BACKUP STRIPING

NO KM HM VOLUME VOLUME RATA JARAK VOLUME

1 50 0 11.99
11.625 0
2 50 11.26
11.18 0
3 100 11.1
11.09 0
4 150 11.08
11.14 0
5 200 11.2
10.995 0
6 250 10.79
10.77 0
7 300 10.75
10.74 0
8 350 10.73
10.6 50 530
9 400 10.47
10.39 50 519.5
10 450 10.31
10.375 50 518.75
11 500 10.44
10.44 50 522
12 550 10.44
10.625 50 531.25
13 600 10.81
10.46 50 523
14 650 10.11
10.095 50 504.75
15 700 10.08
9.97 50 498.5
16 750 9.86
9.265 50 463.25
17 800 8.67
8.5 50 425
18 850 8.33
8.13 50 406.5
19 900 7.93
7.495 50 374.75
20 950 7.06
7.2 50 360
21 51 0 7.34

6,177.25 m2
BACKUP STRIPING

NO KM HM VOLUME VOLUME RATA JARAK VOLUME

1 50 0 8.4
8.4 0
2 50 8.4
8.4 0
3 100 8.4
8.1 0
4 150 7.8
7.8 0
5 200 7.8
7.8 0
6 250 7.8
7.92 0
7 300 8.04
8.04 0
8 350 8.04
7.98 0
9 400 7.92
7.86 50 393
10 450 7.8
7.769 50 388.45
11 500 7.738
7.589 50 379.45
12 550 7.44
7.44 50 372
13 600 7.44
7.32 50 366
14 650 7.2
7.2 50 360
15 700 7.2
7.2 50 360
16 750 7.2
7.2 50 360
17 800 7.2
7.2 50 360
18 850 7.2
7.2 20 144
19 900 7.2
7.472 50 373.6
20 950 7.744
7.592 50 379.6
21 51 0 7.44

4,236.10 m3 3,843.10
BACKUP STRIPING

NO KM HM VOLUME VOLUME RATA JARAK VOLUME

1 50 0 8.118
8.292 0
2 50 8.466
8.354 0
3 100 8.242
7.664 0
4 150 7.086
7.351 0
5 200 7.616
7.418 0
6 250 7.22
7.305 0
7 300 7.39
7.3645 0
8 350 7.339
7.433 50 371.65
9 400 7.527
7.34 50 367
10 450 7.153
7.041 50 352.05
11 500 6.929
7.0455 50 352.275
12 550 7.162
6.979 50 348.95
13 600 6.796
6.468 50 323.4
14 650 6.14
6.2045 50 310.225
15 700 6.269
5.994 50 299.7
16 750 5.719
6.6785 50 333.925
17 800 7.638
7.864 50 393.2
18 850 8.09
8.623 50 431.15
19 900 9.156
8.312 50 415.6
20 950 7.468
8.574 50 428.7
21 51 0 9.68

4,727.83 m3
BACKUP TIMBUNAN

NO KM HM VOLUME VOLUME RATA JARAK VOLUME

1 50 0 20.149
19.7625 0
2 50 19.376
19.401 0
3 100 19.426
18.787 0
4 150 18.148
18.3835 0
5 200 18.619
18.4905 0
6 250 18.362
18.0515 0
7 300 17.741
17.454 0
8 350 17.167
17.049 0
9 400 16.931
16.3925 0
10 450 15.854
15.9625 0
11 500 16.071 10.9 5.171
16.1565 50 807.825 0
12 550 16.242 10.9 5.342
15.8735 50 793.675 0
13 600 15.505 9.9 5.605
15.2405 50 762.025 0
14 650 14.976 9.616 5.36
14.7775 50 738.875 0
15 700 14.579 9.358 5.221
13.512 50 675.6 0
16 750 12.445 9.035 3.41
11.491 50 574.55 0
17 800 10.537 5.225 5.312
9.425 50 471.25 0
18 850 8.313 2.927 5.386
8.852 25 221.3 0
19 900 9.391 4.179 5.212
6.6805 50 334.025 0
20 950 3.97 3.97
3.97 50 198.5 0
21 51 0 3.97 0.88 3.09

5,577.63 m3
8.771
8.8565 442.825
8.942 0
9.0735 453.675
9.205 0
9.0825 454.125
8.96 0
8.8905 444.525
8.821 0
7.9155 395.775
7.01 0
7.961 398.05
8.912 0
8.949 447.45
8.986 0
4.493 112.325
0
4.591 229.55
0
3.53 176.5
0

3,554.80
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL NO KM/HM

1 51+000 3 50+900

2 50+950 4 50+850
MONITORING PROGRES 10%

DESAIN ACTUAL
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL

5 50+800

6 50+750
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL

7 50+700

8 50+650
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL

9 50+600

10 50+550
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL

11 50+500

12 50+450
MONITORING PROGRES 10%

NO KM/HM DESAIN ACTUAL

13 50+400

14 50+350
DATA PENGUJIAN PROGRES 10%

LOKASI
NO PEKERJAAN TES
49+500 49+600 49+700 49+800 49+900 50+000 50+100

1 PERKUATAN
LAPIS 1 CBR 1
CBR 2
LAPIS 2 CBR 1
CBR 2
2 TIMBUNAN
LAYER 1 SANDCOND
LAYER 2 SANDCOND
LAYER 3 SANDCOND
LAYER 4 SANDCOND
LAYER 5 SANDCOND
LAYER 6 SANDCOND
LAYER 7 SANDCOND
LAYER 8 SANDCOND
LAYER 9 SANDCOND

DATA TES
1. FORM HASIL TES
2. FOTO DOKUMENTASI
PROGRES 10%

LOKASI
50+200 50+300 50+400 50+500 50+600 50+650 50+700 50+800 50+900 51+000
FORM
TIAP TERMIN ADALAH PEKERJAAN JADI (TIDAK DALAM KONDISI DIKERJAKAN/ACAK ACAKAN)

NO KM/HM KONDISI 0% STRIPING

1 50+350

2 50+400

3 50+500

4 50+600

5 50+700

6 50+800
7 50+900

8 51+000
FORM MONITORING FOTO PEKERJAAN 10%

GALIAN TANAH PERKUATAN LAPIS 1


AN 10%

PERKUATAN LAPIS 2 TIMBUNAN TANAH


KONDISI 10% (Kondisi jadi rapi)