.5 I) cum 0.050 0.00
(b) Labour
Mate day -
Mason 1st Class day 0.500 545.00 272.50
Mazdoor (Unskilled) day 0.280 515.00 144.20
Agency area allowence /MAA 0.000% 0.00
Total 9,038.53
Over heads & Contractor's profit 12.500% 1,129.82

Add Labour welfare Cess @ 1% 1.000% 101.68

Cost for 30 Nos = (a+b+c+d) 10,270.03


Rate per No of 1m or per 1 Rmt= (a+b+c+d)/30 342.33

Sub analysis
55 RBR- Providing and laying reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG)
SPST mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and
-1 -B 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but
excluding Seig Charges& GST etc,. Complete. for guide posts

R.C.C M 20 Grade (Design Mix)


Unit =cum
Page 120 of 249

S.No Description of item Unit Qty Rate Amount


.
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement t 0.341 5600.00 1,909.60
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour/cum 0.40 627.60 251.04
Generator 33 KVA hour 0.40 1237.40 494.96
5,746.31
d) For formwork and staging refer to sub-item I (B) case I
above
d) Formwork and staging of (a+b+c) 4.00% 229.85
Over heads & Contractor's profit 12.500% 747.02
Add Labour welfare Cess @ 1% 1.000% 67.23
Rate per cum = a+b+c+d+e+f 6,790.41
56 RBR- Providing and laying reinforced cement concrete M15 grade using 20 & 10mm metal (HBG) mechanically
SPST mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
-1 -B MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete. for guide posts

R.C.C M 15 Grade
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement t 0.275 5600.00 1,540.00
Coarse sand cum 0.45 766.18 344.78
20 mm aggregate cum 0.54 2204.25 1,190.30
10 mm aggregate cum 0.36 1938.00 697.68
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
Note : 1. Cost of dewatering upto 5% of a+b may be added, 0.000% 0.00
where required, up to 10 per cent of labour cost. Assessment
for dewatering shall be made as per site conditions.

c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour/cum 0.40 627.60 251.04

Generator 33 KVA hour 0.40 1237.40 494.96


5,376.71
d) For formwork and staging refer to sub-item I (B) case I
above
d) Formwork and staging of (a+b+c) 4.00% 215.07
Over heads & Contractor's profit 12.500% 698.97
Add Labour welfare Cess @ 1% 1.000% 62.91
Page 121 of 249

S.No Description of item Unit Qty Rate Amount


.
Rate per cum = a+b+c+d+e+f 6,353.66
57 RBR- Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new,
TSR plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit
A-6 & Over head charges, but excluding GST etc,. Complete.
Unit = sqm
Taking output = 40 sqm
a)  Labour
Mate day -
Painter (1st Class) day 3.00 625.00 1,875.00
Painter Assistant day
Mazdoor (Unskilled) day 2.20 515.00 1,133.00
Agency area allowence /MAA 0.000% 0.00
b) Material
Cement Primer as per specifications litre 3.00 201.00 603.00
Paint conforming to requirement of Clause 1701.3.8 litre 6.00 264.00 1,584.00
Add for scaffolding @ 1 per cent of labour cost where
required
Filling Material on Paint Cost
Total 5,195.00
Over heads & Contractor's profit 12.500% 649.38
Add Labour welfare Cess @ 1% 1.000% 58.44
Total 5,902.82
Cost for 40 sqm = a+b+c+d 5,902.82
Rate per sqm = (a+b+c+d)/40 147.57
58 RBR- Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true
HLR to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification
D-8 Clause 1608.2 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.
i Earth work in excaion for structures
Unit = Each
Rates as per item No. 1 of Chapter 11 cum 0.04 114.91 4.87
ii RCC M20 grade
Unit = cum
Rate as per item No. 4 (C) (i) of Chapter 11 cum 0.05 6790.41 349.81
iii HYSD steel bars
Unit = t
Rate as per item No. 7 of Chapter 11 t 3.35 73426.75 245.98
iv Painting two coats including prime coat on new concrete
surface
Unit = sqm
Rate as per item No. 5 of Chapter 10 sqm 0.64 147.57 94.12
Total cost for each stone 694.78
Page 1 of 249

TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES


Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
Eturunagaram(M),Mulugu Dist.
Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Allowances Made
Over heads & Contractor's Profit 12.50%
Agency area allowence /MAA 0.00%
Water (Y/N) Y 73.00 Rate per kL
Sub analysis
RBR- 59 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as
FNDN- per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100,
7 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where
they are not welded., But Excluding GST.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and t 1.05 57000.00 59850.00
wastage
Binding wire kg 6.00 66.00 396.00
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Mate day -
Blacksmith day 2.00 540.00 1080.00
Mazdoor (Unskilled) day 6.40 515.00 3296.00
Agency area allowence /MAA 0.000% 0.00
Rate per t = a+b+c+d 64622.00
RBR- 60 Earthwork in excaion for structures as per drawing and technical specifications Clause
FNDN- 305.1 including setting out, construction of shoring and bracing, removal of stumps and
1 other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excaed suitable material as per Technical
Specification 305 MORD / 304 MORTH But Excluding GST.

1(i) A(i) Note : Classifications of Earth Work Specification


are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H
Ordinary soil
Manual means
i Upto 3 m depth
Unit = cum
Taking output = 10 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 3.64 515.00 1874.60
Agency area allowence /MAA 0.000% 0.00
earth compensation Cum 10.00 0.00
1874.60
Rate per cum = /10 187.46
For Road Furniture Items
61 Plain/reinforced cement concrete in Foundations complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and
1500, 1700 & 2200 MORTH including overhead charges & Contractors profit, but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

Note : Water for concrete : A provision for cost


of water may be added at 1.2 kl / 1 cum
(including curing purpose) keeping the site
conditions
Page 2 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Coarse Aggregate : Single grade nominal size
can also be used instead of graded metal,
keeping the site conditions in view
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)

Unit = cum
(a) Material
Cement t 0.275 5600.00 1540.00
Coarse sand cum 0.480 766.18 367.77
40 mm aggregate cum 0.480 1748.00 839.04
20 mm aggregate cum 0.240 2204.25 529.02
10 mm aggregate cum 0.080 1938.00 155.04
Water kl 1.200 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.100 545.00 54.50
Mazdoor (Unskilled) day 1.390 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 627.60 251.04
(d) Formwork @ 4% on cost of material, labour 4.00% 181.59
and machinery (a+b+c)
Rate per cum = a+b+c+d+e+f 4721.45
RBR- 62 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm
FNDN- nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation
4 and compacted by vibration including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100
MORTH including overhead charges & Contractors profit, but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 5600.00 1232.00
Coarse sand cum 0.45 766.18 344.78
40 mm aggregate cum 0.90 1748.00 1573.2
Water kl 1.20 73.00 87.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 545.00 54.50
Mazdoor (Unskilled) day 1.39 515.00 715.85
Agency area allowence /MAA 0.000% 0.00
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity hour 0.40 627.60 251.04
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity hour 0.13 699.00 90.87
4349.84
Rate per cum = a+b+c+d+e+f 4349.84
RBR- 63 Painting Two Coats on New Concrete
TSRA- Surfaces
6
Page 3 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
i Painting two coats including primer coat after filling the surface with synthetic enamel
paint in all shades on new, plastered / concrete surfaces as per drawing and Technical
Specification Clause 1701MORD. including But Excluding GST etc,. Complete.

Unit = sqm
Taking output = 40 sqm
a)  Labour
Mate day -
Painter (1st Class) day 3.00 625.00 1875.00
Painter Assistant day
Mazdoor (Unskilled) day 2.20 515.00 1133.00
Agency area allowence /MAA 0.000% 0.00
b) Material
Cement Primer as per specifications litre 3.00 201.00 603.00
Paint conforming to requirement of Clause litre 6.00 264.00 1584.00
1701.3.8 sythetic enamel
Add for scaffolding @ 1 per cent of labour cost
where required
Filling Material on Paint Cost
Cost for 40 sqm = a+b+c+d 5195.00
Rate per sqm = (a+b+c+d)/40 129.88
RBR- 64 Painting on Concrete/Steel Surfaces with
TSRA- Epoxy
9
Painting two coats including prime coat with epoxy paint of approved brand on
concrete/steel surfaces after through cleaning of surface to give an even shade as per
drawing and Technical Specification Clause 1701 MORD But Excluding GST.

Unit = sqm
Taking output = 10 sqm
a)  Labour
Mate day -
Painter (1st Class) day 0.60 625.00 375.00
Mazdoor (Unskilled) day 0.65 515.00 334.75
Agency area allowence /MAA 0.000% 0.00
b) Material
Epoxy primer / Red-oxide litre 0.60 164.00 98.40
Epoxy paint litre 1.25 223.00 278.75
Add @ 1 per cent on cost of material for 3.77
scaffolding wherever required
Cost for 10 sqm = a+b+c+d 1090.67
Rate per sqm = (a+b+c+d)/10 109.07
Printing New Letters and Figures of any
Shade
RBR- 65 Printing new letter and figures of any shade with synthetic enamel paint black or any
TSRA- other approved colour to give an even shade as per drawings and Technical
1 Specification Clause 1701 MORD / 801 MORTH but Excluding GST.

(ii) English and Roman


Hyphens, commas and the like not to be
measured and paid for.
Detail for 100 letters of 160 mm height, i.e.
1600 cm
Unit = per cm height per letter
a)  Labour
Mate day -
Painter 1st Class day 1.25 625.00 781.25
Page 4 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Painter Assistant day
Mazdoor (Unskilled) day 0.57 515.00 293.55
Agency area allowence /MAA 0.000% 0.00
b) Material
Paint litre 0.50 264.00 132.00
Cost for 1600 cm = a+b+c+d 1206.80
Rate per cm height per letter = (a+b+c+d)/1600 0.75

Rate analysis
B Semi Reflective Traffic Signs
RBR- 66 Providing and fixing of semi-reflective cautionery, mandatory and informatory boards
TSRA-2 as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet
duly stove enamelled paint in white colour in front and grey colour on back with red
reflective boarder of 65mm width and required letters and figures with reflective
engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification
of required shade and colour supported and welded on 47x47mm of 12 SWG square
tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back
firmly fixed to ground by means of properly designed foundations with M-15 grade CC
450x450x600 mm , 600mm below ground level as per approved drawings and
technical specification Clause 1701.2.2 of MORD including contractors profit & Over
head charges, But Excluding GST

Unit = Each
Taking output = one traffic sign
(i) Excaion for foundation
As per item No. 1 of Chapter 11 cum 0.126 187.46 23.62
(ii) Cement concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.126 4721.45 594.90

(iii) Painting two coats including prime coat


on concrete surface with Epoxy Paint as per
specifications
As per item No. 9 of this Chapter sqm 0.46 109.07 50.17
(a) labour (For fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.26 515.00 133.90
Agency area allowence /MAA 0.000% 0.00
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet 3050 mm kg 12.40 52.00 644.80
long
(II) Angle iron 50 x 50 x 6 mm for hold fast kg 1.06 52.00 55.12
including 5% wastage
Add 3% cost of MS Sheet tube 12 SWG and 21.00
angle irons towards the cost of fabrication, drilling
holes, nuts and bolts etc.

(III) 1.6 mm thick M.S. Sheet duly painted with


stove enameled paint including lettering, signs,
border, message with reflective tape of
engineering grade required size, shade and
colour as per Technical Specifications

(i) 900 mm equilateral triangle sqm 0.35


OR
Page 5 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
(ii) 600 mm equilateral triangle sqm 0.156
OR
(iii) 600 mm circular sqm 0.283
OR
(iv) 800 mm x 600 mm rectangular sqm 0.48
OR
(v) 600 mm x 450 mm rectangular sqm 0.27
OR
(0.36 Sqm. X 0.0016X7850 Kg/cum) Kg 4.52 72.00 325.56
(vi) 600 mm x 600 mm square sqm 0.36
OR
(vii) 900 mm side octagon sqm 0.672
(c) Machinery
Tractor with trolley hour 0.08 465.00 37.20
Over heads & Contractor's Profit 12.500% 235.78
Add Labour welfare Cess @ 1% 1.000% 21.22
Rate per traffic sign = (i+ii+iii+a+b+c+d+e) Rs. 2143.27

Note : 1. Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and in accordance with
IRC-67.
2. The rate for excaion, cement concrete M-15, and painting may be taken from respective
Chapters.
3. The depth of foundation and quantity of cement in the foundation are indicative. These
B may be increased
Semi-Reflective for signs
Traffic areas having higher wind velocities like in coastal area. This is
Direction and place identification signs up to
0.9 sqm size board
67 Providing and erecting direction and place identifications of semi reflective sign boards
up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour on back with red reflective
border of 70 mm width and required message, letters, figures with reflective
engineering grade tape as per MORD specifications of required shade and colour.
supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height
duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the
ground by means of properly designed foundation with M15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and
Technical Specification Clause 1701 MORD including contractors profit & Over head
charges, But Excluding GST.
Unit = each
Take Output = 0.9 sqm
(i) Excaion for foundation
As per item No. 1 of Chapter 11 cum 0.126 187.46 23.62
(ii) Cement concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.126 4721.45 594.90

(iii) Painting on M.S. tube post with primer


and two coat of epoxy paint as per
specifications
As per item No.9 of Chapter 10 sqm 0.59 109.07 64.35
(a) labour (For fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.26 515.00 133.90
Agency area allowence /MAA 0.000% 0.00
b) Material
(i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long kg 12.40 52.00 644.80

(ii) Angle iron 50 x 50 x 6 mm for lugs including kg 1.06 52.00 55.12


5% wastage
Page 6 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
(iii) 2 mm thick MS sheet strengthened by 25 mm sqm 0.90
x 5 mm MS flat iron & painted with stove
enameled paint including lettering, signs,
message, border with reflective tape of
engineering grade of required shade and colour
as per Technical Specifications.

(0.90 Sqmx0.002 mx7850 kg/cum) Kg 14.13 72.00 1017.36


Add 3% cost of MS sheet angle iron towards the 30.52
cost of fabrications, drilling, holes, nuts, bolts etc.

(c) Machinery
Tractor with trolley hour 0.08 465.00 37.20
Over heads & Contractor's Profit 12.500% 325.22
Add Labour welfare Cess @ 1% 1.000% 29.27
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e) 2956.26
Rate per 0.9 sqm board 1 No. Rs. 2956.26
Note : Rate for excaion, cement concrete M15 and painting may be taken from respective
RBR- 68 Chapters.
Providing and Fixing 'Typical PMGSY Title
TSRA- informatory sign board with LOGO'
20
Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as
per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle
plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower
plate will be welded with MS angle iron frame of lower most plate and flate iron frame
of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts
duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below
ground level. The top most diamond plate will be welded to middle plate by
47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both
sides. Lettering and paining of superior quality in required shede and colour. All
sections of framed posts and sheet tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including
contractors profit & Over head charges,But excluding GST

Unit = Each
Taking out put = one typical board
i) Excaion for foundation
As per item No. 1 of Chapter 11 cum 0.252 187.46 47.24
(ii) Cement Concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.252 4721.45 1189.81

(iii) Painting on MS Steel tubes with primer


and two coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 9 of Chapter 10 sqm 1.80 109.07 196.33
(iv) Printing new letters and figures of any
shade with synthetic enamel paint black or
any other approved colour to give an even
shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter

Bottom plate border 150x2x5 = 1500 per cm height per letter


Page 7 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Bottom plate border 60x2x5 = 600 per cm height per letter

Words 101x2.5 = 252.5


Words 80x3 = 240.00
Total (4532.5 per cm height per letter)
As per item No. 1 of Chapter 10 per cm height /
letter
4532.50 0.75 3399.38
a) Labour (for fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.78 515.00 401.70
Agency area allowence /MAA 0.000% 0.00
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet kg 63.15 52.00 3283.80
2650 mm long
1 No. MS tube 47mm x 47mm of 12 SWG 1100 kg 4.47 52.00 232.44
mm long
Angle iron 50mm x 50mm x 5 mm for lugs kg 2.12 52.00 110.24
1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron sqm 1.44
on logo and middle plate angle iron 25mm x 25mm x 5mm on
bottom plate painting with stove enameled paint on both sides
as per MORD specifications

(1.44 sqmx0.0016mx7850 kg/cum) Kg 18.09 72.00 1302.48


Add 3% cost of MS tube and angle iron towards the cost of
fabrications, drilling holes, nuts, bolts, etc.
147.87
c) Machinery
Tractor with trolley hour 0.24 465.00 111.60
Over heads & Contractor's Profit 12.500% 1302.86
Add Labour welfare Cess @ 1% 1.000% 117.26
Cost for one Board= (i+ii+iii+iv+a+b+c+d+e) Rs. 11843.01
Printing and lettering for blank spaces on the lower plate will be written as required and paid
69 separately.
PMGSY Citizen informatory sign board
RBR- Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD
TSRA- specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and
20 lower plate duly welded with MS flat iron 40mm x 5m size on back on
edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or
75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-
15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground
level.All M.s. will be stove enameled on both sides. Lettering and printing
arrows, border etc., will be pointed with ready mixed synthetic enamel paint of
superior quality in required shade and colour. All sections of framed posts and
steel tube will be painted with primer and two coats of epoxy paint as per
drawing clause 1701 MORD including contractors profit & Over head
charges,But excluding GST
Unit = Each
Taking out put = one typical board
i Excavation for foundation cum 0.252 187.46 47.24
ii Cement Concrete M15 grade cum 0.252 4721.45 1189.81
Painting on MS Steel tubes with primer and two
iii coats of epoxy paint
2x3.05x0.30=1.83
2x1.00x0.30=0.60
sqm 2.43 109.07 265.04
iv
Printing new letters and figures of any shade with
synthetic enamel paint black or any other approved
colour to give an even shade.
50 mm heading band 40x5=200 200

Government of India words 17x2.5=42.5 42.5


100 mm heading band 90x10=900 900
Page 8 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Logo board 7x4x1.5=42 per cm height per
letter 42

Figure 7x2.5=15 per cm height per letter 15


PRADHANMANTRI GRAM SADAK YOZANA words
heading band 28x2.5=70 70

Top plate border 65x2x1.5+90x1.5=330


per cm height per letter 330
Words 56x1.7=95.2 95.2
Words 21x2.5=52.5 52.5
635x870mm information area
=63.5x87=5524.5 5524.5
Specification plate 495

15mm colour Borders(90x2+75x2)x1.5=495 5200

650x800mm information area =65x80=5200 12967


Total =12966.70 per cm height per letter
per cm height
per letter 12966.70
0.75 9725.03
a) Labour
Mazdoor (Un-skilled) day 0.78 515.00 401.70
b) Material
2nos. MS tubes 75mmx75mm of 12 SWG sheet 3050 52.00
mm long kg 72.68 3779.36
2nos. MS tubes 75mmx75mm of 12 SWG sheet 1000 52.00
mm long kg 23.83 1239.16
Steel flat iron 1490x40mmx5mm for legs kg 2.34 52.00 121.68
2Nosx750x900x1.6mm thick MS sheet strengthened
by 40mmx5mm MS flat iron painting with stove
enameled paint on both sides as per MORD
sqm
specification.
(2*0.75*0.9*0.0016m*7850kg/cum) = kg 16.956 72.00 1220.83

Add 3% cost of MS tube and angle iron towards the


cost of fabrication, drilling holes,nuts,bolts, etc. 190.83
c) Machinery
Tractor with trolley hour 0.24 465.00 111.60
d) Over heads & Contractor's Profit 12.500% 2286.53
Add Labour welfare Cess @ 1% 1.000% 205.79
Cost of each board Rs. 19547.55
RBR- 70 Kilometre Stones
TSRA-13

Reinforced cement concrete M15 grade Kilometre/Hectametre stone of standard


design as per IRC:8 fixing in position including painting and printing, etc as per drawing
and Technical Specification Clause 1703 MORD / 804 MORTH including contractors
profit & Over head charges, but excluding GST
(i) 5th Kilometre Stone (precast)
Unit = each
Taking output = 6 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 2.35 4721.45 11095.42
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 22.08 64.62 1426.85
c) Excaion in soil for foundation
As per item No. 1 of Chapter 11 cum 1.68 187.46 314.93
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 9.85 129.88 1279.32
e) lettering on km post (average 30 letters of 10 cm height
each)
Page 9 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
As per item No. 1 of Chapter 10 per cm high per
letter
1800.00 0.75 1350.00
Transportation and fixing
f)  Labour
Mate day -
Mason (1st Class) day 0.60 545.00 327.00
Mazdoor (Unskilled) day 6.26 515.00 3223.90
Agency area allowence /MAA 0.000% 0.00
g) Machinery
50 HP Tractor with trolley hour 6.00 465.00 2790.00
Over heads & Contractor's Profit 12.500% 2725.93
j )Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i

Rate for each 5th km stone = j/6 4088.90


(ii) Ordinary Kilometer Stone (Precast)
Unit = each
Taking output = 14 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 3.77 4721.45 17799.88
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 26.32 64.62 1700.85
c) Excaion in soil for foundation
As per item No. 1 of Chapter 11 cum 2.77 187.46 519.26
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 11.41 129.88 1481.93
e) lettering on km post (average 12 letters of 10 cm height
each)
As per item No. 1 of Chapter 10 per cm high per
letter 1680.00 0.75 1260.00
Transportation and fixing
f)  Labour
Mate day -
Mason (1st Class) day 1.00 545.00 545.00
Mazdoor (Unskilled) day 7.32 515.00 3769.80
Agency area allowence /MAA 0.000% 0.00
g) Machinery
50 HP Tractor with trolley hour 6.00 465.00 2790.00
Over heads & Contractor's Profit 12.500% 3733.34
Add Labour welfare Cess @ 1% 1.000% 336.00
j) Cost for 14 Nos. ordinary km stone = 33936.06
(a+b+c+d+e+f+g+h+i)
Rate for each ordinary km stone = j/ 14 Rs. 2424.00
(iii) 200 m / Hectometer stone (precast)
Unit = each
Taking output = 33 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 1.58 4721.45 7459.90
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 66.00 64.62 4265.05
c) Excaion in soil for foundation
As per item No. 1 of Chapter 11 cum 1.39 187.46 260.57
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 6.27 129.88 814.35
e) lettering on km post (average 1 letter of 10 cm height each)
As per item No. 1 of Chapter 10 per cm high
per letter
330.00 0.75 247.50
Transportation and fixing
f)  Labour
Mate day -
Page 10 of 249

Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Mason (1st Class) day 1.50 545.00 817.50
Mazdoor (Unskilled) day 7.34 515.00 3780.10
Agency area allowence /MAA 0.000% 0.00
g) Machinery
50 HP Tractor with trolley hour 6.00 465.00 2790.00
Over heads & Contractor's Profit 12.500% 2554.37
Add Labour welfare Cess @ 1% 1.000% 229.89
j) Cost for 33 Nos. 200 m stone = (a+b+c+d+e+f+g+h+i) 23219.23
Rate for each 200 m stone = j / 33 Rs. 703.61
DATA-Road Safety- datas
71 Cost, supply and Painting on road of Thermoplastic Paint including cost and
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.
Initial Rate as per R&B dept Circular memo No. sqm 1.00 663.00 663.00
RSI/DCE®/EE(RS)/DEE(RS)/AEE(RS)/2019, Dt. 31-10.2019.

Over heads & Contractor's Profit 0.000% 0.00


Add Labour welfare Cess @ 1% 1.000% 6.63
Rate per sqm Rs. 669.63

72 Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks)
including cost and conveyance and all labour charges and including contractors
profit & Over head charges, but excluding GST etc,. Complete.

Initial Rate as per R&B dept Circular memo No. Each 1 361.00 361.00
RSI/DCE®/EE(RS)/DEE(RS)/AEE(RS)/2019, Dt. 31-10.2019.

Over heads & Contractor's Profit 0.000% 0.00


Add Labour welfare Cess @ 1% 1.000% 3.61
Rate per Each Rs. 364.61
73 Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated
sheet metal beam rail 70 cm above road/ground level, fixed on ISMC series chennel verical
post 150x75x5mm spaced 2.00m cente-to-centre, 1.80m high, 1.10m below ground/road
level, all steel parts and fitiings to be galvanized by hot dip process, all fittings to confirm to
IS:1367 and IS: 1364, metal beam rail to be fixed on vertical post with a spacer of chennel
section 150x75x5mm, 330mm longs complete as per clause 810, including cost and
conveyance and all labour charges and including contractors profit & Over head charges,
but excluding GST etc,. Complete.
Initial Rate as per R&B dept Circular memo No. Rm 1 2857.00 2,857.00
RSI/DCE®/EE(RS)/DEE(RS)/AEE(RS)/2019, Dt. 31-10.2019.

Over heads & Contractor's Profit 0.000% 0.00


Add Labour welfare Cess @ 1% 1.000% 28.57
Rate per Each Rs. 2885.57

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
Add Road Proposal Details PMGSY3
Construction of BT Road from NH 163 road to R&B Road
Note : All Amounts are in Lakhs and All
Lengths in Kms. Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu
Dist.
Name of State Telangana District Mulugu
Construction Type Upgradation Construction
Existing Surface Type * Earthen
Year * 2021-22 Batch * Batch II
Name of Block * Tadvai Funding Agency * Regular PMGSY
Stream * Regular PMGSY
New Package Select New Package
Package Number * TS31RCP 08
TR/MRL * Select TR/MRL
Habitations Benifited * Always select "Yes"
Road From * NH 163 Road
Road To * Shankarrajupally

Technical Details

CC Length * 0.000 0.640


BT Length * 0.640

Whether any higher specification Always select "No"


beyond PMGSY3 Guidelines have been
proposed(including utility shifting)? *
Riding Quality Length 0.64000
Pavement Cost Details (Including GST)
Clearing Cost* 0.05
Excavation Cost* 4.22
Filling Cost*
Sub Grade Cost* 0.00
Shoulder Cost* 2.13
Sub Granular Grade Cost* 11.44
Soil Aggregate* 0.00
WBM Grade II* 0.00
WBM Grade III* 0.00
WMM* 13.23
Prime Coat* 1.39
Tack Coat* 0.33
BC 8.17
SDBC 0.00
SDBC - 8% plastic waste 0.00
Surface Dressing* 0.00
Dry Lean Concrete* 0.00
Concrete Pavement* 0.00
40.96
Other Cost Details (Including GST)
Pucca Side Drains* 0.00
Number of CD Works 7
CD Works Cost (Total) 5.50
Protection Works Cost (Total) 0.00
Other Works Cost (Total) 10.29
Total Shines (Furniture) Cost(Rs Lakhs)
Total Cost(Rs Lakhs / Excluding Higher
Specification Cost) 56.75
GST Cost (To be entered seperately)* 6.15
Design Details
Carriage Way Width * 3.75
Traffic Category T4
Proposed Surface * BC
Maintenance Cost
Year 1(Rs Lakhs) * 0.34 1.00
Year 2(Rs Lakhs) * 0.51 1.00
Year 3(Rs Lakhs) * 0.68 1.00
Year 4(Rs Lakhs) * 0.85 1.00
Year 5(Rs Lakhs) * 1.01 2.00
Renewal Cost (Rs Lakhs) * 10.39
Remarks Enter Package No.
IMPORTANT INPUT DATA FOR ESTIMATE
Construction of BT Road from NH 163
Name of the Road Work
road to R&B Road Shankarrajupally via
toddy trees of
Eturunagaram(M),Mulugu Dist.

Grant PMGSY-III - 2021-2022 Batch-II

Package TS31RCP16

Length of the road 0.640 Km

Est. Cost in Rs. Lakhs 58.00 Lakhs

State Share Rs. In Lakhs 23.20 Lakhs

Routine Mtc. Est. Cost in Rs. Lakhs ( for 5 Years


3.48 Lakhs
after completio n)

Periodic Mtc. Est. Cost in Rs. Lakhs


8.64 Lakhs
( Renewal Coat) after 5th Year

Name of the Circle Warangal

Name of the District Mulugu

Name of the Division Mulugu

Name of the Mandal Eturunagaram

SSR Addopted SSR- 2021-22

Quarry & Leads Quarry name Lead in Kms

Gravel Local 10 Kms

Selected earth Local 10 Kms

Sand for filling Local 10 Kms

Sand for Concrete / Mortar Local 10 Kms

Boulder stones for revetment - 86 Kms

Metal Quarry Hand broken - 86 Kms

Metal Cursher metal - 86 Kms

B.T & Emultions ( Round Trip Length ) Since Bulk - 442 Kms

Bitchem ( Single Trip length ) Since Packed Drums - 250 Kms


Hume Pipes - 110 Kms

Fly Ash - 270 Kms


Rate of Materials Date Amount
BT Emulsion SS1-Bulk ( Excuding GST ) 45940.00
01-08-2021
BT Emulsion RS1- Bulk ( Excuding GST ) 30060.00
01-08-2021
BT VG-30 (60/70 grade)-Bulk ( Excl. GST ) 38070.00
01-08-2021

HYSD Fe-500- From Primary producers ,Like


19-08-2021 57000.00
TATA,SAIL,VSP, Jindal&Shyam steel Etc ( Per MT)

Cement (OPC) ( Per MT) 19-08-2021 5600.00

Mild steel ( Per MT) 19-08-2021 52000.00

Structural Steel ( Per MT) 19-08-2021 52000.00

HR Sheet 1.60mm ( Per MT) 19-08-2021 72000.00


SELECT LAB
TO PROVID
Additional Charges OR ESTIAM

Over Heads for Roads & CDs 12.500%

Agency area allowence /MAA 0%


Cost of Water required ( Y/N ) Y
Add Labour welfare Cess @ 1% IN DATA 1.000%

Seignarage Charges to be included DATA ( Y/N ) N

IF NEW TECHNOLOGY WITH COLD MIX (BITCHEM) PROPOSED


Coldmix bitumen emulsion (CSS-1) Packed Rates (Excl.GST) as on 34165.00
17-11-2020

Coldmix Bitumen emulsion (RS-1) Packed 32342.00


-- do --

CRRI - Cold Mix Binder -Packed 41241.00


-- do --

IF NEW TECHNOLOGY WITH CEMENT STABILISATION PROPOSED

Cement % for Sub grade as per Design ( As per DPR Designs )


2.40%
Cement % for Sub base as per Design -- Do -- 4.70%

Cement % for base as per Design -- Do -- 5.50%


Inputs for Maintanance Estimate only
BT length Proposed in kms 0.640 Kms

B.T Carriage Width Proposed 3.750-Mtrs

CC Pavement length Proposed in kms 0.000 Kms

Shoulder width proposed in meters 1.875-Mtrs


Sum of vents of Pipe Culverts With Dia 600mm Dia---------- > 0 Nos.
Sum of vents of Pipe Culverts With Dia 900mm Dia ----------> 0 Nos.
Sum of vents of Pipe Culverts With Dia 1000mm Dia ---------> 2 Nos.

Total No. of Spans of Slab Culverts with 3.00m Span ------> 0 Nos.
Total No. of Spans of Slab Culverts with 5.00m Span ------> 0 Nos.
Total No. of Spans of Slab Culverts with 6.00m Span ------> 0 Nos.
Drains length Proposed in meters 0.000-Mtrs
Road Dam /Cause way lengths 0.000-Mtrs
No of Guidestones Proposed If any 5 Nos.

Maintanance Ls amount available ( if minus amount it should be reduce


to minimum by reducing above shoulder widths or any CD work 0.00
numbers to bring with maintanance Estt Cost ) =>
NEW TECHNOLOGY ITEMS & RATES

NON SSR ITEM RATES ( Excluding GST) Basic


Rates
1 HDPE cells 100mm Depth (Rate up to Dec-2021 ) 106.00 Sqm

2 Plastic Waste ( Old DPR Rates ) 27000.00 Tonne

3 ANT Stabiliser ( rate Dt: 17-11-2020 from AVS 12,500.00 litre


INNO INFRA)
4 Terraprime (Rate as per Invoice) 1059.32 Kg

5 Zycotherm (Rate as per Invoice) 1144.07 Kg

6 Terrasil-S (Rate as per Invoice) ( as per Zydex 466.10 Kg


Industries)
7 Zycobond (Rate as per Invoice) ( as per Zydex 152.54 Kg
Industries)
8 Cost of Bioenzyme (TerraZyme) 14000.00 litre

9 Polymer Treated Base Course Compound ( PTBC) 310.00 Litre


viz. SoilTech MK III (Rate as per Invoice) dt:5-6-
2020
10 StrataWeb SW 356, 125 mm Geocell including 360.00 Sqm
transportation charges (Rate as per Invoice)

11 Concrete groove Cutting Charges 55.00 Rm

12 Coir Geo-Textile of 700 GSM ( Excl. 5% GST) 78.20 Sqm

13 Nano Tac 1,059.32 Kg


BT Emulsion 53390.00
SS1-Bulk
(BT
Excuding
Emulsion 48892.00
GST )
SS2-Bulk
(BTExcuding
Emulsion 46033.00
GST )Bulk
RS1-
(BT
Excuding
VG-30
GST ) grade)-
(60/70
Bulk ( Excl. GST 39770.00
)

SELECT LABOUR CESS


TO PROVIDE IN DATA
OR ESTIAMTE

0.000% => LABOUR CESS PROPOSED IN ESTIMATE


Y
Maintenance Shoulders width to be Reduced here if Needed

Enter Equalent Spans Nos of Proposed Slab Culverts ,Ie, of 2v


6.00m Span Culvert enter 2nos in Cell against 6.00m Span

1.875-Mtrs
INPUT SHEET FOR THE ROAD ESTIMATE ITEMS TO BE SPECIFIED WEHTHER R
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturu
Sl.No Estt.ite DETAILS OF ROAD ITEMS Item
m.Sl.No
Required
Y/N

ROAD WORKS -ITEM WISE


1 1 Clearing and Grubbing Road Land Y
2 1 Construction of embankment with material obtained N
from road way cutting by using Machinery

3 2 Construction of Embankment with Material Obtained Y


from Borrow pits by Machinery
4 0 Excavation in Hard Rock ( requiring blasting) with N
Disposal upto 1000m
5 0 Excavation in Ordinary Rock using Hydrulic Excavator N
and Tipper with Disposal upto 1000m

6 2 Trench Cutting both sides for widenining, Excavation in Y


Soil with Dozer with lead upto 100m

7 3 Granular Sub-base with Well Graded Material (Table Y


400.1)- Grading- III
8 3 Gravel / Soil - Aggregate Base (Table 400.2) Grading C N
(Gravel + Stone dust)
9 3 Scarifying existing granular surface to a depth of 50 N
mm and disposal of scarified material
10 3 Scarifying existing granular surface to a depth of 50 N
mm and spreading scarified material
11 3 Scarifying the existing bituminous road surface to a N
depth of 50 mm and disposal of scarified materia

12 3 WBM Grading 2 (using Graded Metal) N


13 3 WBM Grading 3 (using Graded Metal) N
14 4 Wet Mix Macadam Y
15 4 Cement Stabilisation for Improving Subgrade N
16 4 Cement Treated Soil Sub-Base N
17 4 Cement Treated Crushed Rock or combination as per N
clause 403.2 and table 400.4 in Base
18 4 ANTStabilizer Treated Soil Sub-Base N
19 4 ANTStabilizer Treated Soil Base N
20 4 Stabilized Sub base : WITH NANO TECHNOLOGY - N
(Bottom layer)
21 4 Stabilized Base: WITH NANO TECHNOLOGY (Top N
layer)
22 4 Bottom Layer CBR 3-6% - For Terrazyme and N
application only with 1L for 12cum existing subgrade

23 4 Top Layer CBR above 8% - murram/gravel - for N


TerraZyme with borrow soil material in the ratio 1L for
15.0 cum soil with 25% metal
24 4 Polymer Treated Base Course Compound ( PTBC) viz. N
SoilTech MK III
25 4 Granular Sub-base with Well Graded Material (Table N
400.1) using 100 mm Geocell
26 4 Pre-coating of chips with 1 per cent of CRRI - Bitchem N
Cold Mix Binder
27 4 Surface dressing with CRRI - Bitchem Cold Mix Binder N

28 4 Prime Coat with BitChem bitumen emulsion (CSS-1) N

29 4 TACK COAT with BitChem Bitumen emulsion (RS-1) N

30 4 OGPC using CRRI-BitChem tailor made cold mix N


binder
31 4 Seal Coat Type B using CRRI-BitChem tailor made N
cold mix binder
32 5 Earth Shoulders Y

33 6 Prime Coat Y
34 7 TACK COAT Y
35 7 20mm thick Open-Graded Premix Carpet using N
Bituminous (penetration grade/modified bitumen)
Binder using HMP
36 7 Liquid seal coat (Type A) - By Mechanical Means N

37 7 Bituminous premixed Seal coat (Type B) - By N


Mechanical Means
38 7 Bituminous premixed seal coat (Type C) N
39 7 Mix Seal Surfacing - 20 mm thick (HMP) N
40 7 Bituminous Macadam N
41 7 TACK COAT Over BM N
42 8 Bituminous concrete Y
43 8 20mm thick Open-Graded Premix Carpet using N
Bituminous (penetration grade/modified bitumen)
Binder and 8% of Waste Plastic using HMP

44 8 SEAL COAT ( Type A ) With using (8% of Waste N


Plastic )
45 8 Mix Seal Surfacing - 20 mm thick (HMP) - Using 8% of N
Plastic Waste
46 0 BC 30mm thick using 8% of waste plastick. N
47 8 Cement Concrete cell fill Pavement N
48 8 Paneled Cement Concrete Pavement (Panel Size 0.75 Y
X 0.75 mts)
49 8 Cement - Flyash Concrete Pavement. N
50 8 Prime Coat Low porosity with Nano Technology N
51 8 20mm thick Open-Graded Premix Carpet using N
Bituminous (penetration grade/modified bitumen)
Binder using HMP (Binder With Nano Technology
based Organo Silane Compound -Zycotherm @0.10%
of Bitumen)

52 8 Seal Coat Type C (Zycotherm @0.10% of Bitumen) N

53 8 Bituminous concrete ((Binder With Nano Technology N


based Organo Silane Compound -Zycotherm @0.10%
of Bitumen)
54 8 Mix Seal Surfacing - 20 mm thick -BitChem tailor made N
cold mix Binder
55 8 Cement Concrete Pavement Y
56 8 Coir Geo Textile N
57 0 Maintenance of WBM road including filling up of pot N
holes, ruts with Grading-III material 75mm thick

58 0 Maintenance of bituminous surface road Repair to pot N


holes filled with 20mm thick Pre-mix Carpet & Seal
Coat Type-B
59 0 Maintenance of bituminous surface road Repair to pot N
holes filled with 75mm B.M
60 0 Providing Nominal reinforcement in Addl.CC N
Pavement Layer provided over existing damaged CC
Pavements

PROPOSED CD WORKS TYPES

61 Pipe culverts => ( Required Y/N ) Y


62 Slab culverts => ( Required Y/N ) Y
63 Road Dams => ( Required Y/N ) Y
64 Side Drains => ( Required Y/N ) Y
E SPECIFIED WEHTHER REQUIRED "Y" OR "N"
jupally via toddy trees of Eturunagaram(M),Mulugu Dist.
Estimated REMARKS
Qty as per
Detailed Estt

1920.00 ITEM IS OK
0.00 ITEM IS OK

1618.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 QTY TO BE CHECKED

400.50 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK
0.00 ITEM IS OK
371.70 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

792.00 ITEM IS OK

2478.00 ITEM IS OK
2478.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK
74.35 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 QTY TO BE CHECKED

0.00 ITEM IS OK
0.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 QTY TO BE CHECKED


0.00 ITEM IS OK
0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK

0.00 ITEM IS OK
SPECIFICATION REPORT
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via
Name of the Work
toddy trees of Eturunagaram(M),Mulugu Dist.

Grant : PMGSY-III Batch=II Est. Cost . Rs. 58.00


The Road work Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via
toddy trees of Eturunagaram(M),Mulugu Dist. was sanctioned under PMGSY-III Batch-II 2020-
21 Vide Go MS. No. 36, dated 30.03.2021 of PR & RD (progs.I) Dept. for Rs.300.00 Lakhs. The
sanctioned road length is 0.64 Km.

1) Habitations to be Benifitted

The following villages will be benifitted by providing this road.

Name of the Popupation asper 2011cencus


Sl.No. Name of the Village Remarks
Mandal Plain SC ST Total

1 Eturunagaram - 0 Directly

1 - 0

2 - 0

3 - 0

4 - 0

5 - 0

6 - 0 Directly

7 - 0 In-directly

8 - 0 In-directly

9 - 0

10 - 0

11 - 0

12 Total 0 0 0 0
2) Existing Surface Details
The existing surface details of the road for proposed length ie., from 0/0 to 3/4 Km are as follows.
Existing Type Total Length in
S.No Reach/ Reaches Remarks
of surface mts
1 er #NAME? 640

2 er #NAME? 0

3 gravel #NAME? 0

4 metal #NAME? 0
5 bt #NAME? 0

6 cc #NAME? 0

7 er #NAME? 0

8 gravel #NAME? 0

9 metal #NAME? 0

10 bt #NAME? 0

11 cc #NAME? 0

12 bt #NAME? 0

13 bt #NAME? 0

14 #NAME? #NAME? #NAME?

15 cc #NAME? 0

Total 0/0 - 3/5 #NAME?

3) Traffic intensity : Cumulative ESAL is181149 and considered IRC SP-72 Fig-4
Chart T4

4) Reach wise CBR and proposed road Crust thickness w.r.t


existing surface details are as follows Separate Statement
Enclosed

5) CD works Existing Proposed Details are as follows.


Separate Statement
Enclosed
6) Road Safty Interventions Provisions as per RSA report for road length 5.00 Km and above works
(RSA Report enclosed)

7) The Brief Details of specifications provided in Estimate


1) C/o Embankment with Material Obtained from Borrow pits
2) C/o Sub base with GSB Gr. III
3) C/o Base course with WMMI
BT Portion 4) Proposed the surface with Prime coat, Tack Coat & BC

1) C/o Embankment with Material Obtained from Borrow pits


2) C/o Sub base with GSB Gr. III
3) Proposed the surface with CC Pavement of 200 mm thick
CC Portion
8) The current COMMAN SSR of 2020-21 is adopted.

9) The Cement and Steel rates of October-2020 is adopted and BT rates are adopted as on 16-11-
2020 as per DPR provisions.
Estimate is prepared with above provisions and cost comes to Rs.58.00 Lakhs and
same is submitted for accord Technical Sanction.and early sanction is solicited.

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
REACH WISE CBR AND PROPOSED ROAD CRUST THICKNESS W.R.T EXISTING SURFACE DETAILS

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.

Crust
Existing & Proposed Crust provision in mm
Thickness Crust B.T./CC
required Gravel/GSB WBM GR-II WBM GR-III WMM CC Total Pavement thickness thicknes
Reach CBR in %
asper s Check
Pavemnt +/- Propose
design Existing Proposed Existing Proposed Existing Proposed Existing Proposed Ext Prop Existing Proposed Total Existing
d in mm
Sl.No

1 0 to640 5.47% 300 0 150 0 0 0 0 0 150 0 0 0 300 300 0 0 30

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
REACH WISE DETAILS OF EXISTING CD WORKS AND PROPOSED CD WORKS

Existing CD Works Proposed CD Works


Sl.No Sl.No

CD Work Type Reaches CD Work Type Reaches


Nos Nos
1 0 5 0 1 Pipe culvert 1 220.000
2 0 5 0 2 Pipe culvert 1 620.000
3 0 5 0 3 #NAME? 1 #NAME?
4 0 5 0 4 0 1 0.000
5 0 5 0 5 0 1 0
6 0 5 0 6 0 1 0
7 #NAME? 5 #NAME? 7 0 1 0
8 0 5 0 8 0 1 0
9 0 1 0
10 0 1 0
11 0 1 0
12 0 1 0
13 0 1 0
14 0 1 0

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
ROAD SAFTY INTERVENTIONS PROVISIONS AS PER RSA REPORT FOR ROAD LENGTH 5.00 KM AND ABOVE WORKS
(RSA Report enclosed)

Name of Work :
RSA Report No&Dt:

Provisions as per RSA report Provisions proposed in Detailed Estimate


Sl.No Sl.No
Details of Items Page Quantity/Units
Quantity/Units Recommended Remarks/Reasons for deviations if any
recommended No. Proposed
p 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
ABSTRACT MAINTANANCE ESTIMATE
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via
toddy trees of Eturunagaram(M),Mulugu Dist.

PMGSY Length of Road 0.64-Kms


Total Estimate Cost Rs. 3.38 Lakhs
Cost per Km 5.28 Lakhs
The routine meaintanance estimates is prepared for 5 years period, each 6 months
period i.e. 6 months premonsoon and 6 months postmonsoon period. As per the
estimates the following is the estimate cost for the years mentioned below.

Cost of routine maintanance for 5 years Rs

Year Total Amount Generated % Year Remarks


wise per Km rate

1 0.34 10.00% 1

2 0.51 15.00% 1

3 0.68 20.00% 1

4 0.85 25.00% 1

5 1.01 30.00% 2

Total Cost of routine Maintenance 3.39 100.00%


cost Rs.
Add Labour cess @1%

Add GST @12%on all above

LS Provision for Emergency


repairs due to floods , other natural
calamities etc.,
Total Maintenance Cost Rs. 3.39

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
Page 35 of 249

Estimate for maintenance of BT work as per guidelines issued by NRRDA for 5 years
Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist. PMGSY-III-Batch-II- Pkg.No-TS31RCP16 Dia / Span of CD
work
Carriage way width 3.75 Mtrs Rainfall Low-1 Medium-2 High-3 2.00
Roadway Width 7.5 Mtrs Traffic CVPD Value of CPVD 16.00 Sum of vents of Pipe Culverts 0 0.600 0
Shoulder width 1.875 Mtrs 0.00Lakhs Sum of vents of Pipe Culverts 0 0.900 0
0.00
1.000 2
Total length 640 Mtrs Total Road dam/Cause way Lengths 0.00 Mtrs Sum of vents of Pipe Culverts 2
BT length 640 Mtrs Total No. of Pipe Culverts 2 No of equalent vents of 1000mm dia `Total equalent Pipe culvet Vents of 1000mm dia= 2
CC length 0 Mtrs Total No. of Slab Culverts 0 No of eqalent vents f 2.00m Span Sum of Total Spans

Drain Length 0 Mtrs Guard stone Nos 5 Nos Total No. of Slab Culverts 0 3.00 0
Total No. of Slab Culverts 0 5.00 0
As per SSR-Rates as per
Percentage Multiplyi Total No. of Slab Culverts 0 6.00 0
Sl.No Details L (m) B(m) D(m) Nos Quantity Unit SSR 2014-15
/Frequency ng factor Rate Amount `Total Ventage in meters = 0
1 2 3 4 5 6 7 8 9 10 11 12 `Total equalent 2.00m Vents = 0
Filling of Pot holes YEAR WISE BREAKUP FOR MTC. AMOUNT
BT SURFACE year 1 st year 2nd year 3 rd year 4th year 5th year TOTAL
1st year 640 3.75 1 0.5 1.25 15.00 sqm 305.02 4575.30 4575.30
2nd year 640 3.75 1 1.0 1.25 30.00 sqm 305.02 9150.60 9150.60
3rd year 640 3.75 1 1.5 1.25 45.00 sqm 305.02 13725.90 13725.90
1 4th Year 640 3.75 1 2.0 1.25 60.00 sqm 305.02 18301.20 18301.20
5th Year 640 3.75 1 2.5 1.25 75.00 sqm 305.02 22876.50 22876.50
WBM TOP LAYER/WMM layer
Considering effected area
3rd year 640 3.75 0.050 1 1.5 1.25 2.25 sqm 229.16 515.61 515.61
@ 5% of Total area
4th Year 640 3.75 0.050 1 2.0 1.25 3.00 sqm 229.16 687.48 687.48
5th Year 640 3.75 0.050 1 2.5 1.25 3.75 sqm 229.16 859.35 859.35
Subtotal 70691.94 70691.94
Making up of berms/shoulders stripping excesss
soil from the shoulder surface to achieve the required
level

1st year 640 1.875 2 10.0 1.25 300.00 sqm 17.67 5301.00 5301.00
2
2nd year 640 1.875 2 12.0 1.25 360.00 sqm 17.67 6361.20 6361.20
3rd year 640 1.875 2 14.0 1.25 420.00 sqm 17.67 7421.40 7421.40
4th Year 640 1.875 2 16.0 1.25 480.00 sqm 17.67 8481.60 8481.60
5th Year 640 1.875 2 18.0 1.25 540.00 sqm 17.67 9541.80 9541.80
Subtotal 37107.00 37107.00
Restoration of berms and raincuts in
hard shoulders
A- 50% by soil for embankment
Depth Taken 150mm
1st year 640 0.9375 0.15 1 6.0 1.25 6.75 cum 452.41 3053.77 3053.77
2nd year 640 0.9375 0.15 1 7.2 1.25 8.10 cum 452.41 3664.52 3664.52
3rd year 640 0.9375 0.15 1 8.4 1.25 9.45 cum 452.41 4275.27 4275.27
4th Year 640 0.9375 0.15 1 9.6 1.25 10.80 cum 452.41 4886.03 4886.03
3 5th Year 640 0.9375 0.15 1 10.8 1.25 12.15 cum 452.41 5496.78 5496.78
Subsub Total 21376.37 21376.37
B-50% by hard shoulder
1st year 640 0.9375 0.15 1 6.0 1.25 6.75 cum 452.41 3053.77 3053.77
2nd year 640 0.9375 0.15 1 7.2 1.25 8.10 cum 452.41 3664.52 3664.52
3rd year 640 0.9375 0.15 1 8.4 1.25 9.45 cum 452.41 4275.27 4275.27
4th Year 640 0.9375 0.15 1 9.6 1.25 10.80 cum 452.41 4886.03 4886.03
5th Year 640 0.9375 0.15 1 10.8 1.25 12.15 cum 452.41 5496.78 5496.78
Subsub Total 21376.37 21376.37
SubTotal 42752.75
Page 36 of 249

As per SSR-Rates as per


Percentage Multiplyi Total No. of Slab Culverts 0 6.00 0
Sl.No Details L (m) B(m) D(m) Nos Quantity Unit SSR 2014-15
/Frequency ng factor Rate Amount `Total Ventage in meters = 0
1 2 3 4 5 6 7 8 9 10 11 12 `Total equalent 2.00m Vents = 0

exam. For 1 km
Labour for cleaning the shoulders one length 5 labour
4 0.64 hence for 5 year 25 man days 585.17 9362.72 1872.544 1872.544 1872.544 1872.544 1872.544
labour for 200m for one year 5x5=25 man
days

Subtotal 9362.72 9362.72

For 1 km length
Cleaning of CD opening and maintenance 6 labour hence
5 of CD pitchning etc 3 CD per KM two 0.64 for 5 year 30 man days 585.17 11235.26 2247.0528 2247.0528 2247.0528 2247.0528 2247.0528
labour or one 5x6=30 man
days

Subtotal 11235.26 11235.26

Maintenance of 200 m stones and


Km stones by way of refiting , repairing Once in
with cement mortar , cleaning and year . 5 672.93
6 0.64 5 km 2153.39 430.67712 430.67712 430.67712 430.67712 430.67712
lettering as per drawing and technical times in 5
specification clause 1912 (Clause 2.3 of years
OM for Frequency)

Subtotal 2153.39 2153.39

Maintenance of Drains
include erosion, repair, Twice in a
clearing,reshaping, regarding ,deeping of year.For 5 4.87
7 0.00 1 10 Rmt 0.00 0 0 0 0 0
side drains as well as catch water drains as years 10
per clause 1907 of the specification. ( 50 times
% length of drains , for

Subtotal 0.00 0.00

Clearing wild seasonal growth on


640 1.875 1 5 6000 sqm 4.06 121800.00 24360 24360 24360 24360 24360
berm/shoulders etc. ( 50 % area)
Once in a
8 Cutting of Tree Branches ( assuming 10 years 5 times
10 in 5 year 5 32 each 182.57 0.00 0 0 0 0 0
trees in 1 km )
White washing and Geo painting of Tree 0.00
0.5 10 5 25 sqm 0.00 0 0 0 0 0
Trunks ( 0.5 sqm per tree)
Subtotal 121800.00 121800.00

Maintanence of Guard rails and Once in a


9 parapet rails as per 1911 clause 0 year 5 times 0 sqm 0.00 0 0 0 0 0
(considering 10 sqm area ) in 5 year

Subtotal 0.00 0.00


Page 37 of 249

As per SSR-Rates as per


Percentage Multiplyi Total No. of Slab Culverts 0 6.00 0
Sl.No Details L (m) B(m) D(m) Nos Quantity Unit SSR 2014-15
/Frequency ng factor Rate Amount `Total Ventage in meters = 0
1 2 3 4 5 6 7 8 9 10 11 12 `Total equalent 2.00m Vents = 0

Maintenance of culverts and cause


ways as per 1908 and 1909

Twice in a year per row


Pipe Culverts / ASPER ACTUAL 2 1 10 times in 5 2 10 of hume 1622.00 32440.00 6488 6488 6488 6488 6488
years pipe

10 Twice in a year per row


Slab Culverts ASPER ACTUAL 0 1 10 times in 5 0 10 of hume 3361.03 0.00 0 0 0 0 0
years pipe

Cause way ( assuming 10 m causeway ) Twice in a year


0 1 10 times in 5 0 RM 87.63 0.00 0 0 0 0 0
ASPER ACTUAL LENGTH years

Once in a year 5
White washing parapets of CD works 2 5.5 2 1 times in 5 year 110 sqm 23.78 2615.80 523.16 523.16 523.16 523.16 523.16

Subtotal 35055.80 35055.80

Maintence of Road Furniture & Signs

Road Furniture
Once in
11 0.64 1.600 Kms 3111.600 4978.560
two years

2489.28 2489.28
Subtotal 4978.56 4978.56
Maintence of Guard Stones
Refixing of Guard Stones ( 20 % of total Once in a
Numbers) ( Taking out put of 5 guard 5 0.2 years 5 times 5 each 117.03 585.17 117.034 117.034 117.034 117.034 117.034
stones per Man Mazdoor per day) in 5 year
12
Twice in a
White washing of Guard Stone year 10 16.41
5 0.2 10 each 164.08 32.8164 32.8164 32.8164 32.8164 32.8164
( 0.75x0.23x0.23m size) times in 5
years
Subtotal 749.25 749.25

Total 335887.00
52055.12 61401.41 66284.74 75802.90 80342.50 335886.67
PERIODIC MAINTANANCE - SUB ESTIMATE

Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of
Eturunagaram(M),Mulugu Dist.
Measurments
S.No Description No Quantity Rate Amount
L B D
1 2 3 4 5 6 7 8 9
1 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the
existing Bitume surfaces & cleaned with Hydraulic broom as per
Technical Specification Clause 503 MORD, including contractors profit
& Over head charges, but excluding GST etc,. Complete. for Tack
Coat on Bitumen surface.

Total B.T Length Reach 1 x 1 640.00 3.75 2400.000

2400.000 9.97 23925.00


Sqm Sqm
2 Providing and laying Bituminous concrete with 100- 120 TPH batch
type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous
binder @ 5.4 to 5.6 % per cent of mix and filler, transporting the hot
mix to work site, laying with a Mechanical paver finisher to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects,
including overhead charges & Contractors profit. but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

Total B.T Length Reach 1 x 1 640.00 3.75 0.030 72.000

72.000 9816.34 706776.00


Cum Cum
3 Construction of improved subgrade/ Shoulders by providing selected
earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with
LL & PI not more than 40% and 20 respectively and spreading in
uniform layers with tractor grader on prepared surface, and compacted
at OMC with vibratory roller 80-100 kN to meet requirement of Table
300.2 with as per Technical Specification Clause 303 MORD / 305
MORTH, by using machinery including contractors profit & Over head
charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete.
Total B.T Length Reach 1 x 2 640.00 1.875 0.030 72.00

72.00 379.67 27336.00


Cum Cum

Total Rs. 758037.00

Asst.Exe.Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer


R&B AK Ghanpur R&B Mulugu R&B Mulugu R&B Warangal
Page 39 of 249

Schedule A (Part -I)


Schedule of Rates and Approximate Quantities

Name of the work : - Construction of BT Road from NH 163 road to R&B Road Shankarrajupally via toddy trees of Eturunagaram(M),Mulugu Dist.

Estt.Cost Rs.. 58.00 Lakhs Grant PMGSY-III - 2021-2022 Package


Batch-II No.TS31RCP16
A) The quanties here given are those upon which the lumpsum tender cost of work is based but they are subject to alteration, omissions, deductions, or additions
as provided for in the conditions of this contract and do not necessarily show the actual quantities of work to be done. The total contract value and unit rates
noted below are those governing payment of extras or deductions for omissions according to the conditions to the contract as set forth in the preliminary
specifications of the AP Standard Specifications and other conditions of specification of this contract.

B) It is to be expressly understood that the measured work is to be taken net (not withstanding any custom or practice to the contrary) according to the actual
quantities when in place and finished according to the drawings or as may be ordered from time to time by the Executive Engineer and the cost calculated by
measurmeent or weight, at their respective rates wihtout any additional charge for any necessary or contingent works connected works connected therewith.
The total contract value is for works in situ and complete in every respect.

C) Additions and alterations in the Schedule of quantities will disqualify the tender
D) In case of discrepancies between the written description of the item in the Schedule 'A" and the detailed description in the specification of the same item, the
latter shall be adopted.
Sl.No Probable Unit of Description of works MoRD/ MoRT&H Unit of Rate in figures Amount
quantity measureme specification Measureme
both in nt Number nt
figures

1 2 3 4 5 6 7 8
1 Road Portion
1 1920.00 sqm Clearing and grubbing road land including uprooting wild vegetation, grass, 201 MoRD 1.00 sqm 2.29 4397.00
bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of
such trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201 MORD . including contractors profit &
Over head charges, but excluding GST etc,. Complete. .
Page 40 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Construction of embankment with approved materials deposited at site from 301.5 MoRD/ 305 1.00 cum 97.78 0.00
MoRTH
roadway cutting and excaion from drain (not exceeding 0.6 m depth) and
foundation of other structures including breaking clods, ramming, spreading,
sectioning, grading compacting with vibratory roller 80-100KN to OMC
compaction including to a top width of 7.5m and raising to required height
complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5 MORD/ 305 MORTH including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

2 1618.00 cum Construction of embankment with borrowed useful earth from outside road 301.5 MoRD 1.00 cum 233.00 376994.00
boundary by mechanical means upto SDR with a lead of 10 km including pre-
watering of soil at borrow area, removal of top soil, excavation of soils at
borrowed area, conveyance ofsoil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to
10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of
MoRT&H, including all hire andoperational charges of T&P ,contractors profit &
Over head charges and , complete for finished item of work as per MoRT&H
specification 305 (5th revision) but excluding Seigniorage charges, GST
Complete . (Payment will be made based on level for finished item of work).
With borrowed earth from 10 km lead.

0 0.00 cum Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and 301.5 MoRD 1.00 cum 349.21 0.00
breaking, trimming of bottom and side slopes in accordence with requirements
of line,grade and cross-sections, loding and disposal of cut roack with all lifts
and lead upto 1000 m as per Technical Specification Clause 302.3.5 MORD
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.
Page 41 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Excavation for roadway in prdinary rock with hydrulic excavator of 0.90cum 301.5 MoRD 1.00 cum 161.44 0.00
bucket capacity including cutting and loding in tipper, transpoertin to
embankmen site with all lifts, and lead upto 1000 m. trimming bottom nad side
slopes in accordance with requirements of line, grade and cross section as per
Technical Specification Clause 302.3.5 MORD including contractors profit &
Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

0 0.00 cum Excavation for roadway in soil by mechanical means including cutting and 302.3 MoRD 1.00 cum 46.71 0.00
pushing the earth to site of embankment upto a distance of 100 m, including
trimming bottom and side slopes in accordance with requirements of lines,
grades and cross-sections as per Technical Specification Clause 302.3 MORD
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

3 400.50 cum Construction of granular sub-base by providing well graded material(Table 401 MoRD 1.00 cum 2550.95 1021655.00
400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20
and PI Value less than 6 spreading in uniform layers with Tractor grader on
prepared surface, mixing by mix in place method with rotaor at OMC, and
compacting with Vibratory Roller to achieve the desired density, complete as
per Technical Specification Clause 401 MORD including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

0 0.00 cum Construction of Granular Sub base by providing well graded meterial Grading 402 MoRD 1.00 cum 1139.94 0.00
C (Gravel + Stone dust) (i.e 9.5 mm to 4.75 mm size Gravel of 66% and
crusher dust of size < 2.36mm @ 34% ) having soaked CBR not less than 15%
and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with Tractor grader in
uniform layers of loose thickness of not more than 225mm including mixing by
mix in place method with rotaor and compacting at OMC with Vibratory roller 8
to 10 Tonnes capacity to achieve the desired density, complete as per IRC
technical specification clause 402 (3) (iii) of MORD including contractors profit
& Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.
Page 42 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Scarifying existing granular surface to a depth of 50 mm and disposal of 301.4 MoRD 1.00 Sqm 32.27 0.00
scarified material with a lift upto 3 m and leads upto 1000 m as per Technical
Specification Clause 301.4. MORD including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Sqm Scarifying existing granular surface to a depth of 50 mm and spreading 301.4 MoRD 1.00 Sqm 29.56 0.00
scarified material in uniform layers with Tractor grader and compacting with
Vibratory Roller to achieve the desired density as per Technical Specification
Clause 301.4. MORD ,including contractors profit & Over head charges, but
excluding GST etc,. Complete.

0 0.00 Sqm Scarifying the existing bituminous road surface to a depth of 50 mm and 305.4.3 MoRD 1.00 Sqm 9.24 0.00
disposal of scarified material with all lifts and lead upto 1000 m as per
Technical Specification Clause 305.4.3 MORTH including contractors profit &
Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing, laying, spreading and compacting stone aggregates of specific sizes 405 MoRD 1.00 cum 3542.47 0.00
for Grading 2 material to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with Vibratory roller 80-
100 kN in stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density grading 2 as per Technical
Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75
mm. including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.,. Complete. for Grade II
Page 43 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing, laying, spreading and compacting stone aggregates of specific sizes 405 MoRD 1.00 cum 3566.49 0.00
HBG Machine Crushed metal to water bound macadam Grade III specification
including spreading in uniform thickness, hand packing, rolling with Vibratory
roller 80-100 kN in stages to proper grade and camber, applying and brooming,
stone screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per Technical Specification
Clause 405 MORD/ 404 MORTH. For compacted thickness of 75 mm.
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

4 371.70 cum Providing, laying, spreading and compacting graded stone aggregate to wet 406 MoRD 1.00 cum 3177.22 1180973.00
mix macadam specification including premixing the material with water at OMC
in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site,
laying in uniform layers in sub-base/base course on a well prepared sub-base
and compacting with Vibratory Roller 80-100 kN weight to achieve the desired
density including lighting, barricading and maintenance of diversion, etc as per
Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/
MORTH, including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Laying and spreading available soil in the subgrade on a prepared surface, 403 MoRD 1.00 cum 376.51 0.00
pulverising, mixing the spread soil in place with rotaor with 2.4 per cent
quantity of cement by weight of materials( i.e, 42 Kgs per cum of finished qty of
item) grading with motor grader and compacting with the smooth wheel road
roller at OMC to the desired density to form a layer of improved Sub-grade and
PI value should be less than 10 and to achive CBR not less than 5% as per
Technical Specification Cluase 403, including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 44 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Construction of Cement treated Gravel Sub base using 4.7 per cent quantity 404 MoRD 1.00 cum 1663.28 0.00
of cement by weight of materials( i.e, 82.25 Kgs per cum of finished qty of item)
by Providing, laying and spreading well graded material (i.e. 9.5 mm to 4.75
mm size Gravel of 66% and crusher dust of size < 2.36mm @ 34%) having LL
< 45, PI < 20 & Uniformity coefficient (Cu) > 5 on a prepared sub-grade,
pulverising, adding the designed quantity of cement to the spreaded materials,
mix shall be designed for a minimum laboratory test for 7 days unconfined
compressive strength and not less than 1.7 MPa (17 Kg/cm2) for sub-base and
mixing in place with rotavator, grading with the tractor grader and compacting
with the vibratory roller 8-10 tonnes capacity at OMC to achieve the desired
unconfined compressive strength and to form a layer of sub-base as per MORD
Technical Specification Clause 404, including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. For
Cement Treated sub-base.

0 0.00 cum Construction of Cement treated Granular Base by providing, laying and 403 MoRT&H 1.00 cum 3493.73 0.00
spreading crushed rock materials ( as per table 400.4 of MoRTH i.e.., using
crushed stone materials of 37.5 to 9.50mm @ 32.50%, 9.50 to 4.75mm @5%
and 4.75mm to 75 microns @62.50% ) on a prepared sub base by adding 5.5
per cent quantity of cement by weight ( i.e.., at 110 Kgs/Cum of finished qty of
item, the mix shall be designed for a minimum laboratory test for 7 days
unconfined compressive strength and not less than 3.00 MPa (30 Kg/cm2) ) for
base course and mixing in place with rotavator, grading with the tractor grader
and compacting with the vibratory roller 8-10 Tonnes capacity at OMC to
achieve the desired unconfined compressive strengthand to form a layer of
Base, as per MORTH specification 403, including contractors profit & Over
head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete.as per clause 403.2 and Table 400.4 for Cement Treated crushed
rock base
Page 45 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Construction of Cement treated Gravel Sub base using 2.5% per cent quantity 404 MoRD 1.00 cum 1741.43 0.00
of cement and 1.3% ANT Stabiliser by weight of materials by Providing, laying
and spreading well graded material (i.e. 9.5 mm to 4.75 mm size Gravel of
66% and crusher dust of size < 2.36mm @ 34%) having LL < 45, PI < 20 &
Uniformity coefficient (Cu) > 5 on a prepared sub-grade, pulverising, adding the
designed quantity of cement to the spreaded materials, mix shall be designed
for a minimum laboratory test for 7 days unconfined compressive strength and
not less than 1.7 MPa (17 Kg/cm2) for sub-base and mixing in place with
rotavator, grading with the tractor grader and compacting with the vibratory
roller 8-10 tonnes capacity at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base as per MORD Technical
Specification Clause 404, including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete. For Cement
Treated sub-base.

0 0.00 cum Construction of Cement treated Gravel Sub base using 5% per cent quantity of 404 MoRD 1.00 cum 2367.79 0.00
cement and 2.7% ANT Stabiliser by weight of materials by Providing, laying
and spreading well graded material (i.e. 9.5 mm to 4.75 mm size Gravel of
66% and crusher dust of size < 2.36mm @ 34%) having LL < 45, PI < 20 &
Uniformity coefficient (Cu) > 5 on a prepared sub-grade, pulverising, adding the
designed quantity of cement to the spreaded materials, mix shall be designed
for a minimum laboratory test for 7 days unconfined compressive strength and
not less than 3.0 MPa (30 Kg/cm2) for sub-base and mixing in place with
rotavator, grading with the tractor grader and compacting with the vibratory
roller 8-10 tonnes capacity at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base as per MORD Technical
Specification Clause 404, including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.. For Cement
Treated sub-base.
Page 46 of 249

1 2 3 4 5 6 7 8
0 0.00 Cum Stabilized Sub base: Providing, laying, Spreading and compacting selecteed MoRD 1.00 Cum 2177.81 0.00
Earth 70% having CBR >=5% mixed with 30% of GSB Grade-II (Gradation as
per MORD Specification) material as per Mix design Pre-Mixed soil with GSB
Gr-II& Cement @2.50% in yard/Borrow area, Mix Throughly using tractor
operated ripper/rotavator in the soil to form a cement modified Soil-aggregate
Mix. Apply 0.75 kg /cum of Nano Technology organo silane and 0.75
kg/cum of nano acrylic Co-Polymer with OMC water (<1000 ppm TDS) on loose
soil-aggregate-cement mix . Grade the soil with motor grader. Compact the
soil-aggregate surface with 8-10 tonne vibratory power roller to achive the
desired density .Rates including all materials, labour, hire Charges of machery
etc. complete as per MoRD specifications & direction of Engineer-in-Charge.
including contractors profit & Over head charges, but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

0 0.00 Cum Stabilized Base: Providing, laying, Spreading and compacting 60% MoRD 1.00 Cum 2556.17 0.00
in-situ/borrow area Moorum of CBR >=5% mixed with 40% of GSB Grade-II
as per mix design. Application: (1).Rip and loosen Morum with excavator/tractor
operated ripper and scarify with tractor operated rotavator to achive desired
thickness. Mix aggregates/GSB Gr-II material as per mix design with rotavator.
(2).Spread required percntage of Cement @ 4.50% by weight of soil aggregate
mix as per mix design provided and mix with tractor operated rotavator (3).
prepare and apply 0.75kg/cum Organo Silane Nano technology and
0.75kg/cum acrylic copolymer mix in OMC water (<1000 ppm TDS) on loose
Mix. scarify the treated mix with rotavtor.(4).compact the stabilised soil-
aggregate-cement base with 8-10 tonnes vibratory roller to achive stabilized
layer with desired density and thickness. Rates including all materials, labour,
hire Charges of machery etc. complete as per MoRD specifications & direction
of Engineer-in-Charge.including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 47 of 249

1 2 3 4 5 6 7 8
0 0.00 Cum Construction of 1st layer Bio enzyme based soil stabilised to a required MoRD 1.00 Cum 1465.37 0.00
thickness as per manufacturer design with locally available road formation soil
and treating it with TerraZyme in the ratio 1L for 12.0 cum soil, spreading in
uniform layer with tractor grader on prepared surface. mixing by mix in place
method with rotavator at OMC and compacting with smooth wheel vibratory
roller to achieve the desired density complete as per technical specification
incl all labour, equipments etc., complete. as per the directions of the Engineer
incharge of the work . except materials like soil and metal including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.

0 0.00 Cum Construction of 2nd layer Bio enzyme based soil stablised layer to a required MoRD 1.00 Cum 1747.12 0.00
thickness as per manufacturer design with borrow soil material/gravel/murram,
having CBR greater than 8% and treating it with TerraZyme in the ratio 1L for
15.0 cum soil with 25% metal in design mix, spreading in uniform layer with
tractor grader on prepared surface. mixing by mix in place method with
rotavator at OMC and compacting with smooth wheel roller to achieve the
desired density complete as per technical specification incl all labour,
materials, like soil and metal, equipments etc., complete. as per the directions
of the Engineer incharge of the work, including contractors profit & Over head
charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 48 of 249

1 2 3 4 5 6 7 8
0 0.00 Cum Supplying Polymer Treated Base Course Compound ( PTBC) viz. . SoilTech MoRD 1.00 Cum 4005.40 0.00
MK III at a dosage of 10 Litres per Cubic metre with minimum Specific Gravity
of 0,98, Ph Value of 8-9, Solid content more than 53, Viscocity at 25 Deg within
25.5-26.5 and Toxicity Limit for Lead/ Arsenic less than 5 & Cadmium/Mercury
less than 1 as per pre-approved Water PTBC Ratio (Water + PTBC Compound)
F.O.R site inclusive of all taxes and duties, to the Technical Specification of
PTBC Manufacturer and as directed by Engineer in Charge.--Application of
Polymer Treated Base Course (150 mm thick) - Supplying good quality soil of
approved quality having desired grading, CBR & PI values or mixing the borrow
soil with suitable soil to have consistent desired grading, CBR & PI values with
all lead and lift and spreading the same in layers not exceeding around 180 mm
thickness, alternatively ripping the existing soil to 180 mm depth if same soil
meets the desired grading, CBR & PI values or else mixing same with suitable
approved soil from borrow area with all lead and lift to have consistent desired
grading, CBR & PI values. Spreading this approved soil layer evenly. SoilTech
liquid of desired dosage (0.5% weight of Optimum density of soil) is premixed
with water to ensure moisture content of soil to achieve 1% excess of OMC
when mixed properly and consistently. This premixed Soiltech liquid is sprayed
over the evenly spread soil at controlled manner and mixed with tractor
plougher to achieve desired consistency and followed by grader blade to
0 0.00 Cum Construction of granular sub-base by providing well graded material(Table 401 MoRD 1.00 Cum 3183.27 0.00
400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less
than 20 and PI Value less than 6 using a layer of three dimensional
honeycomb like cellular confinement system, STRATAWEB GEOCELL, made
of ultrasonically welded HDPE strips, which act as sub / sub-base improving
reinforcement mat for road pavements, made of high density polyethylene
(HDPE) with density of 0.935 – 0.965 g/cc, and spreading in uniform layers with
Tractor grader on prepared surface, mixing by mix in place method with rotaor
at OMC, and compacting with Vibratory Roller to achieve the desired density,
complete as per Technical Specification Clause 401 MORD including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 Cum Pre-coating of chips with 1 per cent of paving bitumin by weight of chips in 507.2.5 MoRD 1.00 Cum 1205.77 0.00
suitable mixer asper technical specification of MoRD caluse 507.2.5 using
CRRI - Bitchem Cold Mix Binder, complete for finished item and as directed by
the Engineer-in-charge. including contractors profit & Over head charges, but
excluding GST etc,. Complete.
Page 49 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing and laying surface dressing as wearing course consisting of a layer of 507 MoRD 1.00 Sqm 123.86 0.00
bitumen CRRI - Bitchem Cold Mix Binder @ 1.40 kg / sqm laid on prepared
surface followed by a cover of Pre coated crushed stone chippings of 9.5 mm
size @ 0.008 cum per Sqm and rolling with 8-10 T Power Road Roller etc.,
complete for finished item of work as per MoRD Specification 507 and as
directed by the Engineer-in-charge. including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Providing and applying primer coat with BitChem bitumen emulsion (CSS-1) on 502 MoRD 1.00 Sqm 35.58 0.00
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per
Technical Specification Clause 502 MORD (for use on Wet mix macadam &
WBM), including all over heads, Contractor's profit, But Excluding GST etc,.
Complete.

0 0.00 Sqm Providing and applying tack coat with BitChem Bitumen emulsion (RS-1) using 503 MoRD 1.00 Sqm 12.02 0.00
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
granular surfaces treated with primer & cleaned with Hydraulic broom as per
Technical Specification Clause 503 MORD, including all over heads,
Contractor's profit, But Excluding GST etc,. Complete.
Page 50 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of open-graded premix carpet of 20 mm thickness 508 MoRD 1.00 Sqm 175.14 0.00
composed of 13.2 mm to 5.6 mm aggregates machine crushed hard blasted
Granite chips either using CRRI - Bitchem Cold Mix Binder of 20.00 kgs per 10
sqm area of road surface over tack coat to required line, grade and level to
serve as wearing course on a previously prepared base, including mixing a
concrete mixer, laying and rolling with a three wheel 80-100 kN static roller
capacity, finished to required level and grades including cost and conveyance
of all materials from approved sources, seigniorage, labour charges and hire
and operational charges of power road roller and all other machinery, tools and
plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work to
be followed by seal coat of either Type A or B or C as per technical
specifications IRC,SP-100:2014 including all over heads, Contractor's profit,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Providing and laying Seal Coat Sealing the voids in a bituminous surface laid to 510 MoRD 1.00 Sqm 66.24 0.00
the specified levels, grade and cross fall using Type B comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined
in table 500.16 of MORD of crushed Sand defined as passing 2.36 mm sieve
and retained on 180 micron sieve applied @ 0.06 cum /10 sqm to be laid
simultaneously along with the bitumunous course using 10.00 kgs of CRRI -
Bitchem Cold Mix Binder for 10 sqm mixing in a concrete mixer and rolling with
80-100KN Statick roller including of required line, level, grade to serve as
wearing course on previously prepared surface and finishing to rquired level
and grades including cost and conveyance of all materials from approved
sources and stacking at site to departmental gauge for premeasurements,
seigniorage, labour charges and hire and operational charges of power roller
and all other machinery, tools and plants, providing barricading for diversion of
traffic, erecting red flags other incidental and operational charges etc., complete
for finished item of work as per technical specification IRC, SP:100-2014
including all over heads, Contractor's profit,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
Page 51 of 249

1 2 3 4 5 6 7 8
5 792.00 cum Construction of sub grade & earthen shoulders with borrowed useful earth from 303 MoRD 1.00 cum 240.00 190080.00
outside road boundary by mechanical means upto SDR with a lead of 10 km
including pre-watering of soil at borrow area, removal of top soil, excavation of
soils at borrowed area, conveyance ofsoil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet
requirement of table 300-2 of MoRT&H, including all hire andoperational
charges of T&P ,contractors profit & Over head charges and , complete for
finished item of work as per MoRT&H specification 305 (5th revision) but
excluding Seigniorage charges, GST Complete . (Payment will be made based
on level for finished item of work). With borrowed earth from 10 km lead.

6 2478.00 Sqm Providing and applying prime coat with bitumen emulsion (SS-2) Grade on 502 MoRD 1.00 Sqm 50.00 123900.00
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.85 kg/sqm using mechanical means as per
Technical Specification Clause 502 MORD (for use on Wet mix
macadam) ,including contractors profit & Over head charges but excluding
Seigniorage charges, GST Complete .

7 2478.00 Sqm Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion 503 MoRD 1.00 Sqm 11.82 29290.00
distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular
surfaces treated with primer & cleaned with Hydraulic broom as per Technical
Specification Clause 503 MORD, including contractors profit & Over head
charges, but excluding GST etc,. Complete. for Tack Coat
Page 52 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of open-graded premix carpet of 20 mm thickness 508 MoRD 1.00 Sqm 171.34 0.00
composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using
penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm to
required line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying &
levelling with mechanical paver and rolling with a three wheel 0-100 kN static
roller capacity, finished to required level and grades to be followed by seal coat
including cost and conveyance of all materials from approved sources, , labour
charges and hire and operational charges of power road roller and all other
machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for
finished item of work as per clause 508 MORD including contractors profit &
Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete.

0 0.00 Sqm Providing and laying bituminous liquid seal coat (Type A) comprising of a layer 510 MoRD 1.00 Sqm 73.05 0.00
of bitumuneous binder followed by a cover of stone chipping of grading as
defined in table 500.16 of MOST at of Crushed stone chipping of 6.7 mm size
100% passing through 11.2mm seive and retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm chips to be laid simultaneously along with the bitumunous
course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rolling with power
roller including of required line, level, grade to serve as wearing course on
previously prepared surface and finishing to rquired level and grades including
cost and conveyance of all materials from approved sources and stacking at
site to departmental gauge for premeasurements, labour charges and hire and
operational charges of power road roller 8 to 10 tonnes capacity and all other
machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for
finished item of work as per technical specification clause 510 of MORD.
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.,. Complete. Using Hot mix plant
Page 53 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing and laying bituminous premixed Seal coat (Type B) comprising of a 510 MoRD 1.00 Sqm 50.51 0.00
thin application of fine aggregate premixed with bituminous binder of grading as
defined in table 500.16 of MOST Crushed sand defined as passing through
2.36 mm sieve and retained on 180 micron seive applied @ 0.06 cum per 10
sqm.to be laid simultaneously along with the bitumunous course using 6.80 kgs
of bitumen 60/70 grade for 10 sqm and rolling with power roller including of
required line, level, grade to serve as wearing course on previously prepared
surface and finishing to rquired level and grades including cost and conveyance
of all materials from approved sources and stacking at site to departmental
gauge for premeasurements, seigniorage, labour charges and hire and
operational charges of power road roller 8 to 10 tonnes capacity and all other
machinery, tools and plants, providing barricading for diversion of traffic,
erecting red flags other incidental and operational charges etc., complete for
finished item of work as per technical specification clause 510 of MORD Using
Hot mix plant including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Providing and laying bituminous premixed seal coat (Type C) comprising of 510 MoRD 1.00 Sqm 58.06 0.00
stone chipping of grading as defined in table 500.16 of MOST with Crushed
stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on
2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by
mechanical means .with the bitumunous binder using 6.50 kgs of bitumen VG
30 grade for 10 sqm and rolling with power roller including of required line,
level, grade to serve as wearing course on previously prepared surface and
finishing to required level and grades including cost and conveyance of all
materials from approved sources and stacking at site to departmental gauge for
premeasurements, labour charges and hire and operational charges of power
road roller 8 to 10 tonnes capacity and all other machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental
and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
for seal coat.
Page 54 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of close-graded premix surfacing (Mix seal 509 MoRD 1.00 Sqm 195.40 0.00
surfacing) material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-
B) aggregates as per Table 500.15 of MORD using penetration grade bitumen
to required line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable Hot Mix plant (By mechanical
means), laying and rolling with a three wheel 8-10 kN static roller and finishing
to required level and grades as per Technical Specification Clause 509 MORD,
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

0 0.00 Cum Providing and laying bituminous macadam with hot mix plant using crushed 504 MoRD 1.00 Cum 8726.38 0.00
aggregates of grading as per Table 500.4 premixed with bituminous binder of
3.30%, transported to site and laid over a previously prepared surface with
paver finisher to the required grade, level and alignment and rolled to achieve
the desired compaction as per Technical Specification Clause 504.including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 Sqm Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion 503 MoRD 1.00 Sqm 9.97 0.00
distributor at the rate of 0.2 to 0.25 kg per sqm on the existing Bitume surfaces
& cleaned with Hydraulic broom as per Technical Specification Clause 503
MORD, including contractors profit & Over head charges, but excluding GST
etc,. Complete. for Tack Coat on Bitumen surface.

8 74.35 Cum Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP 509 MoRTH 1.00 Cum 9816.34 729845.00
producing an average output of 75 tonnes per hour using crushed aggregates
of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % per cent
of mix and filler, transporting the hot mix to work site, laying with a Mechanical
paver finisher to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects, including
overhead charges & Contractors profit. but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
Page 55 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of open-graded premix carpet of 20 mm thickness 508 MoRD 1.00 Sqm 169.63 0.00
composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using 8% of
waste Plastic (1.17kgs/10Sqm) and penetration grade bitumen to required line
bitumen 60/70 grade at the rate of 13.43 kg/10 sqm to required line, grade and
level to serve as wearing course on a previously prepared base, including
mixing in a Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver
and rolling with a three wheel 0-100 kN static roller capacity, finished to
required level and grades to be followed by seal coat including cost and
conveyance of all materials from approved sources, , labour charges and hire
and operational charges of power road roller and all other machinery, tools and
plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as
per clause 508 MORD including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Providing and laying bituminous liquid seal coat (Type A) comprising of a layer 510 MoRD 1.00 Sqm 71.97 0.00
of bitumuneous binder followed by a cover of stone chipping of grading as
defined in table 500.16 of MOST at of Crushed stone chipping of 6.7 mm size
100% passing through 11.2mm seive and retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm chips to be laid simultaneously along with the bitumunous
course using either using 8% of waste Plastic (0.78kgs/10Sqm) and 9.02 kgs of
bitumen 60/70 grade for 10 sqm and rolling with power roller including of
required line, level, grade to serve as wearing course on previously prepared
surface and finishing to rquired level and grades including cost and conveyance
of all materials from approved sources and stacking at site to departmental
gauge for premeasurements, labour charges and hire and operational charges
of power road roller 8 to 10 tonnes capacity and all other machinery, tools and
plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as
per technical specification clause 510 of MORD. including contractors profit &
Over head charges,but excluding Seig Charges, Labour Cess & GST etc,.
Complete. Hot mix plant
Page 56 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of close-graded premix surfacing (Mix seal 510 MoRD 1.00 Sqm 193.19 0.00
surfacing) material of 20 mm thickness composed of 11.2 mm to 0.09 mm
(Type-B) aggregates as per Table 500.15 of MORD using 8% of Plastic waste
and penetration grade bitumen to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a suitable
Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10
kN static roller and finishing to required level and grades as per Technical
Specification Clause 509 MORD, including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Cum Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP 509 MoRTH 1.00 Cum 9578.79 0.00
producing an average output of 75 tonnes per hour using crushed aggregates
of specified grading, premixed with waste plastic @0.40% & bituminous binder
@ 5.00 to 5.20 % per cent of mix and filler, transporting the hot mix to work
site, laying with a Mechanical paver finisher to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MORTH specification clause No. 509 complete
in all respects, including overhead charges & Contractors profit. but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Cum Construction of un-reinforced, plain cement concrete pavement, thickness as 1501 MoRD 1.00 Cum 8431.12 0.00
per design, over a prepared sub base, and using high density plastic (HDPE)
cells consist of 200-220 micron HDPE sheet having cell of size of
150mmx150mm &100mm deep with 43 grade cement or any other type as per
Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to
IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per
design, mixed in a concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, wedges, steel plates including levelling the
formwork and HDPE plastic cell streighting, threading, string, iron nailing, lacing
etc complete as per drawing), spreading the concrete with shovels, rakes,
labours compacted using needle, screed and plate vibrators and finished in
continuous operation, admixtures as approved, curing of concrete cell for 14-
days, using curing compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501 including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
Page 57 of 249

1 2 3 4 5 6 7 8
0 0.00 Cum Construction of un-reinforced, panneled cement concrete pavement, thickness 1501 MoRD 1.00 Cum 8366.89 0.00
as per design, over a prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS:383, maximum size of coarse aggregate not exceeding 25
mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity
and appropriate weigh batcher using approved mix design, laid in approved
fixed side formwork (steel channel, wedges, steel plates including levelling the
formwork etc complete as per drawing), spreading the concrete with sholvels,
rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation, admixtures as approved, curing of concrete slab for 14-
days, using curing compound (where specified) and water and cutting the
grooves of 1/3rd depth of the slab thickness for forming the panels of 0.75 X
0.75 mts size as per drawing and Technical Specification Clause 1501
including contractors profit & Over head charges,but excluding Seig Charges,
Labour Cess & GST etc,. Complete.

0 0.00 Cum Construction of un-reinforced, dowel jointed at expansion and construction joint 1501 MoRD 1.00 Cum 7046.21 0.00
only, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade Ordinary Portland Cement and replacing
cement by Fly Ash to the extent of 30% by weight of the cement as per Clause
1502.3.2 of Specification for Rural Roads (First Revision) 2014, M30 (Grade),
coarse and fine aggregates conforming to IS : 383, mixing in a concrete mixer
of not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel channel,
laying and fixing of 125 micron thick polythene film, wedges, steel plates
including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and
finished in continuous operation including provision of contraction and
expansion, construction joints, applying debonding strips, primer, sealant,
dowel bars, near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days, curing
compound (where specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges,but excluding Seig Charges, Labour Cess & GST
etc,. Complete.
Page 58 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing and applying primer coat with bitumen emulsion (SS-1) Preparing 502 MoRD 1.00 Sqm 24.07 0.00
and applying of water soluble silane nanotechnology (for bitumen emulsion
application, IRC approved) with cationic bitumen emulsion CSS1 and water
(<1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen
emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200
liter water while filling water in tanker/drum and then add 100 kg cationic
bitumen emulsion under circulation. Mix the solution completely. Spray the
solution at the rate of 1 liter per sqm on compacted stone base. Check quality
of bitumen emulsion before bulk use using mechanical means as per Technical
Specification Clause 502 MORD , including contractors profit & Over head
charges, but Excluding GST etc,. Complete." for Prime Coat

0 0.00 Sqm Providing, laying and rolling of open-graded premix carpet of 20 mm thickness 508 MoRD 1.00 Sqm 173.24 0.00
composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using
penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm Mixed
with Nano Technology Based Organo Silane Compound Zycotherm @0.10%
by the weight of bitumen for enhansed performance and durability to required
line, grade and level to serve as wearing course on a previously prepared base,
including mixing in a Hot Mix plant of 30-40TPH, laying & levelling with
mechanical paver and rolling with a three wheel 0-100 kN static roller capacity,
finished to required level and grades to be followed by seal coat including cost
and conveyance of all materials from approved sources, , labour charges and
hire and operational charges of power road roller and all other machinery, tools
and plants, providing barricading for diversion of traffic, erecting red flags other
incidental and operational charges etc., complete for finished item of work as
per clause 508 MORD including contractors profit & Over head charges,but
excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 59 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing and laying bituminous premixed seal coat (Type C) comprising of 510 MoRD 1.00 Sqm 58.91 0.00
stone chipping of grading as defined in table 500.16 of MOST with Crushed
stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on
2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by
mechanical means .with the bitumunous binder using 6.50 kgs of bitumen VG
30 grade for 10 sqm Mixed with Nano Technology Based Organo Silane
Compound Zycotherm @0.10% by the weight of bitumen for enhansed
performance and durability and rolling with power roller including of required
line, level, grade to serve as wearing course on previously prepared surface
and finishing to required level and grades including cost and conveyance of all
materials from approved sources and stacking at site to departmental gauge for
premeasurements, labour charges and hire and operational charges of power
road roller 8 to 10 tonnes capacity and all other machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental
and operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
for seal coat.

0 0.00 Cum Providing and laying Bituminous concrete with 100-120 TPH batch type HMP 510 MoRD 1.00 Cum 9869.39 0.00
producing an average output of 75 tonnes per hour using crushed aggregates
of specified grading, premixed with bituminous binder @ 5.40 to 5.60 % per
cent of mix,filler and Mixed with Nano Technology Based Organo Silane
Compound Zycotherm @0.10% by the weight of bitumen for enhansed
performance and durability and transporting the hot mix to work site, laying
with a Mechanical paver finisher to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MORTH specification clause No. 509 complete in all
respects, including overhead charges & Contractors profit,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.
Page 60 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Providing, laying and rolling of close-graded premix surfacing (Mix seal 509 MoRD 1.00 Sqm 266.55 0.00
surfacing) material of 20 mm thickness composed of 11.2 mm to 0.09 mm
(Type-B) aggregates as per Table 500.15 of MORD using CRRI-BitChem tailor
made cold mix Binder to required line, grade and level to serve as wearing
course on a previously prepared base, including mixing in a suitable plant by
manual means, laying and rolling with a three wheel 8-10 kN static roller and
finishing to required level and grades as per Technical Specification Clause 509
MORD, including contractors profit & Over head charges, but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of un-reinforced, dowel jointed at expansion and construction joint 1501 MoRD 1.00 cum 7266.55 0.00
only, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per Clause
1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 mictron thick polythene
film, wedges, steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using needle, scareed
and plate vibrators and finished in continuous operation including provision of
contraction and expansion, construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches to bridge / culvert and
construction joints, admixtures as approved, curing of concrete slabs for 14-
days, curing compound (where specified) and water finishing to lines and grade
as per drawing and Technical Specification Clause 1501 MORD including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 Sqm Supply, Providing and laying of Woven Coir Geotextile fabric of 700GSM with MoRD 1.00 Sqm 100.61 0.00
mesh size of 7.50x7.30mm and thickness at 2 kPa is 6.50mm with technical
Specifications as per the table 3. requirement of Woven Coir Geotextiles and
instalation of Coir Geo- textile on the prepared road Subgrade surface by fixing
with U shape 6mm dia MS steel pegs of 0.45m total length @ 1nos per Sqm
area as per the technical guidelines of the Technology providers including cost
and conveyence,contractors profit & Over head charges etc comple, but
excluding Charges &GST.
Page 61 of 249

1 2 3 4 5 6 7 8
0 0.00 Sqm Maintenance of WBM road including filling up of pot holes, ruts and rectifying 1906 MoRD 1.00 Sqm 229.16 0.00
corrugated surface, damaged edges and ravelling as per technical specification
clause 1906 MORD For Grading III material 75mm thick compacting with
Smooth wheel roller 80-100 kN including contractors profit & Over head
charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Repair to pot holes and removal of loose material, trimming of sides, cleaning 1904.2 MoRD 1.00 Sqm 305.02 0.00
of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat
type B specification Clause 1904.2 MORD including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Maintenance of bituminous surface road - Repair to pot holes by removal of 1904 MoRD 1.00 cum 9459.32 0.00
failed material, trimming the sides to vertical and leveling the bottom, cleaning
the same with compressed air or any appropriate method filled with 75mm B.M,
applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack
coat on sides and on bottom as per technical specifications Clauses 502 and
503 and 1904 MORD, including contractors profit & Over head charges, but
excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Mts Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1000, 1202 1 MT 73426.75 0.00
MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

MoRD 1.00 0.00


MoRD 1.00 0.00

CD Works
1 Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 2 Nos.

1 Nos at KM 0/220,0/620
Page 62 of 249

1 2 3 4 5 6 7 8
9 51.47 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 5914.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

10 5.41 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 4877.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
11 8.12 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 43567.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

12 52.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 295062.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work
Page 63 of 249

1 2 3 4 5 6 7 8
13 20.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 10194.41 203888.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

1 Construction of 2 v 1000mm Dia NP3 Class Pipes Culvert 0 Nos.

2 Nos at KM

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH
Page 64 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 10194.41 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

1 Construction of 3 v 1000mm Dia NP3 Class Pipes Culvert 0 Nos.

1 Nos at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 65 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 10194.41 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

1 Construction of 1 v 900mm Dia NP3 Class Pipes Culvert 0 Nos.

1 Nos at Km
Page 66 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work
Page 67 of 249

1 2 3 4 5 6 7 8
0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 8522.82 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

1 Construction of 2 v 900mm Dia NP3 Class Pipes Culvert 0 Nos.

1 Nos at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH
Page 68 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 8522.82 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

1 Construction of 3 v 900mm Dia NP3 Class Pipes Culvert 0 Nos.

1 Nos at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 69 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 8522.82 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

1 Construction of 1 v 600mm Dia NP3 Class Pipes Culvert 1 0 Nos.

Nos at Km
Page 70 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work
Page 71 of 249

1 2 3 4 5 6 7 8
0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 4111.64 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 600 mm dia Pipes

1 Construction of 2 v 600mm Dia NP3 Class Pipes Culvert 1 0 Nos.

Nos at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH
Page 72 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 4111.64 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 600 mm dia Pipes

1 Construction of 3 v 600mm Dia NP3 Class Pipes Culvert 1 0 Nos.

Nos at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 1 Cum 114.91 0.00
MoRD,
Clause 305.1 including setting out, construction of shoring and bracing, removal 304 MoRTH
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 73 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Filling in foundation trenches / Pipe bedding with Sand as per drawing and 305.3.9 1 Cum 900.81 0.00
MoRD,
technical specification Clause 305.3.9 MORD & 304 MORTH ,including 304 MoRTH
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 4111.64 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 600 mm dia Pipes

1 Construction of 1 Vents of 3.00mx1.50m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 74 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 75 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 76 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 77 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 1 Vents of 4.00mx1.50m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 78 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 79 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 80 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 81 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 1 Vents of 5.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 82 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 83 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 84 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 85 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 1 Vents of 6.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 86 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 87 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 88 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 89 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 2 Vents of 4.00mx1.50m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 90 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 91 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 92 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 93 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 2 Vents of 5.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 94 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 95 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 96 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 97 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 2 Vents of 6.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at KM 12/570


Page 98 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 99 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 100 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 101 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 3 Vents of 5.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 102 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 103 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 104 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 105 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Construction of 3 Vents of 6.00mx2.00m span Slab 0 Nos.

Culverts 1 Nos at Kms


Page 106 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 802, 1 Cum 7616.13 0.00
803,
(HBG) mechanically mixed in substructure complete as per drawings and 1202,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD &1203 MoRD/
1500,
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. 2100
(upto 5m height) For For piers, side walls, bed blocks MoRTH
Page 107 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying reinforced cement concrete M25 grade (Design Mix) using 802, 1 Cum 8285.60 0.00
803,
20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing 1202,
and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections &1203 MoRD/
1500, 1600,
1500, 1600 & 1700 MORTH ,including contractors profit & Over head 1700, MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto
5m height. - For Super Structure (Deck slab)

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800, 1 Cum 7248.08 0.00
1206.3 MoRD/
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement 2702 MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 Sqm Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and 1 Sqm 659.03 0.00
conveyance and all labour charges and including contractors profit & Over head
charges, but excluding GST etc,. Complete.

0 0.00 Rms Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in 1608.2 MoRD 1 RM 986.77 0.00
cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and
grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per drawing and
technical specifications Clauses 800, 900 and 1208.3 MORD ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 1204.3.8 MoRD/ 1 Cum 805.52 0.00
2200 MoRTH
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 108 of 249

1 2 3 4 5 6 7 8
0 0.00 Nos. Providing weep holes in brick masonry/stone masonry, plain/reinforced 614,709,1204.3.7 1 No 342.33 0.00
MoRD/ 2706,
concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm 2200 MoRTH
pipe extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, but excluding GST etc,. Complete.

0 0.00 cum Providing and laying filter media with granular crushed aggregates as per 1204.3.8 MoRD/ 1 Cum 2602.32 0.00
2200 MoRTH
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over
head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Construction of embankment with approved material obtained from borrow pits 301.5 MoRD 1 Cum 224.65 0.00
with all lifts, transporting to site, spreading, grading to required slope and
compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MORD including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) 800, 1211 MoRD/ 1 Cum 5937.14 0.00
2700 MoRTH
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including contractors profit & Over head charges,but excluding Seig
Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch
Slab

0 0.00 cum Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm 800, 1211 MoRD/ 1 Cum 6514.54 0.00
1500, 1600 1700,
metal (HBG) mechanically mixed excluding reinforcement complete as per 2704 MoRTH
drawing and technical specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 109 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD/ 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73426.75 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation 2200 MoRTH
complete as per drawings and technical specifications Clauses 1000 and 1202
MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps
and wastage, where they are not welded ,including contractors profit & Over
head charges, but excluding GST etc,. Complete. - For Foundation

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

0 0.00 MT Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 75384.06 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure 2200 MoRTH
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including contractors profit & Over head
charges, but excluding GST etc,. Complete. - For Super Structures

1 Const. of 30 m Road Dam with 3 vents of 600mm Dia NP3 0 Nos.

Class pipes 1 No at Km
Page 110 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 4111.64 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 600 mm dia Pipes

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 710 MoRD 1 Cum 805.52 0.00
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.
Page 111 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802,803,1202& 1 Cum 4942.51 0.00
1203 MoRD
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed,
placed in Foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete..For levelling course

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Const. of 50 m Road Dam with 3 vents of 900mm Dia 0 Nos.

NP3 Class pipes 1 No at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 112 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 8522.82 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 710 MoRD 1 Cum 805.52 0.00
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work
Page 113 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802,803,1202& 1 Cum 4942.51 0.00
1203 MoRD
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed,
placed in Foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete..For levelling course

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Const. of 60 m Road Dam with 3 vents of 1000mm Dia 0 Nos.

NP3 Class pipes 1 No at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course
Page 114 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 10194.41 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

0 0.00 cum Backfilling behind abutment, wing wall and return wall complete as per 710 MoRD 1 Cum 805.52 0.00
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78
& 2200 MORTH, including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802,803,1202& 1 Cum 4942.51 0.00
1203 MoRD
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed,
placed in Foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete..For levelling course
Page 115 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Const. of 20 m Road Dam 1 No at Km 0 Nos.

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH
Page 116 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Const. of 30 m Road Dam 1 No at Km 0 Nos.

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 117 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Page 118 of 249

1 2 3 4 5 6 7 8
1 Const. of 40 m Road Dam 1 No at Km 0 Nos.

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Providing and laying boulder apron for bed protection with stone boulders of 1301 MoRD / 1 Cum 2535.69 0.00
2503 MoRTH
minimum size and weight as per Table 1300.1, no fragment weighing less than
25 / 40 kg laid dry complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors profit & Over head
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For
Protection Work
Page 119 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Construction of Retaining wall of length0 Length 0 Nos.

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course
Page 120 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

1 Construction of Retaining wall of 50.00m Length 3 Nos 0 Nos.

at KM

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course
Page 121 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

1 Construction of Retaining wall of 60.00m Length 1 Nos 0 Nos.

at Km

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 802, 1 Cum 4942.51 0.00
803,
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, 1202,
placed in Foundation and compacted by vibration including curing for 14 days &1203 MoRD/
1500,
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1700,
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & 2100
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. MoRTH
Complete..For levelling course
Page 122 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5674.26 0.00
803,
mechanically mixed in Substructure complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

1 CC. Wearing Coats Over Existing Road Dams @ Kms 0 Nos.

0 0.00 cum Providing and laying cement concrete Wearing course M 30 (Design Mix) grade 800,1206.3 1 Cum 7248.08 0.00
MoRD/ 2702
using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement MoRTH
complete as per drawing and technical specifications Clauses 800 and 1206.3
MORD and 2702 MORTH ,including contractors profit & Over head charges,
but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1 Construction of Village Side Drains mts. 0 Nos.

0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations
Page 123 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Providing concrete for plain concrete M 10 grade in open foundations using 40 305.3.9 MoRD/ 1 Cum 4942.51 0.00
304 MoRTH
mm nominal size Graded hard stone aggregate (HBG), mechanically mixed,
placed in Foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit &
Over head charges, but excluding Seig Charges, Labour Cess & GST etc,.
Complete..For levelling course

0 0.00 cum Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) 802, 1 Cum 5364.75 0.00
803,
mechanically mixed in Foundation complete as per drawings and technical 1202,
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and &1203 MoRD/
1500,
1500, 1700 & 2200 MORTH ,including contractors profit & Over head 1700,
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. 2100
MoRTH

0 0.00 cum Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal 800,1205.4,1205. 1 Cum 7616.13 0.00
5 MoRD/
(HBG) mechanically mixed in substructure complete as per drawings and 1500,
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 1600,
1700
and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head MoRTH
charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete..
(upto 5m height)

0 0.00 MT Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary 1002,105,1010,1 1 MT 73684.23 0.00
202 MoRD/ 1600,
producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure 2200 MoRTH
complete as per drawings and technical specification Clauses 1002, 1005,
1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
contractors profit & Over head charges, but excluding GST etc,. Complete. -
For Sub Structures

1 450mm Dia NP3 Class pipes for Irrigation Channels Road 0 Nos.

Crossings
Page 124 of 249

1 2 3 4 5 6 7 8
0 0.00 cum Earthwork excavation for structures as per drawing and technical specifications 305 MoRD/ 304 1 Cum 114.91 0.00
MoRTH
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excaed suitable
material as per Technical Specification 305 MORD / 304 MORTH ,including
contractors profit & Over head charges,but excluding Seig Charges, Labour
Cess & GST etc,. Complete.. - For Foundations

0 0.00 RM Providing and laying reinforced cement concrete pipe NP3 for culverts on first 1106 MoRD 1 RM 1993.45 0.00
class bedding of granular material including fixing collar with cement mortar
1:2 but excluding excaion, protection works, backfilling, concrete and masonry
works in head wall and parapets. Tech Specification Clause 1106
MORD ,including contractors profit & Over head charges, but excluding Seig
Charges& GST etc,. Complete. - For Pipe Culverts For irrigation Chennels
Road Crossings with 450 mm dia Pipes

2 Road Furniture
0 0 Nos. Reinforced cement concrete M15 grade Kilometre stone of standard design as 1703 MoRD / 804 each 4088.90 0.00
MoRTH
per IRC:8 fixing in position including painting and printing, etc as per drawing
and Technical Specification Clause 1703 MORD / 804 MORTH including
contractors profit & Over head charges, but excluding Seignorage charges
and GST -Ordinary KM Stones
14 2 Nos. Reinforced cement concrete M15 grade Kilometre stone of standard design as 1703 MoRD / 804 each 2424.00 4848.00
MoRTH
per IRC:8 fixing in position including painting and printing, etc as per drawing
and Technical Specification Clause 1703 MORD / 804 MORTH including
contractors profit & Over head charges, but excluding Seignorage charges
and GST -Ordinary KM Stones
15 3 Nos. Reinforced cement concrete M15 grade HM stone of standard design as per 1703 MoRD / 804 each 703.61 2111.00
MoRTH
IRC:8 fixing in position including painting and printing, etc as per drawing and
Technical Specification Clause 1703 MORD / 804 MORTH including
contractors profit & Over head charges, but excluding Seignorage charges
and GST -200M H.M Stones
Page 125 of 249

1 2 3 4 5 6 7 8
16 5 Nos. Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 1608.2 MoRD each 694.78 3474.00
mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical
RCC posts not to exceed 1 in 500 as per drawing and Technical Specification
Clause 1608.2 including contractors profit & Over head charges,but excluding
Seig Charges, Labour Cess & GST etc,. Complete.

17 2 Nos. Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD 1701 MoRD each 11843.01 23686.00
secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded
with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS
angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos
75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of
450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be
welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove
enmeled on both sides. Lettering and paining of superior quality in required shede and colour.
All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy
paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit &
Over head charges,But excluding GST

18 3 Nos. Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD 1701 MoRD each 19547.55 58643.00
specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly
welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be
welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in
cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground
level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will
be pointed with ready mixed synthetic enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head
charges,But excluding GST

19 10 Nos. Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 1701 MoRD each 2956.26 29563.00
sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white
colour in front and grey colour on back with red reflective border of 70 mm width and required
message, letters, figures with reflective engineering grade tape as per MORD specifications of
required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of
3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed
to the ground by means of properly designed foundation with M15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical
Specification Clause 1701 MORD including contractors profit & Over head charges, But
Excluding GST.
Page 126 of 249

1 2 3 4 5 6 7 8
20 16 Nos. Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per 1701 MoRD each 2143.27 34292.00
IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled
paint in white colour in front and grey colour on back with red reflective boarder of 65mm width
and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of
MORD for rural roads specification of required shade and colour supported and welded on
47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron
on edges on back firmly fixed to ground by means of properly designed foundations with M-15
grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and
technical specification Clause 1701.2.2 of MORD including contractors profit & Over head
charges, But Excluding GST

3 ROAD SAFETY INTERVENTIONS


21 188 Nos Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost 803 MoRT&H each 364.61 68547.00
and conveyance and all labour charges and including contractors profit & Over head charges,
but excluding GST etc,. Complete.

22 49 Err:509 Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all 803 MoRT&H Err:509 669.63 33063.00
labour charges and including contractors profit & Over head charges, but excluding GST etc,.
Complete.
### Err:509 Err:509 Err:509 810 MoRT&H Err:509 Err:509 Err:509

Err:509
4 Road Routine Miantenance for five years
### 0.64 Km Rountine maintanance for 1 st year 502,503 &1904 to Km 0.53 0.00
1915 0f MoRD

### 0.64 Km Rountine maintanance for 2 nd year 502,503 &1904 to Km 0.80 1.00
1915 0f MoRD

### 0.64 Km Rountine maintanance for 3 rd year 502,503 &1904 to Km 1.06 1.00
1915 0f MoRD

### 0.64 Km Rountine maintanance for 4 th year 502,503 &1904 to Km 1.33 1.00
1915 0f MoRD

### 0.64 Km Rountine maintanance for 5 th year 502,503 &1904 to Km 1.58 1.00
1915 0f MoRD

5 Road Periodic Miantenance after 5th Year 4.00


Page 127 of 249

1 2 3 4 5 6 7 8
### 2400.00 Sqm Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion 503 0f MoRD 1.00 Sqm 9.97 23925.00
distributor at the rate of 0.2 to 0.25 kg per sqm on the existing Bitume surfaces
& cleaned with Hydraulic broom as per Technical Specification Clause 503
MORD, including contractors profit & Over head charges, but excluding GST
etc,. Complete. for Tack Coat on Bitumen surface.

### 72.00 cum Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP 509 0f MoRD 1 Cum 9816.34 706776.00
producing an average output of 75 tonnes per hour using crushed aggregates
of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % per cent
of mix and filler, transporting the hot mix to work site, laying with a Mechanical
paver finisher to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects, including
overhead charges & Contractors profit. but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

### 72.00 cum Construction of improved subgrade/ Shoulders by providing selected earth 303 MoRD & 305 1 Cum 379.67 27336.00
MoRT&H
having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not
more than 40% and 20 respectively and spreading in uniform layers with
tractor grader on prepared surface, and compacted at OMC with vibratory
roller 80-100 kN to meet requirement of Table 300.2 with as per Technical
Specification Clause 303 MORD / 305 MORTH, by using machinery including
contractors profit & Over head charges, but excluding Seig Charges, Labour
Cess & GST etc,. Complete.

758037.00
Err:509
Err:509

"APPROVED"

Engineer-In-chief
Page 128 of 249

1 2 3 4 5 6 7 8