Vous êtes sur la page 1sur 9

Withdrawn Document Uncontrolled When Printed

Railway Group Standard


GC/RT5023

Issue One Date September 1995

Track Standards Manual - Section 1: Basic Track Category Matrix

Signatures removed from electronic version

Submitted by Synopsis This section of the Track Standards Manual specifies the method of categorising the track forming Railtracks Infrastructure. This document is the property of Railtrack PLC. It shall not be reproduced in whole or in part without the written permission of the Controller, Safety Standards Railtrack PLC. Published by Safety & Standards Directorate Railtrack PLC Floor 2 Fitzroy House 355 Euston Road London NW1 3AG Copyright 1995 Railtrack PLC.

................................................................................................................ Nick Howland Nominated Responsible Manager

Approved by

................................................................................................................ Tom Stevenson Chairman, Civil Engineering Subject Committee

Authorised by ................................................................................................................ Matt Walter Controller, Safety Standards

Withdrawn Document Uncontrolled When Printed

This page is intentionally blank.

Withdrawn Document Uncontrolled When Printed

Railway Group Standard


GC/RT5023

Issue One

Track Standards Manual - Section 1: Basic Track Category Matrix Contents


Section Part A Description Issue record Responsibilities and distribution Implementation Health and Safety Responsibilities Supply

Date September 1995 Page 1 of 7

Page 2 2 2 2 2

Part B 1 2 3 4 5 References

Purpose Scope Principles Equivalent tonnage calculation Basic Track Category Matrix

3 3 3 3 5 7

RAILTRACK

Railway Group Standard


GC/RT5023

Withdrawn Document Uncontrolled When Printed

Issue One Date September 1995 Page 2 of 7

Track Standards Manual - Section 1: Basic Track Category Matrix Part A

Issue record

This standard will be updated when necessary by distribution of a complete replacement. Amended or additional parts of revised pages will be marked by a vertical black line in the adjacent margin. Issue 1 Date Sept. 95 Comments Original document

This standard forms part of GC/RM5600 Track Standards Manual.

Responsibilities and distribution

This standard shall be complied with by all persons who are responsible for the design, installation, inspection, or maintenance of the track on Railtrack controlled infrastructure.

Implementation

The provisions of this Railway Group Standard are mandatory and apply from 6th April 1996.

Health and Safety Responsibilities

Railtrack PLC makes no warranties, express or implied, that compliance with all or any of Railway Group Standards is sufficient on its own to ensure safe systems of work or operation. Each user is reminded of its own responsibilities to ensure health and safety at work and its individual duties under health and safety legislation.

Supply

Controlled and uncontrolled copies of this standard must be obtained from the Catalogue Secretary, Safety & Standards Directorate, Railtrack PLC, Floor 2, Fitzroy House, 355 Euston Road, LONDON NW1 3AG.

RAILTRACK

Withdrawn Document Uncontrolled When Printed

Railway Group Standard


GC/RT5023

Issue One

Track Standards Manual - Section 1: Basic Track Category Matrix Part B


1 Purpose

Date September 1995 Page 3 of 7

This standard specifies the method of categorising track, based on usage, and thereby provides a method for applying the variations in track requirements which other track standards may reference. The contents of this standard apply to all infrastructure controlled by Railtrack. 3.1. As the mandatory requirements relating to design, maintenance, renewal and inspection of the track vary according to usage and speed, sections of track must be categorised such that the variations in the requirements can be correctly specified and applied. 3.2 For the purposes of safe interworking all parties must use the same criteria to calculate the categories. This standard is referenced by the other standards in the GC/RM5600 Track Standards Manual. 3.3. The categories to be used are based on speed and Equivalent Million Gross Tonnes Per Annum (EMGTPA). EMGTPA takes into account variations in damage caused by normal traffic and the calculation for EMGTPA is based on that specified in UIC leaflet 714 for Theoretical Traffic Load. 3.4 The boundaries of the categories are based on historical and experimental data and are described on a graph which has speed plotted against EMGTPA.

2 Scope 3 Principles

4 Equivalent tonnage calculation

EMGTPA = Sp(Kp.Tp + Kt.Ttp) + Sf(Kf.Tf + Kt.Ttf) Where: Tp = Tonnage of passenger vehicles hauled. Tf = freight vehicles hauled. Ttp = passenger tractive units. Ttf = freight tractive units. Note: Tonnages are Annual but based on mean daily values. EMUs & DMUs to be considered as hauled passenger vehicles. HST power cars to be considered as passenger tractive units. Bogie load and wear coefficients: Kp = 0.80 for DMUs * see note below Kp = 1.00 for other passenger stock. Kf = 1.15 where either: all freight vehicles have axle loadings of less than 20.0T or freight vehicle with axles loadings between 20.0T and 22.5T account for less than 50% of total freight traffic.

RAILTRACK

Railway Group Standard


GC/RT5023

Withdrawn Document Uncontrolled When Printed

Issue One Date September 1995 Page 4 of 7

Track Standards Manual - Section 1: Basic Track Category Matrix


Kf = 1.30 where either: freight vehicles with axle loadings between 20.0T and 22.5T account for between 50 and 75% of total freight traffic or freight vehicles with axle loadings of 22.5T or heavier account for less than 50% of total freight traffic Kf = 1.45 where either: freight vehicles with axle loadings of 20.0T or heavier account for more than 75% of total freight traffic or freight vehicles with axle loadings of 22.5T or heavier account for more than 50% of total freight traffic * Only the following DMU sets may be placed in this category: 101, 104, 108, 114, 115, 116, 117, 119, 121, 150, 151, 153, 154, 155, 156, 157, 158, 159, 165 and 166. Speed coefficient, Sp or Sf. Line Speed Value of Sp or Sf Up to 40 mph 1.00 41 - 50 mph 1.10 51 - 75 mph 1.35** 76 - 100 mph 1.55 101 - 125 mph 1.60 126 - 140 mph 1.80 ** A value of 1.20 may be used for freight traffic at 60 mph maximum. Track Coefficient Kt. Kt = 1.40

RAILTRACK

Withdrawn Document Uncontrolled When Printed

Railway Group Standard


GC/RT5023

Issue One

Track Standards Manual - Section 1: Basic Track Category Matrix


5 Basic Track Category Matrix Basic Matrix
150 SPEED - mph

Date September 1995 Page 5 of 7

100

50

0 0 5 10 15 20 25 30 35 40 45

EQUIVALENT TONNAGE

RAILTRACK

Railway Group Standard


GC/RT5023

Withdrawn Document Uncontrolled When Printed

Issue One Date September 1995 Page 6 of 7

Track Standards Manual - Section 1: Basic Track Category Matrix


Track Categories

150 SPEED - mph

Cat 1 100

50 Cat 5 Cat 6 0 0 10 20 Cat 4 Cat 3

Cat 2

30

40

50 EQUIVALENT TONNAGE

60

The horizontal portions of the track category boundaries are based on the maximum speeds of the principal traffic types; the curved portions of the track category boundaries up to 25 equivalent gross million tonnes per annum (EMGTPA) are based on current and past experience. Above 25 EMGTPA the curves have been extrapolated to reflect the anticipated track damage for very heavily used lines. The 6 basic track categories may be defined as follows: Category 1: Category 2: Category 3 Category 4 Category 5 Category 6 For high train speeds and high tonnage. From moderate to high train speeds and high tonnage. For moderate train speeds and moderate to high tonnage. For moderate train speeds and moderate tonnage For moderate train speed and low tonnage For low train speeds and low tonnage

RAILTRACK

Withdrawn Document Uncontrolled When Printed

Railway Group Standard


GC/RT5023

Issue One

Track Standards Manual - Section 1: Basic Track Category Matrix


References
UIC Leaflet 714

Date September 1995 Page 7 of 7

Classification of lines for the purposes of track maintenance

RAILTRACK