S. No 1 1.

SCHEDULE OF WORK Item Code Description of Items 2 EARTH WORK 2.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed : 2.2 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :

Unit

1.2

1.3

2.3

Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m.

1.3.1 1.4

2.3.1 2.6

All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.

cum

1.5

2.7

Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. cum

1.5.1

2.7.1

Ordinary rock

1.6

2.8

Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

1.7

2.9

Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.

1.7.1 1.7.2 1.7.3 2 2.1 2.1.1 2.2 2.2.1 2.3 2.4

2.9.1 2.9.2 2.9.3 13 13.3 13.3.2 13.7 13.7.2 13.9 13.11

Ordinary rock Hard rock (requiring blasting) Hard rock (blasting prohibited) FINISHING 20 mm cement plaster of mix : 1:6 (1 cement : 6 fine sand) 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement : 4 fine sand) Cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement. 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand). 15 mm cement plaster 1:2 (1 cement : 2 stone dust) on the rough side of single or half brick wall.

cum cum cum

sqm

sqm

sqm

2.5

13.14

sqm TOTAL

Rate

Qty

Amount

99.45

23

2287

152.6

24

3662

162.65 272.95 332.45

67 56 78

10898 15285 25931

95.1

56

5326

97.9

678

66376

111.15

78

8670

123.9

89

11027 149462