S.N Site o.

Name 1 Bhonaw as

Date of Visit 27/4/201 1

Problem Observed In Power Plant Display is Faulty One Module faulty One working. Nil Display of Power Plant Faulty Two Module faulty One working.Very Deep discharge in Battery In Power Plant Display is faulty Deep discharge in battery In Power Plant 2modules working 1 more required In battery cellNo.2 is faulty In Power Plant 2 modules are working 1 more is required as per load In Battery Cell No. 22 is weak & 10,11,16,17 observed as mismatch in total voltage In Power Plant 2 modules are working 1 more is required as per load.

Action Proposed Display to be replaced 2 modules required as per load Nil Battery replacement require 2 modules require EB meter to be replaced in coordination with RSEB SMPS display is to be rectified Display of SMPS to be replaced Battery Bank must be replaced 1 Battery Cell to be replaced One module to be required One module is required Cell No. 10,11,16,17,22 to be replaced

IP Name GTL

Area Shahpur a

2 Chapra Khurd 3 Khelna

29/4/201 1 27/4/201 1

GTL GTL

Shahpur a Shahpur a

4 Sangter a

27/4/201 1

GTL

Shahpur a

5 Saiwar

29/4/201 1

GTL

Shahpur a

6 Barijori

29/4/201 1

GTL

Shahpur a

7 Gathwa di

2/5/2011

1 module of SMPS is required Shelter Door is not properly alligned , To be rectified

GTL

Shahpur a

8 Govindp ura basri 9 Nayan

30/4/201 1 30/4/201 1 28/4/201 1 28/4/201 1

Direction of DG silencer

Direction of DG silencer to be changed as it is towards BTS Calibration of SMPS Display voltage is requird Nil SMPS Display to be replaced

GTL

Shahpur a Shahpur a Shahpur a Shahpur a

In Power plant Display Voltage & Actual voltage Calibration error Nil In Power plant Display found faulty Battery Bank Cells are having equal voltage but overall voltage is low due to LVD setting 2 module working ,2 faulty Cell no.8 is weak Nil Nil NIL In Power Plant 2 modules are working 2 more are required In Battery 2 Cells found faulty In Power Plant 2 modules are working 2 more are required. In Power Plant 2 modules are working 2 more are required. In Power Plant 2 modules are working 1 more are required.

GTL

10 Banar 11 TodaBra hman

GTL GTL

12 Pathreri

28/4/201 1 2/5/2011 28/4/201 1 28/4/201 1 28/4/201 1

1 module required 1 cell must be replaced Nil Nil Nil Required 2 module in power Plant 2 Battery cells replacement is required required 2 module in power plant required 2 module in power plant required 1 module in power plant

GTL

Shahpur a Shahpur a Chomu Chomu Chomu

13 Tholai 14 Amloda 15 Dodsar 16 AstiKala n

GTL Quipp o Quipp o Quipp o

17 Kushalp ura 18 Rampur a 19 Kishanp ura

30/4/201 1 30/4/201 1 30/4/201 1

aster

Chomu

aster

Chomu

aster

Chomu

20 Lalasar

30/4/201 1 26/4/201 1 25/4/201 1

21 Bainara 22 Garh Bassi

In Power Plant 2 modules are working 2 more are required. Nil 2 Battery Cells found faulty in Battery Set 1 2 Battery cells are found faulty in Battery set 2 In Power plant Mains MCB found bypassed LVD cutoff voltage are found 42 volt Temprature compensation feature was not working. Nil In Power plant 2 module workin .Battery back up 1.30 hrs. In set A 4 cells found weak In set b 6 cells found weak Nil In battery 1 cell found faulty Battery backup is 3 hrs. Battery Bachup found only two hours In power Plant two modules working Battery back up is 3 hrs

required 2 module in power plant Nil Battery Cells to be replaced For healthy condition cutoff voltage for LVD is b/w 43-44 V. Temprature compensation feature to be corrected

aster

Chomu

aster Quipp o

East East

23 Moondli 24 Baswa 2

25/4/201 1 27/4/201 1

Nil Modules in P/P should increase Battery back up should increase weak Cells to be replaced

aster aster

East Dausa

25 Pichupar a Khurd 26 Garh(Sik rai)

28/4/201 1 29/4/201 1

Nil One Battery Cell should be replaced Battery back up should increase Battery Back up should increase modules in P/P should increase Battery back up should increase.

Quipp o Quipp o

Dausa Dausa

27 Torda 28 Nangal rajawata n

29/4/201 1 27/4/201 1

Quipp o Aster

Dausa Dausa

29 Lalpura

2/5/2011

Nil

1 or 2 modules (50 Amp.) are to be added in power plant 2 cells mentioned to be replaced . 1 module 50 amp needs to be added in power plant Height of Changeover switch will be increased by 1.5 feet & work will be completed upto 1/6/2011 Battery set not sufficient for two operators,Capacity should increase Nil

aster

West

30 Begus

25/4/201 1

In Battery set 1 cell No.15 found faulty In Battery set 2 cell No. 19 found faulty AC changeover switch height is very low.

TVS

West

31 Chittora

2/5/2011

Quipp o

South West

32 Kaliphad i

4/5/2011

Battery Backup only 1 hr.Set weak

GTL

Dausa

33 Kundal

4/5/2011

Nil

GTL

Dausa

34 Titarwar a Kalan

4/5/2011

Nil

Nil

GTL

Dausa

35 Kolana

5/5/2011

Battery backup is 5 hour

Battery back up should increase

GTL

Dausa

36 Chhokar wara

5/5/2011

Battery backup is 4 hrs

Battery backup should increase

GTL

Dausa

37 Kalakho

5/5/2011

Battery backup is only 3.5 hrs. Three operator are working Battery backup 2.5 hrs Six Cells are weak

Battery backup should increase as there are three operators working Battery backup should increase Weak cells to be replaced Faulty module should be replaced

GTL

Dausa

38 Udaipur a

29/4/201 1

Quipp o

Dausa

39 Hingota

2/5/2011

4 modules working 1 module is faulty

Quipp o

Dausa

40 Golara

2/5/2011

Nil

Nil

Quipp o

Dausa

41 Nirjarna

3/5/2011

Nil

Nil

GTL

Dausa

42 Bagri

3/5/2011

Nil

Nil

GTL

Dausa

43 Badaga on

3/5/2011

3 Modules in P/P are working

1 module should increase

GTL

`Dausa

44 Digo

3/5/11

Nil

Nil

GTL

Dausa

45 Let Ka Bas

9/5/11

In Power plant 1 Module is found faulty In Battery 2 cells (Cell no. 2 & 23 ) are weak Nil

1 Module is required 2 Cells of Battery to be replaced Nil

TVS

Shahpur a

46 Baisalan a

9/5/11

TVS

Shahpur a

47 Khawara niji

4/5/11

Nil

Nil

Aster

Shahpur a

48 Natata

6/5/11

As per load 1additional module is required in Power plant As per load 1 additional module is required for Power plant 1 additional module is required for Power plant SMPS Display is found faulty In battery set-A cell no. 3 is weak 1 additional power plant module is required In Battery set-A cell no. 11,23 is weak In Battery set-B cell no. 7,11 is weak 1 additional module is required in power plant In Battery Cell no. 23 is found weak

1 additional module is required

Aster

Shahpur a

49 Udawala

5/5/11

1 additional module is required for Power plant

Aster

Shahpur a

50 Vishang arh

6/5/11

51 Khori

5/5/11

SMPS Display issue to be rectified 1 Battery Cell to be replaced 1 additional module is required 1 additional module is required 4 Battery cells to be replaced

Aster

Shahpur a

Aster

Shahpur a

52 Paniyala

7/5/11

1 additional module is required 1 Battery cell to be replaced

Aster

Shahpur a

53 Sunderp ura

7/5/11

54 Karoli

6/5/11

1 additional module is required for Power plant In Battery set-A Cell No. 1,6 is weak In Battery set B Cell No. 11,22 is found weak In Power plant Display is faulty 1 additional module is required for Power Plant 1 additional module is required for power plant

4 Battery Cells to be replaced 1 Additional module is required

Aster

Shahpur a

SMPS Display to be rectified 1 additional module is required for Power plant 1 additional power plant is required

Aster

Shahpur a

55 Thali

4/5/11

Aster

Shahpur a

56 Todame ena

4/5/11

1 additional module is required for power plant

1 additional power plant is required

Aster

Shahpur a

57 Khorala dkhani

5/5/11

1 additional module is required for power plant

1 additional power plant is required

Aster

Shahpur a

58 Bilander pur

7/5/11

59 Bharajb huree

7/5/11

2 Modules are faulty in Power plant 300 AH Battery Set is isolated due to deep discharge 1 Module in Power Plant is found faulty Excide Battery set has cell no. 2,18 weak HBL Battery set has cell no. 2,18,21 weak Battery Back up is only 40 Minutes

2 Modules are required Isolated Battery Bank to be replaced 5 Battery Cells to be replaced Faulty module in power plant to be replaced Battery Backup to be improved

Quipp o

Shahpur a

Quipp o

Shahpur a

60 Harsoli

11/5/11

Nil

Nil

GTL

Phullera

61 Jhag

11/5/11

Nil

Nil

GTL

Phullera

62 Sali

11/5/11

Nil

Nil

`GTL

Phullera

63 Ugariaw as

10/5/11

Multioperator site Battery Back up is 4 hrs. Battery Backup is 3.5 hours

1 more Battery set is required

GTL

Phullera

64 Kazipura

9/5/11

Require one more battery set as it is multioperator site Require one more module

GTL

Phullera

65 Akoda

10/5/11

Require one additional module for power plant

GTL

Phullera

66 Hingoni ya

10/5/11

Multioperator site ,Battery backup is 3 hrs

1 more Battery set is required

GTL

Phullera

67 Kanchro da

9/5/11

Nil

Nil

GTL

Phullera

68 Sambha r-2

9/5/11

Nil

Nil

GTL

Phullera

69 Bagwad a

6/5/11

Battery Backup is 4 hrs.

Nil

GTL

Phullera

70 Hathnod a

7/5/11

Nil

Nil

GTL

Chomu

71 Aleesa

6/5/11

Nil

Nil

GTL

Chomu

72 SingodK alan

6/5/11

Battery back up is 1.5 hrs.

Battery Bank replace immediately

GTL

Chomu

73 Loharwa da

6/5/11

In Battery Cell No. 1& 21 is faulty

Both faulty cell to be replaced

GTL

Chomu

74 Avadhp uri

30/4/11

Nil

Nil

ITIL

Central