Académique Documents
Professionnel Documents
Culture Documents
Kong
P r o f e s s o r J o n g C. W a n g Bill H s u
D e p a r t m e n t o f E l e c t r i c a l E n g i n e e r i n g Y u a n Ze U n i v e r s i t y
1 3 5 Far E a s t e r n RoadChung-Li, 3 2 0 , Taoyuan Shien
Taiwan e - m a i l :e ej c w a n g a s a t u r n .yzu .e d u .tw
bhsu.bill@msa.hinet.net;bill.hsu@tfclO 1 . c o m . t w
This study is involved with an analysis on the System(GSM900) for the 900MHZ
electrical power system of a Cellular Mobile frequency range, (2)GSM 1800 Digital
Telecommunications Operator in Taiwan. Primary, Cellular System (GSM1800) and (3)GSM
standby and emergency power operations for three 1900 Digital Cellular System (GSM1900)
important types of facilities were addressed as it was called in North America , for the
including Mobile Service Switching Center(MSC) 1900MHZ frequency range.
site, Hub Site and Cell Site or Base Transceiver
Station(BTS).Optimum emergency battery time Since 1996, telecommunication reform
sizing for the above three types of facilities were started in Taiwan, a free mobile
discussed in length. Fume development tasks telecommunication market was then
suggestions on electrical power systems were on opened at the end of 1997 after sewral
long-term system reliability, and fuel cell participating companies completed their
technology adaptation & its system integration. system constructions and started their
operations in addition to the telecom
giant-Chunghwa Telecommunication Co.
Introduction Now, at end of 2001, the customers using
mobile phones and services in Taiwan
The cellular mobile telecommunication have reached over 20 millions.
system is one of the fastest growing and
most demanding of all Electrical power is one of the critical
telecommunications technologies in the elements to the overall operations, and
global market for the recent years. long-term system reliability of a Cellular
Telecommunication Co. In Taiwan, power
In 1982, the Nordic PTT sent a proposal outages and natural
to Conference Europeans Des Posts ET disasters often cause disruptions to
Telecommunications(CEF'T) to specify a continuous telecommunication services
common European telecommunication for the above Cellular
service at 900 MHZ. A GSM Telecommunications Service Operators.
standardization group was established to Thus, in this paper, we attempt to
formulate the specifications for this perform an independent analysis and
Pan-European mobile cellular radio evaluation
system. on the design and performance of their
electrical power systems. Some suggestive
During 1982- 1985, discussions were improvements and actions are
centered on whether to build an analog or recommended.
digital system. In 1985, it was decided to
develop a GSM digital system. Electrical Power System
Operations for a Cellular
In 1986, companies participated in a Mobile Telecommunication
field test in Paris to determine whether a System
narrowband or broadband solution
would be employed. In May 1987, T h e o v e r a l l power s y s t e m f o r
narrowband Time Division Multiple a typical Cellular Mobile
Access (TDMA)solution was chosen. Telecommunications System
c o n s i s t s of t h r e e t y p e s of power
Concurrently, in the GSM evolution, operations & sources:
there were three different specifications of
Personal Communication Network PCN(1) (a) Primary Power: During
GSM 900 Digital Cellular normal operations,
0-7803-8237-4/04/3 17.0002004IEEE
535
2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004) April 2004 Hong Kong
c o m m e r c i a l power i s t h e a g r o u p of C e l l s .
s o u r c e of a l l f a c i l i t i e s .
(b) E m e r g e n c y Power: When A t y p i c a l MSC n o r m a l l y h a s
primary o r commercial b o t h AC a n d DC l o a d s . AC l o a d s
power i s l o s t , t h e facility consists of lightings, air
i s d e s i g n e d w i t h a s e t of conditioning, fire prevention,
emergency b a t t e r i e s to a n d s e c u r i t y e t c . DC l o a d s
a c t as a n emergency consists of various computers,
power s o u r c e . communication equipments etc.
(c) Standby Power: When It n o r m a l l y h a s a t o t a l l o a d of
p r i m a r y power i s l o s t , a 2 0 0 - 3 0 0 k w . For the current
s e t of p o w e r g e n e r a t o r s s y s t e m , two s e p a r a t e s t a n d b y
will b e a c t i v a t e d t o s e r v e power g e n e r a t o r s a r e d e s i g n e d
as s t a n d b y power s o u r c e to serve all loads when
for t h e facility. commercial power i s l o s t . O n e
s e t of U P S s y s t e m i s i n s t a l l e d t o
c o n n e c t c r i t i c a l l o a d s w i t h 30
minutes battery capacity, which
Facility Power Systems is necessary during the
Descriptions transition from commercial
power to standby power
o p e r a t i o n s . A s e t of AC-to-DC
a . MSC(Mobi1e Service converters are used to
Switching Center) s i t e transform
f r o m 380vAC t o 5 4 v D C f o r t h e
The MSC performs the needed communication
telephony switching functions equipments. In a d d i t i o n , a n
for the mobile network. It emergency battery s e t of 8
controls c a l l s to a n d from o t h e r h o u r s capacity i s now designed
telephony a n d d a t a systems, to serve t h e s e above critical
loads.
Cellular Telecommmunication
b. Hub s i t e
In general, a Cellular
Telecommunication operator h a s Telecommunication
s e v e r a l MSC s i t e s i n T a i w a n . An
MSC s e r v i c e a r e a i s m a d e u p of
a n u m b e r of L o c a t i o n A r e a s ( L A )
a n d r e p r e s e n t s t h e geographical
p a r t of t h e n e t w o r k c o n t r o l l e d
by o n e MSC. A LA i s d e f i n e d a s 2
536
2004 IEEE International Conference on Elecmc Utility Deregulation, Restructuring and Power Technologies (DRF’T2004) April 2004 Hong Kong
Hub s i t e c o n t r o l s t e n t o twenty AC a n d DC l o a d s . It n o r m a l l y
Cells. h a s a t o t a l l o a d of 2 t o 3 k w . I t
c a n be c a t e g o r i z e d i n two t y p e s ,
In g e n e r a l , a t y p i c a l H u b s i t e i.e. in-door a n d out-door. In
h a s b o t h AC a n d DC l o a d s . It general, there is no standby
normally h a s a total load in t h e g e n e r a t o r a t t h e Cell s i t e f o r
r a n g e of 2 0 - t o 4 0 k w . T h e m a i n t h e c u r r e n t d e s i g n . For c r i t i c a l
AC loads a r e air conditioning, communication loads, an
fire prevention, lightings a n d e m e r g e n c y b a t t e r y s e t of 4 t o 8
s e c u r i t y e t c . T h e main DC l o a d hours capacity is available,
is for the communication when commercial power i s lost.
equipment usages. A generator
i s a v a i l a b l e t o power t h e e n t i r e
f a c i l i t y w h e n c o m m e r c i a l power
is out. An e m e r g e n c y b a t t e r y
s e t of 8 h o u r s i s now d e s i g n e d
to serve t h e above critical
communication loads when both
commercial power a n d s t a n d b y
power a r e l o s t .
I-
( 1 ) For m o s t of t h e T a i w a n e s e
Cellular Telecommunications
Operators, they have
experienced some scale of
facility modifications and
expansions during the last
4 - t o - 5 y e a r s d u e to i n c r e a s e of
customers and service type
increases and quality
improvements.
537
2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004) April 2004 Hong Kong
(3) It is recommended that the power (c) For those Cell sites that have much
outage data in Taiwan for the past ten to heavier traffic volumes, we can consider
fifteen years be collected. The related data them as network strategic points and
will be extremely useful in sizing the thus extend especially longer emergency
optimum configurations of emergency batteries duration’s to 6 to 8 hours as
batteries for all categories of facilities. compared to that of other BTS Cell sites
of less traffic volumes.
It was found that the majority of BTS Cell
sites are located in metropolitan areas, it
was felt that a two-to-four hour design of
emergency battery time will be sufficient T h e D e v e l o p m e n t of F u t u r e
to cover the needed emergency period Electrical Power s y s t e m
during power outages before the
commercial power comes back. (1) To enhance future
long- term system
Since countryside BTS Cell sites are reliability, f u t u r e efforts
mostly spread out with farther away from c a n be devoted to several
maintenance resources and sometimes a s p e c t s s u c h as
due to road blockage considerations
during power outages, it is reasonably to ( a )t o increase system
require longer duration of BTS Cell site redundancy in standby
emergency battery of 6-to-8 hours. generators using isolated
transformer at the
Based on the data gathered and the commercial power input
related analyses, it is our view that the point.
538
2004 EEE lntemational Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004) April 2004 Hong Kong
539