Vous êtes sur la page 1sur 28

Optical Transmitter Test Report

Date = ___________________ Cable Length = ____________ Km


Fiber Cable/Drum Number = ________ Fiber length = _____________ Km
Tested by = ____________________ Total Fiber Loss = _________ dB
Test Site = _____________________ Far Site = __________________

Cable cutt from Cable Drum Nr = __________________________________________________

Optical Tx Type of Optical RF input


Date Time Optical Parameters
number Tx power. level at Tx
Optical Laser bias Cooler OMI Status OMI
Power current current On/Off Value

Date
time
Optical Transmitter number
Optical output power.
Type of Tx
RF input level at Tx

Optical Parameters
Optical Power
Laser bias current
Cooler current
optical Modulation Index
OMI
RF Gain
RF Parameters
RF input power
RF Slpoe
Test point transmitter signal
eters RF Parameters

RF input Test point


RF Gain RF Slope
power transmitter signal
Individual Material Consumption reports
Seperator Items
14 Air Blower
3 Amplifier bush
9 Attenuation Pads
4 Base of Bracket for SA Node
4 Bracket For SA Node
12 Branch Sealing kit
5 Cable 4mm 2 core
5 Cable 7/29
11 Degrease cleaner
13 Exhaust Fan 10"
8 Extension connector
1 Foam Swabs
10 Forward Equalizer
7 Heat Shrink tube
1 Kim Wipe Tisues
4 LP-08
11 Nitto Tape
8 Patch cord FC-APC
16 Patchcords
16 Pigtails
3 Pin Type Connector
5 Power adopter for Poewer Inserter
2 Power Inserter
14 Power Shoe
14 PVC Strips
10 Reverse Equalizer
8 Right Angle 540
14 Rubber Boots
8 SA Node HGBT
6 Safe Guard for Fan
11 Silicon tube
12 SMOUV-40
12 SMOUV-60
12 Splice Enclosure
15 Splitter Fwd 8 Way
12 Straight Sealing kit
14 Tool
1 Transportation Tubes
13 Tube axial fan
1 XM-2 UPS Wire Kit
Individual Material Consumption reports
Seperator Items
14 Air Blower
3 Amplifier bush
9 Attenuation Pads
4 Base of Bracket for SA Node
4 Bracket For SA Node
12 Branch Sealing kit
5 Cable 4mm 2 core
5 Cable 7/29
11 Degrease cleaner
13 Exhaust Fan 10"
8 Extension connector
1 Foam Swabs
10 Forward Equalizer
7 Heat Shrink tube
1 Kim Wipe Tisues
4 LP-08
11 Nitto Tape
8 Patch cord FC-APC
16 Patchcords
16 Pigtails
3 Pin Type Connector
5 Power adopter for Poewer Inserter
2 Power Inserter
14 Power Shoe
14 PVC Strips
10 Reverse Equalizer
8 Right Angle 540
14 Rubber Boots
8 SA Node HGBT
6 Safe Guard for Fan
11 Silicon tube
12 SMOUV-40
12 SMOUV-60
12 Splice Enclosure
15 Splitter Fwd 8 Way
12 Straight Sealing kit
14 Tool
1 Transportation Tubes
13 Tube axial fan
1 XM-2 UPS Wire Kit
Individual Material Consumption reports
Seperator Items Aditional
XM-2 UPS Wire Kit
Kim Wipe Tisues
1
Foam Swabs
Transportation Tubes
2 Power Inserter
Pin Type Connector
3
Amplifier bush
Bracket For SA Node
4 Base of Bracket for SA Node
LP-08
Power adopter for Poewer Inserter
5 Cable 4mm 2 core
Cable 7/29
6 Safe Guard for Fan
7 heat Shrink tube
SA Node HGBT
Right Angle 540
8
Extension connector
Patch cord FC-APC
9 Attenuation Pads
Forward Equalizer
10
Reverse Equalizer
Nitto Tape
11 Degrease cleaner
Silicon tube
Splice Enclosure
Branch Sealing kit
12 Straight Sealing kit
SMOUV-40
SMOUV-60
Exhaust Fan 10"
13
Tube axial fan
Tool
Air Blower
14 PVC Strips
Power Shoe
Rubber Boots
15 Splitter Fwd 8 Way
Pigtails
16
Patchcords
Seperator Items Aditional
Detail of Trouble shooting of irregular VG-99 DC Levels
Sr No Date Name Node Remarks

8723432.xls Sheet5 Page#______


8723432.xls Sheet5 Page#______
DC Level Measurement at VG-99
Date Date Date Date Date Date Date Date Date Date Date Date

Time Time Time Time Time Time Time Time Time Time Time Time
VG-99 Node
Name Name Name Name Name Name Name Name Name Name Name Name

N-19

N-25
A N-23

N-26

N-27

N-22

N-34
B N-24

N-47

N-48

N-29

N-30
C N-13

N-38

N-40

N-41

N-14
D N-37

N-01

N-10

8723432.xls Sheet4 Page#______


Date Date Date Date Date Date Date Date Date Date Date Date
Nodes

N-11

N-16
E N-15

N-51

N-17

N-55

N-21
F N-42

N-43

N-44

N-12

N-33
G N-54

N-32

N-45
N-52
N-02
H N-04
N-46
N-49

N-09

N-35
I N-05
N-28
N-31

8723432.xls Sheet4 Page#______


FOP Nodes Maintenance Schedule
(July, August, September 2004)
D.H.A Cantt City Side
First Visit N-26 N-42
N-27 N-38 N-43
N-28 N-38-C2 N-44
N-28-C2 N-38-C3 N-45
N-29 N-39 N-45-C2
N-30 N-40 N-46
N-30-C1 N-41 N-46-C3
N-31 N-41-C1 N-47
N-31-C2 N-41-C2 N-47-C1
N-32 N-41-C3 N-47-C2
N-32-C3 N-51
Second Visit
N-33
N-33-C1
N-33-C2A
N-33-C2B
N-34
N-35
N-35-C1
N-35-C3
N-36
N-37
N-37-C1
N-37-C3A
N-37-C3B
N-55
25 Cabinets 11 Cabinets 10 Cabinets

A.I.T Model Town Gulberg


N-01 N-12 N-19
N-02 N-12-C1 N-21
N-04 N-12-C2A N-22
N-05 N-12-C2B N-23
N-09 N-12-C2C N-23-C2
N-09-C3 N-12-C3 N-24
N-10 N-13 N-25
N-10-C2A N-13-C2 N-25-C3
N-10-C2B N-14 N-48
N-10-C3 N-15 N-48-C1
N-11 N-15-C3 N-48-C3
N-11-C2 N-16
N-49 N-16-C3
N-52 N-17
N-54

8723432.xls Sheet7
N-54-C2
14 Cabinets 16 Cabinets 11 Cabinets

8723432.xls Sheet7
Optical Fiber Cable Test Report
Test Date = ___________________ Cable Length = ____________ Km
Fiber Cable/Drum Number = ________ Fiber length = _____________ Km
Tested by = ____________________ Total Fiber Loss = _________ dB
Test Site = _____________________ Far Site = __________________

Cable cutt from Cable Drum Nr = __________________________________________________

Detail of individual Fibers of F-_____.


Exact Fiber length
Serial Fiber Code in Color of Total Fiber Loss of
Fiber No on which loss is
Number OTDR Fiber length (Km) fiber (dB)
measured (mtr)

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21
22 22

23 23

24 24
#DIV/0! #DIV/0!

Signature = ____________
Exact Fiber length
Serial Fiber Code in Color of Total Fiber Loss of
Fiber No on which loss is
Number OTDR Fiber length (Km) fiber (dB)
measured (mtr)

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

46 46
47 47

48 48

49 49

50 50

51 51

52 52

53 53

54 54

55 55

56 56

57 57

58 58

59 59

60 60
Exact Fiber length
Serial Fiber Code in Color of Total Fiber Loss of
Fiber No on which loss is
Number OTDR Fiber length (Km) fiber (dB)
measured (mtr)

61 61

62 62

63 63

64 64

65 65

66 66

67 67

68 68

69 69

70 70

71 71

72 72

73 73

74 74

75 75
76 76

77 77

78 78

79 79

80 80

81 81

82 82

83 83

84 84

85 85

86 86

87 87

88 88

89 89

90 90

91 91

92 92

93 93

94 94

95 95

96 96
_________ Km
_________ Km
________ dB
___________

_____________

Remarks
#DIV/0!

Remarks
Remarks
10/14/2008
Detail Of Purchased Items
Total Bill Paid
Sr No Date Description QTY Rate
Ammount To

8723432.xls Sheet2
10/14/2008

8723432.xls Sheet2
EMPLOYEE LIST OF FOP / FOC FOR ICE ALLOWANCE
Date: From 015-Aug-2006 To 21-Aug-2006 (Week # 16)
Sr.N
Employ List Designation Signature
o
FOP
1 Syed Asif Hussain Associate Engr.

2 Ather-Ul-Hassan Technician

3 Syed Asad Ali Technician

4 Mohammad Azam Technician

5 Mohammad Saad Technician

6 Shahzad Ahmad Technician

FOC

1 Ejaz Ahmad Supervisor

2 Mohammad Saleem AwanSurveyor

3 Shahbaz Ahmad Technician

4 Mohammad Fayyaz Technician

5 Mohammad Saleem Raza Helper

6 Mohammad Iqbal Helper

7 Khizar Hayyat Helper

8 Shahzad Humanyun Helper

9 Mohammad Sharif Helper

10 Saif Ullah Helper

11 Syed Kamran Haider Helper

12 Arshad Mahmood Helper

Notes: Cash Received Rs. 1620/- (From Coordinator Mr. Talha)

Vous aimerez peut-être aussi