Académique Documents
Professionnel Documents
Culture Documents
11 mb, 96 pages
download : http://artikel-software.com/blog
1 introduction
1-1 scope
1-2 purpose of criteria
1-3 specific processes
2 general requirements
5-1 function
5-2 operational considerations
5-3 floor plan
5-4 design criteria
5-4.1 exhaust air system
5-4.2 hood design
5-4.3 ductwork
5-4.4 fans
5-4.5 weather stack design and location
5-4.6 air cleaning devices
5-4.7 industrial vacuum system
5-5 replacement air
5-6 system controls
5-7 safety and health considerations
6-1 function
6-2 operational considerations
6-3 design criteria
6-3.1 exhaust air
6-3.2 blasting cabinets
6-3.3 walk-in blasting enclosures
6-3.4 access doors and observation windows
6-3.5 air cleaning devices
6-3.6 recirculation
6-3.7 media reclamation
6-3.8 ductwork
6-3.9 fans
6-3.10 weather stack design and location
6-3.11 replacement air ventilation systems
6-3.12 heating and air conditioning
6-3.13 system controls
6-4 safety and health considerations
6-4.1 respiratory protection
6-4.2 air supply and air compressors
6-4.3 noise
6-4.5 hygiene facilities
7-1 function
7-2 operational considerations
7-3 floor plan criteria
7-4 design criteria
7-4.1 exhaust air system
7-4.2 hood design
7-4.3 floor sweeps
7-4.4 ductwork
7-4.5 blast gates
7-4.6 duct support
7-4.7 clean out panels
7-4.8 exhaust fans
7-4.9 weather stack design and location
7-4.10 air cleaning devices
7-4.11 heating and air conditioning
7-5 safety and health considerations
9-1 function
9-2 operational considerations
9-2.1 painting equipment types
9-3 design criteria
9-3.1 walk-in spray paint booths
9-3.2 storage and mixing room
9-3.3 paint mix hoods
9-4 fans and motors
9-5 replacement air
9-5.1 air distribution
9-5.2 heating and air conditioning
9-6 system controls
9-7 respiratory protection
10-1 function
10-2 operational considerations
10-3 design criteria
10-3.1 exhaust air system
10-3.2 ventilation system configurations
10-3.3 exhaust filtration system
10-3.4 auxiliary walk-in paint spray room
10-3.5 storage and mixing room
10-3.6 paint mixing hood
10-4 fans and motors
10-5 replacement air
10-5.1 heating and air conditioning
10-6 system controls
10-7 respiratory protection