Conergy Complete 700

1712, Steam engine


In 1712 Thomas Newcomen built the first operational steam engine. 3

1941, Computer
In 1941 Konrad Zuse invented the first programmable computer. 4

2011, Conergy Complete 700


Conergy developed the first synchronized solar power system for free-field installations and launched it on the world market in 2011.

Challenge and rethink for exceptional results


Conergy Complete 700, the planet's first synchronized solar power system, has changed forever the world of open-air solar power plants. Over one hundred specialists have developed Conergy Complete 700 from the ground up as a true system solution, completely rethinking the three most important core concepts for cutting the cost of generating solar power. They have optimized the system components, designed unrivalled efficiency into the module/inverter and module/mounting system interfaces and significantly streamlined and simplified the planning and construction phases. Now you can reap the benefits of their work. Their combined efforts were rewarded with much higher system efficiency, very rapid project implementation and increased output, enhancing your business case over a period of 20 years or more.

Significantly improved shading behaviour has been achieved by connecting the solar cells horizontally. High cell efficiency ensures above average system output, even in low light.

The proprietary QuickFix module connection technology, for which patent applications have been registered, allows modules to be installed without the need for any tools resulting in time savings of up to 50 %. The simplified rail design has considerably reduced the number of parts required.

High performance 360 W modules reduce the total number of modules and components required per kWp. Line losses are minimized thanks to the extremely short cabling distances within the modules and the direct connection of the modules to one another.

Conergy = Quality Conergy is synonymous with first class quality. We guarantee that Conergy solar power systems will reliably generate a high level of output over an extremely long period of time. | Conergy's quality assurance management sets standards throughout the industry in research, development and production. | Without exception, system components are manufactured from the very best of materials. | Quality checks integrated into the complete value chain provide constant quality assurance. | The high level of quality in our production processes is confirmed by TV certifications.

The system's inverter stations are delivered to the site fully configured and ready for immediate operation. All of the integrated components are individually adjusted to best meet the demands of a particular solar power plant. The individual configuration of each inverter station within the solar array ensures optimal dimensioning of capacity.

Efficiency enhanced throughout entire project


With the Conergy Complete 700 solution we are able to provide increased efficiency throughout the entire process, from the planning phase, the construction phase, through to operation. These improvements, which enhance every aspect of the project, secure your investment for over 20 years and result in an unbeatable commercial outcome. Simply put: with Conergy Complete 700 your project is completed faster and more efficiently.

Conergy Complete 700. The benefits:


| Conergy's first class quality: guarantees system reliability throughout the investment period for 20 years or more. | Rapid realization: ensures that the time to production is very short, resulting in early return on investment. | Synchronized system technology = High level of efficiency: will swiftly ensure project profitability. | Comprehensive additional services: such as our preventative maintenance concept or the all-risk insurance policy ensure excellent system productivity. = all this adds up to a compelling business case.

Conergy Complete 700 provides unequalled benefits throughout your entire project.

Planning phase

Construction phase

Operational phase

Simplified planning | A great number of standardized components | Enhanced modular design of the inverter stations ensures precise power configuration of up to 100 kW | State-of-the-art planning software automatically generates a bill of material directly from the general plant layout

Accelerated construction phase | Vastly reduced number of component parts. Far fewer modules thanks to our new large modules; decreased cable requirements due to direct module-to-module connections; innovative rail concept reduces the number of panel mounts necessary | Conergy QuickFix technology for rapid installation | Pre-configured inverter stations, delivered ready for operation

Highly efficient operational phase | Simplified overall system: fewer individual components reduce downtime and repair costs resulting in increased system up time and productivity. | Improved shading behaviour, high efficiency even in low light, very good performance margins | Optimized maintenance in all system areas

Optimal capacity configuration in the shortest possible time

Fast connection to the distribution network

Excellent system efficiency you rapidly surpass the break-even point

Conergy EPCplus our comprehensive service package for solar power plants, from planning through to operational management.
| The Conergy EPC service package covers planning, realization as well as commercial and technical operational management, including all maintenance work. | Day-to-day operational management and monitoring are conducted by an experienced Conergy management team, with a centralized monitoring centre for remote monitoring; our far-reaching guarantee assures a high technical availability or performance ratio. | For the first time, the exclusive all-risk and output insurance policy covers not only damage to equipment, but now also reduced output caused, for instance, by wear in the system. | All of the services are available as modules and can be combined to fully satisfy individual customer requirements. | Conergy provides commercial management to over 170 operating companies with a combined output of over 80 MW. Your Conergy consultant would be pleased to provide you with comprehensive information on the Conergy EPC services package, alternatively please refer to the Conergy EPCplus brochure.

OUR

WORLD

IS

FULL

OF

E N E R G Y.

Conergy AG Anckelmannsplatz 1 20537 Hamburg Germany info@conergy.de

www.conergy.com

Conergy_Complete_700_SF_ENG_2011-02-14

Subject to technical modifications.

2011 Conergy