Vous êtes sur la page 1sur 34

Rates for carraiage of meterials including loading & unloading on surface roads

S.No

Description

Prime caot @0.6kg/sqm


Tack caot @ 0.2kg/sqm
Bituminuous Macadam
Bituminuous Penetration
4 Macadam (75 mm)
Bituminuous Penetration
5 Macadam (50 mm)
6 Built-up Spray grout
Dense graded Bituminuous
7 Macadam (Grade I & II)
Semi Dense Bituminuous
Concrete (Grade- I:13mm
8 nominal size)
Semi Dense Bituminuous
Concrete (Grade- II:10mm
9 nominal size)
Bituminuous Concrete
10 (Grade I & II)
Surface dressing ( Case
11 I:19mm chipping size)
1
2
3

Spn. Unit
No

Metal

Bitumen

Gravel / Earth / Sand

Lime

quantity
Lead
Lead
quantity
Lead
quantity
Lead
Lead
quantity Lead
in Cum charges charges in Cum charges in Cum charges charges in Cum charges
upto
beyond
per Km
upto
beyond
upto
1Km
1Km &
including
1Km
1Km &
1Km
includin
above
O.H &
includin
above
includin
g O.H including
C.P
g O.H including
g O.H
& C.P
O.H &
& C.P
O.H &
& C.P
C.P
C.P
(Rate/Km)
(Rate/Km
)
502 Sqm
------0.00060 0.00080
----------503 Sqm
------0.00020 0.00027
----------504 Cum 1.4151
77.19
3.6085
0.07240 0.09636
----------505 Cum 0.1080

5.89

0.2754

0.00680

0.00905

---

---

---

---

---

505 Cum 0.0750


506 Cum 0.1130

4.09
6.16

0.1913
0.2882

0.00500
0.00300

0.00666
0.00399

-----

-----

-----

-----

-----

507 Cum 1.4436

78.75

3.6812

0.09810

0.13057

---

---

---

---

---

508 Cum 1.4398

78.54

3.6715

0.10380

0.13816

---

---

---

---

---

508 Cum 1.4323

78.13

3.6524

0.11540

0.15360

---

---

---

---

---

509 Cum 1.4623

79.77

3.7289

0.11780

0.15679

---

---

---

---

---

510 Sqm 0.0150

0.82

0.0383

0.00120

0.00160

---

---

---

---

---

Rates for carraiage of meterials including loading & unloading on surface roads
S.No

Description

Spn. Unit
No

Metal

Bitumen

Gravel / Earth / Sand

Lime

quantity
Lead
Lead
quantity
Lead
quantity
Lead
Lead
quantity Lead
in Cum charges charges in Cum charges in Cum charges charges in Cum charges
upto
beyond
per Km
upto
beyond
upto
1Km
1Km &
including
1Km
1Km &
1Km
includin
above
O.H &
includin
above
includin
g O.H including
C.P
g O.H including
g O.H
& C.P
O.H &
& C.P
O.H &
& C.P
C.P
C.P
(Rate/Km)
(Rate/Km
)

Surface dressing ( Case


12 II:13mm chipping size)
510 Sqm 0.0100
Open graded Premix carpet 13 Case I
511 Sqm 0.0270
Closed graded Premix
surfacing / Mix seal
14 surfacing ( case I / Type A)
512 Sqm 0.0270

0.55

0.0255

0.00100

0.00133

---

---

---

---

---

1.47

0.0689

0.00146

0.00194

---

---

---

---

---

1.47

0.0689

0.00220

0.00293

---

---

---

---

---

512 Sqm 0.0270

1.47

0.0689

0.00190

0.00253

---

---

---

---

---

16 Seal Coat ( Case I / Type A )


Seal Coat ( Case I I/ Type B
17 )
18 Mastic asphalt

513 Sqm 0.0090

0.49

0.0230

0.00098

0.00130

---

---

---

---

---

513 Sqm 0.0060


515 Sqm 0.0377

0.33
2.06

0.0153
0.0961

0.00068
0.00570

0.00091
0.00759

-----

-----

-----

-----

-----

19 Slurry Seal ( Case I : 5mm )

516 Sqm 0.0064

0.35

0.0163

0.00121

0.00161

---

---

---

---

---

20 Slurry Seal ( Case II : 3mm )

516 Sqm 0.0037

0.20

0.0095

0.00086

0.00114

---

---

---

---

---

Closed graded Premix


surfacing / Mix seal
15 surfacing ( case I I/ Type B)

Rates for carraiage of meterials including loading & unloading on surface roads
S.No

Description

Slurry Seal ( Case III :


21 1.5mm )
Bituminuous cold mix
including gravel emulsion (
22 Case I & II )
23 Sand Asphalt Base Course
Crack Prevention Courses (
Stress Absorbing Membrane
24 < 6mm )

25

26
27
28

Crack Prevention Courses (


Stress Absorbing Membrane
< 6mm to 9mm )
Crack Prevention Courses (
Stress Absorbing Membrane
> 9mm , cracked area >
50% )
GSB with closely graded
material
GSB with coarse graded
material ( Grade I ,II, III )

Spn. Unit
No

Metal

Bitumen

Gravel / Earth / Sand

Lime

quantity
Lead
Lead
quantity
Lead
quantity
Lead
Lead
quantity Lead
in Cum charges charges in Cum charges in Cum charges charges in Cum charges
upto
beyond
per Km
upto
beyond
upto
1Km
1Km &
including
1Km
1Km &
1Km
includin
above
O.H &
includin
above
includin
g O.H including
C.P
g O.H including
g O.H
& C.P
O.H &
& C.P
O.H &
& C.P
C.P
C.P
(Rate/Km)
(Rate/Km
)

516 Sqm 0.0018

0.10

0.0046

0.00053

0.00071

---

---

---

---

---

519 Cum 1.3170


520 Cum
---

71.84
---

3.3584
---

0.17561
0.10976

0.23374
0.14609

--1.4079

90.20

--1.6184

0.0439
0.0439

2.91
2.91

521 Sqm 0.0100

0.55

0.0255

0.00090

0.00120

---

---

---

---

---

521 Sqm 0.0100

0.55

0.0255

0.00110

0.00146

---

---

---

---

---

521 Sqm 0.0120

0.65

0.0306

0.00150

0.00200

---

---

---

---

---

401 Cum 1.2800

69.82

3.2640

---

---

---

---

---

---

---

401 Cum 1.2800

69.82

3.2640

---

---

---

---

---

---

---

Rates for carraiage of meterials including loading & unloading on surface roads
S.No

29

30
31
32
33
34

35
36

Description

Lime stabilisation for


improving subgrade (By
Mechanicl means)
Lime stabilisation for
improving subgrade (By
Manual means)
Lime treated soil for subbase
cement treated crushed
rock /combinations
Inverted Choke
WBM ( Aggregates GrI,II,III and Gravel Gr-I,II )
Penetration coat over top
layer of crushed cement
concrete base
Wet Mix Macadam

37 Crusher run macadam base


Lime ,flyash stabilished soil
38 sub-base

Spn. Unit
No

Metal

Bitumen

Gravel / Earth / Sand

Lime

quantity
Lead
Lead
quantity
Lead
quantity
Lead
Lead
quantity Lead
in Cum charges charges in Cum charges in Cum charges charges in Cum charges
upto
beyond
per Km
upto
beyond
upto
1Km
1Km &
including
1Km
1Km &
1Km
includin
above
O.H &
includin
above
includin
g O.H including
C.P
g O.H including
g O.H
& C.P
O.H &
& C.P
O.H &
& C.P
C.P
C.P
(Rate/Km)
(Rate/Km
)

402 Cum

---

#VALUE! #VALUE!

---

---

---

---

---

0.0525

3.48

402 Cum

---

#VALUE! #VALUE!

---

---

---

---

---

0.0133

0.88

403 Cum

---

#VALUE! #VALUE!

---

---

---

---

---

0.0525

3.48

69.82
3.2640
#VALUE! #VALUE!

-----

-----

1.2

--76.88

1.3794

-----

-----

403 Cum 1.2800


Cum
--404 Cum 1.2100

66.01

3.0855

---

---

0.08

4.40

0.2448

---

---

405 Sqm 0.0130


406 Cum 1.3200

0.71
72.01

0.0332
3.3660

0.00003
---

0.00004
---

-----

-----

-----

-----

-----

410 Cum 1.3200

72.01

3.3660

---

---

---

---

---

---

---

---

---

---

---

---

---

---

0.0604

4.01

Cum

---

Rates for carraiage of meterials including loading & unloading on surface roads
S.No

Description

Spn. Unit
No

Metal

Bitumen

Gravel / Earth / Sand

Lime

quantity
Lead
Lead
quantity
Lead
quantity
Lead
Lead
quantity Lead
in Cum charges charges in Cum charges in Cum charges charges in Cum charges
upto
beyond
per Km
upto
beyond
upto
1Km
1Km &
including
1Km
1Km &
1Km
includin
above
O.H &
includin
above
includin
g O.H including
C.P
g O.H including
g O.H
& C.P
O.H &
& C.P
O.H &
& C.P
C.P
C.P
(Rate/Km)
(Rate/Km
)

NOTE :- ADD FOR MIX LEAD CHARGES AS PER STANDERED DATA BOOK -2004

s
Lime
Lead
charges
beyond
1Km &
above
including
O.H &
C.P
(Rate/Km
)
---------------

---

-------

s
Lime
Lead
charges
beyond
1Km &
above
including
O.H &
C.P
(Rate/Km
)
-----

---

-------------

s
Lime
Lead
charges
beyond
1Km &
above
including
O.H &
C.P
(Rate/Km
)
---

0.1487
0.1487

---

---

-------

s
Lime
Lead
charges
beyond
1Km &
above
including
O.H &
C.P
(Rate/Km
)

0.1779

0.0451
0.1779
-------

------0.2046

s
Lime
Lead
charges
beyond
1Km &
above
including
O.H &
C.P
(Rate/Km
)

Rates of Material for the Year 2008-2009


S.NO

Description of Material

Unit

Initial rate

Deduct
stacking
charges

Rate of material
after deducting
stacking

Machine
crushing
charges @ 25%

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

75mm metal (IRC MORTH)


65mm metal (IRC MORTH)
60 - 63 mm metal
60 - 63 mm metal (Hand broken)
50 - 55 mm metal
50 - 55 mm metal (Hand broken)
40 - 45 mm metal
40 -45 mm metal (Hand broken)
25 - 27 mm metal
25 - 27 mm metal (Hand Broken)
20 - 22 mm metal
20 - 22 mm metal (Hand broken)
12 - 14 mm metal
10 - 11.2 mm metal
5mm to 7mm metal
2.36mm to 5mm metal
Stone dust(HBG stone chips 2.36
mm and below )
Stone boulders of size 150mm
Supply of stone 150 -200 mm size
Boulder with minimum size of 300
mm for Pitching at Site
Lime
Gravel
Sand for mortar
Sand for filling, blindage
Bulk Bitumen Grade 60/70
Bulk Bitumen Grade 80/100
Modified Bitumen CRMB55
Bitumen emulsion (Bulk)
Cement
20 mm metal SS 5
40 mm metal ss5
10 mm metal ss5
RR masonary (Granite)
CR masonary
Bond stone

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

260.00
325.00
360.00
360.00
390.00
390.00
500.00
500.00
830.00
830.00
845.00
845.00
690.00
560.00
430.00
234.00

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

251.30
316.30
351.30
351.30
381.30
381.30
491.30
491.30
821.30
821.30
836.30
836.30
681.30
551.30
421.30
225.30

------87.83

Cum

225.00

8.70

216.30

Cum
Cum

82.00
117.00

8.70
8.70

73.30
108.30

Cum

136.00

8.70

127.30

Cum
Cum
Cum
Cum
MT
MT
MT
MT
MT
Cum
Cum
Cum
Cum
Cum
each

780.00
56.00
175.00
60.00
31557.95
30605.98
35988.69
30781.00
3100.00
845.00
500.00
560.00
155
218
25

0.00
5.50
5.50
5.50
---------------8.70
8.70
8.70
8.70
8.70
----

780.00
50.50
169.50
54.50
31557.95
30605.98
35988.69
30781.00
3100.00
836.30
491.30
551.30
146.30
209.30
25

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

SOR 2008-09

105

Blasting
charges

Seignorage
charges

Total Rate in Rs

70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00

50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00

371.30
436.30
559.13
471.30
596.63
501.30
734.13
611.30
1146.63
941.30
1165.38
956.30
971.63
809.13
646.63
401.63

----

----

50.00

266.30

-------

70.00

50.00
50.00

193.30
158.30

----

50.00

177.30

0.00
------------------------70.00
70.00
70.00
67.00
69.00
----

0.00
22.00
40.00
40.00
---------------50.00
50.00
50.00
50.00
50.00
----

780.00
72.50
209.50
94.50
31557.95
30605.98
35988.69
30781.00
3100.00
1165.38
734.13
809.13
263.30
328.30
25.00

95.33
122.83
205.33
209.08
170.33
137.83
105.33
56.33

---------------------------209.08
122.83
137.83

----

RMR

Average rates of material


S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

SOR 2008-09

Description
Aggregates below 5.6mm
Aggregates 22.4 mm to 2.36 mm
Aggregates 22.4 mm to 5.6 mm
Aggregates 45 mm to 2.8 mm
Aggregates 45 mm to 22.4 mm
Aggregates 53 mm to 2.8 mm
Aggregates 53 mm to 22.4 mm
Aggregates 63 mm to 2.8 mm
Aggregates 63 mm to 45 mm
Aggregates 10 mm to 5 mm
Aggregates 11.2 mm to 0.99 mm
Aggregates 13.2 mm to 0.99 mm
Aggregates 13.2mm to 5.60 mm
Aggregates 13.2 mm to 10 mm
Aggregates 20 mm to 10 mm
Aggregates 25 mm to 10 mm
Aggregates 19 mm to 6 mm
Aggregates 37.5 mm to 19 mm
Aggregates 37.5 mm to 25 mm
Aggregates 6mm nominal size
Aggregates 10 mm nominal size
Aggregates 13.2/12.5 mm nominal size
Aggregates 20 mm nominal size
Aggregates 25 mm nominal size
Aggregates 40 mm nominal size
Filter media avg of 150mm & 40mm) (Hand broken)
Aggregates 45 mm to 22.4 mm (Hand Broken)
Aggregates 53 mm to 22.4 mm (Hand Broken)
Aggregates 90 mm to 45 mm (Hand Broken)
Aggregates 63 mm to 45 mm (Hand Broken)
Aggregates 4.75 mm to 75 microns
Aggregates 37.5 mm to 9.5 microns
Aggregates 9.5 mm to 75 microns
Aggregates 53 to 26.5
Aggregates 26.5 to 4.75
Aggergates 9.5 mm to 4.75 mm
Aggregates 2.36 mm and below (stone dust)
Aggregates 53mm to 9.5 mm
Aggregates 26.5mm to 9.5 mm
Aggregates 9.5 mm to 2.36 mm
Aggregates 4.75mm to 2.36 mm
Aggregates 20mm SS 5

106

Unit
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

Average Rate
333.96
798.88
898.19
839.30
1015.38
808.97
910.69
781.21
629.96
727.88
530.92
619.06
809.13
890.38
982.04
1023.19
898.19
1015.38
940.38
646.63
809.13
971.63
1165.38
1146.63
734.13
402.30
836.30
752.55
478.30
527.97
333.96
767.68
530.92
825.79
947.88
727.88
266.30
903.92
1023.19
619.13
401.63
1165.38

AVERAGE RATES

SOR 2008-09

107

AVERAGE RATES

Rates for carraiage of meterials including loading & unloading on surface roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

(1)

(2)

(3)

Bitumen

Lead
Lead charges
charges
beyond 1Km
upto 1Km
& above
including
including
O.H & C.P
O.H & C.P
(Rate/Km)
(6)
(5)

quantity
in Cum

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)

(4)

(7)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(9)

Prime caot @0.6kg/sqm

502

Sqm

---

---

---

0.00060

0.00109

---

---

---

Tack caot @ 0.2kg/sqm

503

Sqm

---

---

---

0.00020

0.00036

---

---

---

Bituminuous Macadam

504

Cum

1.4151

205.47

10.1887

0.07240

0.13141

---

---

---

Built-up Spray grout

506

Sqm

0.1130

16.41

0.8136

0.00300

0.00545

---

---

---

Dense graded Bituminuous


Macadam (Grade I & II)
Semi Dense Bituminuous
Concrete (Grade- I:13mm
nominal size)
Semi Dense Bituminuous
Concrete (Grade- II:10mm
nominal size)

507

Cum

1.4436

209.61

10.3939

0.09810

0.17805

---

---

---

508

Cum

1.4398

209.06

10.3666

0.10380

0.18840

---

---

---

508

Cum

1.4323

207.97

10.3126

0.11540

0.20945

---

---

---

Bituminuous Concrete
(Grade I & II)

509

Cum

1.4623

212.33

10.5286

0.11780

0.21381

---

---

---

Surface dressing ( Case


I:19mm chipping size)

510

Sqm

0.0150

2.18

0.1080

0.00120

0.00218

---

---

---

8
9

80

lead statement-surfaced

Rates for carraiage of meterials including loading & unloading on surface roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

(1)

(2)

(3)

Bitumen

Lead
Lead charges
charges
beyond 1Km
upto 1Km
& above
including
including
O.H & C.P
O.H & C.P
(Rate/Km)
(6)
(5)

quantity
in Cum

Gravel / Earth / Sand

Lead
charges
per Km
including
O.H & C.P

quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)

(4)

(7)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(9)

10

Surface dressing ( Case


II:13mm chipping size)

510

Sqm

0.0100

1.45

0.0720

0.00100

0.00182

---

---

---

11

Closed graded Premix


surfacing / Mix seal
surfacing ( case I / Type A)

512

Sqm

0.0270

3.92

0.1944

0.00220

0.00399

---

---

---

Closed graded Premix


surfacing / Mix seal
surfacing ( case I I/ Type B)

512

Sqm

0.0270

3.92

0.1944

0.00190

0.00345

---

---

---

13

Mastic asphalt

515

Sqm

0.0273

3.96

0.1966

0.00580

0.01053

---

---

---

14

GSB with closely graded


material Grade I
GSB with closely graded
material Grade II and III

401

Cum

1.2773

185.46

9.1966

---

---

1.2773

187.30

11.0359

401

Cum

1.2800

185.86

9.2160

---

---

1.2800

187.70

11.0592

401

Cum

1.2800

185.86

9.2160

---

---

1.2800

187.70

11.0592

Cum

---

---

---

1.2

175.97

10.3680

Cum

1.2100

---

---

0.38

55.72

3.2832

12

15
16
17
18

GSB with coarse graded


material ( Grade I ,II, III )
Inverted Choke
WBM ( Aggregates Gr-I
and Gravel Gr-I )

404

175.69

8.7120

81

lead statement-surfaced

Rates for carraiage of meterials including loading & unloading on surface roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

20
21

Lead
Lead charges
charges
beyond 1Km
upto 1Km
& above
including
including
O.H & C.P
O.H & C.P
(Rate/Km)
(6)
(5)

quantity
in Cum

Gravel / Earth / Sand

Lead
charges
per Km
including
O.H & C.P

quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(2)

(3)

WBM ( Aggregates GrII,III and Gravel Gr-II,III )

404

Cum

1.2100

175.69

8.7120

---

---

0.37

54.26

3.1968

Wet Mix Macadam

406

Cum

1.3200

191.66

9.5040

---

---

---

---

---

Crusher run macadam base

410

Cum

1.3200

191.66

9.5040

---

---

---

---

---

(1)
19

Bitumen

(4)

(7)

(9)

NOTE :- (I) ADD FOR MIX LEAD CHARGES AS PER STANDERED DATA BOOK -2004
(II) col 5 = [(col 4 X unit weight X cost of Haulage) + (col 4 X loading and un loading charges )]
(III)col 6 = [(col 4 X unit weight X cost of Haulage) ]
Cast in Situ Cement
Concrete M20 Kerb
Using Concrete Mixer
Using Concrete Batching and
Mixing Plant
Cast in Situ Cement
Concrete M 20 Kerb with
Channel
Using Concrete Mixer

408
408
408

Rmt
Rmt

0.0605
0.0605

8.78

0.4356

8.78

0.4356

0.00

0.0000

17.71

0.8784

0.0303
0.0303

4.44

0.2618

3.87

0.2618

408

408

Rmt

0.122

82

0.0000
0.061

7.78

0.5270

lead statement-surfaced

Rates for carraiage of meterials including loading & unloading on surface roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

(1)

(2)

Using Concrete Batching and 408


Mixing Plant

slurry seal 3 mm thick

(3)
Rmt

516 sqm

Bitumen

Lead
Lead charges
charges
beyond 1Km
upto 1Km
& above
including
including
O.H & C.P
O.H & C.P
(Rate/Km)
(6)
(5)

quantity
in Cum

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)

(4)
0.122

0.00374

(7)
17.71

0.8784

0.54

0.0269

83

(9)
0.061

0.000858

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

7.78

0.5270

0.00156

lead statement-surfaced

Rates for carraiage of meterials including loading & unloading on un-surface gravelled roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

Lead
charges
upto 1Km
including
O.H & C.P

(5)
(1)

(2)

(3)

Bitumen
Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(6)

(4)

quantity
in Cum

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)
(7)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(9)

Prime coat @0.6kg/sqm

502

Sqm

---

---

---

0.00060

0.00109

---

---

---

Tack caot @ 0.2kg/sqm

503

Sqm

---

---

---

0.00020

0.00036

---

---

---

Bituminuous Macadam

504

Cum

1.4151

207.60

12.3114

0.07240

0.13141

---

---

---

Built-up Spray grout

506

Sqm

0.1130

16.58

0.9831

0.00300

0.00545

---

---

---

Dense graded Bituminuous


Macadam (Grade I & II)
Semi Dense Bituminuous
Concrete (Grade- I:13mm
nominal size)
Semi Dense Bituminuous
Concrete (Grade- II:10mm
nominal size)

507

Cum

1.4436

211.78

12.5593

0.09810

0.17805

---

---

---

508

Cum

1.4398

211.22

12.5263

0.10380

0.18840

---

---

---

508

Cum

1.4323

210.12

12.4610

0.11540

0.20945

---

---

---

Bituminuous Concrete (Grade


I & II)

509

Cum

1.4623

214.52

12.7220

0.11780

0.21381

---

---

---

Surface dressing ( Case


I:19mm chipping size)

510

Sqm

0.0150

2.20

0.1305

0.00120

0.00218

---

---

---

8
9

83

lead statement-unsurfaced

Rates for carraiage of meterials including loading & unloading on un-surface gravelled roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

Lead
charges
upto 1Km
including
O.H & C.P

(5)
(1)

(2)

(3)

Bitumen
Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(6)

(4)

quantity
in Cum

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)
(7)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(9)

10

Surface dressing ( Case


II:13mm chipping size)

510

Sqm

0.0100

1.47

0.0870

0.00100

0.00182

---

---

---

11

Closed graded Premix


surfacing / Mix seal surfacing
( case I / Type A)

512

Sqm

0.0270

3.96

0.2349

0.00220

0.00399

---

---

---

Closed graded Premix


surfacing / Mix seal surfacing
( case I I/ Type B)

512

Sqm

0.0270

3.96

0.2349

0.00190

0.00345

---

---

---

13

Mastic asphalt

515

Sqm

0.0273

4.00

0.2375

0.00580

0.01053

---

---

---

14

GSB with closely graded


material Grade I
GSB with closely graded
material Grade II and III

401

Cum

1.2773

187.38

11.1125

---

---

1.2773

189.60

13.3350

402

Cum

1.2800

187.78

11.1360

---

---

1.2800

190.00

13.3632

401

Cum

1.2800

187.78

11.1360

---

---

1.2800

190.00

13.3632

Cum

---

---

---

1.2

178.13

12.5280

Cum

1.2100

---

---

0.38

56.41

3.9672

12

15
16
17
18

GSB with coarse graded


material ( Grade I ,II, III )
Inverted Choke
WBM ( Aggregates Gr- I
and Gravel Gr-I )

404

177.51

10.5270

84

lead statement-unsurfaced

Rates for carraiage of meterials including loading & unloading on un-surface gravelled roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

Lead
charges
upto 1Km
including
O.H & C.P

(5)

20
21

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(6)

quantity
in Cum

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)

Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(2)

(3)

WBM ( Aggregates Gr- II,III


and Gravel Gr-II,III )

405

Cum

1.2100

177.51

10.5270

---

---

0.37

54.92

3.8628

Wet Mix Macadam

406

Cum

1.3200

193.64

11.4840

---

---

---

---

---

Crusher run macadam base

410

Cum

1.3200

193.64

11.4840

---

---

---

---

---

(1)
19

Bitumen

(4)

(7)

(9)

NOTE :- ADD FOR MIX LEAD CHARGES AS PER STANDERED DATA BOOK -2004
(II) col 5 = [(col 4 X unit weight X cost of Haulage) + (col 4 X loading and un loading charges )]
(III)col 6 = [(col 4 X unit weight X cost of Haulage) ]
Cast in Situ Cement
Concrete M20 Kerb
Using Concrete Mixer
Using Concrete Batching and Mixing
Plant
Cast in Situ Cement
Concrete M 20 Kerb with
Channel
Using Concrete Mixer

408
408
408

Rmt
Rmt

0.0605
0.0605

8.88

0.5264

8.88

0.5264

0.00

0.0000

17.90

1.0614

0.0303
0.0303

4.50

0.3163

4.50

0.3163

0.00

0.0000

9.05

0.6368

408

408

Rmt

0.122

85

0.061

lead statement-unsurfaced

Rates for carraiage of meterials including loading & unloading on un-surface gravelled roads

Description

Metal
Spn.No

Unit

quantity
in Cum

S.No

Lead
charges
upto 1Km
including
O.H & C.P

(5)
(1)

(2)

Using Concrete Batching and Mixing 408


Plant

(3)
Rmt

Bitumen
Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(6)

(4)
0.122

quantity
in Cum

1.0614

86

quantity
in Cum

Lead
charges
upto 1Km
including
O.H & C.P

(10)
(8)
(7)

17.90

Lead
charges
per Km
including
O.H & C.P

Gravel / Earth / Sand


Lead
charges
beyond
1Km &
above
including
O.H & C.P
(Rate/Km)
(11)

(9)
0.061

9.05

0.6368

lead statement-unsurfaced

Rates for carraiage of meterials including loading & unloading on surface and unsurfaced roads

Surfaced Roads
Description

Spn Unit
.No

Bitumen

Metal

Un-surfaced roads
Sand / Gravel

Bitumen

Metal

Lead
Lead
Lead
Lead
Lead
Lead
Lead
Lead
charges
charges charges charges
charges charges for charges
charges
for 1Km
beyond
per Km
for 1Km
beyond
1Km
beyond
per Km
including 1Km &
includin including 1Km &
including
1Km &
including
loading,
above
g O.H & loading,u
above
loading,
above
O.H & C.P
unloading including
C.P
nloading, including unloading, including
, O.H
O.H & C.P
O.H &
O.H &
O.H & C.P
O.H &
&C.P,
(Rate/Km)
C.P
C.P
C.P
(Rate/Km)
(Rate/Km)

S.
No

Sand / Gravel
Lead
Lead
charges charges
for 1Km
beyond
including 1Km &
loading,
above
unloadin including
g O.H &
O.H &
C.P
C.P
(Rate/Km)

Prime caot @0.6kg/sqm

502 Sqm

---

---

0.00109

---

---

---

---

0.00109

---

---

Tack caot @ 0.2kg/sqm

503 Sqm

---

---

0.00036

---

---

---

---

0.00036

---

---

Bituminuous Macadam
(Grade I & II)

504 Cum

205.47

10.1887

0.13141

---

---

207.60

12.3114

0.13141

---

---

Built-up Spray grout

506 Sqm

16.41

0.8136

0.00545

---

---

16.58

0.9831

0.00545

---

---

Dense graded
Bituminuous Macadam
(Grade I & II)

507 Cum

209.61

10.3939

0.17805

---

---

211.78

12.5593

0.17805

---

---

209.06

10.3666

0.18840

---

---

211.22

12.5263

0.18840

---

---

207.97

10.3126

0.20945

---

---

210.12

12.4610

0.20945

---

---

Semi Dense Bituminuous


Concrete (Grade- I:13mm 508 Cum
nominal size)
Semi Dense Bituminuous
Concrete (Grade- II:10mm
508 Cum
nominal size)

SOR 2008- 09

107

lead statement-surfaced and unsurfaced roads

Surfaced Roads
Description

Spn Unit
.No

Sand / Gravel

Bitumen

Metal

Lead
Lead
Lead
Lead
Lead
Lead
Lead
Lead
charges
charges charges charges
charges charges for charges
charges
for 1Km
beyond
per Km
for 1Km
beyond
1Km
beyond
per Km
including 1Km &
includin including 1Km &
including
1Km &
including
loading,
above
g O.H & loading,u
above
loading,
above
O.H & C.P
unloading including
C.P
nloading, including unloading, including
, O.H
O.H & C.P
O.H &
O.H &
O.H & C.P
O.H &
&C.P,
(Rate/Km)
C.P
C.P
C.P
(Rate/Km)
(Rate/Km)

S.
No

Bitumen

Metal

Un-surfaced roads

Bituminuous Concrete
(Grade I & II)

Sand / Gravel
Lead
Lead
charges charges
for 1Km
beyond
including 1Km &
loading,
above
unloadin including
g O.H &
O.H &
C.P
C.P
(Rate/Km)

509 Cum

212.33

10.5286

0.21381

---

---

214.52

12.7220

0.21381

---

---

510 Sqm

2.18

0.1080

0.00218

---

---

2.20

0.1305

0.00218

---

---

510 Sqm

1.45

0.0720

0.00182

---

---

1.47

0.0870

0.00182

---

---

512 Sqm

3.92

0.1944

0.00399

---

---

3.96

0.2349

0.00399

---

---

512 Sqm

3.92

0.1944

0.00345

---

---

3.96

0.2349

0.00345

---

---

515 Sqm

3.96

0.1966

0.01053

---

---

4.00

0.2375

0.01053

---

---

14 GSB with closely graded


material Grade I for gravel 401 Cum

--

--

---

187.30

11.0359

187.38

11.1125

---

189.60

13.3350

15 GSB with closely graded


material Grade II and III
for gravel

--

--

---

187.70

11.0592

187.78

11.1360

---

190.00

13.3632

Surface dressing ( Case


I:19mm chipping size)
10 Surface dressing ( Case
II:13mm chipping size)
9

11 Closed graded Premix


surfacing / Mix seal
surfacing ( case I / Type
A)
12 Closed graded Premix
surfacing / Mix seal
surfacing ( case I I/ Type
B)
13 Mastic asphalt

SOR 2008- 09

401 Cum

108

lead statement-surfaced and unsurfaced roads

Surfaced Roads
Description

Spn Unit
.No

Sand / Gravel

Bitumen

Metal

Lead
Lead
Lead
Lead
Lead
Lead
Lead
Lead
charges
charges charges charges
charges charges for charges
charges
for 1Km
beyond
per Km
for 1Km
beyond
1Km
beyond
per Km
including 1Km &
includin including 1Km &
including
1Km &
including
loading,
above
g O.H & loading,u
above
loading,
above
O.H & C.P
unloading including
C.P
nloading, including unloading, including
, O.H
O.H & C.P
O.H &
O.H &
O.H & C.P
O.H &
&C.P,
(Rate/Km)
C.P
C.P
C.P
(Rate/Km)
(Rate/Km)

S.
No

16 GSB with closely graded


material Grade I for
crushed metal.
17 GSB with closely graded
material Grade II and III
for crushed metal.
18 GSB with coarse graded
material ( Grade I ,II, III )
for gravel
19 GSB with coarse graded
material ( Grade I ,II, III )
for crushed metal
20 Inverted Choke

Bitumen

Metal

Un-surfaced roads
Sand / Gravel
Lead
Lead
charges charges
for 1Km
beyond
including 1Km &
loading,
above
unloadin including
g O.H &
O.H &
C.P
C.P
(Rate/Km)

401 Cum

185.46

9.1966

--

--

--

187.38

11.1125

--

--

--

401 Cum

185.86

9.2160

--

--

--

187.78

11.1360

--

--

--

401 Cum

--

--

---

187.70

11.0592

---

---

---

190.00

13.3632

185.86

9.2160

---

---

---

187.78

11.1360

---

---

---

0.00

0.0000

---

175.97

10.3680

0.0000

---

178.13

12.5280

Cum

21 WBM ( Aggregates Gr-I


and Gravel Gr-I )

404 Cum

175.69

8.7120

---

55.72

3.2832

177.507

10.5270

---

56.41

3.9672

22 WBM ( Aggregates GrII,III and Gravel Gr-II,III )

404 Cum

175.69

8.7120

---

54.26

3.1968

177.507

10.5270

4.00000

54.92

3.8628

406 Cum

191.66

9.5040

---

---

---

193.64

11.4840

---

---

---

410 Cum

191.66

9.5040

---

---

---

193.64

11.4840

---

---

---

23 Wet Mix Macadam


24 Crusher run macadam
base

SOR 2008- 09

109

lead statement-surfaced and unsurfaced roads

Surfaced Roads
Description

Spn Unit
.No

Metal

Bitumen

Un-surfaced roads
Sand / Gravel

Bitumen

Metal

Lead
Lead
Lead
Lead
Lead
Lead
Lead
Lead
charges
charges charges charges
charges charges for charges
charges
for 1Km
beyond
per Km
for 1Km
beyond
1Km
beyond
per Km
including 1Km &
includin including 1Km &
including
1Km &
including
loading,
above
g O.H & loading,u
above
loading,
above
O.H & C.P
unloading including
C.P
nloading, including unloading, including
, O.H
O.H & C.P
O.H &
O.H &
O.H & C.P
O.H &
&C.P,
(Rate/Km)
C.P
C.P
C.P
(Rate/Km)
(Rate/Km)

S.
No

Sand / Gravel
Lead
Lead
charges charges
for 1Km
beyond
including 1Km &
loading,
above
unloadin including
g O.H &
O.H &
C.P
C.P
(Rate/Km)

25 Cast in Situ Cement


Concrete M20 Kerb
408 Rmt

8.78

0.4356

4.44

0.2618

8.88

0.52635

4.50

0.316332

B Using Concrete Batching and 408 Rmt


Mixing Plant
26 Cast in Situ Cement
Concrete M 20 Kerb
with Channel

8.78

0.4356

3.87

0.2618

8.88

0.52635

4.50

0.316332

408 Rmt
A Using Concrete Mixer
B Using Concrete Batching and 408 Rmt
Mixing Plant

17.71
17.71

0.8784
0.8784

7.78
7.78

0.5270
0.5270

17.90
17.90

1.0614
1.0614

9.05
9.05

0.63684
0.63684

A Using Concrete Mixer

SOR 2008- 09

110

lead statement-surfaced and unsurfaced roads

SOR 2008- 09

111

lead statement-surfaced and unsurfaced roads

SOR 2008- 09

112

lead statement-surfaced and unsurfaced roads

SOR 2008- 09

113

lead statement-surfaced and unsurfaced roads

SOR 2008- 09

114

lead statement-surfaced and unsurfaced roads

Rates for carraiage of meterials including loading & unloading on surface and
unsurfaced roads( FOR RCC ITEMS with 10% O.H charges)
SURFACED ROADS
LEAD CHARGES
UPTO 1 KM
INCLUDING CP &
OH PER CUM

UNSURFACED ROADS

LEAD CHARGES LEAD CHARGES


LEAD CHARGES BEYOND
BEYOND 1 KM
UPTO 1 KM
1 KM INCLUDING CP & OH
INCLUDING CP & INCLUDING CP &
PER CUM
OH PER CUM
OH PER CUM

S.NO

DESCRIPTION OF THE ITEM

METAL / STONE / RUBBLE STONE

126.3

6.3

127.5

7.5

EARTH / GRAVEL / SAND

127.56

7.56

129

Rates of Material for the Year 2004-2005-culvert works

S.NO

1
2
3
4
5

Description of Material

40 mm (SS-5 metal )
Gravel
Sand for mortar
Sand for filling, blindage
Cement

SOR 2005-06

Unit

Cum
Cum
Cum
Cum
MT

Initial rate

Rate of
Machine
Deduct
material after crushing
stacking
deducting
charges @
charges
stacking
25%

282.00
6.30
40.00
3.80
72.00
3.80
28.50
3.80
2400.00 ----

275.70
36.20
68.20
24.70
2400.00

68.93
-------------

Blasting
charges
55.50
-------------

Seignorage Total Rate in


charges
Rs
45.00
20.00
36.00
36.00
----

445.13
56.20
104.20
60.70
2400.00

RMR-culverts

Rates for carraiage of meterials including loading & unloading on surfaces and un-surface
gravelled roads
Description

S.No

(1)
1

Metal

Sand

cement

Spn. Uni
Lead
Lead
quantity
Lead
Lead
quantity Lead
Lead
No
t quantity
in Cum charges charges in Cum charges charges
in MT charges charges
upto
beyond
upto
beyond
upto
beyond
1Km
1Km &
1Km
1Km &
1Km
1Km &
includin
above
includin
above
includin above
g O.H including
g O.H including
g O.H including
& C.P
O.H &
& C.P
O.H &
& C.P
O.H &
C.P
C.P
C.P
(Rate/Km)
(Rate/Km
(Rate/Km
(4)
(5)
(6)
(9)
(10)
)
(12)
(13)
)
(2)
(3)
(11)
(14)

PCC 1:3:6 in foundation


(surface roads)

408 cum

0.92

50.18

2.34

0.46

25.32

1.40

0.22

16.21

0.37

PCC 1:3:6 in foundation


(un surface roads)

408 cum

0.92

50.6

2.67

0.46

25.58

1.66

0.22

16.28

0.44

(II) col 5 = [(col 4 X unit weight X cost of Haulage) + (col 4 X loading and un loading charges )]
(III)col 6 = [(col 4 X unit weight X cost of Haulage) ]

118 of 34

lead statement

Rates of Material for the Year 2004-2005


S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Description of Material
75mm metal (IRC MORTH)
65mm metal (IRC MORTH)
60 - 63 mm metal
50 - 55 mm metal
50 - 55 mm metal (Hand broken)
40 - 45 mm metal
40 -45 mm metal (Hand broken)
19 - 22 mm metal
19 - 22 mm metal (Hand Broken)
12 - 14 mm metal
9.5 - 11.2 mm metal
Stone dust
Gravel
Sand for filling, blindage

Unit

Initial rate

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

57.00
69.00
69.00
73.00
73.00
82.50
82.50
142.00
142.00
175.00
187.00
25.00
38.50
28.00

Cum
Cum
Cum

138.07
206.90
225.90

Deduct
stacking
charges

Rate of material
after deducting
stacking

6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
0.00
3.70
3.70

50.90
62.90
62.90
66.90
66.90
76.40
76.40
135.90
135.90
168.90
180.90
25.00
34.80
24.30

Machine
crushing
charges @
25%
------0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
----------

Blasting
charges
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-------

Seignorage Total Rate in


charges
Rs
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
20.00
36.00

95.90
107.90
107.90
111.90
111.90
121.40
121.40
180.90
180.90
213.90
225.90
70.00
54.80
60.30

average rates
53 mm 26.5 mm
26.5 mm to 4.75 mm
9.5 mm to 4.75 mm

SOR 2004-05

90

RMR