Casing driving
Welded Splice/ Bolted Joint Common size: 2.0m, 2.5m & 3.0m Commonly by oscillator Down to bedrock/hard stratum
Rotator Vibrator
8
Excavation
By crawler crane simultaneously with casing driving By hammer grab and rock chisel
10
Swivel Head
Power Pack
Drum Stabilizer
Drill Rod
Stabilizer
Drill Bit
Cutter
11
Bell-out tools
Reverse Circulation Drill (RCD) Replaced with bell-out bit No further drilling downwards but only extending the arms Travel calibration
Air-lifting
Air Compressor Flush out to Sedimentation Tank
13
Koden Test
Common acoustic device to verify verticality & bell-out size Require sufficient clarity of water DO NOT expect very exact values
14
Ensure sufficient lapping length Sufficient nos. of reservation pipes (150mm dia.)
15
Concreting
Skip Concreting Platform
Ramp
Tremie Pipe
16
Concreting
Simultaneous with casing extraction and removal and tremie pipe Casing supported securely by oscillator/ crawler crane
17
18
Ground condition
Use Permanent Casing in Very Soft Ground or Subject to Tidal Effect and Underground Stream
19
21
Interface contact
No recovery (inferred as soil inclusion) due to sediment at pile toe Loss of contact at the interface due to inaccessibility of concrete mix into rock fragments
22
23
24
25
26
27
H-pile inspection
Mill cert, stocklist, s/n record Length measurement (VERY important especially for sections cut from other piles) Pile tip inspection
28
Pile pitching/driving
Hydraulic Hammer Offset control
Limit power in the first few blows Close monitoring by pile worker Pile extraction if necessary
Noise permit
Hydraulic hammer
29
30
31
32
Final set
Use of drop hammer of specified weight Specified drop height for 10 blows Final set graph
Cp+Cq
s
33
Calibration
Weight of drop hammer, helmet & follower Temporary compression of helmet (Cc) Coefficient of restitution (e) Hammer efficiency (k)
Hileys formula
35
Post-construction drilling
In case the pile founding level is higher than designed level from pre-drilling Minimum nos. as specified Process similar to pre-drilling
Rockhead/SPT
36
Load Test
Loading to ultimate pile capacity Kentledge with sufficient loading Four dial gauge extensometer Allowable maximum and residual settlement
Conclusion
Typical procedures for Bored Pile and Driven H-Pile construction Examples from the projects involved
END