Académique Documents
Professionnel Documents
Culture Documents
Dear Madam:
According to what has been discussed, the development of an architectural project of a single-family house
type "country house" in the sector ........................................................... is required, for which I present the
following economic proposal.
Floors
Carpentry of doors, windows, partition walls and gratings (basic level)
Bathrooms, changing rooms and kitchens/kitchenettes
Concrete and metal stairs (architecture)
Others (as deemed necessary)
Descriptive report
Finishing Chart.
The budget mentioned below does not include the development of plans mentioned in Item 1.1.2,
nor does it include interior decoration (furniture design), if required by the client the development of
the latter will be added to the budget.
Structures projects, Inst. Electrical, Sanitary, are not part of this proposal and shall be developed by
the respective specialists.
2. DELIVERY TIMES
- PRELIMINARY PROJECT: 30 working days from the acceptance of the present document.
- DRAFT : 15 working days from the approval of the Preliminary Project
- DETAILS AND OTHER: 15 working days after completion of the project.
Note: In case, the elaboration of the final draft takes more time due to changes or other circumstances
generated by the client, the delivery time of the project will be considered from the date of the final
approval of the draft.
3. PROFESSIONAL FEES
The fees for the preparation of the architectural project shall be as follows:
New construction project development
Area Price per m2 Total
m2 S/. 12.00
General Expenses
TOTAL (S/.)
Development of detail drawings
Area Price per m2 Total
m2 S/. 12.00
General Expenses
TOTAL (S/.)
Note: General expenses include the cost of printing and some others not mentioned in the contract at
the client's request.
The form of payment will be as follows:
- 30% upon acceptance hereof.
- 40% to the approval of the preliminary project and start of the definitive plans.
- 25% upon delivery of complete plans.
Any changes subsequent to approval of the plans as well as an increase in the initial built and/or
remodeled area will be considered additional work. The plans will be delivered on Bond paper 2 sets of
duly signed plans and a CD.