About AEPC Renewable Energy projects and CDM projects in Nepal Improved Water Mills project in Nepal Technology of the project Program Management and Implementation Structure IWM CDM project details Challenges in developing the PoAs
Improved Water Mill (IWM): Potential 25,000 Nos (1 M HHs) & Progress : 7000 Nos (0.25 M HHs)
Improved Cook Stove (ICS): Potential 2,500,000 HHs & Progress 500,000 HHs
Solar Home System (SHS): Potential 4.5 kWh/m2/day & Progress 0.2 M HHs
Institutional Solar System & Solar Water Pumping: 13 September 2011 4 Progress 200, 000 HHs
5
6 7 8
IWM is a modified version of the TWM which translates into a higher agro-processing capacity and possibility of providing a diverse range of services like hulling, oil expelling, saw milling etc. Higher efficiency than TWM
IWM Owner
6.22tCO2/year/IWM
Additionality demonstrated using Guidelines for demonstrating additionality of micro-scale project activities
Challenges
Neither this type of CDM project or PoA have got registered not in pipeline 1 project (irrigation) applied this methodology was rejected 1 project (irrigation) applied this methodology was withdrawn