Académique Documents
Professionnel Documents
Culture Documents
273.908
S FOR REPAIR
TO CONDENSER P2
NG TOWER USE. )
BROWN-OUT
K STORAGE
K STORAGE
K STORAGE
NT 3 UNDER REPAIR
6pm to 9pm
ucks
6Am to 6pm
OUT 5 HRS.
t
ent/Flood/
R/H2O PUMP CONDENSER= MALFUNCTION
UT
CK
CK
CK
UT
wly operated
K
gitator p1
Cylinder head P1/Leaking Accumulator PI
r P1 by Jencor- Macky
ation P1. 11 am
e
e
t 3pm
t 8am-6pm
er repair
ME POWER 2PM
UT A.M.
OUT 7AM-7PM
OUT 5PM-9PM
e 430
e 415
e 415
ESUMED 10AM
hoist
hoist
diff.
47.6 113.891 48.1 5421.212 5478.157 56.9455
47.6 20 48.1 952 962 10
47.6 65.778 48.1 3131.033 3163.922 32.889
47.6 25.291 48.1 1203.852 1216.497 12.6455
47.6 99.8 48.1 4750.48 4800.38 49.9
47.6 20 48.1 952 962 10
47.6 123.163 48.1 5862.559 5924.14 61.5815
47.6 60.905 48.1 2899.078 2929.531 30.4525
48.15 112.14 48.65 5399.541 5455.611 56.07
48.15 20 48.65 963 973 10
48.15 16.714 48.65 804.7791 813.1361 8.357
48.15 63 48.65 3033.45 3064.95 31.5
48.15 20 48.65 963 973 10
48.15 69.373 48.65 3340.31 3374.996 34.6865
415.0275
strips (3rd shift)
2 Damage ( no report to office (8pm loss reported 6am )
t
AIR
T 11PM 2AM