Name 1 Bhonaw as
Problem Observed In Power Plant Display is Faulty One Module faulty One working. Nil Display of Power Plant Faulty Two Module faulty One working.Very Deep discharge in Battery In Power Plant Display is faulty Deep discharge in battery In Power Plant 2modules working 1 more required In battery cellNo.2 is faulty In Power Plant 2 modules are working 1 more is required as per load In Battery Cell No. 22 is weak & 10,11,16,17 observed as mismatch in total voltage In Power Plant 2 modules are working 1 more is required as per load.
Action Proposed Display to be replaced 2 modules required as per load Nil Battery replacement require 2 modules require EB meter to be replaced in coordination with RSEB SMPS display is to be rectified Display of SMPS to be replaced Battery Bank must be replaced 1 Battery Cell to be replaced One module to be required One module is required Cell No. 10,11,16,17,22 to be replaced
IP Name GTL
Area Shahpur a
29/4/201 1 27/4/201 1
GTL GTL
Shahpur a Shahpur a
4 Sangter a
27/4/201 1
GTL
Shahpur a
5 Saiwar
29/4/201 1
GTL
Shahpur a
6 Barijori
29/4/201 1
GTL
Shahpur a
7 Gathwa di
2/5/2011
GTL
Shahpur a
Direction of DG silencer
Direction of DG silencer to be changed as it is towards BTS Calibration of SMPS Display voltage is requird Nil SMPS Display to be replaced
GTL
In Power plant Display Voltage & Actual voltage Calibration error Nil In Power plant Display found faulty Battery Bank Cells are having equal voltage but overall voltage is low due to LVD setting 2 module working ,2 faulty Cell no.8 is weak Nil Nil NIL In Power Plant 2 modules are working 2 more are required In Battery 2 Cells found faulty In Power Plant 2 modules are working 2 more are required. In Power Plant 2 modules are working 2 more are required. In Power Plant 2 modules are working 1 more are required.
GTL
GTL GTL
12 Pathreri
1 module required 1 cell must be replaced Nil Nil Nil Required 2 module in power Plant 2 Battery cells replacement is required required 2 module in power plant required 2 module in power plant required 1 module in power plant
GTL
aster
Chomu
aster
Chomu
aster
Chomu
20 Lalasar
In Power Plant 2 modules are working 2 more are required. Nil 2 Battery Cells found faulty in Battery Set 1 2 Battery cells are found faulty in Battery set 2 In Power plant Mains MCB found bypassed LVD cutoff voltage are found 42 volt Temprature compensation feature was not working. Nil In Power plant 2 module workin .Battery back up 1.30 hrs. In set A 4 cells found weak In set b 6 cells found weak Nil In battery 1 cell found faulty Battery backup is 3 hrs. Battery Bachup found only two hours In power Plant two modules working Battery back up is 3 hrs
required 2 module in power plant Nil Battery Cells to be replaced For healthy condition cutoff voltage for LVD is b/w 43-44 V. Temprature compensation feature to be corrected
aster
Chomu
aster Quipp o
East East
23 Moondli 24 Baswa 2
25/4/201 1 27/4/201 1
Nil Modules in P/P should increase Battery back up should increase weak Cells to be replaced
aster aster
East Dausa
28/4/201 1 29/4/201 1
Nil One Battery Cell should be replaced Battery back up should increase Battery Back up should increase modules in P/P should increase Battery back up should increase.
Quipp o Quipp o
Dausa Dausa
29/4/201 1 27/4/201 1
Quipp o Aster
Dausa Dausa
29 Lalpura
2/5/2011
Nil
1 or 2 modules (50 Amp.) are to be added in power plant 2 cells mentioned to be replaced . 1 module 50 amp needs to be added in power plant Height of Changeover switch will be increased by 1.5 feet & work will be completed upto 1/6/2011 Battery set not sufficient for two operators,Capacity should increase Nil
aster
West
30 Begus
25/4/201 1
In Battery set 1 cell No.15 found faulty In Battery set 2 cell No. 19 found faulty AC changeover switch height is very low.
TVS
West
31 Chittora
2/5/2011
Quipp o
South West
32 Kaliphad i
4/5/2011
GTL
Dausa
33 Kundal
4/5/2011
Nil
GTL
Dausa
34 Titarwar a Kalan
4/5/2011
Nil
Nil
GTL
Dausa
35 Kolana
5/5/2011
GTL
Dausa
36 Chhokar wara
5/5/2011
GTL
Dausa
37 Kalakho
5/5/2011
Battery backup is only 3.5 hrs. Three operator are working Battery backup 2.5 hrs Six Cells are weak
Battery backup should increase as there are three operators working Battery backup should increase Weak cells to be replaced Faulty module should be replaced
GTL
Dausa
38 Udaipur a
29/4/201 1
Quipp o
Dausa
39 Hingota
2/5/2011
Quipp o
Dausa
40 Golara
2/5/2011
Nil
Nil
Quipp o
Dausa
41 Nirjarna
3/5/2011
Nil
Nil
GTL
Dausa
42 Bagri
3/5/2011
Nil
Nil
GTL
Dausa
43 Badaga on
3/5/2011
GTL
`Dausa
44 Digo
3/5/11
Nil
Nil
GTL
Dausa
45 Let Ka Bas
9/5/11
In Power plant 1 Module is found faulty In Battery 2 cells (Cell no. 2 & 23 ) are weak Nil
TVS
Shahpur a
46 Baisalan a
9/5/11
TVS
Shahpur a
47 Khawara niji
4/5/11
Nil
Nil
Aster
Shahpur a
48 Natata
6/5/11
As per load 1additional module is required in Power plant As per load 1 additional module is required for Power plant 1 additional module is required for Power plant SMPS Display is found faulty In battery set-A cell no. 3 is weak 1 additional power plant module is required In Battery set-A cell no. 11,23 is weak In Battery set-B cell no. 7,11 is weak 1 additional module is required in power plant In Battery Cell no. 23 is found weak
Aster
Shahpur a
49 Udawala
5/5/11
Aster
Shahpur a
50 Vishang arh
6/5/11
51 Khori
5/5/11
SMPS Display issue to be rectified 1 Battery Cell to be replaced 1 additional module is required 1 additional module is required 4 Battery cells to be replaced
Aster
Shahpur a
Aster
Shahpur a
52 Paniyala
7/5/11
Aster
Shahpur a
53 Sunderp ura
7/5/11
54 Karoli
6/5/11
1 additional module is required for Power plant In Battery set-A Cell No. 1,6 is weak In Battery set B Cell No. 11,22 is found weak In Power plant Display is faulty 1 additional module is required for Power Plant 1 additional module is required for power plant
Aster
Shahpur a
SMPS Display to be rectified 1 additional module is required for Power plant 1 additional power plant is required
Aster
Shahpur a
55 Thali
4/5/11
Aster
Shahpur a
56 Todame ena
4/5/11
Aster
Shahpur a
57 Khorala dkhani
5/5/11
Aster
Shahpur a
58 Bilander pur
7/5/11
59 Bharajb huree
7/5/11
2 Modules are faulty in Power plant 300 AH Battery Set is isolated due to deep discharge 1 Module in Power Plant is found faulty Excide Battery set has cell no. 2,18 weak HBL Battery set has cell no. 2,18,21 weak Battery Back up is only 40 Minutes
2 Modules are required Isolated Battery Bank to be replaced 5 Battery Cells to be replaced Faulty module in power plant to be replaced Battery Backup to be improved
Quipp o
Shahpur a
Quipp o
Shahpur a
60 Harsoli
11/5/11
Nil
Nil
GTL
Phullera
61 Jhag
11/5/11
Nil
Nil
GTL
Phullera
62 Sali
11/5/11
Nil
Nil
`GTL
Phullera
63 Ugariaw as
10/5/11
GTL
Phullera
64 Kazipura
9/5/11
Require one more battery set as it is multioperator site Require one more module
GTL
Phullera
65 Akoda
10/5/11
GTL
Phullera
66 Hingoni ya
10/5/11
GTL
Phullera
67 Kanchro da
9/5/11
Nil
Nil
GTL
Phullera
68 Sambha r-2
9/5/11
Nil
Nil
GTL
Phullera
69 Bagwad a
6/5/11
Nil
GTL
Phullera
70 Hathnod a
7/5/11
Nil
Nil
GTL
Chomu
71 Aleesa
6/5/11
Nil
Nil
GTL
Chomu
72 SingodK alan
6/5/11
GTL
Chomu
73 Loharwa da
6/5/11
GTL
Chomu
74 Avadhp uri
30/4/11
Nil
Nil
ITIL