Vous êtes sur la page 1sur 2

bullion S - Quick Installation Sheet

86 X1 79FL 05 Copyright © Bull SAS, December 2021

FRONT of the cabinet REAR of the cabinet

1 - Install the server rack-mount kit


For each server drawer, mount and secure the rails to the rear and Secure the rails
front frames of the rack cabinet

(X8)

1 2 (X4)
5

Install the inter-rail support bracket

3 4 6
(X4) (X4)

2 - Install the intermodule connecting box in the rack cabinet


Remove the cover Insert and fix the intermodule Install the cover plate Install the Management
plate connecting box to the rack cabinet Switch Module

(X8)

(X4)

(X4)

1 2 3 4

3 - Install the server drawers


Install each server drawer into the rack Secure each server drawer to the Order the server drawers –
Cabinet starting at the bottom front frame of the rack cabinet bullion S8 example

1 2 3
(X2)

bullion S Installation Guide, 86 A1 30FL


bullion S – Fiche d’installation rapide
86 X1 79FL 05 Copyright © Bull SAS, Décembre 2021

AVANT de l’armoire ARRIERE de l’armoire

1 - Installez le kit de montage en rack du serveur


Pour chaque serveur, montez et fixez les rails aux montants arrière Fixez les rails
et avant de l’armoire

(X8)

1 2 (X4) 5

Installez l’équerre support entre les rails

3 4 6
(X4) (X4)

2 – Installez le boîtier de connexion inter-modules dans l’armoire


Retirez le capot Insérez et fixez le boîtier de connexion Installez le capot Installez le Management
inter-modules à l’armoire Switch Module

(X8)

(X4)

(X4)

1 2 3 4

3 – Installez les serveurs


Installez chaque serveur dans l’armoire Fixez chaque serveur au montant avant Ordonnez les serveurs –
en commençant par le bas de l’armoire exemple pour le bullion S8

1 2 3
(X2)

bullion S Guide d’installation, 86 F1 30FL

Vous aimerez peut-être aussi