STUDENT PARTICULAR FIRST NAME : NIKHIL LAST NAME : PATEL BRANCH :- ELECTRICAL ENGINEERING SEMESTER: - 7th MOBILE NO :9601136440

YEAR : - 2011-12 EMAIL ID : niks4205@gmail.com STUDENT SIGNATURE : -

COLLEGE PARTICULAR COLLEGE NAME: - LEELABEN DASHARATHBHAI RAMDAS PATEL INSTITUTE OF TECHNOLOGY AND RESEARCH. COLLEGE CODE: -030 ADDRESS : - KH-5 CIRCLE, SECTOR -15,GANDHINAGAR-382015 CONTACT NO. : - +91-079-23241493 PROJECT CO-ORDINATOR : - Mr. R.P. SUKHADIA

INDUSTRY PARTICULAR INDUSTRY NAME: JINDAL DENIM INC. ADDRESS: - 207, CHIKUWADI, SAIJPUR, PIRANA ROAD, NAROL GUJARAT, INDIA

STUDENT PARTICULAR FIRST NAME : HARDIK LAST NAME : DODIYA BRANCH :- ELECTRICAL ENGINEERING SEMESTER: - 7th MOBILE NO :9033259593 YEAR : - 2011-12 EMAIL ID : hardikdodia16@yahoo.com STUDENT SIGNATURE : -

COLLEGE PARTICULAR COLLEGE NAME: - LEELABEN DASHARATHBHAI RAMDAS PATEL INSTITUTE OF TECHNOLOGY AND RESEARCH. COLLEGE CODE: -030 ADDRESS : - KH-5 CIRCLE, SECTOR -15,GANDHINAGAR-382015 CONTACT NO. : - +91-079-23241493 PROJECT CO-ORDINATOR : - Mr. R.P. SUKHADIA

INDUSTRY PARTICULAR INDUSTRY NAME: JINDAL DENIM INC. ADDRESS: - 207, CHIKUWADI, SAIJPUR, PIRANA ROAD, NAROL GUJARAT, INDIA

STUDENT PARTICULAR FIRST NAME : NITIN LAST NAME : PATEL BRANCH :- ELECTRICAL ENGINEERING SEMESTER: - 7th MOBILE NO :8460866989 YEAR : - 2011-12 EMAIL ID : nitin9099_12@yahoo.com STUDENT SIGNATURE : -

COLLEGE PARTICULAR COLLEGE NAME: - LEELABEN DASHARATHBHAI RAMDAS PATEL INSTITUTE OF TECHNOLOGY AND RESEARCH. COLLEGE CODE: -030 ADDRESS : - KH-5 CIRCLE, SECTOR -15,GANDHINAGAR-382015 CONTACT NO. : - +91-079-23241493 PROJECT CO-ORDINATOR : - Mr. R.P. SUKHADIA

INDUSTRY PARTICULAR INDUSTRY NAME: JINDAL DENIM INC. ADDRESS: - 207, CHIKUWADI, SAIJPUR, PIRANA ROAD, NAROL GUJARAT, INDIA

COLLEGE NAME:

LEELABEN DASHARATHBHAI RAMDAS PATEL INSTITUTE OF TECHNOLOGY AND RESEARCH

COLLEGE CODE: BRANCH: SEM: SUBJECT: INDUSTRY:

030 Electrical VII PRE-PROJECT JINDAL DENIM INC. 207, CHIKUWADI, SAIJPUR, PIRANA ROAD, NAROL, AHMEDABAD

INDUSTRY CO-ORDINATOR:
D .L .PATEL (M) - 9013363168

Submitted by:
NIKHIL PATEL (080300109041) HARDIK DODIYA (080300109013) NITIN PATEL (080300109042)

INDEX

1. TITLE OF PROJECT: FAULTS IN THREE PHASE INDUCTION MOTOR. 2. AIMS AND OBJECTIVES 3. DETAILS OF PRE-PROJECT (7th SEM.) 4. DETAILS OF FINAL PROJECT (8TH SEM.) 5. OUTCOMES

TITLE OF THE PROJECT:

FAULTS IN THREE PHASE INDUCTION MOTOR.

DISCIPLINARY/ INTERDISCIPLINARY: Electrical / Mechanical

AIMS:

The aim of our project is to reduce faults of three phase induction motor (7th Semester)

Detailed study of possible solutions for reducing the faults in three phase induction motor (8th Semester)

OBJECTIVES:

Three phase induction motor faults


can be reduced by using following kind of protection.

PRE-PROJECT
PROBLEM: Real time faults when the three phase induction motor is in running
condition.

HOW THIS PROBLEM OCCURS?

Electrically related faults (33%): The faults come under this classification are over/under voltage, over load, phase reversing, unbalanced voltage, single phasing and earth fault. Mechanically related faults (32%): The rotor winding failure, stator winding failure and bearing faults are most occurring mechanical fault in three-phase induction machine. Environmentally related faults (15%): The external moisture, contamination and ambient temperature also affect the induction motor performance. The vibration of machine also affects the performance of induction machine under various operations.

INFLUENCE OF ELECTRICAL FAULTS ON MOTOR PERFORMANCE Unbalanced voltage comprises of two opposing components, a positive sequence component that produces the wanted positive torque and a negative sequence component that produces unwanted negative torque (Saffet and Nwankpa, 2005). As the amount of unbalance in the supply voltage increase, the positive sequence voltage decreases and negative sequence voltage increases. The percentage of unbalance defined by NEMA:

(1)
Causes and Effects of Unbalanced Supply Voltage Causes Open delta transformers, unbalanced loading, unequal tap settings, high resistance connections, shunted single phase load, unbalanced primary voltage and defective transformer.

POSSIBLE FAULTS AND THEIR SOLUTIONS:


1ST problem: MOTOR DOESNT STARTS. Solution: 1. 2. 3. 4.

Fit new fuses Reset circuit breaker Remove clamps, locks etc Sort out control circuit

2nd problem: SUPPLY OR STARTER TRIPS OUT AT START. Solution: 1. 2. 3. 4.

Fix up connections Change motor for correct size Change cable for correct size Correct setting for over voltage and overload

3rd problem: MOTOR OVERHEATING. Solution: 1. 2. 3. 4. 5. Fix problem with load or fit larger motor Clean motor Sort out cooling of air temperature and flow Correct voltage or frequency Balance supply

4th problem: NO LOAD AMPERES IN EXCESS OR FULL LOAD AMPERES. Solution: 1. Sort out and correct common at motor terminals 2. Correct supply voltage 3. Change motor for correct voltage and frequency

OVERVIEW OF 8th SEMESTER


Detailed study of possible solution to reduce the real time faults of three phase induction motor.

Outcome:
By applying the above mentioned possible solution we can reduce the faults of three phase induction motor and increase performance of three phase induction motor.