EHS Legal Documents with time lines

Sr. No. Name of Document Related Department Time Line Before installing pollution source for Air Before installing pollution source for Water After taking Consent to operate within time line specified in consent to establish. To store, generate, dispose hazardous waste as per Hazardous Waste Management Rules, 1989. Monthly Hazardous Waste Every Month Inventory Annual Hazardous Before 30th June for preceeding April Waste Inventory to March At th ti the time of f disposal of During disposal hazardous activity waste Always available at Marking of container of Hazardous hazardous waste. waste At the timeof accident related to transportation of hazardous waste. When required Annual as per consent conditions Annual as per consent conditions Annual as per consent conditions Annual as per consent conditions Remarks

Consent to Establish for Air Consent to Establish for Water

State Pollution Control Board

State Pollution Control Board

Consent to Operate for Air and Water

State Pollution Control Board

Hazardous Waste Authorization

State Pollution Control Board

Form3

State Pollution Control Board

Form 4

State Pollution Control Board

Form 13

State Pollution Control Board

Form 12

State Pollution Control Board

9 10 11 12 13

Form 14 Stack Emission Monitoring Ambient Air Monitoring Ambient Noise monitoring Accoustic Enclosure efficiency testing

State Pollution Control Board SPCB approved Laboratories SPCB approved Laboratories SPCB approved Laboratories SPCB approved Laboratories

14

Water Cess Return Environmental Statement (Form V)

State Pollution Control Board

15

State Pollution Control Board

16

Battery Return (Form 8)

State Pollution Control Board

Before 5th of every month Before 30th September for each financial year Before 30th June for October to March ; and before 31st December for April to September Before installing extraction system to draw ground water for commercial / industrial purpose At location where public can also see the details of consents limits / details

17

Borewell registeration from CGWA

Central Ground Water Authority

18 19 20 21 22 23

Environmental Information Board Completion Certificate of building Shops and commercial establishment clearance Height Clearance Building Occupancy Certificate Fire NOC

State Pollution Control Board Given by Architect Labour Department Airport Authority of India Urban Development Authority (HUDA in Haryana) ( y ) Fire Department Petroleum and Explosive Safety Organization (PESO) Executive Engineer, Electorate Inspectorate. Electorate Inspectorate Municiple Authority or Industrial Corporation. SPCB approved Laboratories Electorate Inspectorate

Always displayed After completion of structure As per requirement Before building construction Before occupying the building. g After getting, annual renewal After getting, renewal before expiry. Annual Once in three years. Once Annual as per consent conditions Once

24 25 26 27 28 29

Explosive Licence Annual Inspection of HT transformer and DG sets. Inspection of Lifts Sewer connection permit Waste Water testing CEIG approval for electrical systems

Prepared by : Munish Kumar