0 évaluation0% ont trouvé ce document utile (0 vote)
125 vues5 pages
Church of the light was completed in 1989 as an annex to an existing wooden church and ministers house. The budget was relatively low, about $250,000 US in construction costs. The church is seen as a place of retreat where the outside is forgotten.
Church of the light was completed in 1989 as an annex to an existing wooden church and ministers house. The budget was relatively low, about $250,000 US in construction costs. The church is seen as a place of retreat where the outside is forgotten.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
Church of the light was completed in 1989 as an annex to an existing wooden church and ministers house. The budget was relatively low, about $250,000 US in construction costs. The church is seen as a place of retreat where the outside is forgotten.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd