KARTU KONTROL MATERIAL : Pemakaian Bronjong Rusak

PAKET : Proyek Pengandalian Banjir Sungai Bolango


NAMA KONTRAKTOR : PT. Bumi Karsa
KAWAT BRONJONG
VOLUME KELUAR
NO TANGGAL
SISA SATUAN
KELUAR TERPASANG KEMBALI
BRONJONG
JUMLAH BRONJONG RUSAK 169.00 Lembar
1 17-Sep-2018 15.00 15.00 - 154.00 Lembar
2 21-Sep-2018 16.00 12.00 4.00 142.00 Lembar
3 21-Sep-2018 12.00 12.00 - 130.00 Lembar
4 26-Sep-2018 21.00 13.00 8.00 117.00 Lembar
5 27-Sep-2018 10.00 10.00 - 107.00 Lembar
6 30-Sep-2018 5.00 5.00 - 102.00 Lembar
7 30-Sep-2018 9.00 9.00 - 93.00 Lembar
8 2-Oct-2018 15.00 15.00 - 78.00 Lembar
9 5-Oct-2018 2.00 2.00 - 76.00 Lembar
10 10-Oct-1900 8.00 8.00 - 68.00 Lembar
10 12-Oct-1900 10.00 10.00 - 58.00 Lembar
11 13-Oct-1900 4.00 4.00 - 54.00 Lembar
12 17-Oct-1900 7.00 7.00 - 47.00 Lembar
13 23-Oct-1900 15.00 15.00 - 32.00 Lembar
14 - - - 32.00 Lembar
15 - - - 32.00 Lembar
16 - - - 32.00 Lembar
17 - - - 32.00 Lembar
18 - - - 32.00 Lembar
19 - - - 32.00 Lembar
20 - - - 32.00 Lembar
21 - - - 32.00 Lembar
22 - - - 32.00 Lembar
23 - - - 32.00 Lembar
TOTAL 149.00 137.00 12.00 32.00 Lembar

Disetujui Oleh, Diperiksa Oleh,

Muhammad Taslim M Taufiq HM Surya Darmawan


(KA. Proyek) (Kabag. Teknik) (kord. Lapangan)
KAWAT BRONJONG

KETERANGAN
LOKASI PEMASANGAN

Tenilo (SUB MIKAIL) Koperan


Donggala (SUB WIRANTO) Koperan + Tambalan
Tenilo (SUB MIKAIL) Koperan
Tenilo (SUB MIKAIL) Tambalan + Trap 4
Tenilo (SUB MIKAIL) Koperan
Tenilo (SUB MIKAIL) Tambalan
Donggala (SUB WIRANTO) Koperan + Tambalan
Donggala (SUB WIRANTO) Koperan
Tenilo (SUB MIKAIL) Tambalan + Trap 2
Donggala (SUB WIRANTO) Koperan
Donggala (SUB WIRANTO) Tambalan
Donggala (SUB WIRANTO) Koperan
Tenilo (SUB MIKAIL) Tambalan + Trap 4
Tenilo (SUB MIKAIL) Koperan