Vous êtes sur la page 1sur 10

EJC 533

Technical Specification T06533-1

1/10

General Arrangement

65

42

4.7 m (15.4 ft)


Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940 Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

EJC 533

Technical Specification T06533-1

2/10

Standard Unit Specifications General Information


Main Dimensions
Total length Total width Height with safety canopy Height of dump box Dump Height 9804 mm 3099 mm 2743 mm 2438 mm 5207 mm 386 in 122 in 108 in 96 in 205 in

Power Train
Engine
Diesel engine Output Torque Number of cylinders Displacement Cooling system Combustion principle Air filtration Electric system Exhaust system Fuel tank capacity Detroit Diesel Series 60 298 kW (400 HP) @2100 RPM 1898 Nm (1400 ft.lb.) @1200 RPM In line 6 12.7 litres (778 in3) Liquid Cooled Direct injected, turbo charged, after cooled Donaldson, dry type 24 V Catalytic purifier with silencer 333 l 88 US gal.

Operating Weights
Total operating weight Front axle Rear axle 26218 kg 17383 kg 9243 kg 57800 lb. 38324 lb. 19476 lb.

Loaded Weights
Total loaded weight Front axle Rear axle 56155 kg 25412 kg 30743 kg 123800 lb. 56024 lb. 67776 lb.

Converter
Dana SOH CL8652 Single stage, 0.895:1 offset ratio

Capacities
Payload Dump Box Volume 30 tonnes 18.3 m 33 tons 24.0 yd

Transmission
Dana SOH 6422 with electric shift 4-speed forward and reverse

Dump Box Motion Times


Discharging time Dumping angle 17 sec. 65

Axles
Front axle Dana SOH 19D3847, standard differential, oscillating 10 total. Dana SOH 21D3847, standard differential, fixed.

Driving Speeds Forward and Reverse (Loaded)


1st gear 2nd gear 3rd gear 4th gear 7.0 km/h 12.6 km/h 22.2 km/h 40.0 km/h 4.3 m.p.h. 7.8 m.p.h. 13.8 m.p.h. 24.9 m.p.h.

Rear axle

Tires
Tire size Air pressure, front Air pressure, rear 26.5 R25 552 kPa (5.52 bar) (80 psi) 552 kPa (5.52 bar) (80 psi)

Frame
Rear and front frame Material Central hinge Welded steel box construction G40.21 - 50wt. Cat.#3 Full plate, clevis type with spherical bearings

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

EJC 533 Systems


Steering Hydraulics

Technical Specification T06533-1

3/10

Electrical Equipment
Alternator Batteries Starter Driving and working lights 24V 70A, min 2 x 12 V, 950 CCA 24 V, Heavy Duty 4pcs front, 2pcs rear

Full hydraulic power steering, centre articulated with double acting steering cylinder. Open centre system with a gear pump and pilot operated stick steer. Other Standard Equipment Central hydraulic pressure test points Turning Radius Central manual lubrication system Inner 4293 mm (169 ) Back-up alarm, audible Outer 8382 mm (330 ) SAE type hose fittings
Turning angle 42.0

Main Components
Hydraulic pump Control valve Steering cylinder Gear pump Pilot operated 127 mm bore X 64 mm rod (5.0" X 2.5")

Manuals
All manuals are delivered on CD-ROM in web based format with Adobe PDF output for printing.

Distribution
Manual Type Spare parts manuals Operators manual Service manual Customer 3 Copies 3 Copies 3 Copies Market Area 1 Copy 1 Copy 1 Copy

Pressure Settings
Main relief Port relief valves 17.2 MPa 18.6 MPa 172 bar 186 bar 2500 psi 2700 psi

Dump Box Hydraulics

Optional Equipment

Full hydraulic open-centre system with two gear pumps. Specifications Oil flows to the dump box hydraulic system from the dump box pump and the steering pump when the steering system is not in use. Pilot operated lever dump box Available Alternative Equipment control.
Automatic Lubrication

Lincoln modular

Main Components
Dump cylinders (2) Hydraulic pump Control valve 2-stage telescopic, 184/152 mm bores (7.25/6.0) Gear pump Pilot operated

Alternative Dump Box Options


SAE dump box SAE dump box Snub Nose box with tail gate 4.5 m (15 ft.) dump height 13.4 m 15.3 m 17.6 m 17.5 yd 20.0 yd 23.0 yd

Pressure Settings
Main relief Port relief (dump) Hydraulic oil tank capacity 17.2 MPa 17.9 MPa 283 l 172 bar 2500 psi 179 bar 2600 psi 75 US gal.

Available Add-On Options


Dump box Operators compartment Fire suppression systems Hand held fire extinguishers Emergency steering system Split dump box rework Abrasion resistant box liners SAE ROPS canopy Enclosed operators cab with A/C (solid mounts) Manual - Ansul 8 nozzles, 2 tanks Automatic (Checkfire II) - Ansul 8 nozzles, 2 tanks 4.5 kg 10 lb. 9.1 kg 20 lb. SAE J-1511, electric
2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

Standard Brakes
Service brakes are spring applied, hydraulically released, liquid cooled (LCB) multi-disc brakes on all wheels. Service brakes also function as an emergency brake, when the emergency brake system is engaged.

Main Components
Pressure accumulators Brake pedal valve Piston type with charging valve Modulated

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

EJC 533 Tractive Effort Curve (Metric Units)


EJC 533
ENGINE: 300 TRANS: DET. DIESEL DDEC 60 Clark 6000 Series AXLES: TIRES: Payload (kg): 19D Front/ 21D Rear 21.00R25 30000 CONVERTER: Clark 8000 Series

Additional Information T06533-1

4/10

Rolling resistance (% )

EMPTY

FULL LOAD

0 2 4 6 250 Without torque converter lock-up 1'st With torque converter lock-up

0 2 4 6 8

200
40

F (kN)

2'nd

100
40

Grade (%)

150

30

20

3'rd
30

15

50 4'th

20 15 10

10

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

50

Speed (km/h)

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

EJC 533 Tractive Effort Curve (US Units)


EJC 533 (US Units)
60 ENGINE: DET. DIESEL DDEC 60 CONVERTER: Clark 8000 Series TRANS: Clark 6000 Series AXLES: 19D Front / 21D Rear TIRES: 26.5 R25 Payload (lbs): 66000

Additional Information T06533-1

5/10

Rolling Resistance (% )
EMPTY FULL LOAD

0 2 4 6 8 55 Without torque converter lock-up 50 1'st 45 With torque converter lock-up


40

0 2 4 6 8

40

Tractive Effort (Klbf)

35 Grade (%)

30

30

2'nd

25

20

20 3'rd 15

40 15

30

20

10

10

4'th

15 10

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Speed (mph)

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

EJC 533 Productivity Curve (Metric Units)


EJC 533 PRODUCTIVITY CURVE
400
Basic data for calculations: 30000 KG Payload Overall Speed limit 16 km/h Fixed Cycle time3.75 min

Additional Information T06533-1

6/10

350

300

Fixed cycle time includes the time for filling, dumping, turning and accelerating Slope/Grade (%) Loaded speed (km/h) Empty speed (km/h) Hor./0 16 16 1:10/10 10.5 16 1:7/15 7 16 1:5/20 6 16

TONNES PER HOUR

250

200

150

100

50

0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 ONE WAY DISTANCE IN METRES
2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

0%

10%

15%

20%

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

EJC 533 Productivity Curve (US Units)


EJC 533 PRODUCTIVITY CURVE
400
Basic data for calculations: 66000 lbs Payload Overall Speed limit 10.0 mph Fixed Cycle time 3.75 min Fixed cycle time includes the time for filling, dumping, turning and accelerating Slope/Grade (%) Loaded speed (mph) Empty speed (mph) Hor./0 10.0 10.0 1:10/10 6.5 10.0 1:7/15 4.3 10.0

Additional Information T06533-1

7/10

350

300

TONS PER HOUR

250

1:5/20 3.7 10.0

200

150

100

50

0 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 ONE WAY DISTANCE IN FEET
2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

0%

10%

15%

20%

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

EJC 533

Additional Information T06533-1

8/10

17.6 m (23 yd) Optional Snub Nose Box

4572 (180)

650

2591 (102)

2667 (105)

432 (17)

356 (14) 4775 (188) 9373 (369)

1422 (56)

2997 (118)

3073 (121)

42

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

Note: all dimensions in millimetres, dimensions in brackets are in inches. All vertical dimensions are for an empty unit. Optional Snub Nose" box shown. .

429 3 (169 )

83 (33 82 0)

EJC 533

Additional Information T06533-1

9/10

15.3 m (20 yd) Optional Snub Nose Box

4572 (180)

650

2362 (93)

2667 (105)

432 (17)

356 (14) 4775 (188) 9373 (369)

1422 (56)

2997 (118)

3073 (121)

42

Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940

Revision Date: 2006-2-08 Web: http://www.sandvik.com

2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice

Note: all dimensions in millimetres, dimensions in brackets are in inches. All vertical dimensions are for an empty unit. Optional Snub Nose" box shown. .

429 3 (169 )

83 (33 82 0)

We make it possible

Sandvik Mining and Construction Canada Inc.

4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Web: http://www.sandvik.com

Tel.: (905) 632-4940

Vous aimerez peut-être aussi