Construction
Output
Roof Slab
One Way Spanning Continuous Slab
Loading
Gk = 0.22 x 24 + 0.5 + 0.5 = 6.28kN/m2
Qk = 5.0kN/m2
Bending Moment Check
From Analysis
Msag = 55.8kN/m2
Mhog = 66.2kN/m2
End Span
V = 61kN
Qk = 5.0kN/m2
Qk = 5.0kN/m2
Class C4 & C5
Dance Hall, Concert,
Pub Usage
Sagging
b = 1000mm
fcu = 30N/mm2
d = 220-20-6 = 194mm
k = 55.8x106/30x1000x1942 = 0.049
z = 0.942d = 182.7mm
As,req = 55.8x106/182.7x360/1.15 = 976mm2/m
As, prov 12 @150 c/c 754mm2/m
Reduce Live Load Qk = 3.0kN/m2
Class C of BS6399
2.0 + 1.0 = 3.0kN/m2
Msag = 44.1kN/m2
Mhog = 52.8kN/m2
V = 49.1kN
Lower Qk
3.0kN/m2
capacity
2
OK
Hogging
d = 220-20-14/2 = 193mm
k = 52.8x106/30x1000x1932 = 0.047
z = 0.944d = 182.2mm
As, req = 52.8x106/182.2x0.87x360/1.15 = 925.2mm2/m
As, prov 14 @ 150c/c 1026mm2/m OK
Shear Check
vc = 0.79 x 5311/3 x 30/251/3/1.25 = 0.54N/mm2
v = 49.1x103/193x1000 = 0.25N/mm2 OK in Shear
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
13/06/11
Tender
Calculations
Job No:
11.203
Sheet No:
C.C-01
Construction
Output
Slabs
20mm
Beams 25mm
Columns 30mm
(15mm + 5mm)
(20 bar + h (5mm)
(24 bar + h (5mm)
Project Title:
Addis Hotel
Part of Structure:
Originator:
Checker:
Calculations Status:
Preliminary
Date:
Planning
Tender
Job No:
11.203
Sheet No:
SK-01
Construction
Calculations
6
33.6
30.3
27.0
23.7
36.7
Height
32.7
4.0
29.25
3.45
1
Roof
7th
6th
3.45
25.8
5th
3.45
22.35
20.4
4th
3.45
18.9
17.1
3rd
3.45
15.45
13.5
2nd
3.3
12.15
10.5
1st
3.0
9.15
Service
Floor
7.8
6.15
3.0
Mezzanine
4.5
2.25
3.9
Ground
0.00
-2.1
-4.2
Basement
-6.2
Section at G.L G
Project Title:
Addis Hotel
Part of Structure:
Global loads
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Job No:
11.203
Sheet No:
C-03
Tender
Calculations
Output
Construction
Project Title:
Addis Hotel
Part of Structure:
Loading
Originator:
EH
Checker:
Calculations Status:
Preliminary
Calculations
kN/m2
= 6.0
= 0.5
= 0.5
7
Beam, 0.3 x (0.65 -0.25) x 24 = 2.88kN/m
Ground Floor
Gk
0.2 x 24
Ceiling & Services
Finishes
Qk
Partitions
12/04/11
Tender
11.203
Sheet No:
L-02
Construction
Output
Mezz Floor
Gk
0.25 x 24
Ceiling & Services
Finished
Qk
Partitions
Planning
Date:
Job No:
= 5.0
= 1.0
6.0
= 4.8
= 0.5
= 0.5
5.8
= 5.0
= 1.0
6.0
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Tender
Job No:
11.203
Sheet No:
L-01
Construction
Calculations
Output
kN/m2
= 5.28
= 0.5
= 0.5
6.28
= 2.0
= 1.0
3.0
kN/m2
Terrace (Actual)
Gk
= 5.28
= 0.5
= 1.15
= 2.3
= 0.2
= 0.07
9.5
= 5.0
110
379
= 7.5kN/m2
Waffle Floor
150
Gk
[0.75 x 0.2 x 24 x 2 x 8] + [0.15 x 1.863 x 8 x 24] +
750
[0.2 x 0.45 x 24 x 1.863]
= 115.3kN 115.3/8x1.863 = 7.74kN/m2
200
1463
Project Title:
Addis Hotel
Part of Structure:
Roof beams
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Tender
Job No:
11.203
Sheet No:
RB-01
Construction
Calculations
Summary of Reinforcement
Provided
Sagging 12 @ 130
Hogging 14 @ 150
Transverse 10 @ 170
Output
mm2/m
869
1026
461
Required mm2/m
835
1019
286
1000
1250
6000
500
1460
Project Title:
Addis Hotel
Part of Structure:
Roof beams
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Tender
Calculations
Job No:
11.203
Sheet No:
RB-01
Construction
Output
Gk = 6.28 kN/m2
ULS = 13.59kN/m2
Qk = 3.0 kN/m2
Use 13.59 x 6 = 81.55kN/m
Bending Moment Check
Msag = wl2/14 = 372.8kNm
Mhog = wl2/12.5 = 417.5kNm
V = 0.6F = 391.44kN
Sagging
b = 300mm
d = 650 - 8 - 25 - 10 = 607mm
fcu = 30N/mm2
k = 372.8x106/30x300x6072 = 0.112
z = 0.854d = 518.4mm
As, req = 372.8x106/518.4 x 0.87 x 360 = 2296mm2
As, prov = 5 x 20 = 1570mm2
As a T-Beam
MR = 0.45fcubhf(d-hf/2)
b = 0.7x 8000/10 + 300 = 860mm
hf = 220mm
MR = 1269.4kNm NA in flange
k = 372.8x106/30x560x6072 = 0.039
z = 0.95d = 576.65mm
As,req = 372.8x106/576.65x.087x360 = 2064.2mm2
- not adequate
Project Title:
Addis Hotel
Part of Structure:
Roof beams
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
12/04/11
Tender
Calculations
Shear Check
100As/bd = 100x3166/300x603 = 1.75 vc = 0.76N/mm2
10 Shear Links, Asv = 157mm2
Sv = 157x0.87x360/300x(2.16-0.76) = 116.9mm
10 @ 70 c/c provided OK
11.203
Sheet No:
RB-01
Construction
Output
Hogging
d = 650 - 25 - 10 -24/2 = 603mm
b = 300mm
k = 417.5x106/30x300x6032 = 0.128
z = 0.828d = 499.28mm
As, req = 417.5x106/499.28x0.87x360 = 2670mm2
As,prov = 7 x 24 3166mm2
As Total Beam,
Provided
1570 + 3166 = 4736mm2
Job No:
Required
4966mm2
Further
Detailed
Analysis
Required
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Calculations
Planning
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
HR-03
Construction
Output
Output
Output
2
2
Lift
Analysis
Reinforcement
Waffle
Column
G
Shade
Wall
E/3
7.12kN/m
6040kN
1
off
2/G
Rib
pressure
Basement
Slabs
AreasInProvided
Effect
n = 14.768kN/m
ULS =1.4x6040
+ 1.6x2208
Required
= 10,576kN
Fy = 360/1.15
k =
2
4
See
Sagging
Symmetrical
Q
L
=
=
2.7m
following
3.0kN/m
2208kN
Steel
;
b
=
Loads,
RAM
0.2m
output
;
Short
I
=
=
0.328m
12
&
for
Braced
analysis
@
130c/c
results
N
= 0.35f
(vertical
0.7Ascfy
=313.04N/mm2
k
cuAc + loads)
2
2
2
2
G
Effective
+ 1.0
Under
= 8.74kN/m
Column
= 869mm
x 1.4 /m
=>
773mm
UDL
= 21.84kN/m
/m Gk Qk
Cumulative
k = 7.74Pad
Roof
2
Self
Results
Hogging
Q
10,576x103
Punching
(6040+2208/400)
Wall
5.0
2, 3,+Steel
4,
at
1.0
==
5
Column
0.3x0.65x24
0.35x35x850
&
= 6.28x8x6
6.0kN/m
61/2 = 4.54m
=2 +
x14
=221.6
+
468kN/m
0.7xA
@
150c/c
x360
UDL
Gk
Qk
k = Weight
sc
3.1x8 + 3.3x0.6 x24 354
2
4
2
2
Beam
A
L
=
=
2.7m
7874mm
GL
G
;
3
b=0.2m
Disperse
=
7.12
x
;
(6-0.3)
I
Load
=
0.328m
=1026mm
@
+
2
4.68
on
1
=
/m
Down
45.26kN/m
Beams
935mm
/m
sc
k
Terrace
(48-1.75x8) x (9.5-6.28)
110
2
Msc,
Transverse
Ribs
A
Say
4.5x4.5x0.5
=@=
177kNm
1.7m
Q
16k =xSteel
3x6
24
c/c5dp.
=
Pad
7238mm
=
10A
= 20.25m2
Accepted as our
sagprov
p@170c/c
Imposed
x 18.0kN/m
48
240
2
2
2
MthhogFloor
Perimeter
Area
Columns
=Panel
119kNm
n ===
1.4
0.85x4
ABx=17.12
48m
+ 4x(1+1+0.5)
+=1.6
461.7mm
x 3 = =14.77kN/m
13.4m
/m
286mm2/m
3985
loads higher
1680
than
7
2
2
V = 153kN
Moment
However
Grids
1 &=rebar
4wl2/8drgs
=
21.84x1.7x12
say 800x800
/8Col.
668.3kNm
those used in MGM
6.28x8x6
+ 3.1x8
+=3.3x0.6
x24
354
Consider
Asses
Shear
A
d
Assume
= req
500-50-16-10
==
Effect
12,486mm
21.84x1.7x0.5x8
equal
SlabofLoads
storey
Centre
=2 424mm
on
heights
Span
Beam
= 148.5kN
Opes
& as
550x550
2-Way
- 1250mm
average
Spanning
widedimensions
design
sc,
3x48
144
3 A
B
th
B
BS
vBending
=
8110
10576x10
Moment
Table
/850x4x424
3.15
Check
= 7.33N/mm2
6col Floor
3
b==0.55x0.55
Bending
ILinks
300mm
Moment
/12As
xCheck
9Above
= 0.0686m4 Not permitted
354
p/2
Consider
d
M
b
24/4
=Col
650-25-10-24/2
200+1500
== 25.4kN/m
+
6 Dispersal
Beam= GL
Links
1700mm
through
3
= 603mm
Provided
Beams
= 8 @ 200c/c
sag
As
Above
144
2
p/2
fLoad
b
d=
12
Grids
900-25-8-24-12
1000-1250/2
=
30N/mm
from
2288
& 3Slab
4B
= 375mm
= D3
831mm
Adequate
5cuth==Floor
W8
63
22 2
vk= 10576x10
Say
177x10
25.4x10
668.3x10
600x600
Lx =66/30x300x603
/30x375x194
6m
/30x1700x831
average
/13400x424
Ly/LAbove
3.33
==0.054
0.060
1.86N/mm
= size
0.019 2
x =column
354
L = 6.350m
; b =As
0.25m
; I = 5.33m4
z = 0.95d
0.936d
0.928d
Ly===789.45mm
20m
564.41mm
180.0mm
OK
AsAAbove
144
p
3
6
Ath=s, req
ITotal
0.6x0.6
=Load
177x10
=
/12
10,576kN
x/0.87x360x564.41
9 = 0.097m
ULS 4
= 1001.92mm2
4
Floor
W9
6
2
2
2
3 s,req
A
At
Edges
top
=5of
668.3x10
25.4x10
x Discontinuous
500
20 dp.
6/180x0.87x360
1571mm
/789.45x0.87x360
Slab
One
Long
=edge
2703mm
prov=
4= 450.5mm
As
Above
354
L s,=req
5.8m ; b = 0.2m
: I = 3.25m
2
2
2
A
p/2
Find
=
Centre
10576/20.45+48
12
6
x
24
@
=
of
0.63
150c/c
Twist
2714mm
Continuous
=
754mm
154.9kN/m
/m
Edge
6040
2208
s, prov
sx
As Above
144
2
rdhog
M
Perimeter
Lift
Moment
J/4
=
119kNm
V
=
on
=
0.85x4
0.63x14.77x6
Beam
+4x(0.75x2+0.5)
B1
=
wL
=
/24
55.83kN/m
+WL/16
=
11.4m
over
0.75
span
sx
3
Floor
W10
2
2
As,Opes
Shear
xAdequately
24 As
3166mm
Provided
> 1001mm
for by adjacent
(M = 177kNm)
strips in terms
Hogging
of strength
Reinforcement
prov 7Check
Above
354
L = 5.8m less 3doors,
1.1m W x 2.3m H2 2
2
Slab
vV
== 10576x10
148.5x103/200x831
Panel B3/11400x424
toAs
I2+3Above
= 0.894N/mm
= 2.19N/mm
Adequate
154.9x4.5x1.5
/24
154.9x1.5x0.5x1.5/16
= 76.24kNm
2
4
144
I nd
= 3.25 2(0.2x1.1 /12 + 0.2x1.1x1.4 ) = 2.34m
Floor
100A
L1000
6mwide
Ly/Lwidth
=
1.63
OK
Full
slab
shear
s/bd
x==100x2714/200x831
x = 10 resisting
2
2
vShear
0.74N/mm
Check
Ly = 60m
acceptable
on
2000
dp. Beam
c =
As
Above
354
W11
V Shear
= 153kN
ok, see As
previous
TEDDS sheets
2
3
4
Above
144
I st= 0.2x3 /12
3 0.2x1.1 /12 = 0.43m 2
v2 =
Short
Min
153x10
Links
Edges
/300x603
Discontinuous
= 0.847N/mm < 0.8fcu = 4.38N/mm2
1
Floor
s/bdsx= =100x628/300x603
100A
0.54
= 0.347
As Above
354
W12
1/3
1/3
2
2
vcsv==3/J
A
Lift
0.79x0.347
0.4x200x110/0.87x360
V4sx = 0.54x14.77x6
x(30/25)
/1.25
=
=
47.85kN/m
28.01mm
= 0.472N/mm
As
Above
144
I = 0.45m
Assumed
REF Dimensions
I
I
y
Iy
Iy2
v
<Total
Links
vW1
0.4
OK
onProvide
Beam
55.83
links
+ 47.85 = 103.68kN/m
c + UDL
0.328 =min
1.05
0.344
-2.61
-0.856
2.234
Service
W13
2
Asv =W2
100.5mm (3.02+1)x48
2 legs of 8+1.05
4
0.328
0.344
-0.01
-0.003
0.00
2.7x0.85
x(/4)x24
230
L = 4.35m ; b = 0.250m ; I = 1.71m
See Attached
Spreadsheet
W3
0.328
1.05
0.344
2.59
0.850
2.20
30x48
144
S
100.5x(300/1.15)/300x0.4
= A218.6mm
Location
As,-1.758
v = W4
s, req
prov
0.328
33.25
10.91
-5.36
9.42
Mezz
W14
Sv, maxW5
= 0.75x603
= 452mm
Moment
4
0.328
33.25
10.91
-2.76
-0.905
2.50
7x48
+
8x2x2.88
Use more
I = 0.43m
2
2
2
Grid W6
C
3558mm
3166mm
0.328 +3.3x0.85
34.75
11.40
3.24
1.060
3.44
x(/4)x24
427
detailed analysis
Shear
Links
Provided
542kNm
0.328 8 @ 150c/c
34.75 Adequate
11.40
5.84
1.920
11.19
6x48
288
W14W7
2
2
on RAM
B
to C
1570mm
C1 4
0.274
03704mm 0
15.09
4.130
62.39
Ground
I = 0.45m
Deflection
C2 829kNm5.3x48
0.274 + 16x2.88
0
0
9.09
2.490
22.64
2
l/d = C3
800/603 = 13.26
< 26
OK
0.274
0
0
3.09
0.847
2.616
+4.5x0.85
x(/4)x24
386
REF
I
I
y
Iy
Iy2
C4
0.274
0
0
-2.91
-0.80
2.32
6x48
288
9.175 45.65
48.9 Shear Wall
-0.085
-0.45
0.04
Shear
Wall GL A 2.575.33
GL J
Basement
TotalW8
120.95
W9
3.25
8.9
28.93
0.19
0.62
0.12
Col.
0.85x0.85x4.2x24
73
W10
2.34
8.9
20.83
0.19
0.44
0.08
Beams
384
= Iy Total / I Total = 2x0.5x16x24
45.65/2.57 = 17.76m
?
W11
1.1x48x19
0.43
13.5
1003
5.81
-4.41
-1.90
8.36
100 dp.
Slab
0.1x48x24
1156.08
W12
0.45
13.5
-4.411575
-1.98
8.75
Qk 48W13
x5
1.71
9.5
16.25
-0.41
-7.54
0.29
240
W14
0.43
4.5
1.94
4.59
1.97
9.06
500 dp. Slab 0.5x(48-16x0.5)x24
480
W15
0.45
4.5
2.03
4.59
2.07
9.48
Total
14.39
130.77
36.18
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
14/04/11
Tender
Job No:
11.203
Sheet No:
HR-04
Construction
Calculations
Output
Eccentricity
Width = 18m
= 9.09m North of Grid Line 2
Eccentricity = (9.09+6) 18/2 = 6.09m
Parallel
to Walls
Perpendicular
to Walls
Parallel
to Walls
Moment on walls
Mwall = Mexternal x {EIwall/EIwall + MeccxEIwall/EIy2+EIy2}
Perpendicular
to Walls
= 0.328/2.57 6.09x0.856/120.95+36.18
= 0.094
W2
= 0.328/2.57 6.09x0.003/157.13
= 0.128
W3
= 0.328/2.57 + 6.09x0.85/157.13
= 0.161
W4
= 0.328/2.57 6.09x1.758/157.13
= 0.059
W5
= 0.328/2.57 6.09x0.905/157.13
= 0.093
W6
= 0.328/2.57 + 6.09x1.06/157.13
= 0.169
W7
= 0.328/2.57 + 6.09x1.92/157.13
= 0.202
C1
= 0.274/2.57 + 6.09x4.13/157.13
= 0.267
C2
= 0.274/2.57 + 6.09x2.49/157.13
= 0.203
C3
= 0.274/2.57 + 6.09x0.847/157.13
= 0.033
C4
= 0.274/2.57 6.09x0.80/157.13
= 0.076
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-01
Construction
Calculations
Output
Check Wall W7
FH = 20.2%
Moment at Ground Level
M = 68x40.9 + 136x(39.6+33.45+30+26.55+23.1+19.65+16.2)
+ 136x(12.9+8.7+4.2)
M = 31565.6kNm
Moment in Wall at Ground
= 31565.6 x 0.202 = 6376.25kNm
Axial Load
Self Weight = 0.75 + 2.7/2 x 0.2 x 24 x 36.7 = 370kN
In Basement
?
Slab
Beams
?
Hardcore
Screed
Return Wall
Ground Slab
0.25x24x2.7x3
0.5x3.6x1.8x24
1.5x3.6x2x0.5x24
3.6x1.8x19x1.1
3.6x1.8x0.3x20
0.1x24x3.6x1.8
3.6x2.3x0.25x24
N/A
= 48.6kN
= 77.76kN
= 129.6kN
= 135.43kN
= 38.8kN
= 15.5kN
= 49.68kN
495.4kN
Total
865.25kN
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Calculations
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-02
Construction
Output
Rebar in Wall
d = 2700-20-10-20/2 = 2660mm
b = 200+0.7x3450/10 = 441.5mm
fcu = 35N/mm2
k = 63576.25x106/441.5x35x26602 = 0.0583
z = 0.93d = 2473.8mm
As, req = 6376.25x106/0.87x360x2473.8 = 8229.6mm2
Legs
370x103/0.87x360 = 1181mm2
As, net = 8229.6 1181 = 7048.2 mm2
As, prov = 16 x 20 = 5026.5mm2
Column Moments
Say equal storey heights & stiffness on cross section
C1 grid takes 26.7%
Total load
136x10 + 68 = 1428kN
Conservative hand
calculation,
computer model
would yield more
accurate results
Project Title:
Addis Hotel
Part of Structure:
Column design
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-03
Construction
Calculations
Output
354/2 = 177kN
354-(177+105.92)/354 = 20%
Gk = 3985x0.8 = 3188kN
Qk = 1680x0.8 = 1344kN
N ULS = 1.2x3188 + 1.2x1344x0.6 = 4793kN
600x600 Col at Gnd
d = 600-30-8-24/2 = 550
d/h = 0.92
N/bhfcu = 4793x103/6002x35 = 0.38 ; M/bh2fcu = 1.2x100x106/600x6002x35 = 0.0159
From Design Charts
P = 0%
Use axial load formula
N = 0.4fcuAc + 0.8Ascfy
4793x103 = 0.4x35x6002 + 0.8x360xAsc
Asc = 807mm2 => min steel
Asc, prov =16 x 24 7238mm2 Column Rebar OK