Académique Documents
Professionnel Documents
Culture Documents
Jyhguuuuuuuu
Jyhguuuuuuuu
20
17/41 32/4 42/1 81/24 164/18
25
35/8
173/13
164/26
~ 81/25
164/19
36/14 49/1
36/12 48/2 164/12
35/7 42/2 49/2 81/23
20/16 35/11
18/49
40
17/40
~ 53/1
81/6
81/24 164/16
OD50
61
Pk. 0
~ ~ g DN10
KAFARAJ
OD1
165/6 164/17
36/16 35/9 48/1 existin ~
HDPE
OD28
10
36/15
20/15 261
35/13 81/5 81/20 165/8
HDP
~ ~
42/4 42/3
0 HDPE
54/2
PN10
35/12
TRA-NP018
E PN10
17/39
18/48
60
36/18 ~
Pk. ~ 53/2
PN10
35/10 165/7 164/15
~ 259
81/4 81/17 81/23 165/5
20/14 ~ ~
~ 36/17
36/19 ~ 40/2
54/1
53/3
~ 81/19
OD63
40/1
59
~
40
81/22 165/4
Pk.
A
HDP
~ 54/4 52/2
25
17/38 18/47 39/1
255
41/1
~ 165/2
E PN10
18/46 164/25
Cocnrete pipe Crossing 257
52/1
81/1
40/4 81/22
od 80cm 39/2
~ 81/18
20/13 ~ ~ 54/3
174/8
Cocnrete pipe Crossing 36/21
100
260 52/3 81/21 HD
DN
39/3
75
58
40/5 174/3
~
e
Pk.
81/2 OD
pip
36/23
existing
54/5
~ der
ply
52/4
fee
sup
165/24
g
17/37
20/12 ~ 41/3 54/8
~
g
stin
DN100
OD2
OD1
stin
238 0
165/3 exi
exi
E PN1
54/7
55/7
80
10
~ ~ ~ 52/5
OD40
18/45 81/3
0 HDP
36/22
HDP
HDP
36/24 ~
40/6
OD5
~ 165/19
174/2
E
39/4
HDPE
PN1
PN1
165/26 165/25
236
55/6 54/10
~ 64
0
~
0
57
Pk.
PN10
17/36 55/9
36/26
30
20/11 256
55/2 ~ 52/6
~ 165/23
10
55/8 54/9
18/44
~ ~
15
18/43 36/25 ~ 263
165/18
55/1 55/5
20/10 55/3
10 55/11 ~ ~ 64
PN 55/10
165/22
20/9
56
PE 55/4
Pk. HD
20/8
50 262
17/35 258 OD 61/2
235 20/7 ~ 56/3 61/1
40
17/34 TRA-NP016
56/1 ~ 56/8
~ 165/13
20/5
~ ~ 56/6 165/17
Cocnrete pipe Crossing Connection to existing water ~ 61/3 61/4
OD50
17/33
TRA-NP017
37/2
~ 56/9
~ 65
OD2
17/31
10
~ 56/10 10
PN
HDPE
56/5 61/6 165/16
20/4
80
18/19
55 PN 10
PE
165/20
Pk. 56/11
~ ~ PE PN
HDP
~
HD
~ 56/21
OD1
61/5
100 HD PE
PN10
56/4
75
10
E PN1
38/2 DN
160 HD
77/8
OD
17/29
10
56/13 ~ e
pip OD 160 572
der
HDP
20/3 ~ ~ ~
56/20
~ e OD
0
ply
fee
18/42 63 165/12 165/15 pip e
50PE 56/12
E PN1
sup
g
17/30
~ 61/8
~ pip
stin
38/1
56/15 ~ g der
fee ply
exi
20/2
TROKAJ
61/7 stin
0
TRA-NP015 56/14 56/22 exi sup
17/28
54 38/3
~ 56/19 ~
56/23
~
Pk. Connection to existing water 77/7
25
existing DN100
56/24 174/1
17/26
237 53
56/18
~ 61/10
585
Pk.
~ 165/11
OD
Cocnrete pipe Crossing 38/4 77/6
17/27 60/6
50
od 100cm 56/25
~ ~
HD
17/25 ~ 77/1
00
PE
20/1
56/17
DN1
18/41
PN
264 ~ 77/5
10
ting
17/24
52
56/27
~ ~
exis
20
Pk. 60/5
18/18 38/5
~
E PN10
60/3
56/26
~
30
165/9
0 HDP
17/23 60/4
OD5
38/6
Pk.
51 ~ 77/4
60/2
17/22
~ ~
50
18/16
Pk.
18/17 67/4
77/1 77/3
30
OD
60/1 77/2
265 ~
49
110
18/40
Pk.
82/6
OD
59 76/8
HD
17/21 82/5
67/3
~
280
PE
67/2
~
48
PN
76/7
HD
67/1 76/1
40
67/6
Pk.
18/15 82/4
10
~
PE
13/9
25
PN
17/20
10
266 76/2
10
17/19 239
E PN10
18/14
Cocnrete pipe Crossing
PN
~ ~
76/5
78 590
47
76/10
od 100cm 0 HDP
PE
13/8 18/13
Pk.
67/5
Box Culvert Crossing 5 & 6
HD
76/6
18/39
68/1 r OD9 BOC-DET001
20
63
feede 76/3
OD
ing
13/7 17/18 exist
76/9
46
18/12 76/3 76/4
17/17 68/2
~ 79 82/3
Pk.
76/9
18/11 75/1
73
18/10 TRA-NP013
45
82/7
18/40 82/2
Pk.
68/3
18/16
Connection to existing water 75/2
TRA-NP012 network village Trokaj 175/1
82/7
17/18 ~ ~ 82
0
44 68/3 175/1
od 100cm
OD9
Pk.
pipe n
78 82/3
er ratio
82/2
existout of
17/17
18/15 75/2
30
feed ope
ing opera
OD2
17/16
18/39
ting in
OD6 tion
80
exis keep
79
HDP
3 HDP
590
~ 87/4
E PN1
75/3
E
18/38
~
~
0
17/15 237 18/12
TRA-NP058 Connection to existing feeder ~ 87/3
18/14
Cocnrete pipe Crossing 69/1
pipe to Trokaj reservoir266 ~
18/10 od 100cm 75/3
10
TRA-WAS08 TRA-NP011 PN 10 ~
Pk. 43 OD40
18/13 HDPE OD110 74 PE PN
Pk.
OD90 HDPE PN10 HDP HD PE 87/2
88/8
73
E PN10
160 HD
42
TRA-EFM01
TRA-NP010 80/2
235 18/11 DN80 OD 160
e OD
29 18 25 16
OD280
COC 02 - Concrete Chamber 69/2 pip e 87/1
existing of operation
Cocnrete pipe Crossing for Flow Control Valve installation der pip PE 88/7
18/37 ply HD
od 100cm COC-LAY001 fee
HDPE
75 on
out
~ 82/1 sup
OD rati
feeder pipe
72/1
13/5 80/3
ting of ope 88/6
PN10
17/14
exis out 85/3 88/3
82/7
18/9
~ 74
~
OD90
88/2
NODE A
88/4
Pk. 41 72/2
85/2 85/4
80/4
18/8 88/1 88/5
25
236 ~
85/1
18/36 40 85/6
Pk.
~ 85/5
86/1
17/13
86/5
13/4 267
85/8
86/2
85/7
86/8 ~
83/4
~
80/1
30 86/11 86/6
20
10 239 80/1 82/8
~
OD4
18/7
84/1 86/12
0 HDP
~ ~ 271
71/1
~ 86/3
88
Cocnrete pipe Crossing 83/3
~
E PN1
39
17/12 17/11
od 100cm ~ 86/9
25 ~ ~
0
17/10 85/9 86/13
18/34
~
83/2
~
~
86/7
84/2
17/9
86/4 0
13/3
38 PN1
Pk. 82/9 ~ PN10
E
71/2
84/4
HDPE 3 HDP
OD50 OD6
18/33 18/5 69/4 82/9 20 83/1
84/5
~
84/3
PE
0 HD ~ 94/25 94/26
PN1 0 75 on ~ ~
E PN184/7 OD rati
HDP E
ting of ope
84/7 ~
17/8
18/3
60 HDP 94/23 94/24
~ 93/3
OD
50
37 OD1 60 84/9
exis out 268
HD
Pk. 10
pipe OD1
er pipe
~ PN PE
OD
PN1
18/4 feed ply ~ PE
~ ~
50
0
Kee
18/32
sup
84/6
94/22 HD
94/21 75
HD ope
93/4
HAMATAJ
p
84/10
OD
in
~
PE rati
13/2
PN on
TRA-NP053
10
TRA-NP004 84/8
~ ~ ~ 93/2
Connection to existing water ~
84/11 E PN10
17/7 17/5 36 network village Hamataj HDP tion ~ 94/13 ~
94/27
Pk.
OD50 in opera
94/12
~
OD5
17/6 18/31 69/5 84/9 93/1
~ ~
OD16
OD Box Culvert Crossing Keep 94/17 94/20
~
0 HDP
13/1 93/11
280
0 HDPE
238
~
exi
HD
2KT
~ ~
E
~
stin out
70/1
B
~
PN1
PE 94/16
~
g of
18/29 268
~
fee ope
18/30 18/2 PN
0
17/4 TRA-NP003
PN10
der rati
94/19
10 70/2
2KT ~ 93/13
pip on
17/3 ~ 94/11
~
e
35 93/5
~
OD
Pk. Connection to existing water ~
10
94/15
OD50
75
269
70/3
~
PN
34
0
network village Hamataj HDPE
Bridge Crossing Typ1 Pk. exisitng Bridge
PN10
PE
33 94/18
PN1
14/15
BRC-DET001 TRA-NP002
1KT E
HD
Pk. Box Culvert Crossing
HDP 0
94/10 94/14 ~
75
Pk. 32 60
0
94/8
18/27
~
95/2
~
PN1
6 PN1
OD
18/28
PN1 6 pipe
OD1 E ~
HDP PE
30
River Crossing 01
E
17/2 er
DI 60
00 DI PN1 HD ~ 93/14
0 HDP
feed
RIC-DET001 & 002 OD1 90 on ~
0 Bridge
DN3 exisitng pipe OD rati 94/5 ~ ~ ~ 270
OD5
ly
~
Pk.
DN8
OD5
supp ting opeCOC 01 - Concrete Chamber
31
94/9 94/7 95/6
of
0 HDP
18/1 93/15
exis out for Flow Control Valve installation
94/2
Pk.
Gravel ~ ~ ~
30
COC-LAY001
Pk. 29
E PN1
18/26 HDPE OD90 HDPE PN10 ~ 95/1
95/7
g OD75 on
existinof operati TRA-NP009
10
~ ~ ~
0
out 97/1
TRA-NP057 ~ 94/6
OD1
10
Pk. 28
94/1
18/25 OD50 95/4 PN
14/14
HDPE ~
60
Gravel 95/5
PE
~ PN10 ~
existi in
~
HDP
HD
keep
~
40
94/3
~ 63
Pk. 27
ng opera
E
94/4
17/1 OD
PN1
OD75
~
0
14/13
HDPE
Pk.
2KT
tion
18/24
~
26
PN16 Gravel exi out ~ ~ 95/8
5 HDPE stin of
g ope 25 95/3
Pk. 25
OD5
Cocnrete pipe Crossing OD31 Connection to existing water 92
18/23
OD rati
od 100cm 90 on network village Hamataj ~
0 HDP
228
~ HD
PE TRA-NP008
20 96
~
Pk.
14/12 Keep in operation
E PN1
24
18/22 OD90 HDPE PN10
TRA-NP007
15
0
10
Pk.
97/1
200 6
23
18/21 Gravel
TRC 02 - Trench Crossing
TRC-DET001 ~
Pk. 22
14/11
PN16
HDPE
OD315
Pk. 21
16/5
Cocnrete pipe Crossing
natural
surface ~ ~
18/20 od 115cm
DI PN16
14/10 97/2
Highway Crossing 01 ~
4
~
Pk. 20
Pk.
HWC-DET001 DN300
PN16
19
surface
0 DI
Pk.
natural
DN30
18
PN16 102/1 30
Pk. 17
5 HDPE
16/4 104/1
TRC 01 - Trench Crossing OD31
TRC-DET001 PN16
HDPE
Pk. 16
14/8
OD315 surface
natural
14/9
~ ~
Pk. 15
98/18
20/1
16/3
Pk. 14
232
14/7 PN16 104/2
HDPE 98/16
Pk. 13
OD315 Gravel
~
27 15 40 15 103 103 15 40 15 27
98/15
Pk. 12
16/2
102/2
Pk. 11
102/3
106/1
Pk. 10
231
98/17
14/6
PN16
10
230 HDPE
Pk. 9
300 300 100 440
98/13
16/1 OD315
104/3
Pk. 8
Gravel
102/3
98/14
102/4
106/2
Pk. 7
14/5
EXISTI
EXISTI
Pk.
14/3
NG STEEL
6
98/12
14/4
PN16
NG DCI
HDPE
OD315 m 102/4
401
Pk. 5
98/8
5
Cocnrete pipe Crossing L= 104/4
PIPE
PIPE
98/3
od 100cm 102/5
98/10
Connection to existing
DN500
98/11
DN800
transmission main DN500 98/4 98/7
Pk. 4
installed by UK Fier
Pk. 3
14/2 98/9
107/1
98/6
Gravel
98/2
Pk. 2
98/5
TRA-NP001
Pk. 1
5
Fier 14/1
UK
d by PN16 106/3
15 104/5
installe HDPE 108
OD315 Main valve chamber 102/5
connections to villages
out of operation
102/6
107/2
out of operation
4
~ 238
102/7
102/6
99
107/3
UK
Fier ~ 159/1
d by PN16
installe HDPE 104/6
OD315
25
110
30
176/15
106/4 176/21
107/4
159/2
OD315
102/7
102/8
4
176/28
176/22
OD315
112/1
159/3
104/7
176/24
7 7
159/4
106/5 102/8
20
HDPE
274
102/9
159/6
New Pumping
159/7
HDPE
112/2
104/8
102/9
159/8
159/9
159/10
176/23
15
112/8
102/10
176/25
272 159/11
112/3
PN16
276
176/26
275 159/12
130
130
113/5 107/6 238
104/9
140
140
107/7
106/7
100/1
113/6
112/4
159/13 176/27
102/10
107/8
~
104/10
113/7
100/2
107/9
104/11
112/5 102/11
106/8
10
113/8
20
10
107/10
102/11
25
100/3
104/12
113/9
165
106/9
100/4
112/6 107/11 ~
104/13
112/7
113/10
102/12
107/12
113/11
106/10
102/12
REFERENCE DRAWINGS:
10
10
10 70 10 10 70 10 DRAWING TITLE: DRAWING NO: SHEET:
90 90 LOT 2-TRANSMISSION MAIN Kafaraj well field - Komuna of Levan
EXCAVATION 1900
B EXCAVATION Detail layout drawing - part #1
Detail layout drawing in Kafaraj well field
FIE-DRW-TRA-W-LAY02 1
15
33
25
39 2
26 CONCRETE
88
18
15/20 3
20 10
STRAP 1
ELASTIC RING PIECE 5 6
29
FF PIECE DCI DN300
130
60
130
CHROME-HEX-BOLTS
CONCRETE M 20 (THROUGH BOLTS)
CONCRETE STOPPING PIECE
20/25 16 46 10
60 L SECTION 100X100 mm
80
20
BRACKET
CONCRETE
10
80 15/20 CHROME-HEX-BOLTS
70 M 20 (THROUGH BOLTS) B Second Issue As Built Drawing 13-04-2017
20
15
15
Contractor:
35.5
23
2
30.0
Ø12/20
10 23 64 Adresa: Zona industriale Patos, Fier
Tel: ++355 385 40900
20
70 70 Fax: ++355 385 40062
46 B B e-mail: infofr@albstar.com
124
124
124
124
80
130
130
74
74
Sh.A Ujesjelles Kanalizime Fier
Kreditanstalt für Wiederaufbau and European Union
64
1 Ø10/20
2 Ø12/20 1 Ø12/20 Ø12/20 3
3
L=296cm
70
74 62
Ø12/20 Ø12/20
80 L=440cm
1 70 L=392cm
2 Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
MATERIALS TABLE and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
REINFORCEMENT TABLE Project No: ALB-ST-SW-1004-INT-STP-2013-FR
FIE-DRW-HWC-W-DET001