This is to certify that the report entitled “POWER FACTOR CORRECTION


OF COLLEGE OF ENGINEERING AND TECHNOLOGY” is a record of
bonafide work carried by the participants under my supervision. This report
is in partial fulfillment of the requirements for the award of degree in
Electrical Engineering from College of Engineering & Technology,
Bhubaneswar.
I recommend this piece of work for acceptance.

Submitted by

• Abheejeet Mohapatra……………………0401106154
• Ashoka Kumar Mishra………………...0521106012
• Arjuna Panda……………………………...0521106009
• Bipin Kumar Ray…..……………………0521106011
• Dibya Jyoti Satpathy…………….........0401106132
• Soumen Priyadarshee……………………0401106173

External H.O.D
(Electrical)

Project Guide
College of Engineering and Technology,
BBSR
Department of ELECTRICAL Engineering

CERTIFICATE

This is to certify that students bearing registration nos.


0401106154, 0521106012, 0521106011, 0521106009,
0401106132, 0401106173 of final year Electrical Engg. CET,
Bhubaneswar have under taken the Electrical Engg. Project work
and been able to complete it in due time by virtue of their
diligences and devoted adherence to my guidance and advice.
And their unremitting Endeavour has turned this project task
into an enviable credential.

Le
cturer Project in charge

Er.B.M.Das
C
ollege of Engg. & Tech.

Bhubaneswar
ACKNOWLEDGEMENT

Before getting into the thick of things, we would like to add


a few heart left words for the people who were a part of the
project in numerous ways….people who gave unending support
right from the stage the idea was conceived. In particular we
express our deep sense of gratitude to our faculty in charge,
Er.B.M.Das, for inspiring us to choose the particular topic and
guiding us all although. Being a expert himself, he was able to
explain the technical details to us lucidly enough to pursue the
subject further by ourselves.

We would also like to utilize this opportunity to express


our deepest gratitude to Dr. P.K.Satpathy, H.O.D., Dept. of
Electrical Engg. for his support that inspired us to successfully
carry out the project. Special thanks are also to the members of
faculty of Electrical Engg. Department for their inspiration and
guidance throughout the project work.

“The Project Team”


Abheejeet Mohapatra
Ashoka Kumar Mishra
Arjuna Panda
Bipin Kumar Ray
Dibya Jyoti Satpathy
Soumen priyadarshee

PROJECT LIFE CYCLE


The various phases undertaken for the completion of the project were:
1. PLANNING
• After the topic selection of the project, we analyzed what has to be
done and how is to be done properly and efficiently for the
completion of the project.
• We then divided ourselves into three groups namely: Bipin Ku. Ray
and Abheejeet Mohapatra, Arjuna Panda and Dibyajyoti Satpathy,
Ashoka Ku. Mishra and Soumen Priyadarshee and distributed among
ourselves the various tasks to be performed.
2. ANALYSIS
• The three groups individually studied the three transformers and
their respective connected loads. The load study showed that most
of the loads in CET are inductive in nature which is the principle
reason for low power factor.
• We collected the electricity bill for the month Dec 2007 from our
guide and studied it thus knowing the monthly consumption,
amount paid and the penalty associated with the low power factor.
• To improve the power factor, we studied what are the methods
possible for doing so and came to know that LT Capacitor Banks are
the most effective ones.
• We then gathered information about the devices to be used and
consulted our guide Er. B. M. Das about the design.

3. DESIGN

• In this phase, design of the capacitor bank, its location and the
associated mounting and protecting devices and the cost involved
are decided along with help of our guide.

4. OPTIMIZATION AND PAYBACK PERIOD

• How many capacitor banks to be used, type of operation whether


manual or automatic, selection of specific brands for optimum
performance, estimation of savings and the cost and finally the
payback period is calculated.

5. SUPPORT

• The support phase included post-implementation review of the


system with help of our faculties and the guide. It also included a
systematic approach to identify the major and minor changes