Project Name :- GESHEN Road Upgrading Project

EMPLOYER CONSULTANT
PROMINAT Engineers
Ethiopian Roads Authority
Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK
CODE BS FS ∆H CODE BS FS ∆H
GPS001 1.16 GPS101 0.8
1.285
0.502 1.201 1.455

1.420 1.067

GPS101 2.445 1.922 0.523 GPS101 2.001 2.522 -0.521

GPS101 1.342 GPS101A 0.243


3.951
0.088 0.035 3.634
3.67 0.062 0.464 3.232

0.279 2.407

GPS101A 8.963 0.429 8.534 GPS101 0.742 9.273 -8.531

GPS101A 2.700 BM1.1 0.588


2.931 0.128 0.268 3.711
2.183 0.016 0.517 3.104

1.167 1.063
BM1.1 7.814 1.311 6.503 GPS101A 1.373 7.878 -6.505

BM1.1 3.679 BM1.2 0.320

2.490
0.094 0.319 3.906
3.043 0.194 0.167 2.615
2.888 0.014 0.04 3.197
3.887 0.215 0.038 2.713
3.399 0.302 0.477 3.622
3.559 0.102 0.414 3.773
3.141
0.168 0.229 3.804

3.825
0.028 0.153 3.342
3.803 0.038 0.055 3.94
3.539 0.106 0.566 3.752
3.701 0.162 0.014 3.943
2.857 0.232 0.783 3.482

0.395 3.244

BM1.2 43.811
2.050 41.761 BM1.1 3.575 45.333 -41.758

BM1.2 3.458 BM1.3 0.227


3.541 0.233 0.537 3.45
3.679 0.351 0.203 3.726
3.326 0.048 0.33 3.835
3.571 0.335 0.277 3.321
3.779
0.09 0.352 3.758

3.714
0.234 0.387 3.898
3.631 0.516 0.448 3.585
3.375 0.43 0.169 3.65
2.882 0.221 1.321 3.322

1.256 2.949
BM1.3 34.956 3.714 31.242 BM1.2 4.251 35.494 -31.243

1.93
BM1.3 BM1.4 2.412
0.2
2.539 2.810 1.803
0.35 2.751 2.737 0.259
2.561 2.63 1.905 0.456
0.285 1.829 1.754 2.639
1.743 0.297

BM1.4 5.326
11.492 -6.166 BM1.3 11.618 5.454 6.164

BM1.4 2.307 BM1.5 0.475


0.982 0.501 2.646 2.281
0.336 2.45 2.624 1.179
0.438 2.759 3.378 0.202
0.25 3.2 2.839 0.617
0.298
2.841 3.602 0.248
0.178 3.717 2.738 0.182
0.273 2.825 3.431 0.09
0.282 3.386 3.719 0.32
0.090 3.671 2.511 0.328
0.088 2.448 3.297 0.152

3.201 0.183

BM1.5 5.522
30.999 -25.477 BM1.4 31.260 5.782 25.478

BM1.5 2.953 BM1.6 0.468


2.736 0.036 0.182 2.27
2.002 0.074 0.122 2.723
3.439 0.414 0.0888 3.984
2.727 0.134 0.158 2.847
3.938 0.003 0.231 3.688
2.987 0.013 0.033 2.789
3.712 0.018 0.049 3.648
3.934 0.042 0.171 2.866
3.563 0.144 0.059 3.845
2.696 0.017 0.464 2.813
2.864 0.098 0.136 3.177
2.654
0.034 0.092 2.062
1.159 0.05 0.273 3.225
BM1.6 0.357 BM1.5 2.516
41.364 1.434 39.930 2.527 42.453 -39.926

BM1.6 3.582 BM1.7 0.649


2.613 0.529 0.314 3.7
3.501 0.416 0.262 2.512

0.283 3.479

BM1.7 9.696 1.228 8.468 BM1.6 1.225 9.691 -8.466

BM1.7 2.751 BM1.8 0.603


3.559 0.457 0.303 2.899
2.984 0.166 0.353 3.697
3.519
0.216 0.274 3.124

3.320 0.067 0.494 3.726

2.087
0.320 1.066 3.493

0.902 2.251
BM1.8 18.22 2.128 16.092 BM1.7 3.093 19.19 -16.097

BM1.8 2.41 BM1.9 0.414


3.381
0.222 0.875 2.603

0.787 3.47

BM1.9 5.791 1.009 4.782 BM1.8 1.289 6.073 -4.784

BM1.9 3.021 BM1.10 0.443


3.507 0.278 0.219 3.184
3.952 0.002 0.152 3.728
3.882 0.129 0.082 3.974
2.863 0.106 0.376 3.857

0.303 2.935
BM1.10 17.225 0.818 16.407 BM1.9 1.272 17.678 -16.406

BM1.10 3.438 BM1.11 0.433


3.318 0.393 0.295 3.477

3.352 0.475 0.06 3.138

2.307 0.06 0.372 3.352

0.307 2.372

BM1.11 12.415 1.235 11.18 BM1.10 1.16 12.339 -11.179

BM1.11 3.253 BM1.12 2.694

2.843 2.503 0.019 3.445

3.479 0.13 0.151 2.732

2.725 0.139 0.185 3.49

0.101 2.81

BM1.12 12.3 2.873 9.427 BM1.11 3.049 12.477 -9.428

BM1.12 1.233 BM1.13 0.617

2.536 0.057 0.133 1.795

2.527 0.06 0.644 2.61

0.598 2.573

BM1.13 6.296 0.715 5.581 BM1.12 1.394 6.978 -5.584

BM1.13 0.196 BM1.14 3.548

0.227 3.511 2.487 0.234

0.038 2.483 3.953 0.231

0.807 3.647 2.221 0.345

0.3 2.538 3.09 0.491

3.111 0.278

BM1.14 1.568 15.29 -13.722 BM1.13 15.299 1.579 13.72


BM1.14 1.799 BM1.15 1.107

0.845 2.061

BM1.15 1.799 0.845 0.954 BM1.14 1.107 2.061 -0.954

BM1.15 1.039 BM1.16 0.235

0.433 0.841

BM1.16 1.039 0.433 0.606 BM1.15 0.235 0.841 -0.606

BM1.16 2.12 BM1.17 0.45

2.593 0.532 0.42 2.04

3.517 0.197 0.431 2.817

3.675 0.266 0.258 3.682

0.086 3.848

BM1.17 11.905 1.081 10.824 BM1.16 1.559 12.387 -10.828

BM1.17 0.372 BM1.18 1.017

2.721 0.55 0.364 0.837

2.668 0.05 0.498 3.027

3.477 0.344 0.326 2.821

2.478 0.195 0.311 3.609

3.983 0.13 0.05 2.659

3.861 0.132 0.138 3.902

3.803 0.092 0.134 3.907

3.28 0.035 0.451 3.923

3.685 0.168 0.448 3.562

3.645 0.184 0.318 3.949

2.91 0.143 0.478 3.818

3.361 0.163 1.793 3.227


2.772 1.805 0.084 3.351

2.85 0.199 0.114 2.659

3.438 0.084 0.251 2.882

3.268 0.112 0.219 3.578

4.177 0.122 0.556 3.366

0.748 3.964

BM1.18 56.749 5.256 51.493 BM1.17 7.55 59.041 -51.491

BM1.18 1.908 BM1.19 1.554

2.732 1.654 0.413 1.808

2.674 0.38 0.065 2.767

3.244 0.263 0.174 2.478

0.296 3.123

BM1.19 10.558 2.593 7.965 BM1.18 2.206 10.176 -7.97

BM1.19 2.83 BM1.20 0.098

3.573 0.31 0.361 2.619

2.92 0.127 0.428 3.802

3.348 0.58 0.397 2.765

2.799 0.138 0.382 3.606

3.632 0.182 0.214 2.999

2.683 0.246 0.187 3.602

3.725 0.081 0.268 2.801

2.625 0.06 1.225 3.933

1.288 2.562

BM1.20 28.135 3.012 25.123 BM1.19 3.56 28.689 -25.129

BM1.20 2.033 GPS002 0.288

2.512 0.05 0.21 2.266


3.72 0.343 0.19 2.38

2.671 0.01 0.1 3.9

3.762 0.219 0.551 2.552

2.712 0.683 0.164 3.63

3.36 0.257 0.443 2.62

2.633 0.078 0.394 3.724

1.089 0.187 0.045 2.841

2.151 0.058 0.463 1.078

2.563 0.311 0.194 2.306

0.214 2.543

GPS002 29.206 2.41 26.796 BM1.20 3.042 29.84 -26.798

GPS002 0.215 GPS102 2.92

0.362 2.563 2.222 0.573

2.672 2.058 0.188 0.527

3.847 0.23 0.067 2.63

2.774 0.156 0.196 3.757

3.383 0.069 0.341 2.9

3.513 0.113 0.433 3.61

3.099 0.094 0.368 3.852

0.424 3.043

GPS102 19.865 5.707 14.158 GPS002 6.735 20.892 -14.157


Upgrading Project ( 53.09 KM).
CONTRACTOR
ECWC Contractor
EL FORMAT

Difference ∆H Average Actual Elevation CODE


1728.038 GPS001

0.002 0.522 1728.038 GPS101

0.003 8.533 1736.571 GPS101A

-0.002 6.504 1743.075 BM1.1


0.003 41.7595 1784.834 BM1.2

-0.001 31.243 1816.077 BM1.3


-0.002 -6.165 1809.912 BM1.4

0.001 -25.478 1784.434 BM1.5


0.004 39.928 1824.362 BM1.6

0.002 8.467 1832.829 BM1.7

-0.005 16.0945 1848.924 BM1.8

-0.002 4.783 1853.707 BM1.9


0.001 16.4065 1870.113 BM1.10

0.001 11.1795 1881.293 BM1.11

-0.001 9.4275 1890.720 BM1.12

-0.003 5.5825 1896.303 BM1.13

-0.002 -13.721 1882.582 BM1.14


0 0.954 1883.536 BM1.15

0 0.606 1884.142 BM1.16

-0.004 10.826 1894.968 BM1.17


0.002 51.492 1946.460 BM1.18

-0.005 7.9675 1954.427 BM1.19

-0.006 25.126 1979.553 BM1.20


-0.002 26.797 2006.350 GPS002

0.001 14.1575 2020.508 GPS102


292.992
276
Checked by___________________________
Aproved by________________________

Date__________________ Date____________________
Project Name :- GESHEN Road Upgrading Project ( 53.09 K

EMPLOYER CONSULTANT CONTRA


PROMINAT Engineers
Ethiopian Roads Authority ECWC Con
Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK
CODE BS FS ∆H CODE BS FS ∆H Difference
GPS002 0.215 GPS102 2.92
0.362 2.563 2.222 0.573
2.672 2.058 0.188 0.527
3.847 0.23 0.067 2.630
2.774 0.156 0.196 3.757
3.383 0.069 0.341 2.9
3.513 0.113 0.433 3.61
3.099 0.094 0.368 3.852
GPS102 0.424 GPS002 3.043
Ʃ 19.865 5.707 14.158 Ʃ 6.735 20.892 -14.157 0.001

GPS102 1.618 BM2.1 2.498


1.169 2.457 1.340 2.828
3.877 0.583 0.171 2.523
2.603 0.014 3.718
BM2.1 1.147 GPS102
Ʃ 9.267 4.201 5.066 Ʃ 4.009 9.069 -5.060 0.006

BM2.1 4.152 BM2.2 0.224


3.147 0.135 0.118 1.717
1.951 0.453 0.332 2.908

0.457 4.253
BM2.2 BM2.1
Ʃ 9.250 1.045 8.205 Ʃ 0.674 8.878 -8.204 0.001

BM2.2 2.912 BM2.3 0.134


2.637 0.287 0.438 2.344
2.96 0.203 0.131 3.548
2.918 0.031 0.287 2.632
3.336 0.113 0.193 3.427
2.911 0.413 0.162 2.736
3.881 0.024 0.081 3.438
2.353 0.233 0.436 2.651
BM2.3 0.315 3.372
Ʃ 23.908 1.619 22.289 Ʃ 1.862 24.148 -22.286 0.003

BM2.3 2.926 BM2.4 0.019


2.917 0.025 0.453 3.085
3.331 0.027 0.383 2.577
2.909 0.266 0.202 3.921
3.388 0.261 0.122 2.819
3.615 0.101 0.306 2.752
BM2.4 0.203 0.537 2.801
BM2.3 2.271
Ʃ 19.086 0.883 18.203 Ʃ 2.022 20.226 -18.204 -0.001

BM2.4 3.031 BM2.5 0.592


2.8 0.271 0.36 3.352
3.465 0.294 0.692 2.866
2.677 0.221 0.325 3.937
2.633 0.105 0.913 2.898
2.21 0.693 0.549 2.852
3.54 0.223 0.39 2.538
2.808 0.173 0.32 3.757
BM2.5 0.192 BM2.4 2.937
Ʃ 23.164 2.172 20.992 Ʃ 4.141 25.137 -20.996 -0.004

BM2.5 2.569 BM2.6 0.289


3.91 0.068 0.228 3.872
2.649 0.11 0.085 3.517
3.924 0.031 0.126 2.944

2.350 0.376 0.238 3.818

3.854 0.192 0.292 2.333

BM2.6 0.268 BM2.5 2.988


Ʃ 19.256 1.045 18.211 Ʃ 1.258 19.472 -18.214 -0.003

BM2.6 0.677 BM2.7 1.73


0.326 2.882 3.287 3.372
0.036 3.400 3.321 0.048
2.968 0.926 BM2.6 0.813
BM2.7 0.899

Ʃ 4.007 8.107 -4.1 Ʃ 8.338 4.233 4.105 0.005

BM2.7 3.316 BM2.8 0.467


2.958 0.013 0.207 2.824
3.796 0.105 0.123 2.296
2.913 0.058 0.125 3.318
2.672 0.117 0.178 2.546
2.427 0.937 0.189 3.513
BM2.8 0.068 BM2.7 3.578
Ʃ 18.082 1.298 16.784 Ʃ 1.289 18.075 -16.786 -0.002

BM2.8 2.557 BM2.9 0.987


3.515 1.137 0.359 2.406
0.373 0.077 1.598 3.793
BM2.9 0.939 BM2.8 1.033
Ʃ 6.445 2.153 4.292 Ʃ 2.944 7.232 -4.288 0.004

BM2.9 3.325 BM2.10 0.621


2.664 0.28 0.293 3.665
3.215 0.032 0.007 2.927
3.450 0.283 0.463 2.938

3.210 0.031 0.147 3.883


3.35 0.319 0.383 3.038
3.193 0.066 0.701 3.667
1.622 0.237 0.874 3.658
BM2.10 0.599 BM2.9 1.897
Ʃ 24.029 1.847 22.182 Ʃ 3.489 25.673 -22.184 -0.002

BM2.10 3.613 BM2.11 0.339


2.853 0.013 0.373 3.383
3.552 0.157 0.082 2.622

2.907 0.025 0.032 3.659


2.801 0.027 0.137 2.936
BM2.11 0.131 BM2.10 3.738
Ʃ 15.726 0.353 15.373 Ʃ 0.963 16.338 -15.375 -0.002
BM2.11 1.422 BM2.12 3.887
0.204 3.554 0.172 1.755
2.824 0.011 0.25 0.364
2.87 0.378 0.266 2.698
2.287 0.521 0.373 2.615
BM2.12 0.583 BM2.11 2.077
Ʃ 9.607 5.047 4.56 Ʃ 4.948 9.509 -4.561 -0.001

BM2.12 2.843 BM1.13 0.486

2.7 0.155 0.264 1.699

3.529 0.017 0.351 2.566


2.642 0.303 0.41 2.547

2.858 0.273 0.078 2.961

1.879 0.557 0.202 2.735

BM2.13 0.657 0.574 2.287

BM1.12 2.056

Ʃ 16.451 1.962 14.489 Ʃ 2.365 16.851 -14.486 0.003

BM2.13 2.759 BM2.14 0.443

3.859 0.108 0.214 3.609

3.14 0.174 0.179 3.663

3.282 0.012 0.573 3.768

BM2.14 0.115 BM2.13 2.998

Ʃ 13.04 0.409 12.631 Ʃ 1.409 14.038 -12.629 0.002

BM2.14 0.552 GPS003 3.107

0.95 1.999 2.128 0.928

GPS003 3.128 BM2.14 0.68


Ʃ 1.502 5.127 -3.625 Ʃ 5.235 1.608 3.627 0.002

GPS003 0.182 GPS103 2.398

1.675 2.656 2.143 0.523

GPS103 3.029 GPS003 0.188

Ʃ 1.857 5.685 -3.828 Ʃ 4.541 0.711 3.83 0.002

0.014
Project ( 53.09 KM).

CONTRACTOR

ECWC Contractor

∆H Actual
Average Elevation CODE
2006.350 GPS002

14.1575 2020.508 GPS102

5.063 2025.571 BM2.1


8.2045 2033.775 BM2.2

22.2875 2056.063 BM2.3

18.204 2074.266 BM2.4


20.994 2095.260 BM2.5

18.2125 2113.473 BM2.6

-4.1025 2109.370 BM2.7


16.785 2126.155 BM2.8

4.29 2130.445 BM2.9

22.183 2152.628 BM2.10

15.374 2168.002 BM2.11


4.5605 2172.563 BM2.12

14.4875 2187.050 BM2.13

12.63 2199.680 BM2.14


-3.626 2196.054 GPS003 -0.102

-3.829 2192.225 GPS103


Project Name :- GESHEN Road Upgrading Project ( 53.09 KM
EMPLOYER CONSULTANT CONTRACTO
Ethiopian Roads PROMINAT Engineers
ECWC Contracto
Authority Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK ∆H
CODE BS FS ∆H CODE BS FS ∆H DifferenceAverage
GPS004 3.191 GPS104 0.789
1.826 0.789 0.767 0.621
3.289 0.928 1.874 1.664
GPS104 1.813 GPS004 3.351
Ʃ 8.306 3.53 4.776 Ʃ 3.430 5.636 -2.206 2.570 4.776

GPS104 0.11 BM4.1 3.695


0.203 3.339 3.703 0.464
0.233 3.823 3.677 0.084
BM4.1 3.183 GPS104 0.728
Ʃ 0.546 10.345 -9.799 Ʃ 11.075 1.276 9.799 0.000 -9.799

BM4.1 0.406 BM4.2 3.622


0.892 3.747 2.311 0.282
BM4.2 2.552 BM4.1 0.649
Ʃ 1.298 6.299 -5.001 Ʃ 5.933 0.931 5.002 0.001 -5.0015

BM4.2 1.082 BM4.3 1.244


2.245 1.365 0.369 0.962
0.667 0.205 3.299 2.408
BM4.3 3.584 BM4.2 0.382
Ʃ 3.994 5.154 -1.16 Ʃ 4.912 3.752 1.160 0.000 -1.16

BM4.3 0.219 BM4.4 2.487


0.168 2.632 0.755 0.074
2.539 0.698 1.197 0.227
BM4.4 1.338 BM4.3 2.397
Ʃ 2.926 4.668 -1.742 Ʃ 4.439 2.698 1.741 -0.001 -1.742

BM4.4 0.332 BM4.5 3.807


0.202 3.977 3.923 0.162
0.083 3.75 2.481 0.374
3.831 2.112 0.108 0.451
2.63 0.014 1.848 3.926
BM4.5 2.058 BM4.4 2.42
Ʃ 7.078 11.911 -4.833 Ʃ 12.167 7.333 4.834 0.001 -4.8335

BM4.5 0.907 BM4.6 1.793


BM4.6 1.947 BM4.5 0.753
Ʃ 0.907 1.947 -1.04 Ʃ 1.793 0.753 1.04 0 -1.04

BM4.6 0.044 BM4.7 3.913


0.134 3.717 3.33 0.242
BM4.7 3.158 BM4.6 0.308

Ʃ 0.178 6.875 -6.697 Ʃ 7.243 0.55 6.693 -0.004 -6.695

BM4.7 0.262 BM4.8 0.857


3.857 0.61 0.072 0.508
3.432 0.037 0.565 3.892
3.03 0.205 1.862 3.792
BM4.8 2.013 BM4.7 2.878
Ʃ 10.581 2.865 7.716 Ʃ 3.356 11.070 -7.714 0.002 7.715

BM4.8 0.417 BM4.9 0.883


3.96 1.117 0.037 0.183
3.1 0.083 0.263 3.913
3.777 0.092 0.222 3.269
3.962 0.081 0.097 3.918
3.804 0.327 0.008 3.732
2.239 0.144 0.6 3.669
BM4.9 0.897 BM4.8 1.943
Ʃ 21.259 2.741 18.518 Ʃ 2.11 20.627 -18.517 0.001 18.5175

BM4.9 0.782 BM4.10 3.658


0.212 3.562 3.704 0.879
0.062 3.813 3.785 0.103
0.078 3.627 3.328 0.221
0.913 3.118 3.196 0.288
BM4.10 3.300 BM4.9 0.808
Ʃ 2.047 17.42 -15.373 Ʃ 17.671 2.299 15.372 -0.001 -15.373

BM4.10 1.57 BM4.11 0.292


3.557 0.065 0.443 3.543
BM4.11 0.153 1.071 1.749
BM4.10 1.423
Ʃ 5.127 0.218 4.909 Ʃ 1.806 6.715 -4.909 0 4.909

BM4.11 2.126 BM4.12 0.153


3.26 0.061 0.078 3.789
3.243 0.057 0.033 2.524
3.205 0.186 0.25 2.868
BM4.12 0.323 BM4.11 2.539
Ʃ 11.834 0.627 11.207 Ʃ 0.514 11.72 -11.206 0.001 11.2065

BM4.12 3.274 BM4.13 0.210


3.807 0.052 0.103 3.304
3.606 0.027 0.162 3.727
3.834 0.267 0.097 3.787
2.849 0.117 0.333 3.47
BM4.13 0.452 BM4.12 3.076

Ʃ 17.370 0.915 16.455 Ʃ 0.905 17.364 -16.459 -0.004 16.457

BM4.13 2.508 BM4.14 0.174


3.616 0.435 0.049 3.757
3.255 0.03 0.332 1.89
BM4.14 0.5 BM4.13 3.322
Ʃ 9.379 0.965 8.414 Ʃ 0.555 8.969 -8.414 0 8.414

BM4.14 3.583 BM4.15 0.223


3.675 0.011 0.047 3.928
3.731 0.067 0.104 3.749
BM4.15 0.055 BM4.14 3.55

Ʃ 10.989 0.133 10.856 Ʃ 0.374 11.227 -10.853 0.003 10.8545

BM4.15 3.719 BM4.16 0.433


3.613 0.033 0.022 3.863
3.858 0.025 0.156 3.829
3.745 0.021 0.118 3.727
3.837 0.043 0.293 3.917
3.674 0.022 0.098 3.836
3.835 0.144 0.142 3.912
2.956 0.023 0.13 3.639
BM4.16 0.888 BM4.15 2.703

Ʃ 29.237 1.199 28.038 Ʃ 1.392 29.426 -28.034 0.004 28.036

BM4.16 3.774 BM4.17 0.165


3.808 0.072 0.217 3.665
3.772 0.042 0.263 3.809
3.856 0.172 0.158 3.718
3.632 0.017 0.082 3.857
2.607 0.145 0.087 3.39
BM4.17 0.949 BM4.16 2.587
Ʃ 21.449 1.397 20.052 Ʃ 0.972 21.026 -20.054 -0.002 20.053

BM4.17 3.868 BM4.18 0.089


3.702 0.017 0.3 3.935
3.955 0.054 0.317 3.889
3.83 0.144 0.158 3.683
3.894 0.171 0.181 3.792
2.967 0.258 0.023 3.809
3.123 0.372 0.407 3.35
BM4.18 0.222 BM4.17 3.115
Ʃ 25.339 1.238 24.101 Ʃ 1.475 25.573 -24.098 0.003 24.0995

BM4.18 3.655 Bm4.19 0.699


3.730 0.122 0.164 3.82
3.607 0.024 0.124 3.922
3.857 0.052 0.238 3.641
3.973 0.027 0.136 3.902
3.905 0.010 0.087 3.637
3.763 0.107 0.155 3.687
3.971 0.045 0.129 3.769
3.9 0.03 0.269 3.985
3.662 0.042 0.338 3.272
3.185 0.57 0.192 3.817
Bm4.19 1.52 BM4.18 3.742
Ʃ 41.208 2.549 38.659 Ʃ 2.531 41.194 -38.663 -0.004 38.661

Bm4.19 3.179 GPS005 0.750


3.708 0.223 0.208 3.867
3.863 0.041 0.191 3.913
3.46 0.012 0.039 3.550
3.85 0.063 0.2 3.926
2.14 0.049 0.609 3.537
GPS005 0.601 Bm4.19 2.417
Ʃ 20.2 0.989 19.211 Ʃ 1.997 21.21 -19.213 -0.002 19.212

GPS005 3.643 GPS105 0.106


3.991 0.660 0.141 3.767
3.717 0.013 0.123 3.869
3.991 0.3 0.568 3.884
1.103 0.589 GPS005 4.094
GPS105 0.203
Ʃ 16.445 1.765 14.680 Ʃ 0.938 15.614 -14.676 0.004 14.678
ject ( 53.09 KM).
ONTRACTOR
CWC Contractor

Actual
Elevation CODE
2402.587 GPS004

2407.363 GPS104

2397.564 BM4.1

2392.563 BM4.2

2391.403 BM4.3
2389.661 BM4.4

2384.828 BM4.5

2383.788 BM4.6

2377.093 BM4.7

2384.808 BM4.8
2403.325 BM4.9

2387.953 BM4.10

2392.862 BM4.11

2404.068 BM4.12

2420.525 BM4.13
2428.939 BM4.14

2439.794 BM4.15

2467.830 BM4.16

2487.883 BM4.17
2511.982 BM4.18

2550.643 BM4.19

2569.855 GPS005

2584.533 GPS105
Project Name :- GESHEN Road Upgrading Project ( 53.09 KM
EMPLOYER CONSULTANT CONTRACTO
Ethiopian Roads PROMINAT Engineers
ECWC Contracto
Authority Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK ∆H
CODE BS FS ∆H CODE BS FS ∆H DifferenceAverage
GPS005 3.643 GPS105 0.106
3.991 0.660 0.141 3.767
3.717 0.013 0.123 3.869
3.991 0.3 0.568 3.884
1.103 0.589 4.094
GPS105 0.203 GPS005
Ʃ 16.445 1.765 14.68 Ʃ 0.938 15.614 -14.676 0.004 14.678

GPS105 3.573 BM5.1 0.119


3.45 0.028 0.327 3.592
3.757 0.161 0.288 3.703
3.949 0.107 0.024 3.655
3.71 0.252 0.13 3.797
3.476 0.073 0.237 3.705
3.725 0.138 0.104 3.963
3.573 0.256 0.188 3.646
3.85 0.076 0.317 3.861
2.997 0.215 0.607 3.58
BM5.1 0.468 GPS105 3.123
Ʃ 36.06 1.774 34.286 Ʃ 2.341 36.625 -34.284 0.002 34.285

BM5.1 2.816 BM5.2 0.742


3.469 0.167 0.292 3.766
3.988 0.298 0.117 3.958
3.901 0.306 0.203 3.499
3.637 0.275 0.01 3.872
3.991 0.285 0.138 3.449
3.923 0.14 0.333 3.284
2.580 0.193 0.878 3.331
BM5.2 1.016 BM5.1 3.181
Ʃ 28.305 2.68 25.625 Ʃ 2.713 28.34 -25.627 -0.002 25.626

BM5.2 3.698 BM5.3 0.090


3.783 0.024 0.030 3.698
3.942 0.057 0.149 3.849
3.947 0.088 0.325 3.913
3.681 0.023 0.171 4.008
3.337 0.125 0.397 3.982
BM5.3 0.397 BM5.2 3.383
Ʃ 22.388 0.714 21.674 Ʃ 1.162 22.833 -21.671 0.003 21.6725

BM5.3 3.771 BM5.4 0.193


2.41 0.049 0.313 3.771
2.939 0.351 0.88 2.556
BM5.4 0.88 BM5.3 2.9
Ʃ 9.12 1.280 7.840 Ʃ 1.386 9.227 -7.841 -0.001 7.841

BM5.4 3.742 BM5.5 0.099


3.143 0.023 0.272 3.214
3.676 0.196 0.433 3.742
3.651 0.151 0.22 3.752
3.668 0.052 0.7 3.933
3.74 0.018 0.194 3.839
3.747 0.033 0.079 3.794
3.902 0.294 0.134 3.907
2.618 0.069 0.073 3.687
BM5.5 0.7 BM5.4 2.683
Ʃ 31.887 1.536 30.351 Ʃ 2.204 32.551 -30.347 0.004 30.349

BM5.5 2.002 BM5.6 2.064


0.416 1.812 2.835 0.667
BM5.6 2.835 BM5.5 2.002
Ʃ 2.418 4.647 -2.229 Ʃ 4.899 2.669 2.23 0.001 -2.2295

BM5.6 3.801 BM5.7 0.12


3.887 0.047 0.293 3.801
3.968 0.342 0.264 3.96
3.896 0.304 0.123 3.919
3.907 0.062 0.369 3.856
3.473 0.301 0.16 3.969
3.643 0.037 1.209 3.54
2.925 0.794 0.382 3.765
BM5.7 1.209 BM5.6 2.512
Ʃ 29.5 3.096 26.404 Ʃ 2.92 29.322 -26.402 0.002 26.403

BM5.7 3.974 BM5.8 0.153


4.002 0.245 0.237 3.910
3.748 0.041 0.265 3.945
3.805 0.174 0.352 3.897
3.419 0.027 1.158 3.974
3.573 0.021 0.278 3.743
BM5.8 1.158 BM5.7 3.831
Ʃ 22.521 1.666 20.855 Ʃ 2.443 23.300 -20.857 -0.002 20.856

BM5.8 3.98 BM5.9 0.314


3.179 0.149 0.33 3.98
3.319 0.018 0.073 3.346
BM5.9 0.33 BM5.8 3.377
Ʃ 10.478 0.497 9.981 Ʃ 0.717 10.703 -9.986 -0.005 9.9835

BM5.9 3.951 BM5.10 1.742


3.853 0.033 0.097 3.951
3.448 0.15 0.105 3.914
3.492 0.141 0.338 3.402
3.682 0.008 0.166 3.688
3.083 0.161 0.028 3.839
2.975 0.366 0.384 2.95
BM5.10 1.742 BM5.9 2.993
Ʃ 24.484 2.601 21.883 Ʃ 2.86 24.737 -21.877 0.006 21.880

BM5.10 3.398 BM5.11 0.114


3.828 0.223 0.204 3.398
3.681 0.123 1.381 3.718
2.007 0.625 0.756 3.763
BM5.11 1.381 BM5.10 2.138
Ʃ 12.914 2.352 10.562 Ʃ 2.455 13.017 -10.562 0 10.562

BM5.11 3.668 BM5.12 0.312


3.601 0.031 0.388 3.813
3.906 0.05 0.024 3.631
3.807 0.036 0.144 3.887
3.542 0.153 0.053 3.643
2.999 0.417 0.361 3.716
BM5.12 0.332 BM5.11 3.1
Ʃ 21.523 1.019 20.504 Ʃ 1.282 21.79 -20.508 -0.004 20.506

BM5.12 3.983 BM5.13 0.294


BM5.13 0.603 BM5.12 3.673

Ʃ 3.983 0.603 3.380 Ʃ 0.294 3.673 -3.379 0.001 3.3795

BM5.13 1.01 BM5.14 1.68


1.347 2.56 1.52 0.451
BM5.14 1.654 BM5.13 0.888

Ʃ 2.357 4.214 -1.857 Ʃ 3.2 1.339 1.861 0.004 -1.859

BM5.14 1.052 BM5.15 0.248


1.5 2.466 0.533 2.338
2.278 0.291 1.69 0.755
BM5.15 0.324 BM5.14 1.123

Ʃ 4.83 3.081 1.749 Ʃ 2.471 4.216 -1.745 0.004 1.747

BM5.15 3.56 BM5.16 0.903


2.045 0.046 0.623 2.548
BM5.16 1.308 BM5.15 3.231

Ʃ 5.605 1.354 4.251 Ʃ 1.526 5.779 -4.253 -0.002 4.252

BM5.16 0.679 GPS006 3.755


0.182 3.726 3.473 0.041
0.084 3.554 3.789 0.263
0.299 3.768 3.61 0.027
0.171 3.893 3.987 0.087
0.265 3.828 3.584 0.156
0.176 3.752 3.462 0.237
1.312 3.455 2.855 0.123
GPS006 3.431 BM5.16 1.342
Ʃ 3.168 29.407 -26.239 Ʃ 28.515 2.276 26.239 0.000 -26.239

GPS106 3.974 GPS106 0.27


2.827 0.084 0.727 3.715
GPS106 0.767 GPS006 3.234
Ʃ 6.801 0.851 5.950 Ʃ 0.997 6.949 -5.952 -0.002 5.951
oject ( 53.09 KM).
ONTRACTOR
ECWC Contractor

Actual
Elevation CODE
2569.87 GPS005

2584.534 GPS105

2618.819 BM5.1
2644.445 BM5.2

2666.118 BM5.3

2673.958 BM5.4

2704.307 BM5.5
2702.078 BM5.6

2728.481 BM5.7

2749.337 BM5.8

2759.320 BM5.9
2781.200 BM5.10

2791.762 BM5.11

2812.268 BM5.12

2815.648 BM5.13

2813.789 BM5.14

2815.536 BM5.15
2819.788 BM5.16

2793.549 GPS006

2799.500 GPS106
Project Name :- GESHEN Road Upgrading Project ( 53.09 KM
EMPLOYER CONSULTANT CONTRACTO
Ethiopian Roads PROMINAT Engineers
ECWC Contractor
Authority Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK ∆H
CODE BS FS ∆H CODE BS FS ∆H DifferenceAverage
GPS106 3.974 GPS106 0.27
2.827 0.084 0.727 3.715
GPS106 0.767 GPS006 3.234
Ʃ 6.801 0.851 5.950 Ʃ 0.997 6.949 -5.952 -0.002 5.951

GPS106 3.599 BM6.1 0.463


3.336 0.033 0.352 3.766
3.563 0.117 0.237 3.838
3.752 0.139 0.146 3.86
3.881 0.183 0.2 3.807
3.598 0.07 0.012 3.766
3.738 0.252 0.094 3.872
3.936 0.04 0.021 3.833
3.364 0.096 0.703 3.881
BM6.1 0.481 GPS106 2.959
Ʃ 32.767 1.411 31.356 Ʃ 2.228 33.582 -31.354 0.002 31.355

BM6.1 3.41 BM6.2 0.281


3.271 0.254 0.08 3.954
3.843 0.044 0.15 3.644
3.645 0.106 0.673 3.403
BM6.2 0.476 BM6.1 3.471
Ʃ 14.169 0.88 13.289 Ʃ 1.184 14.472 -13.288 0.001 13.2885

BM6.2 0.333 BM6.3 3.285


BM6.3 3.48 BM6.2 0.14
Ʃ 0.333 3.480 -3.147 Ʃ 3.285 0.140 3.145 -0.002 -3.146
BM6.3 0.424 BM6.4 1.290
0.28 3.715 3.977 0.087
0.076 3.765 3.088 0.017
BM6.4 1.115 BM6.3 0.44
Ʃ 0.78 8.595 -7.815 Ʃ 8.355 0.544 7.811 -0.004 -7.813

BM6.4 2.989 BM6.5 0.65


1.367 2.5 1.507 0.477
BM6.5 0.793 BM6.4 2.74
Ʃ 4.356 3.293 1.063 Ʃ 2.157 3.217 -1.060 0.003 1.0615

BM6.5 2.466 BM6.6 0.687


1.626 0.444 0.822 1.458
BM6.6 0.856 BM6.5 2.841
Ʃ 4.092 1.3 2.792 Ʃ 1.509 4.299 -2.79 0.002 2.791

BM6.6 3.879 BM6.7 0.817


3.388 0.028 0.179 2.704
2.012 0.013 0.141 3.758
BM6.7 0.868 BM6.6 3.044
Ʃ 9.279 0.909 8.37 Ʃ 1.137 9.506 -8.369 0.001 8.3695

BM6.7 0.588 BM6.8 2.253


0.25 3.698 3.955 1.312
1.404 3.69 3.256 0.107
BM6.8 2.346 BM6.7 0.552
Ʃ 2.242 9.734 -7.492 Ʃ 9.464 1.971 7.493 0.001 -7.493

BM6.8 0.475 BM6.9 3.028


0.727 3.177 2.888 1.097
BM6.9 2.658 BM6.8 0.187
Ʃ 1.202 5.835 -4.633 Ʃ 5.916 1.284 4.632 -0.001 -4.6325

BM6.9 0.213 BM6.10 3.4


0.126 3.62 3.682 0.193
0.012 3.843 3.509 0.028
0.033 3.877 3.895 0.054
0.087 3.588 3.964 0.035
0.283 3.689 3.494 0.166
BM6.10 3.207 BM6.9 0.397
Ʃ 0.754 21.824 -21.070 Ʃ 21.944 0.873 21.071 0.001 -21.071

BM6.10 0.112 BM6.11 0.24


0.132 0.355 3.483 0.112
0.392 3.703 3.583 0.019
0.508 3.542 2.828 0.172
BM6.11 2.828 BM6.10 0.55
Ʃ 1.144 10.428 -9.284 Ʃ 10.134 0.853 9.281 -0.003 -9.2825

BM6.11 3.732 GPS007 0.019


3.253 0.056 0.072 3.752
4.059 0.207 0.055 3.205
GPS007 0.055 BM6.11 3.915
Ʃ 11.044 0.318 10.726 Ʃ 0.146 10.872 -10.726 0 10.726

GPS007 3.516 GPS007 0.010


4.093 0.212 0.099 3.893
3.940 0.030 0.113 3.516
3.913 0.337 0.095 4.007
3.904 0.242 0.507 3.687
GPS107 0.507 GPS107 3.757

Ʃ 19.366 1.328 18.038 Ʃ 0.824 18.860 -18.036 0.002 18.037


oject ( 53.09 KM).
ONTRACTOR
ECWC Contractor

Actual
Elevation CODE
2793.446

2799.386 GPS106

2830.741 BM6.1

2844.030 BM6.2

2840.884 BM6.3
2833.071 BM6.4

2834.132 BM6.5

2836.923 BM6.6

2845.293 BM6.7

2837.800 BM6.8
2833.168 BM6.9

2812.097 BM6.10

2802.815 BM6.11

2813.541 GPS007 -0.117

2831.578 GPS107 0.069


Project Name :- GESHEN Road Upgrading Project ( 53.09 KM
EMPLOYER CONSULTANT CONTRACTO
Ethiopian Roads PROMINAT Engineers
ECWC Contracto
Authority Consultant PLC.
DIFFERENTIAL LEVEL FORMAT
RUN CHECK BACK ∆H
CODE BS FS ∆H CODE BS FS ∆H DifferenceAverage
GPS005 3.643 GPS105 0.106
3.991 0.660 0.141 3.767
3.717 0.013 0.123 3.869
3.991 0.3 0.568 3.884
1.103 0.589 4.094
GPS105 0.203 GPS005
Ʃ 16.445 1.765 14.68 Ʃ 0.938 15.614 -14.676 0.004 14.678

GPS105 3.573 BM5.1 0.119


3.45 0.028 0.327 3.592
3.757 0.161 0.288 3.703
3.949 0.107 0.024 3.655
3.71 0.252 0.13 3.797
3.476 0.073 0.237 3.705
3.725 0.138 0.104 3.963
3.573 0.256 0.188 3.646
3.85 0.076 0.317 3.861
2.997 0.215 0.607 3.58
BM5.1 0.468 GPS105 3.123
Ʃ 36.06 1.774 34.286 Ʃ 2.341 36.625 -34.284 0.002 34.285

BM5.1 2.816 BM5.2 0.742


3.469 0.167 0.292 3.766
3.988 0.298 0.117 3.958
3.901 0.306 0.203 3.499
3.637 0.275 0.01 3.872
3.991 0.285 0.138 3.449
3.923 0.14 0.333 3.284
2.580 0.193 0.878 3.331
BM5.2 1.016 BM5.1 3.181
Ʃ 28.305 2.68 25.625 Ʃ 2.713 28.34 -25.627 -0.002 25.626

BM5.2 3.698 BM5.3 0.090


3.783 0.024 0.030 3.698
3.942 0.057 0.149 3.849
3.947 0.088 0.325 3.913
3.681 0.023 0.171 4.008
3.337 0.125 0.397 3.982
BM5.3 0.397 BM5.2 3.383
Ʃ 22.388 0.714 21.674 Ʃ 1.162 22.833 -21.671 0.003 21.6725

BM5.3 3.771 BM5.4 0.193


2.41 0.049 0.313 3.771
2.939 0.351 0.88 2.556
BM5.4 0.88 BM5.3 2.9
Ʃ 9.12 1.280 7.840 Ʃ 1.386 9.227 -7.841 -0.001 7.841

BM5.4 3.742 BM5.5 0.099


3.143 0.023 0.272 3.214
3.676 0.196 0.433 3.742
3.651 0.151 0.22 3.752
3.668 0.052 0.7 3.933
3.74 0.018 0.194 3.839
3.747 0.033 0.079 3.794
3.902 0.294 0.134 3.907
2.618 0.069 0.073 3.687
BM5.5 0.7 BM5.4 2.683
Ʃ 31.887 1.536 30.351 Ʃ 2.204 32.551 -30.347 0.004 30.349

BM5.5 2.002 BM5.6 2.064


0.416 1.812 2.835 0.667
BM5.6 2.835 BM5.5 2.002
Ʃ 2.418 4.647 -2.229 Ʃ 4.899 2.669 2.23 0.001 -2.2295

BM5.6 3.801 BM5.7 0.12


3.887 0.047 0.293 3.801
3.968 0.342 0.264 3.96
3.896 0.304 0.123 3.919
3.907 0.062 0.369 3.856
3.473 0.301 0.16 3.969
3.643 0.037 1.209 3.54
2.925 0.794 0.382 3.765
BM5.7 1.209 BM5.6 2.512
Ʃ 29.5 3.096 26.404 Ʃ 2.92 29.322 -26.402 0.002 26.403

BM5.7 3.974 BM5.8 0.153


4.002 0.245 0.237 3.910
3.748 0.041 0.265 3.945
3.805 0.174 0.352 3.897
3.419 0.027 1.158 3.974
3.573 0.021 0.278 3.743
BM5.8 1.158 BM5.7 3.831
Ʃ 22.521 1.666 20.855 Ʃ 2.443 23.300 -20.857 -0.002 20.856

BM5.8 3.98 BM5.9 0.314


3.179 0.149 0.33 3.98
3.319 0.018 0.073 3.346
BM5.9 0.33 BM5.8 3.377
Ʃ 10.478 0.497 9.981 Ʃ 0.717 10.703 -9.986 -0.005 9.9835

BM5.9 3.986 BM5.10A 0.004


3.513 0.223 0.022 3.297
3.881 0.138 0.043 3.986
3.975 0.065 0.367 3.763
3.99 0.433 0.017 3.953
3.256 0.092 0.022 3.921
4.001 0.071 0.013 3.183
3.948 0.133 0.016 3.951
3.927 0.287 0.068 3.828
3.863 0.164 0.013 3.656
3.908 0.068 0.013 3.768
3.859 0.106 0.028 3.853
3.831 0.12 0.234 3.766
3.799 0.292 0.033 3.739
4.009 0.129 0.062 3.742
3.813 0.293 0.026 3.913
1.703 0.02 1.314 3.58
BM5.10A 1.314 BM5.9 1.708
Ʃ 63.262 3.948 59.314 Ʃ 2.295 61.607 -59.312 0.002 59.313

BM5.10A 2.373 GPS001 0.638


GPS001 1.014 BM5.10A 1.999
Ʃ 2.373 1.014 1.359 Ʃ 0.638 1.999 -1.361 -0.002 1.36

GPS001 0.283 GPS101 3.082


GPS101 2.923 GPS001 0.442
Ʃ 0.283 2.923 -2.64 Ʃ 3.082 0.442 2.64 0 -2.64
roject ( 53.09 KM).
CONTRACTOR
ECWC Contractor

Actual
Elevation CODE
2569.87 GPS005

2584.534 GPS105

2618.819 BM5.1
2644.445 BM5.2

2666.118 BM5.3

2673.958 BM5.4

2704.307 BM5.5
2702.078 BM5.6

2728.481 BM5.7

2749.337 BM5.8

2759.320 BM5.9
2818.633 BM5.10A

2819.993 GPS008 -0.163

2817.353 GPS108 -0.081