Gas lost during purging of one short S/L (Uncorrected) = 11.92 CFT for 30 seconds Gas lost during purging of service lines as measured with meter in the presence of Audit personal (Site: Askari X, block B, Near Alama Iqbal Air Port) Correction factor (for pressure 28 psig) = = Gas lost during purging of one short S/L (Corrected) = (28+14.65) / 14.65 2.91 11.92 * 2.91 = 34.7 CFT

THEORATICAL MEASUREMENT OF GAS LOST: Gas lost during purging Pressure P Hole of dia D Gas lost during purging = = = = = Gas lost during purging of one service line = P * D2 28 psig

0.3125 inches 28 * (0.3125)2 2.73 MCFH 22.78 CFT for 30 seconds

COMMERCIAL SERVICE LINES (1)


EXPERIMENTAL MEASUREMENT OF GAS LOST (WITH METER)

Gas lost during purging of one S/L Gas lost during purging of service lines as measured with meter in the presence of Audit personal

65 CFT for 30 second (Uncorrected)

(Site: Jamia Ghazalia, Patiala Ground, Hall Road Lhr.) Correction factor (for pressure 35 psig) = = = Gas lost during purging of one S/L = (35+14.65) / 14.65 3.39 65 * 3.39 220.35 CFT (Corrected)

THEORATICAL MEASUREMENT OF GAS LOST: P * D2 35 psig 0.75 inches 35 * (0.75)2 19.68 MCFH 164 CFT for 30 seconds

Gas lost during purging Pressure P Hole of dia D Gas lost during purging

= = = = =

Gas lost during purging of single 1 service line

INDUSTRIAL SERVICE LINES (2)


EXPERIMENTAL MEASUREMENT OF GAS LOST (WITH METER) Gas lost during purging of one 2 dia S/L Gas lost during purging of 2 service lines as measured with meter in the presence of Audit personal (Site: FAS TUBE, SUNDER INDUSTRIAL STATE) = Correction factor (for pressure 60 psig) = = = Gas lost during purging of one S/L = 244.49 CFT (60+14.65) / 14.65 5.09 244.49*5.09 1242.42 CFT (Corrected) 6.93 m3 for 60 second (Uncorrected)

THEORATICAL MEASUREMENT OF GAS LOST: Gas lost during purging Pressure P Hole of dia D Gas lost during purging = = = = = Gas lost during purging of single 1 service line = P * D2 60 psig 1.5 inches 60 * (1.5)2 135 MCFH 2250 CFT for 60 seconds

Total Number of Service Lines Laid Type of Connection During the Period Jan. 2009-Aug.2009 A Nos. Domestic Commercial Industrial 36532 1140 111

Gas lost per Connection During Purging B CF 34.7 220.35 1242.42

Gas Consumed in Packing of Pipeline Per Connection C CF 0.234 0.416 3.66

Gas lost Per Connection B+C CF 34.93 220.766 1246.08

Total Gas Lost During the Period Jan. 2009 Aug.2009 A*(B+C) MCF 1276.06 251.673 138.31

1 MS PIPELINE:
EXPERIMENTAL MEASUREMENT OF GAS LOST (WITH METER) Gas lost during purging of 457 meter 1 pipeline minutes As measured by I-7M meter in the presence of Audit personal. (Site: Askari X, block B, Near Alama Iqbal Air Port) Gas lost per meter length of 1 pipeline = 0.35 CFT = 160 CFT for 3

Diameter of pipeline

Total Length of Pipeline Commissioned During the Period Jan.2009-Aug.2009

Gas lost Per Unit length of Pipeline During Purging 0.35 25.24 89.26

Gas lost Per Unit length of Pipeline During Packing 0.0351 0.111

Gas lost Per Unit Length of Pipeline 51.62292+1 56.85806 25.35

Total Gas Lost

1 2 4

448165.9

208.48 5693.12

224572 135746.05